About this file
This document is an Addendum No. 4 to Request for Bid (RFB) 2024-055 for the Water Transmission / American Plaza to Exchange Parkway – Phase II project issued by the City of Waco, Texas. The project generally consists of installing approximately 6,800 linear feet of 30-inch C-900 PVC DR 18 PVC water line, 745 linear feet of bore and encase construction utilizing 42-inch steel pipe for road and railroad crossings, and associated pipe and miscellaneous work. The bid closing time is 2:00 P.M. CT on August 21, 2024, with the bid opening at 2:01 P.M. CT the same day. A non-mandatory pre-bid meeting was held on July 10, 2024. This addendum revises the bid proposal form, adds an allowance item, and provides a drilling and testing report for the project.
The addendum includes pricing information and adds an Allowance item of $50,000 to be used only as authorized by the City of Waco. The project is funded by the City of Waco, and the contractor must be prepared to handle varying amounts of groundwater during excavation and construction. The contractor is responsible for all trench safety and excavation procedures in accordance with OSHA requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services Post Office Box 2570
Waco, Texas 76702-2570 Phone: 254-750-8098
Fax: 254-750-8063 melaniew@wacotx.gov
CITY OF WACO www.waco-texas.com
Date: 08/19/2024
RFB No: 2024-055 Commodity: Water Transmission – American Plaza to Exchange Parkway – Phase II Purchasing Agent: Melanie Wade
Closing Time: 2:00 P.M. CT, Wednesday, August 21, 2024 Opening Time: 2:01 P.M. CT, Wednesday, August 21, 2024
RFB Opening Location: Via Zoom and Dial In
Addendum No: 4 Updated Pricing Sheet
Drilling and Testing Report Please see the next pages for all changes.
The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFP response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.
Firm:
Address
Signature of Person Authorized to Sign Bid:
Signor's Name and Title (print or type):
E-mail Address:
Date: Telephone: Fax:
mailto:melaniew@wacotx.gov http://www.waco-texas.com/
ADDENDUM 4
Project Name:
Project No.:
Owner:
Engineer:
Water Transmission/American Plaza to Exchange Parkway, Phase II
RFB 2024-055
City of Waco CP&Y, Inc. dba STV Infrastructure
This addendum forms a part of the Contract Documents and modifies the original Project Manual dated June 2024 and Addenda 1, 2 and 3. Bidder shall acknowledge receipt of this addendum in the space provided below and in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
CLARIFICATIONS:
Special Project Provisions:
Spanos Parkway (Sta 46+48.51 to Sta 53+35.64)
• The Contractor may not conduct any work within these limits from October 1 through February 15.
BID PROPOSAL:
Bid Item 78 Installation of Reflective Pavement Markings and Markers (all types) The Contractor shall be aware that this bid item does include all pavements markings and/or markers found within public right of way or private property. The Contractor is responsible for replacement of all markings and/or markers that are disturbed during the construction process.
Boring Report:
The Contractor shall find attached to this addendum a copy of the Drilling & Testing Report conducted by Langerman Engineering. The report is not intended to be a comprehensive assessment of all soil conditions that a Contractor may encounter, and differing soil conditions is not grounds for a change order.
BID DOCUMENTS:
Bid Item 12C Allowance An allowance of $50,000 has been added to the bid proposal. This item may only be utilized with the authorization of the City of Waco.
Bid Item 69 Groundwater Occurrence (Addendum 1) The Groundwater Occurrence Bid Item has been removed from the Contractor's Bid Proposal.
All subsequent items have been renumbered.
August 2024 Project RFB 2024-055 Addendum No. 4 00 9113 - 1
BID DOCUMENTS:
Replace: Bid Proposal Form. Document has been revised to reflect revisions as mentioned in this Addendum.
Add: Drilling and Testing Report American Plaza to Exchange Parkway Phase II Report - LE Project no W24-022.
Please acknowledge receipt of this Addendum No. 4 by signing below and submitting with the Bid.
Acknowledged:
By:
August 2024 Project RFB 2024-055
--~E OF r. \\\ -~1.~·········/1ci. ,, ; .. ··· ·····.IS' .. '*. .. " ,, ... ·. *'J '*: ·. " , :.~.~
1. DAVID L. MAREK I ~·'.:o~·······•• , f -J)_\ 83327 .. ~~ •-0~.:9~ ~Q .··~,, t,~~•.!?ISTE\2-.~.•·~;
/Cf.At/r-" ·~1 ,~eNA'Ci~~-- -;2c,';j' ''"~
Addendum No. 4 00 9113 - 2
PRICING INFORMATION -ADDENDUM 4
NOTE: Depending on unit prices, requirements and approved budgeted funds, quantities may be reduced or increased during the contract period.
THE CONTRACTOR IS RESPONSIBLE FOR ALL MATH, CALCULATIONS, AND FORMULAS
BASE BID
ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE SUB-TOTAL
GENERAL CONDITIONS
1 Mobilization, Permits and Project Incidentals (10% 1 LS $ - Maximum of Total Bid)
2 Bonding & Insurance (2.5% Maximum of Total Bid) 1 LS $ -
3 Stormwater Pollution & Prevention Plan 1 LS $ -
4 Stormwater Pollution & Prevention Plan 1 LS $ Implementation -
Testing of Improvements, including but not limited to all
5 testing required for acceptance of the water 1 LS $ - improvements, and all material, labor, equipment and incidentals, complete and in place.
