EO-3742 - Plans.pdf
PDF 28 MB Posted
- Solicitation number
- UD-26-358
- Issued by
- Los Angeles County, California
About this file
This is a construction plans document for the Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2 (EO-3742) in Long Beach, California, prepared by Long Beach Utilities with engineering support from Tetra Tech Inc. The project involves the removal and replacement of existing butterfly valves, electric motor-operated valve actuators, associated steel piping, Victaulic couplings, and appurtenances throughout the groundwater treatment plant's filter gallery serving 10 filters. The scope includes rehabilitation of existing 36-inch, 42-inch, and 24-inch steel pipe spools through mortar lining repairs or epoxy coating; replacement of 32 butterfly valve units ranging from 12 to 36 inches in diameter with new electric-actuated open/close or modulating controls; recoating of existing surface washwater piping segments; replacement of electrical conduits, struts, and junction boxes; connection of new actuators to the existing SCADA/PLC system; and repair of approximately 1,500 linear feet of filter basin exterior concrete wall cracks through polyurethane foam grout injection. The work is organized under three separate shutdown sequences: a full plant shutdown for backwash and washwater valve replacement, a south filter shutdown for air scour and filter effluent throttling valve work, and individual filter shutdowns for remaining valve and inlet piping replacements.
The project requires contractor coordination with Long Beach Utilities for facility shutdown, dewatering, power and PLC integration, and dechlorination of nuisance water. Contractors must provide written notice two weeks before dewatering requests, 72 hours before official shutdown dates, and 48 hours before electrical disconnection work. The contractor assumes full responsibility for job site safety, environmental compliance including stormwater pollution prevention, material disposal, cleanup, and any damage to existing facilities. All construction shall comply with the Standard Specifications for Public Works Construction, Long Beach Utilities Standard Drawings, and specified sections covering steel pipe installation with cement mortar lining, painting, ultrasonic thickness testing, pressure testing, and piping disinfection per ANSI/AWWA C651-92. The contractor must obtain a Long Beach business license prior to construction and maintain plans, specifications, and permits on-site at all times.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EO-3742 WD-05-25 -Addendum 1.pdf | ||
| UD-26-358_T_ItemExport.csv | CSV file | |
| EO-3742 WD-05-25 Addendum 3.pdf | ||
| EO-3742 WD-05-25 Addendum 2.pdf | ||
| EO-3742 - Pre-Bid Sign-In Sheet.pdf | ||
| EO-3742 - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LONG BEACH UTILITIES
LONG BEACH, CALIFORNIA
PLANS FOR THE CONSTRUCTION OF
APRIL 2026
GENERAL MANAGER
B. ANATOLE FALAGAN
WD - 05-25
THOMAS BEKELE - SENIOR DIRECTOR OF ENGINEERING DATE
LONG BEACH UTILITIES
APPROVED BY:
NEHA A. GAJJAR R.C.E. # 55574 DATE
GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
(EO-3742)
TETRA TECH
SUBMITTED BY:
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 3:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\G -0
TI
TL
E
SH
EE
T.
D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
04/17/26
G-001
TITLE SHEET
07/29/2026 wadepew Image wadepew Text Box 7/31/2026 wadepew Image wadepew Text Box 7/31/2026
E SPRING ST
R
ED
O N
D O
A
VE
TE
M
PL
E
AV
E
E WILLOW ST
N L
AK
EW
O O
D B
LV
D
LBU GROUNDWATER
TREATMENT PLANT
FILTRATION SYSTEM
KILROY AIRPORT WAY
405 SAN DIEGOFREEWAY
LONG BEACH
AIRPORT
KILROY AIRPORT WAY
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 3:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\G -0
SI
TE
P
LA
N .D
W G
C
LA
R
K, J
U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
PROJECT LOCATION
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
G-002
VICINITY MAP AND LOCATION MAP
07/29/2026 wadepew Image wadepew
1. ALL CONSTRUCTION DETAILED ON THESE PLANS SHALL BE PERFORMED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, MOST RECENT EDITION, LONG BEACH UTILITIES STANDARD DRAWINGS, CITY OF LONG BEACH DEPARTMENT OF PUBLIC WORKS STANDARDS AND SPECIAL PROVISIONS AND
THESE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL HAVE A COPY OF THESE PLANS, SPECIFICATIONS AND SUBMITTALS FOR THIS PROJECT ON THE SITE AT ALL TIMES, AND THE CONTRACTOR SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS AND
SPECIFICATIONS.
3. WORK SHOWN OR INDICATED ON THESE PLANS, OR CALLED FOR IN THE SPECIFICATIONS, BUT NOT INCLUDED AS PAY QUANTITY ITEMS, SHALL BE CONSIDERED INCIDENTAL WORK - COST OF WHICH SHALL BE INCLUDED IN THE
CONTRACTOR'S BID FOR PAY QUANTITY ITEMS.
4. THE CONTRACTOR SHALL NOTIFY THE LBU INSPECTOR SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN THE PLANS AND/OR FIELD CONDITIONS IMMEDIATELY TO DESIGN ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION AND SHALL BE RESPONSIBLE
FOR DISCREPANCIES NOT SO REPORTED AND RESOLVED.
6. CONTRACTOR SHALL OBTAIN A BUSINESS LICENSE FROM THE CITY OF LONG BEACH PRIOR TO CONSTRUCTION.
7. THE CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING FACILITIES, AS A RESULT OF THEIR OPERATIONS, AND WILL BE REQUIRED TO REPAIR OR REPLACE IN KIND TO THE SATISFACTION OF AND AS
DIRECTED BY THE CITY OR THE ENGINEER.
9. THE CONTRACTOR SHALL MAINTAIN THE WORK AREA IN A NEAT, SAFE, CLEAN, AND SANITARY CONDITION AT ALL TIMES, AND TO THE SATISFACTION OF THE LONG BEACH UTILITIES. GWTP WORK AREAS SHALL BE KEPT CLEAN OF DEBRIS, WITH DUST AND NUISANCE BEING CONTROLLED AT ALL TIMES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY CLEAN UP ON SITE AFFECTED BY THEIR CONSTRUCTION. CONTRACTOR TO CLEAN GWTP
WORK AREAS PRIOR TO THE END OF EACH WORK DAY AS A MINIMUM.
10. SURPLUS AND MATERIAL REMOVED WHICH IS NOT SUITABLE FOR USE IN THIS PROJECT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF AWAY FROM THE JOB SITE IN A MANNER AND AT A LOCATION ACCEPTABLE TO ALL JURISDICTIONAL AGENCIES UNLESS IDENTIFIED BY THE OWNER TO BE SALVAGED.
11. THE CONTRACTOR SHALL COOPERATE WITH CONTRACTORS PERFORMING OTHER CONSTRUCTION WORK IN
AREAS ADJACENT TO THE PROJECT SITE.
12. THE CONTRACTOR SHALL CONDUCT THEIR CONSTRUCTION OPERATIONS IN SUCH A MANNER THAT STORM OR
OTHER WATERS MAY PROCEED UNINTERRUPTED WITHIN THE GWTP.
13. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN UNANTICIPATED STORM DOES NOT
CARRY WASTES OR POLLUTANTS OFF THE SITE.
SUCH "DISCHARGES" OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER
FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302.
MATERIALS WHICH MAY HAVE EFFECTS OF POLLUTION INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING, AND SUPER CHLORINATED POTABLE WATER LINE FLUSHINGS.
DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS.THE CONTRACTOR SHALL KEEP A SIGNED SET OF APPROVED PLANS AND SPECIFICATIONS AND A COPY OF ALL CONSTRUCTION PERMITS ON THE JOB
SITE AT ALL TIMES DURING WORKING OPERATIONS.
