ESBD_368991_1724082731553_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf

PDF 108 KB Posted

Attached to
HUSH HOUSE POWER RESTORATION BLDG 1395
Solicitation number
TMD24-ANG-WJ-24142008
Issued by
Harris County, Texas

About this file

This document is an attachment to a state and local contract opportunity from the Texas Military Department (TMD) for the 147th Attack Wing located in Harris County, Texas. The attachment describes the Hazardous Material (HM) procedures that the contractor must comply with when performing work at Ellington Field. The contractor must establish an HM storage and distribution system, obtain approval from the Hazardous Material Pharmacy (HMP) office for all HM used, provide a list of HM and Safety Data Sheets, and track the use and removal of all HM from the installation. The contractor must also accompany the Project Manager and Environmental Manager for a project close-out inspection to ensure all used and unused HM has been removed prior to the government accepting beneficial occupancy.

The state and local contract opportunity is for the removal and replacement of wire from existing conduit and installation of new 15 kilovolt (kV) wire for a transformer located at Building 1395 of the 147th Attack Wing in Houston, Texas. The contractor will be required to provide all parts and labor to complete this work.

View the file

Other files

File Type Posted
ESBD_368991_1724082976624_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_368991_1724082890585_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_368991_1724082931291_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_368991_1725886672960_Addendum 1 - TMD24-ANG-WJ-24142008.pdf PDF
ESBD_368991_1724082698512_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_368991_1724082710316_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_368991_1724082747289_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_368991_1724082674402_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_368991_1724082942443_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_368991_1724082996919_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (01OCT23).pdf PDF
ESBD_368991_1724082778254_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_368991_1724082841358_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_368991_1724082731553_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_368991_1724082606067_TMD24-ANG-WJ-24142008 HUSH HOUSE POWER RESTORATION BLDG 1395.pdf PDF
ESBD_368991_1724082857255_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_368991_1724082921642_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_368991_1724082954334_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_368991_1724082663749_ATTACHMENT G.4 TMD Standard Terms and Conditions.pdf PDF
ESBD_368991_1724082965372_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_368991_1724082636922_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_368991_1724082818767_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_368991_1724082720968_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_368991_1724082686931_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_368991_1724082792520_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_368991_1724082829837_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_368991_1724082911427_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_368991_1724082650762_ATTACHMENT G.3 Pricing Schedule.pdf PDF
ESBD_368991_1724082867681_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_368991_1724082763544_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_368991_1724082804482_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_368991_1724082988276_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_368991_1724082901306_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_368991_1724082626168_ATTACHMENT G.1 Direct Deposit 74-176.pdf PDF
ESBD_368991_1724082829837_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_368991_1724082792520_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_368991_1724082698512_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_368991_1724082778254_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_368991_1724082942443_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_368991_1725886672960_Addendum 1 - TMD24-ANG-WJ-24142008.pdf PDF
ESBD_368991_1724082650762_ATTACHMENT G.3 Pricing Schedule.pdf PDF
ESBD_368991_1724082747289_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_368991_1724082996919_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (01OCT23).pdf PDF
ESBD_368991_1724082857255_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_368991_1724082674402_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_368991_1724082804482_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_368991_1724082841358_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_368991_1724082636922_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_368991_1724082818767_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_368991_1724082663749_ATTACHMENT G.4 TMD Standard Terms and Conditions.pdf PDF
ESBD_368991_1724082976624_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.F - ELLINGTON AFB (EF) EMS HAZARDOUS

MATERIAL PROCEDURES

PART 1 – GENERAL

1. SUMMARY OF WORK

A. A key element to the Pollution Prevention program at Ellington Field is the control of

Hazardous Material (HM) office. To control HM use, a Hazardous Materials

Pharmacy (HAZMART) program has been fully implemented within Ellington Field.

The HAZMART focuses on source reduction as the preferred method of pollution prevention. Control of HM includes reducing the number of types and amounts of

HM used, and controlling its proper distribution, storage, use, and disposal. The

Contractor shall comply with all Federal, state, and local Environmental Management

System (EMS) environmental standards (ISO 14001:2015, the standard that we use as a management system for all environmental actions).

B. Contractor shall establish Hazardous Material (HM) storage and distribution system when HM is to be used. Hazard materials can represent many different chemicals used in a construction project. Flammables, Corrosives, adhesives, paints, etc.

a. All HM required to support the contract shall be reported to the Hazardous

Material Pharmacy (HMP) office using the Contractor HM Identification

Form attached. The Form may be altered to improve tracking. This listing will be provided prior to work beginning and will strictly be enforced by the

Project Manager. The form shall constitute a materials submittal in the form of a quarterly report being submitted to the Base Environmental Officer throughout the course of the project.

b. Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting.

c. Additional HM needed by the Contractor shall be identified to the Project

Manager’s Representative for approval by the HMMP. (See Attachment X)

C. Contractor shall register with the installation HMMP prior to start of work using HM to support the installation’s compliance with Executive Order 12856, Federal

Compliance with Right-to-Know Laws and Pollution Prevention Requirements.

D. Contractor shall maintain a Contractor HM Identification Form for all HM on the job site for inspection/verification.

E. Project Manager will verify that the HM identified to the HMMP is the only HM in use on the job site.

F. Contractor shall provide the following to the HMMP:

a. A list of each material and quantity of material for all proposed HM.

Hazardous Material (HM) shall be construed to mean any item that is:

i. A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).

ii. Regulated in its disposal by federal Environmental Protection Agency

(EPA) under 40 CFR.

iii. Hazardous as defined by federal Texas Department of Transportation

(TXDOT) regulations under 49 CFR.

iv. Hazardous as defined by the Dangerous Goods Regulations of the

International Air Transport Association.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

b. A binder containing all Safety Data Sheets (SDS) for each item on the HM list. Safety Data Sheets are provide information on hazards of working with a chemical and procedures that should be used to ensure safety. This listing shall also be provided electronically by individual SDS for processing prior to work beginning. These SDS shall also be maintained in a Binder within the

Job Trailer or wherever the construction project is headquartered out of.

c. Examples of hazardous materials used on the job site include, but are not limited to:

i. Petroleum based liquids/gases (gasoline, kerosene, diesel, propane, butane, acetylene, etc.).

ii. Adhesives and glues.

iii. Shot charges for anchor systems.

iv. Volatile solvents (such as PVC cleaner and glues, paint thinners).

v. Non-water-based paints.

vi. Liquid sealants.

vii. Epoxies and coating systems.

viii. Acidic or alkali cleaners.

G. Contractor shall establish a construction-specific HM storage and issue location that fully complies with federal, state and local environmental regulations. Once established, the contractor is required to notify the Project Manager so that the base environmental manager can visit the site and approved the storage location and inventory control of materials.

a. Materials issued shall be tracked for quantities used.

b. Unused materials shall be inventoried and removed from Base property prior to close-out of the contract or expiration date of the HM.

c. Reports of materials delivered, used and removed from the installation shall be submitted to the Project Manager monthly and prior to contract close-out.

H. Contractor shall accompany the Project Manager and the installation Environmental

Manager (CEV) on project close-out inspection to ensure all used and unused HM has been removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the government accepting beneficial occupancy of the facility or construction item.

2. SUPPLEMENTS

A. The supplements listed below are part of this specification.

a. Attachment G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage

Data

b. Attachment G.F.2 - Ellington AFB (EF) Contractor Hazardous Material

Identification Form Close-Out Procedures.