6 Coordination of Utility Installation with Private Utility 1 LS $ - Companies
7 Trench Safety Plan 1 LS $ -
8 Confined Space Plan & Implementation 1 LS $ -
9 Traffic Control Plan 1 LS $ -
10 Traffic Control Implementation 1 LS $ - UPRR Coordination including by not limited to Safety
11 Training, Flagging, Observation, Track Monitoring, 1 LS $ - Liability Insurance, as required within the UPRR Pipeline Agreement
Building Waco Signage, including all signage, 12 anchorage, installation, removal, and all material, labor, 3 EA $ -equipment, and incidentals, complete and in place
Utility Potholes, including all necessary traffic control, traffic control plans, non destructive potholing of the
12A identified utility, coordination with utility provider, 1 LS $ - surveying of pothole, repair to surface, and all material, labor, equipment, and incidentals, complete and in place.
Additional Utility Potholes as directed by the City of Waco, including all necessary traffic control, traffic
128 control plans, non destructive potholing of the identified 0 EA $ - utility, coordination with utility provider, surveying of pothole, repair to surface, and all material, labor, equipment, and incidentals, complete and in place.
12C Allowance to be used only as authorized by the 1 LS $ 50,000.00 $ 50,000.00 City of Waco
SUBTOTAL - GENERAL CONDITIONS
AUUl:.l'IIUUIVI 4
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
BID PROPOSAL
ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE SUB-TOTAL
WATER IMPROVEMENTS
Existing 6" Water Line (All Types) to be abandoned in
13 place, including installation of plugs in pipe, grout 78 LF $ -installation, and all material, labor, equipment and incidentals, complete and in place Existing 8" Water Line (All Types) to be abandoned in
14 place, including installation of plugs in pipe, grout 332 LF $ - installation, and all material, labor, equipment and incidentals, complete and in place Existing 12" Water Line (All Types) to be abandoned in
15 place, including installation of plugs in pipe, grout 635 LF $ - installation, and all material, labor, equipment and incidentals, complete and in place Existing 16" Water Line (All Types) to be abandoned in
16 place, including installation of plugs in pipe, grout 3250 LF $ - installation, and all material, labor, equipment and incidentals, complete and in place Existing Gate Valve to be closed, remove valve lid and
17 fill valve stem with 2,000 PSI concrete, and all material, 4 EA $ - labor, equipment and incidentals, complete and in place
Existing Gate Valve (All Sizes) to be Removed and Delivered to the City of Waco, including necessary
18 excavation, dewatering, transportation and delivery to 11 EA $ - City Facilities, installation of backfill, installation of solid block sod, and all material, labor, equipment, and incidentals complete and in place
Existing Fire Hydrant to be Removed and Delivered to the City of Waco, including necessary excavation, 19 dewatering, transportation and delivery to City 3 EA $ - Facilities, installation of backfill, installation of solid block sod, and all material, labor, equipment, and incidentals complete and in place Installation of 16" Concrete Plug, including all necessary excavation, cutting of pipe, installation of
20 plug, trench backfill, surface replacement, and all 1 EA $ -material, labor, equipment, and incidentals complete and in place Connection to existing 8" water line, including necessary pothole investigation, special fittings, spool
21 pieces, thrust blocking, trench backfill and all material, 6 EA $ -labor, equipment, and incidentals complete and in place Connection to existing 12" water line, including necessary pothole investigation, special fittings, spool
22 pieces, thrust blocking, trench backfill and all material, 1 EA $ -labor, equipment, and incidentals complete and in place Connection to existing 16" water line, including necessary pothole investigation, special fittings, spool
23 pieces, thrust blocking, trench backfill and all material, 4 EA $ -labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
Connection to existing 30" water line, including necessary pothole investigation, special fittings, spool
24 pieces, thrust blocking, trench backfill and all material, 1 EA $ -labor, equipment, and incidentals complete and in lolace Connection to existing 42" water line, including necessary pothole investigation, special fittings, spool
25 pieces, thrust blocking, trench backfill and all material, 2 EA $ -labor, equipment, and incidentals complete and in place 8" C-900 DR18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary
26 excavation, embedment, tracer wire, marking tape, 289 LF $ - installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place 12 C-900 DR18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary
27 excavation, embedment, tracer wire, marking tape, 55 LF $ -installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in lplace 16" C-900 DR18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary
28 excavation, embedment, tracer wire, marking tape, 129 LF $ - installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in lplace 30" C-900 DR 18 PVC Water Line (All Depths) (Street Trench) including necessary excavation, embedment, 29 tracer wire, marking tape, installation of utility, trench 1182 LF $ -backfill and all material, labor, equipment, and incidentals complete and in place
30" C-900 DR 18 PVC Water Line (All Depths) (Off
30 Street Trench) including necessary excavation, 733 LF $ - embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary
31 excavation, embedment, tracer wire, marking tape, 3254 LF $ - installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary
32 excavation, embedment, tracer wire, marking tape, 740 LF $ - installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
30" C-900 DR 18 PVC Water Line installed in 48" Steel 33 Encasement Pipe (All Depths) including tracer wire, 20 LF $ -installation of utility and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 Restrained Joint PVC Water Line installed in 48" Steel Encasement Pipe (All Depths)