14. ALL WORK SHALL COMPLY WITH CONDITIONS ESTABLISHED BY THE CALIFORNIA REGIONAL WATER QUALITY
CONTROL BOARD.
15. THE CONTRACTOR SHALL PROVIDE PRE-CONSTRUCTION PHOTOGRAPHS/VIDEO OF THE PROJECT SITE ON A DVD
AS PART OF THE WORK. REFER TO SECTION 01 32 33 OF THE SPECIFICATIONS.
16. SHUTDOWN OF THE EXISTING FACILITIES SHALL BE COORDINATED WITH LBU. LBU WILL SHUT DOWN AND DRAIN THE FILTRATION SYSTEM TO FACILITATE CONSTRUCTION ACTIVITIES. THE CONTRACTOR IS RESPONSIBLE FOR NUISANCE WATER DRAINAGE AND WILL BE DIRECTED BY LBU FOR THE LOCATION TO DRAIN THE WATER.
CONTRACTOR SHALL PROVIDE 72 HOUR NOTICE TO LBU BEFORE OFFICIAL SHUTDOWN DATE.
17. OPERATION OF ALL VALVES ON THE PUBLIC WATER LINES SHALL BE PERFORMED BY LBU UNLESS OTHERWISE SHOWN. COORDINATE ALL VALVE OPERATIONS WITH LBU PLANT OPERATIONS STAFF AS REQUIRED.
18. CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES (BMP'S). SAND BAGS AND FABRIC SHALL BE PLACED
OVER ANY STORM DRAINS IN CLOSE PROXIMITY TO THE PROJECT SITE.
19. DISCONNECTION AND RECONNECTION OF ELECTRICAL CONDUIT AND WIRING INCLUDING SCADA TO BE DONE BY CONTRACTOR AND COORDINATED WITH LBU. CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE TO LBU BEFORE
START OF THE WORK.
20. THE CONTRACTOR SHALL DISINFECT ALL NEW PIPING THAT IS TO BE CONNECTED TO THE EXISTING PIPING PER
ANSI\AWWA C651-92.
21. THE CONTRACTOR SHALL PROVIDE THE OWNER OR ITS CONTRACTORS ACCESS TO USE CERTAIN FACILITIES AND AREAS, EITHER CONCURRENTLY OR EXCLUSIVELY AS DIRECTED BY THE OWNER, AT NO ADDITIONAL COST TO OWNER. IF SUCH WORK IS DEEMED AN EMERGENCY THAT REQUIRES THE CONTRACTOR TO STOP ITS WORK, THE CONTRACTOR SHALL BE GRANTED A NON-COMPENSABLE, EXCUSABLE EXTENSION OF ADDITIONAL WORKING DAYS.
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\G -0
G
EN
ER
AL
N O
TE
S.
D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE
APP'D - APPROVED
AVE - AVENUE
AWWA - AMERICAN WATER WORKS ASSOCIATION
BFV - BUTTERFLY VALVE
BLVD - BOULEVARD
BMP - BEST MANAGEMENT PRACTICES
BW - BACKWASH
CFR - CODE OF FEDERAL REGULATIONS
CK'D - CHECKED
CO - COMPANY
CPLG - COUPLING
CYL - CYLINDER
DIA - DIAMETER
DCDA - DOUBLE CHECK DETECTOR ASSEMBLY
DN - DOWN
DO - DOUBLE OFFSET
DR - DRIVE
DTL - DETAIL
DVD - DIGITAL VERSATILE DISC
DWG - DRAWING
E - EAST
EL - ELEVATION
EMBED - EMBEDMENT
ENG - ENGINEER
EXIST - EXISTING
F/FLG - FLANGE
FAW - FILTER AIR WASH
FIG - FIGURE
FSW - FILTER SURFACE WASH
FE - FILTER EFFLUENT
FT - FEET
FTW - FILTER TO WASTE
GALV - GALVANIZED
GWTP - GROUND WATER TREATMENT PLANT
HWY - HIGHWAY
IN - INCHES
L - LUG
LB - LONG BEACH
LBU - LONG BEACH UTILITIES
M - MODULATING
MIN - MINIMUM
N - NORTH
N/A - NOT APPLICABLE
NDT - NON DESTRUCTIVE TESTING
NO - NUMBER
NTS - NOT TO SCALE
O/C - OPEN/CLOSE
OD - OUTSIDE DIAMETER
PE - PLAIN END
RD - ROAD
REC - RECEIVED
REV - REVISION
S - SOUTH
SCADA - SUPERVISORY CONTROL AND DATA ACQUISTION
SHT - SHEET
SPEC - SPECIFICATION
SS - STAINLESS STEEL
ST - STREET
STL - STEEL
THK - THICK
TYP - TYPICAL
V - VALVE
WW - WASTE WASHWATER
GENERAL NOTES ABBREVIATIONS
LONG BEACH UTILITIES (562) 570-2347
1800 E WARDLOW RD NIKOLAS BAYKAL
LONG BEACH, CA 90807
CITY OF LONG BEACH - FIRE DEPARTMENT (562) 591-7631
3205 LAKEWOOD BLVD
LONG BEACH, CA 90808
PUBLIC AGENCIES AND UTILITIES
CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS LONG BEACH UTILITIES, TETRA TECH, INC., ITS EMPLOYEES, OFFICERS, AND AGENTS, AGAINST ANY AND ALL CLAIMS BY ANY PARTIES ARISING FROM, OR RELATED TO, ANY AND ALL DAMAGES, INCLUDING LEGAL COSTS AND ATTORNEY'S FEES, RESULTING FROM INTERFERENCE WITH, INTERRUPTION OF, DAMAGE TO, OR ANY AND ALL INJURIES WHICH RESULT FROM DAMAGE CAUSED TO SUBSURFACE INSTALLATIONS AS DEFINED IN GOVERNMENT CODE 4216.1(J), WHICH IS UNFORESEEN AND DESPITE ENGINEER'S EFFORT DURING THE DESIGN PROCESS WAS NOT LOCATED, EXCEPTING ONLY THE GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF ENGINEER IN
PROVIDING ITS SERVICES.
THESE DOCUMENTS HAVE BEEN PREPARED FOR A SPECIFIC PROJECT AND SHALL NEITHER BE ALTERED NOR REUSED FOR ANY OTHER PURPOSE. ALSO, THESE DOCUMENTS DO NOT REPRESENT AS-BUILT CONDITIONS. IF THESE DOCUMENTS ARE ALTERED INTENTIONALLY OR UNINTENTIONALLY, OR REUSED WITHOUT THE DESIGN ENGINEER'S WRITTEN APPROVAL, IT WILL BE AT THE SOLE RISK AND RESPONSIBILITY OF THE USER. THE ACT OF ALTERING OR REUSING IS CONSTRUED AS INDEMNIFYING AND HOLDING THE DESIGN ENGINEERING FIRM AND ITS EMPLOYEES HARMLESS FROM ALL CLAIMS, DAMAGES, AND EXPENSES, INCLUDING ATTORNEY FEES, ARISING OUT OF SUCH ACT.
