ES7034 Rework Repair RR-202.pdf

PDF 81 KB Posted

Attached to
RR-202/AL Federal contract opportunity
Solicitation number
FA821324RB010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is an attachment titled "ES7034 REWORK AND REPAIR OF NONCONFORMING MATERIAL" that outlines the procedures for rework and repair of nonconforming material for a federal contract. It defines rework as reprocessing material to completely conform to requirements, and repair as reprocessing to reduce but not eliminate nonconformance. The contractor must document rework and repair procedures and submit them to the Government Quality Assurance Representative or Contracting Officer for review and approval prior to implementation. The submission must include the cause of the nonconformance and actions to prevent recurrence. Rework and repair is a flow-down requirement that applies to contractors, suppliers, vendors, and subcontractors.

The related federal contract opportunity is a 3-year Indefinite Delivery Indefinite Quantity (IDIQ) solicitation for the RR-202/AL chaff countermeasure. The total estimated ceiling amount for this contract is $49 million. This is anticipated to be a sole source award to Armtec Defense Technologies due to the highly specialized nature of the requirement.

View the file

Other files for this federal contract opportunity

Other files attached to RR-202/AL, newest first.
File Type Posted
Solicitation Amendment FA821324RB0100002 SF 30.pdf PDF
Solicitation Amendment - FA821324RB0100002.pdf PDF
Solicitation Amendment FA821324RB0100001 SF 30.pdf PDF
Solicitation Amendment - FA821324RB0100001.pdf PDF
GFP Attachment.pdf PDF
AIRSPEC FD2020-24-51495 RR-202 Final.pdf PDF
Pricing Table.pdf PDF
FD2020-24-51495 CDRLs 1423-1.pdf PDF
IHC Log No 23-163.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of attachment)

(ES7034)

File details come from the government source that posted it. Updated .