34 including tracer wire, installation of utility and all 858 LF $ -material, labor, equipment, and incidentals complete and in place 48" Steel Encasement Pipe installed by Open Cut (All Depths) including necessary excavation, embedment, 35 tracer wire, marking tape, installation of utility, trench 133 LF $ -backfill and all material, labor, equipment, and incidentals complete and in place 48" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction
36 of bore pits, jacking of encasement pipe, and all 745 LF $ -material, labor, equipment, and incidentals complete and in place
37 42" X 30" DIP Tee, including necessary excavation, 1 EA $ - thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
38 30" X 30" DIP Tee, including necessary excavation, 3 EA $ - thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
39 30" X 16" DIP Tee, including necessary excavation, 1 EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
40 30" X 12" DIP Tee, including necessary excavation, 1 EA $ - thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
41 30" X 8" DIP Tee, including necessary excavation, 18 EA $ - thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
42 30" X 6" DIP Tee, including necessary excavation, 1 EA $ - thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
43 16" X 16" DIP Tee, including necessary excavation, 1 EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
44 8" X 8" DIP Tee, including necessary excavation, thrust 1 EA $ - blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
45 8" X 6" DIP Tee, including necessary excavation, thrust 2 EA $ - blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
/-\UUt:I\IUUIVI LI American Plaza to Exchange Parkway
Water Transmission Line Improvements, Phase II
30" X 16" DIP Reducer, including necessary 46 excavation, connection to water line, spool pieces, 3 EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
47 16" DIP Plug, including necessary excavation, thrust 1 EA $ -blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
6" - 45° DIP Bend, including necessary excavation, 48 connection to water line, spool pieces, thrust blocking, 2 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
8" - 45° DIP Bend, including necessary excavation, 49 connection to water line, spool pieces, thrust blocking, 12 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
8" - 22 1/2° DIP Bend, including necessary excavation, 50 connection to water line, spool pieces, thrust blocking, 1 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
8" - 11 1/4° DIP Bend, including necessary excavation, 51 connection to water line, spool pieces, thrust blocking, 5 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
12" - 45° DIP Bend, including necessary excavation, 52 connection to water line, spool pieces, thrust blocking, 4 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
16" - 45° DIP Bend, including necessary excavation, 53 connection to water line, spool pieces, thrust blocking, 10 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 45° DIP Bend, including necessary excavation, 54 connection to water line, spool pieces, thrust blocking, 49 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 22 1/2° DIP Bend, including necessary 55 excavation, connection to water line, spool pieces, 9 EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 11 1/4° DIP Bend, including necessary 56 excavation, connection to water line, spool pieces, 12 EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
42" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 57 tracer wire, thrust blocking, valve box and lid, and all 1 EA $ -material, labor, equipment, and incidentals complete and in place 30" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 58 tracer wire, thrust blocking, valve box and lid, and all 13 EA $ -material, labor, equipment, and incidentals complete and in place 16" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 59 tracer wire, thrust blocking, valve box and lid, and all 2 EA $ -material, labor, equipment, and incidentals complete and in place 16" Resilient Seat Gate Valve "Cut-In" to Existing Pipe, including necessary excavation, connection to water
60 line, thrust blocking, tracer wire, thrust blocking, valve 1 EA $ -box and lid, and all material, labor, equipment, and incidentals complete and in place 12" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 61 tracer wire, thrust blocking, valve box and lid, and all 3 EA $ -material, labor, equipment, and incidentals complete and in place 8" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 62 tracer wire, thrust blocking, valve box and lid, and all 8 EA $ -material, labor, equipment, and incidentals complete and in place
4" Air Release & Vacuum Valve (In Street), including 63 service, line, 4" gate valve, valve vault, appurtenances, 14 EA $ -vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place
4" Air Release & Vacuum Valve (Off Street), including 64 service, line, 4" gate valve, valve vault, appurtenances, 1 EA $ -vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place Fire Hydrant Assembly, including necessary excavation, embedment, 6" DIP Fire Line, 6" Resilient
65 Seat Gate Valve, valve box and lid, Gradlock, trench 3 EA $ -backfill, and all material labor, equipment, and incidentals complete and in place
STA 29+84.58 ARV Piping Connection, including 8" x
66 4" DIP reducer, connection to flanged tee, 4" resilient 1 LS $ - seat gate valve, concrete diamond, 4" 45° DIP bends, 4" x 4" DIP Tee, and all material, labor, equipment, and incidentals, complete and in place 4" DIP ARV Piping@ STA 29+84.58, including
67 excavation, embedment, pipe installation, backfill, 56 LF $ - connection to piping, and all material, labor, equipment, and incidentals, complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
2" Commercial Service (Street Trench) including
68 connection to water main, necessary excavation, 1 EA $ -embedment, installation of service, backfill, connection to existing bullhead meter, and all material, labor, equipment, and incidentals, complete and in place.