BY ACCEPTING THIS CONTRACT, CONTRACTOR HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND, HOLD HARMLESS LONG BEACH UTILITIES, TETRA TECH, INC. (HEREINAFTER ENGINEER), THEIR PARENT AND SUBSIDIARY COMPANIES, AGENTS, EMPLOYEES, CONSULTANTS AND REPRESENTATIVES FOR ANY AND ALL DAMAGE TO PERSONS OR PROPERTY OR WRONGFUL DEATH REGARDLESS OF WHETHER OR NOT SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS CAUSED IN WHOLE OR IN PART BY THE NEGLIGENCE, ACTIVE OR PASSIVE, OF LONG BEACH UTILITIES, ENGINEER, THEIR PARENT AND SUBSIDIARY COMPANIES, AS WELL AS THEIR AGENTS AND EMPLOYEES, EXCEPTING ONLY THE SOLE NEGLIGENCE OF LONG BEACH UTILITIES, ENGINEER, THEIR PARENT AND SUBSIDIARY COMPANIES AND THEIR AGENTS AND EMPLOYEES TO THE FULLEST EXTENT PERMITTED BY LAW. SUCH INDEMNIFICATION SHALL EXTEND TO ALL CLAIMS, DEMANDS, ACTIONS, OR LIABILITY FOR INJURIES, DEATH OR DAMAGES OCCURRING AFTER COMPLETION OF PROJECT, AS WELL AS DURING THE WORK'S PROGRESS. CONTRACTOR FURTHER AGREES THAT IT SHALL ACCOMPLISH THE ABOVE AT ITS OWN COST, EXPENSE AND RISK EXCLUSIVE OF AND REGARDLESS OF ANY APPLICABLE INSURANCE POLICY OR POSITION TAKEN BY ANY INSURANCE COMPANY REGARDING
COVERAGE.
JOB SITE SAFETY
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR
DISCLAIMER
G-003
GENERAL NOTES, JOB SITE
SAFETY, AND ABBREVIATIONS
07/29/2026 wadepew Image wadepew
R
ED
O N
D O
A
VE
E SPRING ST
PARKING LOT
FILTER GALLERYLBU LABORATORY
& OPERATIONS
BUILDING
ACCESS DOOR TO
INSIDE GALLEY
CISTERNS
SEDIMENTATION
BASINS
SLOPED ACCESS
WALKWAY
SECURITY KIOSK
DAILY CHECK IN
ACCESS STAIRS TO
TOP OF GALLERY
ACCESS DOOR TO
INSIDE GALLEY
ACCESS STAIRS TO
TOP OF GALLERY
NO.9
NO.10
NO.7
NO.8
NO.5
NO.6
NO.3
NO.4
NO.1
NO.2
MOTORIZED
ACCESS GATE
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\C -0
C O
N
ST
R U
C
TI
O N
A C
C
ES
S.
D
W G
C
LA
R
K, J
U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
CONSTRUCTION ACCESS
SCALE: NTS N
SHEET INDEX
SHT # DWG # SHEET TITLE
GENERAL
1 G-001 TITLE SHEET
2 G-002 VICINITY MAP AND LOCATION MAP
3 G-003 GENERAL NOTES, JOB SITE SAFETY, AND ABBREVIATIONS
CIVIL
4 C-001 CONSTRUCTION ACCESS AND SHEET INDEX
MECHANICAL
5 M-001 VALVE SCHEDULE
6 M-002 OVERALL SITE FILTER GALLERY PLAN
7 M-003 OVERALL FILTER GALLERY PLAN AND ISOMETRIC VIEW
8 M-004 MECHANICAL PLAN AND SECTION
9 M-005 VALVE 4-V-X03 REPLACEMENT
10 M-006 VALVE 4-V-2 AND 4-V-3 REPLACEMENT
11 M-007 VALVE 4-V-X06 REPLACEMENT
12 M-008 VALVE 4-V-X02 AND 4-V-X07 REPLACEMENT
13 M-009 VALVE 4-V-X04 REPLACEMENT
14 M-010 VALVE 4-V-X01 REPLACEMENT
15 M-101 MISCELLANEOUS DETAILS
ELECTRICAL
16 E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS
17 E-101 ELECTRICAL DEMOLITION PLAN
18 E-102 ELECTRICAL SITE PLAN
INSTRUMENTATION AND CONTROL
19 I-001 P&ID SYMBOLS & ABBREVIATIONS
20 I-101 FILTER BACKWASH SYSTEM - 1
21 I-102 FILTER BACKWASH SYSTEM - 2
22 I-103 WWW PUMPS
C-001
CONSTRUCTION ACCESS
AND SHEET INDEX
LEGEND
ARROWS POINTING TOWARDS THE PARKING/LAYDOWN AREA
ARROWS POINTING TOWARDS THE ACCESS TO THE FILTER GALLERY
07/29/2026 wadepew Image wadepew
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
E
SC
H
ED
U
LE
.D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
*NOTES:
(1) THE 12" SURFACE WASHWATER VALVES AND ACTUATORS (4-V-X05) ARE TO BE PROTECTED IN PLACE.
(2) L = LUG STYLE, ZERO OFFSET; F = FLANGE STYLE; DO = DOUBLE OFFSET
(3) M = MODULATING; O/C = OPEN/CLOSE
NO. TAG
ASSOCIATED
FILTER VALVE SERVICE (1)
SIZE
(IN)
DEVICE TO REPLACE
REMARKSVALVE TYPE (2)
ACTUATOR (3)
TYPE
EXISTING HP
(FOR REFERENCE ONLY)
PHASE 2
SHUTDOWN NO. 1 (FULL PLANT SHUTDOWN)
1 4-V-203 2 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/3 REPLACE EXISTING 2 4-V-403 4 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/3 REPLACE EXISTING 3 4-V-603 6 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/3 REPLACE EXISTING 4 4-V-803 8 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/3 REPLACE EXISTING 5 4-V-1003 10 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/3 REPLACE EXISTING 6 4-V-2 NORTH WASHWATER 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING 7 4-V-3 SOUTH WASHWATER 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING
SHUTDOWN NO. 2 (SOUTH SHUTDOWN)
8 4-V-206 2 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING 9 4-V-406 4 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING
10 4-V-606 6 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING 11 4-V-806 8 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING 12 4-V-1006 10 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING 13 4-V-202 2 FILTER EFFLUENT THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M 1/6 REPLACE EXISTING 14 4-V-402 4 FILTER EFFLUENT THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M 1/6 REPLACE EXISTING 15 4-V-602 6 FILTER EFFLUENT THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M 1/6 REPLACE EXISTING 16 4-V-802 8 FILTER EFFLUENT THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M 1/6 REPLACE EXISTING 17 4-V-1002 10 FILTER EFFLUENT THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M 1/6 REPLACE EXISTING 18 4-V-207 2 FILTER TO WASTE VALVE 12 N/A ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING ACTUATOR ONLY 19 4-V-407 4 FILTER TO WASTE VALVE 12 N/A ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING ACTUATOR ONLY 20 4-V-607 6 FILTER TO WASTE VALVE 12 N/A ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING ACTUATOR ONLY 21 4-V-807 8 FILTER TO WASTE VALVE 12 N/A ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING ACTUATOR ONLY 22 4-V-1007 10 FILTER TO WASTE VALVE 12 N/A ELECTRIC MOTOR O/C 1/2 REPLACE EXISTING ACTUATOR ONLY
SHUTDOWN NO. 3 (INDIVIDUAL FILTER SHUTDOWN)
23 4-V-204 2 WASTE WASHWATER VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 24 4-V-404 4 WASTE WASHWATER VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 25 4-V-604 6 WASTE WASHWATER VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 26 4-V-804 8 WASTE WASHWATER VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 27 4-V-1004 10 WASTE WASHWATER VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 28 4-V-201 2 FILTER INLET VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 29 4-V-401 4 FILTER INLET VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 30 4-V-601 6 FILTER INLET VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 31 4-V-801 8 FILTER INLET VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING 32 4-V-1001 10 FILTER INLET VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C 1/6 REPLACE EXISTING
M-001
VALVE SCHEDULE
07/29/2026 wadepew Image wadepew
M-003
4-V-204
4-V-205
4-V-201
4-V-405
4-V-404
4-V-604
4-V-605
4-V-401 4-V-601 4-V-801
4-V-805
4-V-804 4-V-1004
4-V-1005
4-V-1001
4-V-901
4-V-905
4-V-904 4-V-704
4-V-7054-V-5054-V-305
4-V-7014-V-5014-V-3014-V-101
4-V-105
4-V-504 4-V-304
4-V-104
12" FSW
36" WW
12" FSW
36" WW
PLATFORM WALKWAY
FILTER NO. 1 FILTER NO. 3 FILTER NO. 5 FILTER NO. 7 FILTER NO. 9
FILTER NO. 2 FILTER NO. 4 FILTER NO. 6 FILTER NO. 8 FILTER NO. 10
ACCESS
STAIRS
PROTECT IN PLACE
EXIST TRANSFORMER,
BOLLARDS, PULLBOXES,
AND VAULTS
PROTECT IN PLACE
EXIST BUILDING
PROTECT IN PLACE
EXIST RETAINING WALL,
DCDA, AND MANHOLE
PROTECT IN PLACE
EXIST GENERATOR.
