Statement Of Work

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration 400 15th St SW Auburn, WA 98001 GSA Northwest/Arctic Region

Upgrade Blaine POE Inspection Booth

Upgrade Blaine POE Inspection Booth

STATEMENT OF WORK

11/29/17

DESCRIPTION: Replace existing commercial primary inspection booth (Lane #2) with a hi-low inspection booth at the Blaine Port of Entry (POE).

LOCATION: US Customer and Border Protection (CBP), Area Port of Blaine, Pacific Highway Port of Entry, Blaine WA.

BACKGROUND: As the third busiest POE on the norther U.S. border, the Blaine POE has seen a steady increase in traffic. On peak travel days, the Blaine Peace Arch and Pacific Highway Ports of Entry experience exceptionally high wait-times. The Pacific Highway POE has six primary inspection lanes, five of which operate as general vehicle processing lanes, and one that operates as a NEXUS Lane. The POE also has three commercial lanes; of which one lane contains a Hi / Low booth that is utilized to process NEXUS traffic during high peak travel days. Steadily increasing NEXUS traffic volumes have far exceeded existing POE facility capabilities. During peak travel periods, vehicles are routed through cargo lane one (Hi / Low booth) in order to maintain CBP’s service standard for NEXUS and reduce wait-times for general traffic. Utilizing High/Low booths in the cargo lanes will allow the port to efficiently manage wait-times in the general traffic lanes, as well as NEXUS.

1. GENERAL DISCUSSION

1.1 DESCRIPTION OF WORK

1.1.1 Contractor shall supply all supervision, equipment, labor and materials necessary to remove an existing inspection booth and replace with a new hi-low inspection booth.

Design services: Contractor shall develop project design documentation including drawings, specifications, design analysis etc. representative of a 95% and 100% design effort.

- Provide dimensional or scaled floor plans; building sections; wall and footing sections and details; doors, windows, roofs and finishes detail and schedules as required; related mechanical and electrical plans showing the interfacing of work of different disciplines;

identifying material types and grade of construction, and provide all other architectural services as required.

- All design must satisfy the requirements of this SOW, the GSA Standardized High-Low Both, Lane and Trench System Drawings (2009) and the Land Port of Entry Design Standard (2014).

Demolition:

0 SOW for LPOE Replace Existing Booth with Hi-Low Both Blaine (5 Dec 17)

- Disconnect and remove conduit and wire supporting existing inspection booth back to nearest junction box between booth and the main building.

- Disconnect and remove all low voltage wire and conduit back to nearest junction box between booth and the main building

- Disconnect and remove HVAC ductwork entering from underneath the floor inside booth. Cap ductwork to allow air to continue to flow from main building to adjacent inspection booths.

- Remove inspection booth and associated equipment and delivery booth to a location as determined by Customs and Border Patrol (CBP). Booth and associated equipment shall remain property of CBP.

- Demolish and dispose of concrete crash barrier (6’x4’x9’) located in front of booth.

- Demolish and dispose of existing booth concrete stairs, hand rail, and concrete foundation.

Concrete:

- Install new precast concrete trench system to act as booth foundation and utilities access.

Concrete trench unit under booth will serve as a small utility vault and as the hi-low booth foundation. Provide access to trench from inside booth. Refer to GSA Standardized High-Low Booth, Lane and Trench System drawings for details.

- Extend underground concrete trench unit two feet pass new precast concrete crash barrier located in front of booth and cap with a bulkhead for future work. Trench system will be extended further under future work.

- Install new Precast 6’ x 4’ x 9’ concrete crash barrier located in front of booth in accordance with Land Port of Entry Design Standard dated September 2014 and GSA Standardized High-Low Both, Lane and Trench System drawings dated June 3, 2009.

- Run four 4” conduits two feet pass the hi-low booth foundation and cap for future installation of underground trench system. Coordinate depth and location of stub out with the Contracting Officer Representative.

Electrical and Communication:

- Install new overhead conduit and wire from nearest junction box from main building and drop through roof of new inspection booth. At a minimum provide one 2” conduit for each type of power/data/communication/security supply.