Trench Safety Implementation, including all necessary
69 material, labor, equipment, training and incidentals 6647 LF $ -complete and in place
SUBTOTAL-WATER IMPROVEMENTS $ -
MISCELLANEOUS IMPROVEMENTS
Existing Concrete Curb and Gutter to Be Removed and Replaced, including necessary saw cutting, removal
70 transportation and disposal, forming, reinforcement, 270 LF $ -dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place
Class 'A' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade
71 compaction, installation of concrete base, bonding 4732 LF $ - course, placement of HMAC (Type D), cleanup and all material, labor, equipment and incidentals complete and in place
Class 'D' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade
72 compaction, reinforcement, forming, installation of 110 LF $ -asphalt, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place Class 'F' Surface Replacement Solid Block Sod, 73 including all necessary preparation, installation of 1184 SY $ - salvaged topsoil, watering, and all material, labor, equipment and incidentals complete and in place
Class 'F' Surface Replacement Hydromulch Seeding, 74 including all necessary preparation, installation of 2282 SY $ -salvaged topsoil, watering, and all material, labor, equipment and incidentals complete and in place
Temporary Street Replacement, including installation of prime coat on gravel trench backfill, installation of 2"
75 HMAC Type "C", installation of temporary striping as 4575 LF $ -required, saw cutting and removal of material upon acceptance of utility, disposal of removed material, and all material, labor, equipment and incidentals complete and in place Installation of Reflective Pavement Markings and Markers(AII Types), including all necessary surface
76 preparation, removal of temporary striping, and all 1 LS $ -material, labor, equipment, and incidentals, complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
Removal & Replacement of Existing Fence (all Types), 77 including removal and disposal of existing wire, posts, 40 LF $ - foundations, installation of new posts, foundations, necessary bracing, wire and all material, labor, equipment and incidentals complete and in place 8" Diameter Steel Bollards, including excavation, placement, any necessary surface repair, and all 24 EA $ - material, labor, equipment and incidentals complete and in place
Removal and Replacement of Reinforced Concrete
79 Channel, including sawcutting, subgrade preparation, 525 SF $ - forming, dowels, reinforcement, placement of concrete, and all material, labor, equipment, and incidentals complete and in place.
Removal and Replacement of Existing Concrete Drive Approach, including sawcutting, subgrade preparation, 80 forming, dowels, reinforcement, placement of concrete, 210 SF $ -and all material, labor, equipment, and incidentals complete and in place.
81 Furnish and Install Galvanized Steel Delineator Post 1 EA $ and Signage (All Types), including all material, labor, -equipment, and incidentals, complete and in place Tapco Round Dometop Utility Water Marker, including
82 all material, labor, equipment, and incidentals, 4 EA $ -complete and in place
SUBTOTAL - MISCELLANEOUS IMPROVEMENTS $ -
TOTAL BASE BID AMOUNT
BID PACKAGE ONE: BASE BID
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
ALTERNATE DEDUCT BID
Connection to existing 16" water line, including necessary pothole investigation, special fittings, spool
D23 pieces, thrust blocking, trench backfill and all material, (4) EA $ -labor, equipment, and incidentals complete and in lolace Connection to existing 30" water line, including necessary pothole investigation, special fittings, spool
D24 pieces, thrust blocking, trench backfill and all material, ( 1) EA $ -labor, equipment, and incidentals complete and in place Connection to existing 42" water line, including necessary pothole investigation, special fittings, spool
D25 pieces, thrust blocking, trench backfill and all material, (2) EA $ -labor, equipment, and incidentals complete and in place 16" C-900 DR18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary
D28 excavation, embedment, tracer wire, marking tape, (129) LF $ - installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 PVC Water Line (All Depths) (Street Trench) including necessary excavation, embedment, D29 tracer wire, marking tape, installation of utility, trench ( 1182) LF $ -backfill and all material, labor, equipment, and incidentals complete and in place
30" C-900 DR 18 PVC Water Line (All Depths) (Off
D30 Street Trench) including necessary excavation, (733) LF $ -embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary
D31 excavation, embedment, tracer wire, marking tape, (3254) LF $ -installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary
D32 excavation, embedment, tracer wire, marking tape, (740) LF $ - installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place
30" C-900 DR 18 PVC Water Line installed in 48" Steel D33 Encasement Pipe (All Depths) including tracer wire, (20) LF $ -installation of utility and all material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
30" C-900 DR 18 Restrained Joint PVC Water Line installed in 48" Steel Encasement Pipe (All Depths)
034 including tracer wire, installation of utility and all (858) LF $ -material, labor, equipment, and incidentals complete and in place 48" Steel Encasement Pipe installed by Open Cut (All Depths) including necessary excavation, embedment, 035 tracer wire, marking tape, installation of utility, trench (133) LF $ -backfill and all material, labor, equipment, and incidentals complete and in place 48" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction
036 of bore pits, jacking of encasement pipe, and all (745) LF $ -material, labor, equipment, and incidentals complete and in place
037 42" X 30" DIP Tee, including necessary excavation, (1) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
038 30" X 30" DIP Tee, including necessary excavation, (3) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
039 30" X 16" DIP Tee, including necessary excavation, ( 1) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
040 30" X 12" DIP Tee, including necessary excavation, ( 1) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