PROTECT IN PLACE
EXIST RETAINING
WALL AND MANHOLE
PROTECT IN PLACE
EXIST VENT AND
UNDERGROUND VAULT
PROTECT IN PLACE
EXIST FIRE HYDRANT
M-004
3'
0'
ACCESS DOOR TO
INSIDE GALLERY
SLOPED ACCESS
WALKWAY
0" 5
0"
PROTECT IN PLACE EXIST
FILTER WASTE WASHWATER
PIPING AND VAULT
PROTECT IN PLACE EXIST
WATER VALVE BOXES
www.tetratech.com
GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
DRAWING-FILE NUMBER:
E0-3742
MUNIS PROJECT:
FAMIS PROJECT:
0000000000
SHEET OF SHEETS
RECOMMENDED
MANAGER OF ENGINEERING
APPROVED
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
DATE
DATE
CONTRACT NO.SPEC. NO
WD-05-25
SECTION MAP VARIOUS
GIS TILE
SERVICE ATLAS PAGE N/A
SCALE AS SHOWNDESIGNED BY DATE
CHECKED BY DATE
CORRECTED BY DATE
AS-BUILT BY DATE
POSTED GIS DATE
GATE VALVES REC. DATE
CONSTRUCTED BY DATE
DATEINPUT BYDEPARTMENT
APP'D.CK'D.BYDESCRIPTIONDATEREV.
FIRE
CITY ENG.
LB ENERGY
EDISON CO.
VERIZON
LONG BEACH UTILITIES
B. ANATOLE FALAGAN
GENERAL MANGER
WAPM-XX
N/A
JRC 4/26
NG 4/26
WATER, GAS, SEWER
/1
/2
1:
8:
A
M A ut od es k
D o cs
-1
2-
L
B U
D V
A
LV
E R
E H
A B
P H
2/ D
-L B
W D
-F ilt e rs
-2
-1
-2
-v
5.
rv t
OVERALL SITE FILTER GALLERY PLAN
17885 Von Karman Ave, Suite 500 Irvine, CA 92614
(949) 809-5000 M-002
SCALE: 3/32" = 1'-0"
FILTER GALLERY PLATFORM
(OUTSIDE UPPER LEVEL)
0 5'-4" 10'-8" 21'-4"
SCALE: 3/32" = 1'-0"
N
07/29/2026 wadepew Image wadepew
36" BW 42" FE
42" FE
30" BW
FILTER NO. 1 FILTER NO. 3 FILTER NO. 5 FILTER NO. 7 FILTER NO. 9
FILTER NO. 2 FILTER NO. 4 FILTER NO. 6 FILTER NO. 8 FILTER NO. 10
12" FILTER TO WASTE
14" FILTER AIR WASH
24" WW
24" WW
4-V-3
4-V-2
N www.tetratech.com
4' 8' 16'
SCALE: 1/8" = 1'-0"
GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
DRAWING-FILE NUMBER:
E0-3742
MUNIS PROJECT:
FAMIS PROJECT:
0000000000
SHEET OF SHEETS
RECOMMENDED
MANAGER OF ENGINEERING
APPROVED
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
DATE
DATE
CONTRACT NO.SPEC. NO
WD-05-25
SECTION MAP VARIOUS
GIS TILE
SERVICE ATLAS PAGE N/A
SCALE AS SHOWNDESIGNED BY DATE
CHECKED BY DATE
CORRECTED BY DATE
AS-BUILT BY DATE
POSTED GIS DATE
GATE VALVES REC. DATE
CONSTRUCTED BY DATE
DATEINPUT BYDEPARTMENT
APP'D.CK'D.BYDESCRIPTIONDATEREV.
FIRE
CITY ENG.
LB ENERGY
EDISON CO.
VERIZON
LONG BEACH UTILITIES
B. ANATOLE FALAGAN
GENERAL MANGER
WAPM-XX
N/A
JRC 4/26
NG 4/26
WATER, GAS, SEWER
/1
/2
1:
9:
A
M A ut od es k
D o cs
-1
2-
L
B U
D V
A
LV
E R
E H
A B
P H
2/ D
-L B
W D
-F ilt e rs
-2
-1
-2
-v
5.
rv t
OVERALL FILTER GALLERY PLAN AND
ISOMETRIC VIEW
17885 Von Karman Ave, Suite 500 Irvine, CA 92614
(949) 809-5000 M-003
SCALE: 1/8" = 1'-0"M-002
PIPE FILTER GALLERY
(INSIDE LOWER LEVEL)
42" FILTER EFFLUENT
12" FILTER TO WASTE
14" FILTER AIR WASH
36" BACKWASH
4-V-X03
4-V-X07
4-V-X02
4-V-X06
(BEYOND)
NTS
SCALE:
PIPE GALLERY - ISOMETRIC VIEW
TYPICAL FILTER OUTLET VALVES
(SOUTH WALL)
07/29/2026 wadepew Image wadepew
A M-004
12" FSW
36" WW
PROTECT IN PLACE
FILTER WALL
PROTECT IN PLACE
FILTER WALL
PLATFORM WALKWAY
REHABILITATE FLANGED SPOOL
PER NOTES TO CONTRACTOR NOS. 8 AND 10 ON DWG M-009
PROTECT IN PLACE SURFACE
WASHWATER VALVE
REPLACE WASTE
WASHWATER VALVE,
BONNET, AND ACTUATOR
PER DWG M-009
PROTECT IN PLACE
FILTER WALL
RECOAT SURFACE WASHWATER PIPE
SEGMENT FOR FILTER 2, 4, 8 AND 10
PER DTL 1 ON DWG M-101 AND
RECOAT SURFACE FOR FILTER 5 AND 6
PER DTL 3 ON DWG M-101
REPLACE FILTER INLET
VALVE, BONNET, AND
ACTUATOR PER DWG M-010
4-V-X01
4-V-X05
4-V-X04
36" BW
42" FE
12" FSW
36" WW
EL 43.00
EL. 30.17
EL. 18.59
INV. 37.50
EL. 39.50
EL. 53.50
SURFACE WASTEWATER
PROTECT IN PLACE FILTER WALL
PROTECT IN PLACE FILTER WALL
ANTHRACITE
WASTE WASHWATER BASIN
4-V-X04
4-V-X05
4-V-X01
4-V-X03
4-V-X07
4-V-X06
4-V-X02
INFLUENT CHANNEL
RECOAT SURFACE
WASHWATER PIPE SEGMENT
FOR FILTER 2, 4, 8 AND 10
PER DTL 1 ON DWG M-101 AND
RECOAT SURFACE FOR
FILTER 5 AND 6
PER DTL 3 ON DWG M-101
PROTECT IN PLACE SURFACE
WASHWATER VALVE
REHABILITATE FLANGED SPOOL
PER NOTES TO CONTRACTOR NOS. 8 AND 10 ON DWG M-009
REPLACE FILTER INLET VALVE, BONNET,
AND ACTUATOR PER DWG M-010
REPLACE WASTE WASHWATER
VALVE, BONNET, AND ACTUATOR
PER DWG M-009
EXIST GROUND LINE
REPLACE BACKWASH VALVE
AND ACTUATOR PER DWG M-005
REPLACE FILTER TO WASTE
ACTUATOR ONLY PER DWG M-008
REPLACE FILTER EFFLUENT THROTTLING
VALVE AND ACTUATOR PER DWG M-008
REPLACE AIR SCOUR VALVE AND
ACTUATOR PER DWG M-007
SEE OPTIONAL BID ITEM FOR
PIPE SEGMENT REHABILITATION
SEE OPTIONAL BID ITEM FOR
PIPE SEGMENT REHABILITATION
www.tetratech.com
GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
DRAWING-FILE NUMBER:
E0-3742
MUNIS PROJECT:
FAMIS PROJECT:
0000000000
SHEET OF SHEETS
RECOMMENDED
MANAGER OF ENGINEERING
APPROVED
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
DATE
DATE
CONTRACT NO.SPEC. NO
WD-05-25
SECTION MAP VARIOUS
GIS TILE
SERVICE ATLAS PAGE N/A
SCALE AS SHOWNDESIGNED BY DATE
CHECKED BY DATE
CORRECTED BY DATE
AS-BUILT BY DATE
POSTED GIS DATE
GATE VALVES REC. DATE
CONSTRUCTED BY DATE
DATEINPUT BYDEPARTMENT
APP'D.CK'D.BYDESCRIPTIONDATEREV.
