4_SF_1442a_Continuation_Sheet_LPOE_Inspection_Booth.pdf
PDF 239 KB Posted
- Attached to
- Upgrade Blaine LPOE Inspection Booth
- Solicitation number
- EQ10PCP170040
About this file
SF 1442a Continuation Sheet
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE $ AMOUNT $
0001 Upgrade Blaine LPOE Inspection Booth; Design Cost
Location: US Customer and Border Protection (CBP), Area Port of Blaine, Pacific Highway Port of Entry, Blaine WA
Period of performance is 160 Days from Notice to Proceed.
1 LS
Contractor must submit CSI Masterformat Level 3 break-out to support their pricing.
TOTAL PRICE
0002 Contractor shall provide all labor, materials to replace existing commercial primay inspection booth with a hi-low inspection booth at the Blaine Port of Entry in accordance with SOW.
Construction Cost
1 LS
HSPD-12 Processing Firm-fixed-Price: Contractor’s costs, as incurred by Contractor’s team, in order to comply with GSA’s Office of Mission Assurance (OMA) security related clearance & adjudication functions in support of the overall project.
1 LS
File details come from the government source that posted it.