041 30" X 8" DIP Tee, including necessary excavation, (18) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
042 30" X 6" DIP Tee, including necessary excavation, (1) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
043 16" X 16" DIP Tee, including necessary excavation, (1) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
30" X 16" DIP Reducer, including necessary 046 excavation, connection to water line, spool pieces, (3) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
047 16" DIP Plug, including necessary excavation, thrust ( 1) EA $ -blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
16" - 45° DIP Bend, including necessary excavation, 053 connection to water line, spool pieces, thrust blocking, (10) EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 45° DIP Bend, including necessary excavation, 054 connection to water line, spool pieces, thrust blocking, (49) EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 22 1/2° DIP Bend, including necessary 055 excavation, connection to water line, spool pieces, (9) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
30" - 11 1/4° DIP Bend, including necessary 056 excavation, connection to water line, spool pieces, (12) EA $ -thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place 30" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 058 tracer wire, thrust blocking, valve box and lid, and all (13) EA $ -material, labor, equipment, and incidentals complete and in place 16" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, 059 tracer wire, thrust blocking, valve box and lid, and all (2) EA $ -material, labor, equipment, and incidentals complete and in place
4" Air Release & Vacuum Valve (In Street), including 063 service, line, 4" gate valve, valve vault, appurtenances, (14) EA $ -vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place
4" Air Release & Vacuum Valve (Off Street), including 064 service, line, 4" gate valve, valve vault, appurtenances, ( 1) EA $ -vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place Trench Safety Implementation, including all necessary
D69 material, labor, equipment, training and incidentals (6647) LF $ -complete and in place
TOTAL DEDUCT ALTERNATE BID $
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
ADD AL TERNA TE BID
Connection to existing 16" water line, including necessary pothole investigation, special fittings for
A23 BWCC, spool pieces, thrust blocking, trench backfill 4 EA $ -and all material, labor, equipment, and incidentals complete and in place Connection to existing 30" water line, including necessary pothole investigation, special fittings for
A24 BWCC, spool pieces, thrust blocking, trench backfill 1 EA $ -and all material, labor, equipment, and incidentals complete and in place Connection to existing 42" water line, including necessary pothole investigation, special fittings for
A25 BWCC, spool pieces, thrust blocking, trench backfill 2 EA $ -and all material, labor, equipment, and incidentals complete and in place 16" C-303 BWCC Water Line (All Depths) (Street Trench) including necessary excavation, embedment, A28 tracer wire, marking tape, installation of utility, and 129 LF $ -trench backfill and all material, labor, equipment, and incidentals complete and in place 30" C-303 BWCC Water Line (All Depths) (Street Trench) including necessary excavation, embedment, A29 tracer wire, marking tape, installation of utility, trench 4436 LF $ -backfill and all material, labor, equipment, and incidentals complete and in place 30" C-303 BWCC Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, A30 tracer wire, marking tape, installation of utility, trench 1473 LF $ -backfill and all material, labor, equipment, and incidentals complete and in place
30" C-303 BWCC Water Line installed in 42" Steel A33 Encasement Pipe (All Depths) including tracer wire, 878 LF $ -installation of utility and all material, labor, equipment, and incidentals complete and in place 42" Steel Encasement Pipe installed by Open Cut (All Depths) including necessary excavation, embedment, A36 tracer wire, marking tape, installation of utility, trench 133 LF $ -backfill and all material, labor, equipment, and incidentals complete and in place 42" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction
A36 of bore pits, jacking of encasement pipe, and all 745 LF $ -material, labor, equipment, and incidentals complete and in place 42" BWCC Fitting (42"x30" Tee), including necessary
A37 excavation, thrust blocking, trench backfill and all 1 EA $ -material, labor, equipment, and incidentals complete and in place 30" BWCC Fitting (30"x30" Tee), including necessary
A38 excavation, thrust blocking, trench backfill and all 3 EA $ -material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
30" BWCC Fitting (30"x16" Tee), including necessary
A39 excavation, thrust blocking, trench backfill and all 1 EA $ - material, labor, equipment, and incidentals complete and in place 30" BWCC Fitting (30"x12" Tee), including necessary
A40 excavation, thrust blocking, trench backfill and all 1 EA $ - material, labor, equipment, and incidentals complete and in place 30" BWCC Fitting (30" X 8" Tee), including necessary
A41 excavation, thrust blocking, trench backfill and all 18 EA $ - material, labor, equipment, and incidentals complete and in place 30" BWCC Fitting (30" X 6" Tee), including necessary
A42 excavation, thrust blocking, trench backfill and all 1 EA $ - material, labor, equipment, and incidentals complete and in place 16" BWCC Fitting (16" X 16" Tee), including necessary
A43 excavation, thrust blocking, trench backfill and all 1 EA $ - material, labor, equipment, and incidentals complete and in place
30" BWCC Fitting (30" X 16" Reducer), including A46 necessary excavation, connection to water line, thrust 3 EA $ -blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place 16" BWCC Fitting (16" Plug), including necessary
A47 excavation, connection to water line, thrust blocking, 1 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