FIRE
CITY ENG.
LB ENERGY
EDISON CO.
VERIZON
LONG BEACH UTILITIES
B. ANATOLE FALAGAN
GENERAL MANGER
WAPM-XX
N/A
JRC 4/26
NG 4/26
WATER, GAS, SEWER
/1
/2
1:
9:
A
M A ut od es k
D o cs
-1
2-
L
B U
D V
A
LV
E R
E H
A B
P H
2/ D
-L B
W D
-F ilt e rs
-2
-1
-2
-v
5.
rv t
MECHANICAL PLAN AND SECTION
17885 Von Karman Ave, Suite 500 Irvine, CA 92614
(949) 809-5000 M-004
N
SCALE: 1/4" = 1'-0"M-002
1 TYPICAL FILTER PLAN VIEW
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"M-004
A TYPICAL SECTION
07/29/2026 wadepew Image wadepew
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
E X0
3.
D
W G
C
LA
R
K, J
U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
TYPICAL VALVE 4-V-X03 REPLACEMENT
SCALE: NTS
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL SUBMIT TO LBU A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2)
WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBU WILL BE RESPONSIBLE FOR CLOSING
ALL THE DESIGNATED SHUT-DOWN VALVES AND DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL EXPECT TO PUMP OUT ANY REMAINING NUISANCE WATER IN THE PIPE
AND DISCHARGE THE WATER TO A LOCATION DESIGNATED BY LBU. THE CONTRACTOR SHALL
DECHLORINATE THE NUISANCE WATER TO NEUTRALIZE THE CHLORINE TREATED WATER PRIOR
TO DISCHARGE.
2. CONTRACTOR SHALL PROTECT IN PLACE EXISTING PIPING, APPURTENANCES, ELECTRICAL
EQUIPMENT, AND ALL OTHER PIPING AND EQUIPMENT NOT TO BE REPLACED DURING
CONSTRUCTION OPERATIONS UNLESS OTHERWISE NOTED. ANY PIPING AND EQUIPMENT
DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION.
3. CONTRACTOR SHALL DISINFECT PIPING PER GENERAL NOTE NO. 20.
4. CONTRACTOR SHALL FIELD VERIFY FLANGE BOLT PATTERNS MATCH PRIOR TO CONNECTING.
5. ALL FITTINGS CALLED OUT ON PLANS SHALL BE RELINED PER SPECIFICATION SECTION 33 11 18.
REMOVE EXISTING LINING PRIOR TO INSTALLATION OF NEW.
6. ALL FLANGES SHALL BE JOINED WITH 316 SS NUTS, BOLTS, AND WASHERS.
7. PROTECT IN PLACE EXISTING 42" STEEL SPOOL AND REHABILITATE MORTAR LINING AS
FOLLOWS:
ALTERNATIVE 1: IF THE EXISTING LINING IS IN FAIR TO GOOD CONDITION, REMOVE THE RUST
FROM THE EXPOSED PIPE AND REPAIR THE MORTAR LINING INSIDE OF THE PIPE, ADD 3" OF
MORTAR REPAIR FROM THE INSIDE BASIN FACE AND FEATHER INTO THE EXISTING
CONCRETE WALL TO COVER THE PIPE EDGE.
ALTERNATIVE 2: IF THE EXISTING LINING IS IN POOR CONDITION, REMOVE THE CEMENT
MORTAR LINING AND APPLY AN EPOXY LINING TO THE EXPOSED STEEL PIPE (12 MILS
MINIMUM UP TO 16 MILS). APPLY A MINIMUM OF TWO COATS.
TAG ASSOCIATED
FILTER VALVE SERVICE SIZE (IN)
DEVICE TO REPLACE
VALVE TYPE ACTUATOR TYPE
4-V-203 2 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-403 4 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-603 6 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-803 8 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-1003 10 BACKWASH VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
SHUTDOWN NO. 1 (FULL PLANT SHUTDOWN)
CONSTRUCTION SEQUENCE:
1. DISCONNECT ELECTRICAL CONDUITS FROM CONNECTING EXISTING ACTUATOR.
2. REMOVE VICTAULIC COUPLINGS, 42" CROSSING PIPING, VALVE (4-V-X03), AND 36" ELBOW.
3. RELINE EXISTING 42" CROSS PIPING AND 36" ELBOW.
4. INSTALL NEW VALVE (4-V-X03), NEW ACTUATOR, NEW VICTAULIC COUPLINGS, EXISTING
42" RELINED CROSS PIPING, AND 36" ELBOW.
5. LBU TO CONFIRM POWER AND PLC POINT READS. CONTRACTOR TO RECONNECT
ELECTRICAL CONDUITS/WIRING TO NEW ACTUATOR.
6. CONTRACTOR TO COORDINATE FINAL CALIBRATION AND INTEGRATION WITH LBU.
TYPICAL VALVE 4-V-X03 REPLACEMENT
SCALE: NTS
M-005
VALVE 4-V-X03
REPLACEMENT
TEMPORARILY REMOVE CROSS PIPING
TO ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE NEW 36" BFV.
RELINE EXIST CROSS PIPING WITH
CEMENT MORTAR. AFTER INSTALLATION
IS COMPLETE, REINSTALL EXISTING
CROSS PIPING.
(SEE NOTE NO. 5).
SEE OPTIONAL BID ITEM FOR
INTERIOR WELD REHABILITATION.
REMOVE AND REPLACE
EXIST 42" VICTAULIC
CPLG IN KIND
REMOVE AND REPLACE
EXIST 24" VICTAULIC
CPLG IN KIND
PROTECT IN PLACE
EXIST 24" STEEL PIPE
PROTECT IN PLACE EXIST
12" BFV AND ACTUATOR
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
RELINE EXIST 36" ELBOW WITH
CEMENT MORTAR
(SEE NOTE NO. 5).