- The inspection booth shall have two dedicated 208Y/120V, 100A panelboards. One panelboard shall power all equipment serving that booth and lane. The second panelboard shall power the HVAC system for the booth.

- Install two 2 inch conduits for future License Plate Reader (LPR) from the main building overhead dropping down to a junction box inside the booth, and from the junction box stub out the two 2 inch conduit from booths to the front of island. Coordinate location of stub out with Contracting Officer Representative.

- Power up all existing associated hi-low both equipment located outside of booth.

HVAC:

- Provide and install roof mounted HVAC system in accordance with Land Port of Entry Design Standard dated September 2014 and GSA Standardized High-Low Both, Lane and Trench System drawings dated June 3, 2009

Controls:

- Utilize a BAS (Building Automation System) to assist in reducing energy consumption.

BAS Design shall incorporate BAS from the thermostat and all components of the HVAC system to provide a fully integrated system operating during the cooling and heating seasons. All points that appear within the IO and sequences shall be addressable. The sequence of operations shall incorporate energy saving measures.

Hi-Low Inspection Booth:

- Provide and install new pre-fabricated hi-low inspection booth in accordance with the Land Port of Entry Design Standard dated September 2014 and the details outlined in GSA Standardized High-Low Both, Lane and Trench System drawings dated June 3, 2009. The hi-low inspection booth is used to conduct primary inspections of vehicles in the Primary Inspection Area of the Port. The split level inspection booth is a pre-fabricated metal enclosure on a concrete platform with a wide-angle view and bullet resistant enclosure, typically located under the primary inspection canopy. Booth exterior walls and glazing shall be constructed to meet or exceed UL-752-95 Level 3 for bullet resistance and ASTM F1233 Class 3 Level III for forced entry resistance. This booth type is able to service noncommercial vehicles in the at-grade portion of the booth and commercial traffic in the upper level of the booth. If requirements on the data sheets are in conflict with the standard details, the details shall take precedence.

- Booths shall have a minimum of two data lines: one for US-VISIT and one for CBP systems. A multiple use telephone line shall be provided for a wall mounted telephone in the booth. All communications and data outlets shall have protected identification/address labeling capability.

- Provide and install powered solar shades for windows inside booth.

- All lighting inside booth shall be dimmable.

- Install minimum two concrete-filled steel bollards or equal constructed bollard 6 inches from each back corner of the booth and next to the booth side door. These bollards protect booths from vehicles and provide a safe area for CBP Officers to stand. Bollards used to protect booth shall be rated M-40 at a minimum. Bollards used to protect lane infrastructure shall be rated M- 30 at a minimum.

Remove and Relocate Two Large Overhead Electronic Open/Close Reader Boards:

- The contractor shall detach, remove and reinstall, at a location identified by CBP, two large overhead open/close electronic reader boards. Disconnect all associated power supply and reinstall new conduit and wire to support reader boards.

1.2 AREA / FACILITY DESCRIPTION

1.2.1 Known Existing Site Conditions:

1.2.1.1 Adjacent facility will be occupied by Federal employees during normal business hours.

Contractor shall ensure that access to the facility and the adjacent office/work area is maintained and safe.

1.2.1.2 Coordinate closures of adjacent vehicle lanes when needed with CBP and the Contracting Officer Representative.

2. PERFORMANCE AND SCHEDULING

2.1 Performance Period Requirements

2.1.1 Contractor shall commence work under this contract within five (5) calendar days after the issuance of the Notice to Proceed (NTP), prosecute the work diligently, and complete all work no later than sixty (160) calendar days after the issuance of NTP. The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation.