16" BWCC Fitting (45° Bend), including necessary A53 excavation, connection to water line, thrust blocking, 10 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" BWCC Fitting (45° Bend), including necessary A54 excavation, connection to water line, thrust blocking, 49 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" BWCC Fitting (22 1/2° Bend), including necessary A55 excavation, connection to water line, thrust blocking, 9 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place
30" BWCC Fitting (11 1/4° Bend), including necessary A56 excavation, connection to water line, thrust blocking, 12 EA $ -trench backfill and all material, labor, equipment, and incidentals complete and in place 30" Resilient Seat Gate Valve, including necessary excavation, connection to BWCC water line, thrust
A58 blocking, tracer wire, thrust blocking, valve box and lid, 13 EA $ -and all material, labor, equipment, and incidentals complete and in place
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
16" Resilient Seat Gate Valve, including necessary excavation, connection to BWCC water line, thrust
A59 blocking, tracer wire, thrust blocking, valve box and lid, 2 EA $ -and all material, labor, equipment, and incidentals complete and in place 4" Air Release & Vacuum Valve (In Street), including
A63 service, line, valve vault, appurtenances, vent, vent 14 EA $ - enclosure, and all material, labor, equipment, and incidentals complete and in place 4" Air Release & Vacuum Valve (Off Street), including
A64 service, line, valve vault, appurtenances, vent, vent 1 EA $ - enclosure, and all material, labor, equipment, and incidentals complete and in place Trench Safety Implementation, including all necessary
A69 material, labor, equipment, training and incidentals 6647 LF $ -complete and in place
TOTAL ADD ALTERNATE BID $
DEDUCT AL TERNA TE TOT AL AMOUNT
ADD ALTERNATE TOTAL AMOUNT
TOT AL AL TERNA TE BID AMOUNT (DEDUCT AL TERNA TE + ADD AL TERNA TE)
BID PACKAGE TWO: BASE BID+ TOTAL ALTERNATE BID
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
THIS COMPLETE FORM MUST BE SUBMITTED WITH BID
SIGNATURE PAGE
The General Contractor must self perform a minimum of 51 % of the work in the awarded contract.
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
FIRM NAME
BY:
TITLE:
ADDRESS
Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the extended amounts.
Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed.
Any mistakes should be rewritten and initialed by the Contractor.
American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase II
ADDENDUM 4
2000 South 15th Street, Waco, Texas 76706 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625
August 16, 2024
STV, Inc.
200 West Highway 6, Suite 100 Waco, Texas 76712
Attention: Mr. David Marek, P.E.
Vice President
Reference: Drilling and Testing Services Report American Plaza to Exchange Parkway Phase II Waco, Texas LE Project No. W24-022
Dear Mr. Marek:
This letter transmits our drilling and testing services report, which has been electronically produced. We appreciate the opportunity to provide engineering services for you.
If project plans and specifications are developed based on this report, we would be pleased to review those portions that pertain to this report. We would also appreciate the opportunity to provide construction phase services such as materials testing as a part of the success of the project. If you have any questions regarding our report, please call me at (254) 235-1048 or email JElmshaeuser@LFEctx.com.
Best Regards, LANGERMAN ENGINEERING
Texas Registered Engineering Firm No. F-13144
Jakob S. Elmshaeuser Graduate Engineer
Distribution List:
• STV, Inc.- Mr. David Marek, P.E. (David.Marek@STVInc.com)
DRILLING AND TESTING SERVICES REPORT
American Plaza to Exchange Parkway Phase II
Waco, Texas
LE Project No. W24-022
Report Prepared For:
STV, Inc.
Waco, Texas
August 16, 2024
Report Prepared By: Report Reviewed By:
Jakob S. Elmshaeuser Graduate Engineer
Scott M. Langerman, P.E.
Principal / Geotechnical Engineer
2000 South 15th Street, Waco, Texas 76706 Ph: 254/235-1048 www.LFEctx.com
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 1 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
DRILLING AND TESTING SERVICES REPORT
AMERICAN PLAZA TO EXCHANGE PARKWAY PHASE II
WACO, TEXAS
1.0 INTRODUCTION
Purpose: The purpose of this drilling and testing services report is to provide subgrade material descriptions that will help others plan and design a new 30-inch Water Line. Observations and test results are provided in a brief, and hopefully user-friendly manner.
Authorization: Services were performed in general accordance with LE Proposal No.
GEO24-041, dated February 26, 2024. Authorization to proceed was provided by Mr. David Marek, P.E. on February 26, 2024.
The project was put on hold by Mr. David Marek, P.E. via email on February
27, 2024 due to Right of Entries needing to be obtained. Langerman Engineering was released to start drilling operations via email on July 22, 2024.
Originally, four borings were planned; however, one boring was eliminated from the project because Richland Mall would only allow a single boring on their property.
2.0 SUBSURFACE EXPLORATION
Drilling Date: August 2, 2024
Boring Layout: The borings were staked in the field by Langerman Engineering personnel based on locations provided by Mr. David Marek, P.E. Plates 1 and 2 show the approximate boring locations.
Sampling Methods: An auger was used to penetrate through the existing asphalt and base in
Borings B-2 and B-4. Push-tubes were then used in the upper clay soils. A split-spoon was used in less cohesive soils and severely weathered limestone. The split spoon sampler was used in conjunction with standard penetration tests, and N-Values were recorded on the boring logs.
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 2 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
3.0 LABORATORY TESTS
Test Procedures: The following tests were conducted in general conformance with the standards noted in Table 3.1.
TABLE 3.1: LABORATORY TESTS
Test Name Test Method
Atterberg Limits ASTM D 4318
-#200 Mesh Sieve ASTM D 1140
Moisture Content ASTM D 2216
Soil Classification ASTM D 2487
Unconfined Compression (Soil) ASTM D 2166
Test Results: Laboratory test results are shown on Plate 3 in the Appendix, and selected test results on the boring logs.