SEE OPTIONAL BID ITEM FOR
INTERIOR WELD REHABILITATION
REMOVE AND REPLACE
EXIST ACTUATOR
TEMPORARILY REMOVE AND
REPLACE PIPE HANGER AS
NECESSARY FOR THE
INSTALLATION OF THE 36" BFV
SEE OPTIONAL BID ITEM
FOR 42" PIPE SEGMENT
REHABILITATION
(SEE NOTE NOS. 5 AND 7)
PROTECT IN PLACE
EXIST 24" STEEL PIPE
REMOVE AND REPLACE
EXIST 36" BFV (4-V-X03)
REMOVE AND REPLACE
EXIST 42" VICTAULIC
CPLG IN KIND
REMOVE AND REPLACE
EXIST 24" VICTAULIC
CPLG IN KIND
RELINE EXIST 36" ELBOW WITH
CEMENT MORTAR
(SEE NOTE NO. 5).
SEE OPTIONAL BID ITEM FOR
INTERIOR WELD REHABILITATION
TEMPORARILY REMOVE
AND REPLACE PIPE
HANGER AS NECESSARY
FOR THE INSTALLATION OF
THE NEW 36" BFV
SEE OPTIONAL BID ITEM
FOR 42" PIPE SEGMENT
REHABILITATION
(SEE NOTE NOS. 5 AND 7)
REMOVE AND REPLACE
EXIST 36" BFV (4-V-X03)
07/29/2026 wadepew Image wadepew t3(3/4"MAX) t t
MORTAR
O U
TL
ET
LINING DRILL AND TAP 1 HOLE
I.D. PL.
MORTAR
MINIMUMNOMINAL
BRANCHMAIN LINE
NOMINAL
(P
ER
P
LA
N S)
SIZE (IN.)SIZE (IN.) LINING (IN.)
24 4 1/4
NOTE:
1.) "t" INDICATES THE THICKNESS OF THE
STEEL PLATE AT STATION USED.
2.) LENGTH OF OUTLET SHALL BE 2'-3" MIN
UNLESS OTHERWISE SHOWN ON PLAN.
SLIP-ON FLANGE BOLT
HOLES TO STRADDLE CL
t
EPOXY COATING - 12 MILS (MIN) TO 16 MILS (MAX)
REPAIR MORTAR COATING WITHIN
THE EXISTING 24" STEEL PIPE
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
ES
-V -2
, 4 -V
-3 .D
W G
C
LA
R
K, J
U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
VALVE AND ACTUATOR SCHEDULE
TAG ASSOCIATED
FILTER VALVE SERVICE SIZE (IN) VALVE TYPE ACTUATOR TYPE
4-V-2 NORTH SIDE WASHWATER VALVE 24 BUTTERFLY ELECTRIC MOTOR O/C
4-V-3 SOUTH SIDE WASHWATER VALVE 24 BUTTERFLY ELECTRIC MOTOR O/C
SHUTDOWN NO. 1 (FULL PLANT SHUTDOWN)
VALVE 4-V-2 REPLACEMENT
SCALE: NTS
REMOVE AND REPLACE
EXIST 24" BFV (4-V-2)
VALVE 4-V-3 REPLACEMENT
SCALE: NTS
TEMPORARILY REMOVE PIPING TO
ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE 24" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING.
REMOVE AND REPLACE
EXIST 24" VICTAULIC
CPLG IN KIND
PROTECT IN PLACE
EXIST 24" STEEL PIPE
PROTECT IN PLACE
EXIST PIPING
TEMPORARILY REMOVE PIPING TO
ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE 24" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING.
REMOVE AND REPLACE
EXIST ACTUATOR
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
REMOVE AND REPLACE
EXIST ACTUATOR
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
PROTECT IN PLACE
EXIST 24" STEEL PIPE
REMOVE AND REPLACE
EXIST 24" BFV (4-V-3)
TEMPORARILY REMOVE PIPING TO
ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE 24" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING. TEMPORARILY REMOVE PIPING TO
ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE 24" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING.
PROTECT IN PLACE
EXIST VAULT WALLS
PROTECT IN PLACE
EXIST VAULT WALLS
PROTECT IN PLACE
EXIST PIPING
REMOVE AND REPLACE
EXIST 24" VICTAULIC
CPLG IN KIND
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL SUBMIT TO LBU A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2)
WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBU WILL BE RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND DEWATERING THE PIPELINE. THE CONTRACTOR SHALL EXPECT TO PUMP OUT ANY REMAINING NUISANCE WATER IN THE PIPE AND DISCHARGE THE WATER
TO A LOCATION DESIGNATED BY LBU. THE CONTRACTOR SHALL DECHLORINATE THE NUISANCE
WATER TO NEUTRALIZE THE CHLORINE TREATED WATER PRIOR TO DISCHARGE.
2. CONTRACTOR SHALL PROTECT IN PLACE EXISTING PIPING, APPURTENANCES, ELECTRICAL
EQUIPMENT, AND ALL OTHER PIPING AND EQUIPMENT NOT TO BE REPLACED DURING CONSTRUCTION
OPERATIONS UNLESS OTHERWISE NOTED. ANY PIPING AND EQUIPMENT DAMAGED BY THE
CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR BETTER THAN THE EXISTING
CONDITION.
3. CONTRACTOR SHALL DISINFECT PIPING PER GENERAL NOTE NO. 20.
4. CONTRACTOR SHALL FIELD VERIFY FLANGE BOLT PATTERNS MATCH PRIOR TO CONNECTING.
5. ALL FLANGES SHALL BE JOINED WITH 316 SS NUTS, BOLTS, AND WASHERS.
6. REPAIR MORTAR LINING ON THE EXISTING 24-INCH STEEL PIPE PER SPECIFICATION SECTION 33 11 18.
REMOVE EXISTING LINING PRIOR TO INSTALLATION OF NEW.
7. PRIOR TO START OF WORK, CONTRACTOR SHALL PERFORM ULTRASONIC THICKNESS TESTING (UTT) PER ASTM E797 OF THE PIPE SEGMENTS TO DETERMINE THE EXISTING PIPE THICKNESS. PIPE THICKNESS SHALL BE A MINIMUM OF 0.25" TO INSTALL THE OUTLET. CONTRACTOR SHALL PROVIDE
TEST RESULTS TO LBU AND RECEIVE THEIR AUTHORIZATION PRIOR TO PROCEEDING WITH THE
OUTLET INSTALLATION.
CONSTRUCTION SEQUENCE:
1. DISCONNECT ELECTRICAL CONDUITS FROM EXISTING ACTUATOR TO BE REPLACED.
2. REMOVE VICTAULIC COUPLING, 24" PIPE SPOOL, VALVE (4-V-2 OR 4-V-3), AND
MISCELLANEOUS PIPING.
3. INSTALL NEW VALVE (4-V-2 OR 4-V-3), NEW ACTUATOR, NEW VICTAULIC COUPLING,
EXISTING 24" PIPE SPOOL, AND MISCELLANEOUS PIPING.
4. LBU TO CONFIRM POWER AND PLC POINT READS. CONTRACTOR TO RECONNECT
ELECTRICAL CONDUITS/WIRING TO NEW ACTUATOR.
5. CONTRACTOR TO COORDINATE FINAL CALIBRATION AND INTEGRATION WITH LBU.
M-006
VALVE 4-V-2 AND 4-V-3
REPLACEMENT
FLANGED OUTLET1
_ SCALE: NTS
17"
5"
CONSTRUCT A 4" WELD ON
FLANGED NOZZLE ON
EXISTING 24" STEEL PIPE
PER DTL 1 ON THIS DWG
(SEE NOTE NOS. 6 AND 7)
CONSTRUCT A 4" WELD ON
FLANGED NOZZLE ON
EXISTING 24" STEEL PIPE
PER DTL 1 ON THIS DWG
(SEE NOTE NOS. 6 AND 7)
VALVE 4-V-2 INSTALL 4" FLANGED NOZZLE
SCALE: NTS
VALVE 4-V-3 INSTALL 4" FLANGED NOZZLE
SCALE: NTS
07/29/2026 wadepew Image wadepew
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 4:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
E V-
X0 6.