2.2 Liquidated Damages

2.2.1 Reserved.

3. DRAWINGS

3.1 U.S. Land Port of Entry, Standardized Elements, Standardized High-Low Booth, Lane and Trench Systems, June 3, 2009.

4. CODES AND SPECIFICATIONS

4.1 Codes and Standards

4.1.1 Contractor shall comply with the most recent edition, at the time of solicitation, of all pertinent Federal, State, local, GSA and tenant agency (where applicable) building and life/health/safety codes, to include the following:

a. Facility Standards for the Public Buildings Service (PBS P-100) (http://www.gsa.gov/portal/mediaId/127494/fileName/P100_Version_2016.action)

b. USACE Safety and Health Requirements Manual EM-385-1-1 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf)

c. Americans with Disabilities Act Accessibility Guide (http://www.access-board.gov/)

d. GSA Accessible Facility Design (http://www.gsa.gov/portal/content/104460)

e. Green Seal Standard GS-11 (http://www.greenseal.org)

f. National Electric Code (NFPA 70)

g. National Electrical Safety Code (IEEE NESC C2)

h. National Fire Protection Association (NFPA) Codes

i. Uniform Building Code

j. National Environmental Standards for Hazardous Air Pollutants (EPA) http://www.gsa.gov/portal/mediaId/127494/fileName/P100_Version_2016.action http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.access-board.gov/ http://www.gsa.gov/portal/content/104460 http://www.greenseal.org/

k. Telecommunication Industry Association/Electrical Industry Association Wiring Standards (Building Telecommunication Wiring Standards)

4.2 Specifications

4.2.1 Contractor shall comply with all relevant specification sections set forth in the contract.

4.3 Design Standard: Land Port of Entry Design Standard date September 2014.

5. SUBMITTALS

5.1 Product / Material Submittals

5.1.1 Contractor shall submit the following product/material submittals. Submittals shall be reviewed and acknowledged by the GSA Project Manager/COR prior to use.

5.1.2 Shop drawings for prefabricated Hi-Low Inspection Booth. Contractor shall coordinate and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission.

5.2 Safety Plan

5.2.1 Prior to commencing on-site work, the Contractor shall submit a site specific Safety and

Accident Prevention Plan (APP) in accordance with USACE EM-385-1-1 Appendix A for Government review and acknowledgement.

5.3 Work Schedule

5.3.1 Contractor shall, within ten (10) calendar days after contract award, submit for

Government review and acknowledgment, a CPM Construction Schedule (MS Project version 2010 or later).

5.3.2 Schedule shall indicate all tasks necessary for GSA to: a) understand the intended work plan; b) implement a Quality Assurance (QA) plan, and c) coordinate with the Property Management Office and tenant agency representative. At a minimum, schedule shall include dates for submittals, material ordering and lead times, mobilization, start and end dates for each work feature, Pre-Final and Final Inspections, and demobilization.

5.3.3 Tasks shall indicate all trades as appropriate, basic work features, and work area information in sufficient detail. Task details shall include estimated start and end dates in order to provide GSA with sufficient understanding of the intended outcome of each task and definable feature of work.

5.3.4 Anticipated deviations and/or delays in the submitted schedule shall be brought to the attention of the GSA Project Manager/COR as soon as they are known in order to facilitate any resultant changes to the QA Plan as well as coordination with any follow-on activities and with the CBP POC.

5.4 Schedule of Values (SOV)

5.4.1 Contractor’s schedule shall be fully cost loaded, and the SOV shall serve as a means for verification of work performed and for the Contractor’s invoicing and payment.

5.5 Closeout Submittals

5.5.1 All required closeout submittals, e.g. as-built drawings, O&M manuals, Release of

Claims, etc., shall be submitted & approved prior to submitting the final invoice.

6. ENVIRONMENTAL AND CULTURAL RESOURCES

6.1 Asbestos Containing Material (ACM)

6.1.1 It is not anticipated that the Contractor will encounter asbestos or ACM during performance of this contract. An AHERA survey is not required as part of this contract.

If the Contractor becomes aware of potential ACM disturbance during performance of this contract, they shall stop work and notify the GSA Project Manager/COR immediately.

6.2 Lead Based Paint (LBP)

6.2.1 It is not anticipated that the Contractor will encounter LBP during performance of this contract. A lead paint survey is not required as part of this contract. If the Contractor becomes aware of potential LBP disturbance during performance of this contract, they shall stop work and notify the GSA Project Manager/COR immediately.