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 3 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
4.0 SUBSURFACE MATERIALS
Stratigraphy: Major strata types for the borings are listed in Table 4.1. Individual boring logs are contained in the Appendix. Material descriptions are general and range of depths approximate because boundaries between different strata are seldom clear and abrupt in the field.
TABLE 4.1: MAJOR STRATA TYPES
Strata Depth to Top of
Strata (ft) Depth to Base of
Strata (ft) General Description
I 0 0.1 to 1 1” to 3” Asphalt over 9” Clayey Sand; tan, with gravel (Borings B-2 and B-4 only)
II 0.1 to 1 5 to 7
FAT CLAY, GRAVELLY LEAN CLAY, and LEAN CLAY;
dark brown, brown, and tan, with sand and limestone fragments
III 5 7.4
SEVERELY WEATHERED LIMESTONE; tan, consists of broken limestone interbedded with marly clay (Boring B-5 only)
Strata changes are approximate, and in-situ transitions are usually gradual.
Geology: Based on the available geologic map1 of the area, and the contents of the borings, the site located within the Austin Chalk Formation.
The Austin Chalk is considered a relatively soft limestone based on universal rock classification systems but is considered relatively hard rock in the Central Texas area. Although the Austin Chalk is usually described as limestone, it is comprised of chalk, limestone, and marl (marl is calcareous clay). The unweathered Austin Chalk is gray in color.
Severely weathered limestone is a transition between clay and rock. At this site, its composition varies from broken limestone to marly clay. For discussion purposes in this report, severely weathered limestone is mostly soil-like. However, there are layers of hard broken limestone.
Groundwater: The Borings were drilled to depths ranging from 7 to 7.4 feet using dry drilling methods, meaning that water was not used in the drilling process.
Groundwater was not observed in the borings during drilling.
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 4 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
Groundwater is common in this area, and may be present at the time of construction. Excavation operations should be prepared to handle groundwater. Water tends to percolate down through the surficial soils until encountering a relatively impervious layer, and then either flow down gradient or become trapped. The groundwater observations conducted for this investigation are short-term and should not be interpreted as a groundwater study.
Excavations: All excavations and trench safety procedures must be in accordance with
OSHA requirements.
The following paragraphs contain general comments regarding below grade excavations. Excavation characteristics, design of temporary support systems, and dewatering methods are the sole responsibility of the contractor. Accordingly, the following statements should be regarded only as opinions.
The upper clay materials may be excavated with conventional earth moving equipment. Materials described as SEVERELY WEATHERED LIMESTONE in the borings consists of broken limestone that may potentially be excavated with a heavy-duty backhoe. However, there are likely harder layers in the rock that may require hoe rams or other heavy-duty excavation equipment.
The design of temporary excavation support systems, trench safety systems, and slope stability for temporary open cut excavations were excluded from our scope of services. The contractor is solely responsible for designing and constructing stable, temporary excavations and must shore, slope or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. All excavations must comply with applicable local, state, and federal safety regulations including current OSHA Excavation and Trench Safety Standards. Construction site safety is generally the sole responsibility of the contractor, who shall also be responsible for the means, methods, and sequencing of construction operations. We are providing information in this report solely as a service to our client. Under no circumstances should the provided information be interpreted to mean that LE is assuming responsibility for construction site safety or the contractor’s activities; such responsibility is not being implied and must not be inferred.
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 5 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. Specifically, the current OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926 must be followed.
The contractor’s “responsible person” as defined in 29 CFR Part 1926, must evaluate the materials exposed in the excavations as part of the contractor’s safety procedures. If an excavation, including a trench, is extended to a depth of more than twenty (20) feet, it will be necessary to have the side slopes designed by a professional engineer licensed in the State of Texas.
The contractor’s “responsible person” must establish a minimum lateral distance from the crest of the slope for vehicles, spoil piles, or other surcharge loads. Likewise, the contractor’s “responsible person” shall establish protective measures for exposed slope faces.
The contractor must include the proximity to adjacent features when planning their method of excavation and support. These features include, but are not limited to, adjacent structures and utility lines. The contractor must also be prepared to manage varying amounts of subsurface water.
Dewatering quantities will depend on drainage features, any groundwater, and rainfall prior to and during construction.
Copyright 2024 Offices in Waco and Harker Heights, Texas Page 6 of 6 LE Project No. W24-022 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 August 16, 2024
5.0 REPORT LIMITATIONS
Limitations: This report has been prepared for the exclusive use of our client and their designated project design team. Preparation of the report has been performed using that degree of care and skill ordinarily exercised under similar conditions by reputable geotechnical engineers practicing in the same locality. No warranties, express or implied, are intended or made.
As stated in the attachment “Important Information about Your Geotechnical Engineering Report”, the subsurface conditions are interpreted from observations only at the boring locations. During construction, variations will be encountered. This report does not include geotechnical engineering recommendations or environmental testing or evaluations.
6.0 REFERENCES:
1. Geologic Atlas of Texas, Waco Sheet, Bureau of Economic Geology, The University of Texas at Austin, Austin, Texas 1970.