D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
TYPICAL VALVE 4-V-X06 REPLACEMENT
SCALE: NTS
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL PROTECT IN PLACE EXISTING PIPING, APPURTENANCES, ELECTRICAL
EQUIPMENT, AND ALL OTHER PIPING AND EQUIPMENT NOT TO BE REPLACED DURING
CONSTRUCTION OPERATIONS UNLESS OTHERWISE NOTED. ANY PIPING AND EQUIPMENT
DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION.
2. CONTRACTOR SHALL DISINFECT PIPING PER GENERAL NOTE NO. 20.
3. CONTRACTOR SHALL FIELD VERIFY FLANGE BOLT PATTERNS MATCH PRIOR TO
CONNECTING.
4. ALL FLANGES SHALL BE JOINED WITH 316 SS NUTS, BOLTS, AND WASHERS.
TEMPORARILY REMOVE PIPING AND
14" CHECK VALVE TO ALLOW
ACCESS FOR REMOVAL AND
INSTALLATION OF THE NEW 14" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING AND
14" CHECK VALVE.
REMOVE AND REPLACE
EXIST 14" BFV (4-V-X06)
VALVE AND ACTUATOR SCHEDULE
TAG ASSOCIATED
FILTER VALVE SERVICE SIZE (IN)
DEVICE TO REPLACE
VALVE TYPE ACTUATOR TYPE
4-V-206 2 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C
4-V-406 4 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C
4-V-606 6 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C
4-V-806 8 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C
4-V-1006 10 AIR SCOUR VALVE 14 BUTTERFLY (L) ELECTRIC MOTOR O/C
PROTECT IN PLACE
EXIST 14" STEEL PIPE
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
SHUTDOWN NO. 2 (SOUTH SHUTDOWN)
M-007
VALVE 4-V-X06
REPLACEMENT
REMOVE AND REPLACE
EXIST ACTUATOR
CUT AND REMOVE EXISTING FLANGE.
TRIM STAINLESS STEEL PIPE SPOOL TO
ACCOMMODATE THE NEW VALVE LAY LENGTH.
FURNISH AND WELD NEW FLANGE,
INCLUDING NDT TESTING AND PASSIVATION.
07/29/2026 wadepew Image wadepew
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 5:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
ES
X
, X
.D
W G
C
LA
R
K, J
U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
TYPICAL VALVE 4-V-X02 AND 4-V-X07 ACTUATOR REPLACEMENT
SCALE: NTS
VALVE AND ACTUATOR SCHEDULE
TAG ASSOCIATED
FILTER VALVE SERVICE SIZE (IN)
DEVICE TO REPLACE
VALVE TYPE ACTUATOR TYPE
4-V-202 2 FILTER EFFLUENT
THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M
4-V-402 4 FILTER EFFLUENT
THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M
4-V-602 6 FILTER EFFLUENT
THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M
4-V-802 8 FILTER EFFLUENT
THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M
4-V-1002 10 FILTER EFFLUENT
THROTTLING VALVE 24 BUTTERFLY (F, DO) ELECTRIC MOTOR M
4-V-207 2 FILTER TO WASTE
VALVE 12 N/A ELECTRIC MOTOR O/C
4-V-407 4 FILTER TO WASTE
VALVE 12 N/A ELECTRIC MOTOR O/C
4-V-607 6 FILTER TO WASTE
VALVE 12 N/A ELECTRIC MOTOR O/C
4-V-807 8 FILTER TO WASTE
VALVE 12 N/A ELECTRIC MOTOR O/C
4-V-1007 10 FILTER TO WASTE
VALVE 12 N/A ELECTRIC MOTOR O/C
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL SUBMIT TO LBU A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2)
WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBU WILL BE RESPONSIBLE FOR CLOSING
ALL THE DESIGNATED SHUT-DOWN VALVES AND DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL EXPECT TO PUMP OUT ANY REMAINING NUISANCE WATER IN THE PIPE
AND DISCHARGE THE WATER TO A LOCATION DESIGNATED BY LBU. THE CONTRACTOR SHALL
DECHLORINATE THE NUISANCE WATER TO NEUTRALIZE THE CHLORINE TREATED WATER PRIOR
TO DISCHARGE.
2. CONTRACTOR SHALL PROTECT IN PLACE EXISTING PIPING, APPURTENANCES, ELECTRICAL
EQUIPMENT, AND ALL OTHER PIPING AND EQUIPMENT NOT TO BE REPLACED DURING
CONSTRUCTION OPERATIONS UNLESS OTHERWISE NOTED. ANY PIPING AND EQUIPMENT
DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION.
3. CONTRACTOR SHALL DISINFECT PIPING PER GENERAL NOTE NO. 20.
4. CONTRACTOR SHALL FIELD VERIFY FLANGE BOLT PATTERNS MATCH PRIOR TO CONNECTING.
5. ALL FITTINGS CALLED OUT ON PLANS SHALL BE RELINED PER SPECIFICATION SECTION 33 11 18.
REMOVE EXISTING LINING PRIOR TO INSTALLATION OF NEW.
6. ALL FLANGES SHALL BE JOINED WITH 316 SS NUTS, BOLTS, AND WASHERS.
SHUTDOWN NO. 2 (SOUTH SHUTDOWN)
CONSTRUCTION SEQUENCE:
1. DISCONNECT ELECTRICAL CONDUITS FROM EXISTING ACTUATOR TO BE REPLACED.
2. REMOVE VALVES (4-V-X02 AND 4-V-X07), 24" TEE, 4" PLUG VALVE, 4" DRAIN PIPING AND FITTINGS, 1/2" SAMPLING DRAIN PIPING AND FITTINGS, 12"/24" VICTAULIC COUPLINGS, AND 12" SPOOL.
3. RELINE EXISTING 24" TEE.
4. INSTALL NEW VALVES (4-V-X02 AND 4-V-X07), NEW ACTUATORS, EXISTING 24" RELINED TEE, EXISTING 4" PLUG VALVE, NEW 4" DRAIN PIPING AND FITTINGS, AND NEW 1/2" SAMPLING DRAIN
AND FITTINGS.
5. LBU TO CONFIRM POWER AND PLC POINT READS. CONTRACTOR TO RECONNECT ELECTRICAL
CONDUITS/WIRING TO NEW ACTUATOR.
6. CONTRACTOR TO COORDINATE FINAL CALIBRATION AND INTEGRATION WITH LBU.
TYPICAL VALVE 4-V-X02 AND 4-V-X07 ACTUATOR REPLACEMENT
SCALE: NTS
M-008
VALVE 4-V-X02 AND 4-V-X07
REPLACEMENT
REMOVE AND REPLACE
EXIST 12" VICTAULIC
CPLG IN KIND
REMOVE AND REPLACE
EXIST 24" BFV (4-V-X02)
PROTECT IN PLACE
EXIST 24" OUTLET
PROTECT IN PLACE
EXIST 24" OUTLET
PROTECT IN PLACE
EXIST 24" OUTLET
TEMPORARILY REMOVE 24" TEE,
VICTAULIC CPLG, AND 4" PLUG VALVE TO
ALLOW ACCESS FOR REMOVAL AND
INSTALLATION OF THE EXIST 12" BFV
AND NEW 24" BFV. RELINE EXIST 24" TEE
WITH CEMENT MORTAR. AFTER
INSTALLATION IS COMPLETE, REINSTALL
EXIST 24" TEE AND 4" PLUG VALVE.
