AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 1
2. AMENDMENT MODIFICATION NO.
3. EFFECTIVE DATE
16 April 2018
4. REQUISITION/PURCHASE REQ. NO.
EQ10PCP-17-0040
5. PROJECT NO. (if applicable)
6. ISSUED BY CODE
General Services Administration PBS Region 10, Regional Office Acquisition Solutions Branch (10PQC) 400 15th St SW Auburn WA 98001-6599
7. ADMINISTERED BY (If other than item 6) CODE
Same as Block 7
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code) ( x) 9A. AMENDMENT OF SOLICITATION NO.
EQ10PCP-17-0040 Upgrade Blaine LPOE Inspection Booth 007
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
ElThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers El is extended, XEl is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ___1___ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not required to sign this document and return 1 copies to the issuing office. 1
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) The purpose of this amendment is to:
Post GSA’s answers to PPI’s dated 16 April 2018.
Please sign SF 30 and submit with your proposal.
No other changes to the solicitation are made by Amendment 007.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Maria Dawn Ashton, Contracting Officer Dawn.ashton@gsa.gov
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF
16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243 mailto:Dawn.ashton@gsa.gov
Pre Proposal Inquiries (PPI’s) Blaine LPOE 16 April 2018
1. Are there any LEED Certification requirements for this project?
GSA Response: NO
2. BACKGROUND: A previous Contractor Question included within Amendment 6 (last page) states in part “…The Until will NOT meet the Level III Forced Entry Rating as it cannot be met with the style of Construction and features needed”. The CPB Response was “The GSA standardized drawings have been removed from the contract.” Which does not seem to address the Forced entry Requirement in anyway. On PAGE 1 of 11 of Amendment 6 in BOLD the text reads in Part: “….Contractor must meet or exceed…….ASTM F1233 Class 3 Level III for Forced entry resistance...”
QUESTION: It appears very clear that the Big Booth unit prescribed by the CPB does not meet the requirements set out on Page 1 of 11 of the Amendment 6 regarding Level III for Forced entry resistance. What shall be provided or is the Level III (3) Forced Entry Requirements waived?
GSA Response: CBP understands the forced entry issue with a sliding door/window. CBP recommends that the contractors propose a solution, perhaps an additional bar or lock that basically fixes the door to the booth, then use the rear swing door as the entry/exit when that is locked. Or maybe put the sliding part on the outside of the door/booth.
3. The US Customs and Border Protection Guideline indicates we need to get Presidential Permits for Modifications to any crossings with Canada, is this required by the contractor or did the customer/GSA obtain?
GSA Response: NO. We are not modifying the crossing (border), only a booth on the US side.
4. Are we within 10’ of Canada, and if so, it is required that we go obeyed by the Multinational Commission Concurrence. Is this required or has this been completed by GSA/Customer?
GSA Response: Not required.
5. There is a requirement that all design/shop drawing documents be done using the metric system. Is this requirement waived or do we need to follow guideline requirements?
GSA Response: Use English system.
6. Since the SOW drawings were removed will we be required to provide a new site plan, architectural drawings, electrical etc.? If so, how many phases of design is anticipated by GSA?
Pre Proposal Inquiries (PPI’s) Blaine LPOE 16 April 2018
GSA Response: The only drawings needed will be foundation and booth. Should only be 2 phases – initial drawing with GSA/CBP review and then final with comments incorporated.
7. With the US Customs and Border Protection Guideline as part of the RFP, are we obligated to follow the entire guide or just portions? If only portions, can you please provide those sections.
GSA Response: Only portions regarding hi-low booths.
8. Can the GSA please provide clarification on the requirements for the following? “The unit will have U.L Level 3 forced entry rated glazing to meet ASTM F1233 Class 3 Level III. Please note that is ASTM number is for glazing and therefore ONLY the Glazing will meet this requirement. The sliding doors, slide windows, and walls will not meet the ASTM F1233 requirement in any way" Will this be accountable?
GSA Response: The doors should be of the same material as the walls. The walls are called out to be Level 3 bullet resistant.
9. Below is a concern from my HVAC subcontractor. There is no way for him to identify the limit of the scope for balancing the existing system after capping off the Booth when it is removed.
We could not find any as-builts/archive drawings showing origin of that duct that we are capping. Without existing conditions (airflows) stated, there is no way to produce a test/adjust/balancing (TAB) estimate. The existing booth supply duct will be capped off.
That will create what could be considered a small impact on other grilles, but probably not produce out of spec results, usually +/- 10%.
GSA Response: Should not be a concern.
| Amendment 007 Post PPI's 16Apr18 |