6.3 Sustainable Acquisition

6.3.1 Contractor shall comply with all federally mandated sustainable acquisition requirements, including the purchase, supply and use of environmentally preferable products and services. Program elements include: recovered material products; energy and water efficient products; alternative fuels and fuel efficiency; bio-based products; non-ozone depleting substances, and environmentally preferable products. These elements are described on the Office of Federal Procurement Policy website:

(http://www.whitehouse.gov/omb/procurement_index_green/).

6.4 Debris, Demolition, Salvage and Clean-up

http://www.whitehouse.gov/omb/procurement_index_green/

6.4.1 Contractor shall remove and dispose of debris, dirt, excess materials, etc. daily as may be generated during performance of work in accordance with Federal, State and local laws and regulations. Upon completion of work, the Contractor shall restore the work area to a clean, neat and orderly condition satisfactory to the Contracting Officer or their Representative.

6.4.2 Government retains no salvage to materials and items demolished and/or removed as a result of this contract. Contractor shall remove and dispose of, at an appropriate off-site location(s), all materials, construction debris, etc. generated as a result of this contract.

6.5 Environmental Coordination

6.5.1 Reserved.

7. SPECIAL ACCESS REQUIREMENTS

7.1 Vehicle Access and Parking

7.1.1 On-site parking is available at no cost to the Contractor. Parking curbside next to the facility shall be used for drop-off and pick-up only. Once tools, equipment, materials, personnel, etc. have been loaded and/or unloaded, vehicles shall be moved to the main parking area away from the building.

7.2 Site Access and Security

7.2.1 Access to the facility before mobilization shall be coordinated via email with the GSA

Project Manager/COR. After mobilization, access shall be coordinated through the GSA Project Manager/COR using the construction schedule and in accordance with GSA security clearance procedures. The Contractor shall also be required to schedule work activities (work site access, construction activities, etc.) with the CBP IT Manager through the GSA Project Manager/COR prior to starting on-site work.

7.2.2 Contractor personnel accessing the facility shall be badged in accordance with the following security clearance procedures. The clearance procedure may take as long as

(30) working days to complete, and personnel shall not be permitted to start on-site work until a favorable initial adjudication is received. The Contractor shall schedule accordingly. The Government will not provide additional time due to Contractor’s delay in obtaining clearance and facility access.

7.2.2.1 Upon contract award, the Contractor will be provided with a CIW (Contractor

Information Worksheet) and a copy of an OF-306 Application for Federal Employment fillable form. Each contractor employee, including subcontractors, shall email their completed form to r10securityem@gsa.gov.

mailto:r10securityem@gsa.gov

7.2.2.2 The CIW form will be partially pre-populated with applicable contract information by the GSA Requesting Official, usually the GSA Project Manager/COR. The Contractor shall complete the CIW and forward a copy to the GSA Project Manager/COR.

7.2.2.3 As part of the initial adjudication process, Contractor employees (applicants) will also be required to utilize the MSO/USAccess Credentialing Center to submit fingerprints.

Shortly after submission of the CIW & OF-306 forms, applicants will receive a fingerprint/enrollment scheduling instructional email from the GSA Managed Service Office’s (MSO) USAccess program via HSPD12Admin@usaccess.gsa.gov. Applicants will need to schedule an appointment at the closest center via the link provided in the instructional email. A list of Credentialing Centers is available at http://www.fedidcard.gov/.

7.2.2.4 Government will provide a Notice of Initial Adjudication (NIA) to the Contractor’s employee (applicant) and the GSA Security Office via email. Upon receipt of a favorable NIA, the Contractor’s employee may begin on-site work under the contract.

A Final Notice of Adjudication (FNA) will be provided once the entire security investigation is complete.

7.2.3 Contractor personnel shall prominently wear and display GSA-issued security badges at all times while on GSA property.

8. OTHER CONDITIONS AFFECTING WORK

8.1 Work Coordination

8.1.1 Interfacing with Others:

8.1.1.1 Contractor shall plan work activities in a manner that will minimize interference and inconvenience to traffic and ongoing daily operations in the facility and the specific work area(s). All work shall be scheduled and coordinated with the Contracting Officer or their Representative.

8.1.1.2 The facility will be occupied by Federal employees during normal business hours.

Contractor is responsible for ensuring that access to the facility and the work site is maintained and safe.

8.1.1.3 Contractor shall ensure that employees conduct themselves in a professional, businesslike manner and that they comply with all use and access policies. Contractor and their employees are prohibited from: a) accessing spaces or offices not pertinent to the work to be performed under the contract; b) using telephones (except pay phones);

and c) disturbing property, furniture, papers, etc. belonging to the Government.

8.1.1.4 Contractor shall not block traffic, roads, access routes, and/or facility entrances/exits without prior coordination with the GSA Project Manager/COR.

mailto:HSPD12Admin@usaccess.gsa.gov http://www.fedidcard.gov/

8.1.2 Pre-Construction Conference

8.1.2.1 Contractor shall attend a pre-construction meeting presided over by the Contracting

Officer prior to commencing on-site construction activities. Contractor shall contact the Contracting Officer within five (5) business days of issuance of the NTP to establish a date and time for the pre-construction meeting. Contractor shall submit a site-specific construction schedule and a site specific Work Plan at that meeting unless these items have been previously provided to the Government.

8.2 Compliance with Rules, Regulations and Statutes

8.2.1 Contractor employees shall observe and comply with all applicable Federal, State, local and GSA rules, regulations, and statutes including those concerning fire, life, safety, sanitation, security, vehicle safety, and hazardous material handling while performing this contract.

8.2.2 All work shall meet or exceed all applicable industry standards.

8.3 Firearms

8.3.1 Contractor personnel are prohibited from carrying firearms on Federal property while performing work under this contract.

8.4 Work Hours

8.4.1 Construction activity period shall be restricted to the hours from 07:00am to 4:00pm

Monday through Friday, excluding Federal holidays. Work hours other than specified requires prior coordination and approval through the GSA Project Manager/COR.

8.5 Site Utilities

8.5.1 Outages

8.5.1.1 Facility’s utility systems shall remain operational throughout the contract. Any requested utility outages, including but not limited to electrical, fire alarm, mechanical, and plumbing systems, shall be coordinated through the GSA Project Manager/COR at least fifteen (15) working days prior to the proposed outage(s). Outages shall be scheduled to minimize interruptions to using agency’s normal operations. Contractor shall not secure (shutdown) any utility system(s) without prior approval from the GSA Project Manager/COR.

8.5.2 Potable Water

8.5.2.1 Subject to available supply, the Government will, without charge, make available to the

Contractor from existing outlets and supplies, reasonable amounts of potable water as may be necessary to perform the required scope at the work area. Contractor shall conserve potable water furnished.

8.5.3 Electricity

8.5.3.1 Subject to available supply, the Government will, without charge, make available to the

Contractor reasonable amounts of electric current as may be necessary to perform the required scope at the work area. Contractor shall conserve electric current furnished.

8.5.4 Restrooms

Contractor shall provide sanitary accommodations for the use of employees as may be necessary and shall maintain accommodations approved by the Contracting Officer and shall comply with the requirements and regulations of the State Health Department, County Sanitarian, or other authorities having jurisdiction.

8.6 Government Furnished Property and Equipment

8.6.1.1 Reserved.

8.7 Permits

8.7.1.1 Contractor shall obtain and submit copies of all required permits. Each permit shall be obtained before starting the respective item(s) of work.

8.8 Safety

8.8.1.1 USACE Safety and Health Requirements Manual (EM 385-1-1) is considered part of this contract and will be enforced as such. Contractor shall prepare a project specific Safety and Accident Prevention Plan in accordance with the current version of EM 385- 1-1. Contractor shall conduct operations in a manner so as to prevent unsafe and/or unhealthy conditions for the building occupants and/or place Government property in jeopardy.