APPENDIX
Site Location Map Boring Location Sketch Laboratory Test Results Boring Logs Important Information about Your Report
SITE LOCATION MAP
LE PROJECT NO. W24-022
PLATE
American Plaza to Exchange Parkway
BORING LOCATION MAP
2A
B - 2
2B
B - 4
2C
B - 5
B-2 0.0 - 1.0 45 10 B-2 1.0 - 3.0 44 18 26 75 18 B-2 3.0 - 5.0 59 20 39 86 22 B-2 5.0 - 7.0 17 101.5 5.2 6.5 B-4 0.0 - 1.0 72 14 B-4 1.0 - 3.0 15 108.5 4.8 3.7 B-4 3.0 - 5.0 72 23 49 93 31 B-5 0.0 - 2.0 9 103.2 12.6 2.3 B-5 2.0 - 4.0 49 19 30 70 9 B-5 4.5 - 6.0 38 17 21 79 11
Liquid Limit
Unconfined Compressive
Strength (tsf)
Plastic Limit
Plasticity Index
Project: American Plaza to Exchange Parkway Phase II
Project Number: W24-022
Summary of Laboratory Results
Moisture Content
Percent Passing No. 200 Sieve
Sample Depth
(ft.)
Boring No.
Strain at Failure
Unit Dry Weight
(pcf)
Plate 3
6.55.2
2.5
4.0
4.0
A
ST
ST
ST 102
3" Asphalt over 9" Clayey Sand; tan, with gravel
LEAN CLAY; dark brown and tan, with sand and limestone fragments
FAT CLAY; dark brown and tan, with limestone fragments
ATTERBERG
LIMITS
Remarks:
Completion Depth:
Date Started:
Completed:
Logged by:
Boring was advanced to a depth of 7 feet using dry drilling techniques.
Groundwater was not observed above that depth.
S T
R A
IN
A
T F
A
IL
U R
E
U N
C O
N F
IN
E
D C
O M
P R
E S
S
IV
E S
T R
E N
G T
H ts f)
G R
A P
H
IC
LO
G
D E
P T
H (f t)
0.0
2.5
5.0
R E
C O
V E
R Y
(R
Q D
P O
C K
E T
P E
N
(t sf
LI
Q
U
ID
LI
M
IT
P
LA
S T
IC
LI
M
IT
F
IN
E S
C O
N T
E N
T
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
S A
M P
LE
T
Y P
E
D R
Y U
N
IT
W T
(p cf
MATERIAL DESCRIPTION
7 ft.
8/2/24
8/2/24
T. Towery
B
LO
W C
O U
N T
S (N
V A
LU
E
BORING NO. B-2
CLIENT STV, Inc.
PROJECT NUMBER W24-022
PROJECT NAME American Plaza to Exchange Parkway Phase II
PROJECT LOCATION Waco, TX
LA
N
G E
R M
A N
F O
S T
E R
N
O E
LE
V
A T
IO
N
G
IN
T
S T
D U
S L
A B
.G D
T
/1
/2
5:
Z
:\G
IN
T P
R O
JE
C
T S
\W
-0
, A M
E R
IC
A
N P
LA
Z
A .G
P J
Langerman Engineering Waco and Harker Heights (Killeen), Texas Ph: 254-235-1048 www.LFECTX.com
3.74.84.5+
3.5
3.5
72 23
A
ST
ST
ST
1" Asphalt FAT CLAY; brown, with sand
FAT CLAY; dark brown
ATTERBERG
LIMITS
Remarks:
Completion Depth:
Date Started:
Completed:
Logged by:
Boring was advanced to a depth of 7 feet using dry drilling techniques.
Groundwater was not observed above that depth.
S T
R A
IN
A
T F
A
IL
U R
E
U N
C O
N F
IN
E
D C
O M
P R
E S
S
IV
E S
T R
E N
G T
H ts f)
G R
A P
H
IC
LO
G
D E
P T
H (f t)
0.0
2.5
5.0
R E
C O
V E
R Y
(R
Q D
P O
C K
E T
P E
N
(t sf
LI
Q
U
ID
LI
M
IT
P
LA
S T
IC
LI
M
IT
F
IN
E S
C O
N T
E N
T
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
S A
M P
LE
T
Y P
E
D R
Y U
N
IT
W T
(p cf
MATERIAL DESCRIPTION
7 ft.
8/2/24
8/2/24
T. Towery
B
LO
W C
O U
N T
S (N
V A
LU
E
BORING NO. B-4
CLIENT STV, Inc.
PROJECT NUMBER W24-022
PROJECT NAME American Plaza to Exchange Parkway Phase II
PROJECT LOCATION Waco, TX
LA
N
G E
R M
A N
F O
S T
E R
N
O E
LE
V
A T
IO
N
G
IN
T
S T
D U
S L
A B
.G D
T
/1
/2
5:
Z
:\G
IN
T P
R O
JE
C
T S
\W
-0
, A M
E R
IC
A
N P
LA
Z
A .G
P J
Langerman Engineering
2.312.64.5+
4.5+ 49
ST
ST
A
SS
A
SS
GRAVELLY LEAN CLAY; brown
SEVERELY WEATHERED LIMESTONE; tan, consists of broken limestone interbedded with marly clay
3-39-35 (74)
33-50/5"
ATTERBERG
LIMITS
Remarks:
Completion Depth:
Date Started:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .