ES7034.pdf
PDF 10 KB Posted
- Attached to
- Advanced Concept Ejection Seat (ACES) II Harness Release Cartridge and Drogue Gun Cartridge
- Solicitation number
- FA8213-25-R-3026
About this file
This document is a federal contract clause titled "Rework and Repair of Nonconforming Material" dated January 2012. The clause defines and establishes procedures for rework and repair of materials that do not meet contract specifications. Rework is defined as reprocessing nonconforming material to fully conform to drawings and requirements, while repair is a process to bring nonconforming material into a usable condition without completely eliminating the nonconformance.
The clause outlines specific requirements for contractors, including: documenting rework and repair procedures, submitting these procedures to the Government Quality Assurance Representative (QAR) or Contracting Officer for review, providing descriptions of nonconformance causes and prevention methods, and including reinspection provisions. The requirements apply to the contractor and extend through the supply chain to suppliers, vendors, and subcontractors, ensuring quality control and compliance throughout the production process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA821325R3026 A5.pdf | ||
| FA821325R3026 A4.pdf | ||
| FA821325R3026 A3.pdf | ||
| FA821325R3026 A2.pdf | ||
| FA821325R3026 A1.pdf | ||
| AirSpec.pdf | ||
| PackagingSOW.pdf | ||
| Section_L_CADPAD.pdf | ||
| Section_M_CADPAD.pdf | ||
| REPSHIP.pdf | ||
| ADC_SOW.pdf | ||
| F010528206SPI.pdf | ||
| EDL_Combined.pdf | ||
| F013193847SPI.pdf | ||
| Combined_Item_Descriptions.pdf | ||
| FA821325R3026.pdf | ||
| ItemMarkingInstruction.pdf | ||
| F010528208SPI.pdf | ||
| CDRL.pdf | ||
| Statement_of_Objectives_SOO.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for
Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the
Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)
(ES7034)
File details come from the government source that posted it. Updated .