Hood River Design Interior Design Q and A.pdf
PDF 197 KB Posted
- Solicitation number
- EQ10PRBB1-21-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW.pdf | ||
| FIT Program Design guide Checklist.pdf | ||
| Agency Specific Requirements.pdf | ||
| Solicitation EQ10PCPB-21-0012.pdf | ||
| Standard Form 1449.pdf | ||
| SF81.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hood River Interior Design Q&A
QUESTION 1
Has a lease been signed with a Lessor for this project? (SOW item 3 a on page 1/4)
ANSWER 1
No
QUESTION 2
If so and the space has already been selected or designed, is there a shell plan, dimensioned floor plan, and/or plans that indicate structural, electrical, and mechanical locations available prior to
Feb. 11th?
ANSWER 2
N/A
QUESTION 3
Is the Fit Criteria Plan available from the Lessor to be seen prior to Feb. 11th?
ANSWER 3
FIT program design checklist was provided as an attachment to this RFP.
QUESTION 4
If so, does the Forest Service plan on acquiring a space of 2 or more stories? Stacking plans are more effective in buildings with 2 or more stories.
ANSWER 4
2 or more stories is a possibility.
QUESTION 5
If a space has not been selected or designed, when can the team anticipate receipt of a shell plan or floor plan?
ANSWER 5
March / April
QUESTION 6
Is an existing plan of the current facility illustrating the layout of all personnel and support spaces available?
ANSWER 6
Yes, however this design will change to meet the FIT design.
QUESTION 7
Is there an activity task plan showing preferred adjacencies of personnel and support spaces?
ANSWER 7
Yes, located in the ASR’s adjacencies plan section.
QUESTION 8
Is the Architect designing the space associated with the Lessor or are they a part of the Furniture
Design Consultant.
ANSWER 8
Architect is part of the lessors team, design A/E is not.
QUESTION 9
If the architect is a part of the Lessor group, will coordination be required between the interior design architect that is laying out the furniture and workplace arrangements and the Lessor architect?
ANSWER 9
Coordination between GSA, Lessor’s architect and design A/E.
QUESTION 10
Does the interior design team need to coordinate/communicate with the GSA only, or with the
GSA and the Lessor?
ANSWER 10
GSA only
QUESTION 11
Are there Twelve (12) or Fourteen (14) furniture typicals? (SOW items 3 a 3 and 3 a 5 1 on page
1/4 but numbers vary throughout)
ANSWER 11
14 typicals
QUESTION 12
Who is required to attend the DID workshop and will the worship be on-site or virtual? (SOW page 2)
ANSWER 12
Lessors, Lessors architect, design A/E, GSA
QUESTION 13
The Scope of Work mentions that an inventory of current furniture shall be performed prior to the DID workshop (SOW item 3 f 2 page 2/4). Is this the responsibility of the contracted Interior
Design team to inventory existing furniture?
ANSWER 13
This is the responsibility of the agency / GSA
QUESTION 14
If so, to what level of detail shall the team do the inventory?
ANSWER 14
N/A
QUESTION 15
Is on-site field measurement required for items to be reused?
ANSWER 15
Yes
QUESTION16
Is on-site interviewing, data collection, and photo documentation required of the Interior Design
Furniture Consultant?
ANSWER 16
yes
QUESTION 17
Is this required to be performed in the first 120 days and prior to the DID workshop?
ANSWER 17
QUESTION 18
If not and the inventor will any inventory or a plan of the existing space be available prior to Feb.
11th?
ANSWER 18
No
QUESTION19
Is the furniture limited to any one set of vendors for this project such as:
a. Prison Industries or a similar government operated company? No
b. Blanket Purchase Agreement (BPA) with a particular manufacturer? No
c. The manufacturer of the existing furniture system to be reused? No
d. The manufacturer of the furniture system that the Lessor dictates? No
ANSWER 19
Not limited
QUESTION 20
Will the Tenant Agency COR act independently or require input from the Interior Design Team for the 3/5 year FIT term?
ANSWER 20
COR will require input from the A/E design team and FIT program manager
QUESTION 21
What is the breakdown of “components” in the preliminary space plan? (SOW 3.4.3 page 3/4)
ANSWER 21
Items such as desk lighting, chairs and pin boards
QUESTION 22
What is the scope of the meeting between the Interior Design Team and the GSA Project
Manager? (SOW item 3.4.3 page 3/4)
ANSWER 22
Review the design intentions and requirements
QUESTION 23
Will anything be finalized beyond the space plan(s)?
ANSWER 23
QUESTION 24
What program(s) shall be used by the Interior Design Team to develop the furniture plans?
(SOW 3.3.2 page 3/4 and page 4/4)
ANSWER 24
FIT design guide and the ASR’s
QUESTION 25
SOW mentions delivery in PDF and CAD formats only, which does not specify a program or a version year.
ANSWER 25
2018 CADD or newer if possible, Adobe PDF, or Foxit PDF
QUESTION 26
The SOW also mentions 3-D visualizations and renderings.
ANSWER 26
Correct, after DID’s
QUESTION 27
It is recommended that the GSA does not require the selected program(s) be the latest versions available, as this eliminates any potential Interior Design Team with older software and limits the produced documents from being opened on any machines except those with the latest software.
ANSWER 27
3-D Visuals are required.
QUESTION 28
What are the existing documents supplied by others mentioned in SOW paragraph 3.4.3?
ANSWER 28
ASR’s, FIT Design Guide
QUESTION 29
Regarding the 30-page Agency Specific Requirements (ASR) document provided:
Please confirm that this is provided for information only and the scope of this item applies only to the “Lessor” and NOT to the “Furniture Consultant”?
ANSWER 29
This document is agency specific requirements and the design and build out should match. This is what will be used as design before DID workshops.
QUESTION 30
Regarding the “SOLICITATION NO: EQ10PCPB-21-0012” document provided:
It indicates under Past Experience “Provide a description of two similar projects (size, scope, and complexity) completed within the past three years.”
If a provided project is older than 3 years, will this automatically disqualify or not be counted for an offeror.
ANSWER 30
Only projects within 3 years will be accepted.
QUESTION 31
Will an example FIT Program document for a previous project be made available to use as a reference standard for the Interior Design Team?
ANSWER 31
QUESTION 32
Please confirm the project schedule and delivery timeline. The Solicitation document states a 120-day performance period for delivery after award. The Scope of Work mentions a list of items that shall be completed before the DID workshop, slated to begin 5/27/2022.
ANSWER 32
DID’s to be completed within 60 days of lease award, CD completed within 60 days of 1005 DID’s
QUESTION 32
Please provide links to: US Forest Service Space Guideline(s), US Forest Service Hood River
Space Program, and the National Workplace Design Guide.
ANSWER 32
Information is not needed.
QUESTION 33
Is there a way to get a file or drawing that represents the areas for the overhaul?
ANSWER 33
This will be provided after the RLP is issued. There is nothing available at this time, however the build out design will closely match the ASR’s and square footage of proposed space.
QUESTION 34
would you have any branding/mission/values info available to incorporate into the design.
ANSWER 34
None at this time. Meet the ASR’s and FIT program requirements