8.8.1.2 Contractor shall take every precaution to prevent fires during the performance of this contract. Contractor shall provide a covered metal receptacle, placed away from combustibles, for storage of oily rags, waste, etc. used or generated in the performance of work. All such receptacles shall be emptied at the end of each work day and properly disposed of off Federal property. Paint product containers shall be kept sealed when not in use. Contractor shall provide portable fire extinguishers suitable for the hazards involved, shall have them available at all times, and shall assure that all Contractor employees are trained in their use.

8.9 Construction Facilities and Temporary Controls

8.9.1.1 A staging area will be provided for the Contractor at/adjacent to the project site.

Coordinate location with the GSA Project Manager/COR during the site walk.

8.9.1.2 Contractor is responsible for security of his own property and security of Government property when construction activities affect existing security measures.

8.9.1.3 Contractor is responsible for securing the work site in a manner that provides a safe project site while maintaining the facility’s on-going operations. Contractor shall use physical means, e.g. barricades, ropes, signs, lights, etc., as necessary to restrict access to or direct flow of pedestrians around the work area. Coordinate the use of safety measures through the GSA Project Manager/COR.

8.9.1.4 Contractor shall provide adequate protection for all parts of the facility, its contents and occupants wherever work is performed under this contract. Any damage caused by the Contractor shall be repaired, at Contractor’s expense, to the satisfaction of the Contracting Officer.

9. INSPECTIONS

9.1 GSA Project Manager/COR or their representative may review and observe the

Contractor’s materials and workmanship to ensure compliance with this contract.

9.2 Pre-Final Inspection

9.2.1 Prior to scheduling substantially complete inspection, the Contractor shall request a pre-final/walk-through inspection with the GSA Project Manager/COR. The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. The pre-final request shall be accompanied by a list of deficiencies known to the contractor at the time of the request. A government punch List may be developed as a result of this inspection; however, this list should be minimal considering the facility is complete and ready to be occupied. Deficiencies identified during the pre-final inspection shall be annotated on the pre-final deficiencies list (punch list). Contractor shall correct all major deficiencies prior to requesting substantially complete inspection.

9.3 Substantially Complete

9.3.1 The substantially complete inspection will be formally scheduled by the Contracting Officer Representative based upon results of the pre-final inspection and correction of punch list items. The contractor shall notify the Contracting Officer Representative at least 7 calendar days prior to the substantially complete inspection and confirm that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract will be complete and acceptable by the date scheduled for the substantially complete inspection.

9.4 Final Inspection

9.4.1 Contractor shall notify the GSA Project Manager/COR when all punch list items have been corrected and shall request a Final Inspection.

10. MATERIALS AND WORKMANSHIP

10.1 All equipment, materials and articles incorporated by this contract shall be new and of the most suitable grade for the purpose intended. When required by this contract, the Contractor shall obtain the COR’s approval of the material(s) or article(s) that the Contractor proposes to incorporate into the work. All work under this contract shall be performed in a skillful workmanlike manner. Contracting Officer may require, in writing, that the Contractor remove from the work site any employee that the Contracting Officer or their Representative deems incompetent, careless or otherwise objectionable.

11. WARRANTIES

11.1 Contractor shall be responsible for installing all materials and equipment in accordance with manufacturer’s specifications and recommendations. Contractor shall provide a copy of all warranty documentation as part of the O&M manuals close-out submittals.

(END OF SECTION)

a. Facility Standards for the Public Buildings Service (PBS P-100)
(http://www.gsa.gov/portal/mediaId/127494/fileName/P100_Version_2016.action)
b. USACE Safety and Health Requirements Manual EM-385-1-1
(http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf)
c. Americans with Disabilities Act Accessibility Guide (http://www.access-board.gov/)
d. GSA Accessible Facility Design (http://www.gsa.gov/portal/content/104460)
e. Green Seal Standard GS-11 (http://www.greenseal.org)
f. National Electric Code (NFPA 70)
g. National Electrical Safety Code (IEEE NESC C2)
h. National Fire Protection Association (NFPA) Codes
i. Uniform Building Code
j. National Environmental Standards for Hazardous Air Pollutants (EPA)
k. Telecommunication Industry Association/Electrical Industry Association Wiring Standards (Building Telecommunication Wiring Standards)