(SEE NOTE NO. 5)
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM
EXIST ACTUATOR. RECONNECT
BACK TO NEW ACTUATOR
PER P&ID DWG I-102
TEMPORARILY REMOVE PIPING, 12" BFV,
AND ACTUATOR TO ALLOW ACCESS FOR
REMOVAL AND INSTALLATION OF THE NEW
24" BFV. AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING AND REPLACE
EXIST ACTUATOR
TEMPORARILY REMOVE INTERFERING
PORTIONS OF 4" DRAIN PIPING AND
FITTINGS TO ALLOW ACCESS FOR
REMOVAL AND INSTALLATION OF THE
EXIST 12" BFV AND NEW 24" BFV.
AFTER INSTALLATION IS COMPLETE,
INSTALL NEW 4" PVC DRAIN PIPING
AND FITTINGS IN KIND.
REMOVE AND REPLACE
EXIST ACTUATOR
REMOVE AND REPLACE
EXIST ACTUATOR
REMOVE AND REPLACE
EXIST 12" VICTAULIC
CPLG IN KIND
TEMPORARILY REMOVE 24" TEE, VICTAULIC
CPLG, AND 4" PLUG VALVE TO ALLOW ACCESS
FOR REMOVAL AND INSTALLATION OF THE
EXIST 12" BFV AND NEW 24" BFV. RELINE EXIST
24" TEE WITH CEMENT MORTAR. AFTER
INSTALLATION IS COMPLETE, REINSTALL
EXIST 24" TEE AND 4" PLUG VALVE.
(SEE NOTE NO. 5)
TEMPORARILY REMOVE INTERFERING
PORTIONS OF 1/2" SAMPLE DRAIN PIPING AND
FITTINGS TO ALLOW ACCESS FOR REMOVAL
AND INSTALLATION OF THE EXIST 12" BFV AND
NEW 24" BFV. AFTER INSTALLATION IS
COMPLETE, REINSTALL NEW 1/2" SAMPLE
DRAIN PIPING AND FITTINGS IN KIND.
TEMPORARILY REMOVE PIPING, 12" BFV,
AND ACTUATOR TO ALLOW ACCESS FOR
REMOVAL AND INSTALLATION OF THE NEW
24" BFV. AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING PIPING AND REPLACE
EXIST ACTUATOR.
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
PROTECT IN PLACE
EXIST 12" FILTER TO
WASTE PIPELINE
REMOVE AND REPLACE
EXIST 24" BFV (4-V-X02)
PROTECT IN PLACE
EXIST 24" OUTLET
07/29/2026 wadepew Image wadepew
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 5:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
E V-
X0 4.
D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
TYPICAL VALVE 4-V-X04 REPLACEMENT
SCALE: NTS
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL SUBMIT TO LBU A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2)
WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBU WILL BE RESPONSIBLE FOR CLOSING
ALL THE DESIGNATED SHUT-DOWN VALVES AND DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL EXPECT TO PUMP OUT ANY REMAINING NUISANCE WATER IN THE PIPE
AND DISCHARGE THE WATER TO A LOCATION DESIGNATED BY LBU. THE CONTRACTOR SHALL
DECHLORINATE THE NUISANCE WATER TO NEUTRALIZE THE CHLORINE TREATED WATER PRIOR
TO DISCHARGE.
2. CONTRACTOR SHALL PROTECT IN PLACE EXISTING PIPING, APPURTENANCES, ELECTRICAL
EQUIPMENT, AND ALL OTHER PIPING AND EQUIPMENT NOT TO BE REPLACED DURING
CONSTRUCTION OPERATIONS UNLESS OTHERWISE NOTED. ANY PIPING AND EQUIPMENT
DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION.
3. CONTRACTOR SHALL DISINFECT PIPING PER GENERAL NOTE NO. 20.
4. CONTRACTOR SHALL FIELD VERIFY FLANGE BOLT PATTERN AT FLANGE CONNECTION POINT
PRIOR TO SUBMITTING SHOP DRAWINGS.
5. ALL NEW PIPING SHALL BE STEEL PIPE AND CEMENT MORTAR LINED PER SPECIFICATION
SECTION 33 11 13.
6. ALL NEW PIPING SHALL BE PAINTED PER SPECIFICATION SECTION 09 90 00.
7. ALL FLANGES SHALL BE JOINED WITH 316 SS NUTS, BOLTS, AND WASHERS.
8. ALL FITTINGS CALLED OUT ON PLANS SHALL BE RELINED PER SPECIFICATION SECTION 33 11 18.
REMOVE EXISTING LINING PRIOR TO INSTALLATION OF NEW.
9. THE EXISTING BUILDING IS 10'-3" AWAY FROM THE FILTER WALL AT VALVE 4-V-204 AND 13'-3" AWAY FROM THE FILTER WALL AT VALVES 4-V-404 AND 4-V-604. THE CONTRACTOR SHALL
PROTECT IN PLACE THE EXISTING BUILDING. THE CONTRACTOR SHALL ALSO PROTECT IN
PLACE THE EXISTING ELECTRICAL FACILITIES NEAR VALVES 4-V-804 AND 4-V-1004.
10. PROTECT IN PLACE EXISTING 36" STEEL SPOOL AND REHABILITATE MORTAR LINING AS
FOLLOWS:
ALTERNATIVE 1: IF THE EXISTING LINING IS IN FAIR TO GOOD CONDITION, REMOVE THE RUST
FROM THE EXPOSED PIPE AND REPAIR THE MORTAR LINING INSIDE OF THE PIPE, ADD 3" OF
MORTAR REPAIR FROM THE INSIDE BASIN FACE AND FEATHER INTO THE EXISTING
CONCRETE WALL TO COVER THE PIPE EDGE.
ALTERNATIVE 2: IF THE EXISTING LINING IS IN POOR CONDITION, REMOVE THE CEMENT
MORTAR LINING AND APPLY AN EPOXY LINING TO THE EXPOSED STEEL PIPE (12 MILS
MINIMUM UP TO 16 MILS). APPLY A MINIMUM OF TWO COATS.
VALVE AND ACTUATOR SCHEDULE
TAG ASSOCIATED
FILTER VALVE SERVICE SIZE (IN)
DEVICE TO REPLACE
VALVE TYPE ACTUATOR TYPE
4-V-204 2 WASTE WASHWATER
VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-404 4 WASTE WASHWATER
VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-604 6 WASTE WASHWATER
VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-804 8 WASTE WASHWATER
VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
4-V-1004 10 WASTE WASHWATER
VALVE 36 BUTTERFLY (F, DO) ELECTRIC MOTOR O/C
TYPICAL VALVE 4-V-X04 ACTUATOR REPLACEMENT
SCALE: NTS
DISCONNECT EXIST ELECTRICAL
CONDUITS AND WIRES FROM EXIST
ACTUATOR. RECONNECT BACK TO
NEW ACTUATOR
REMOVE AND REPLACE
EXIST ACTUATOR
PROTECT IN PLACE EXIST
ELECTRICAL PANEL BOX
PROTECT IN PLACE EXIST
PLATFORM WALKWAY
SHUTDOWN NO. 3 (INDIVIDUAL FILTER SHUTDOWN)
REMOVE AND REPLACE EXIST
8" PAINTED STEEL AND
CEMENT LINED VALVE CAN
RISER AND VALVE EXTENSION
BONNET IN KIND
PROTECT IN PLACE
EXIST FILTER WALL
REHABILITATE
EXIST 36" (FLG X PE) SPOOL
(LENGTH VARIES = 2'-8"±)
(SEE NOTE NOS. 8 AND 10)
1'-0"±
(VARIES) PROTECT IN PLACE EXIST
4" OUTLET AND 2" PIPING
TO BE CONTINUED
ON THE RIGHT
REHABILITATE EXIST 36" (FLG X PE) SPOOL
(SEE NOTE NOS. 8 AND 10)
(OPTIONAL BID ITEM)
REMOVE AND REPLACE EXIST 8"
PAINTED STEEL AND CEMENT LINED
VALVE CAN RISER AND VALVE
EXTENSION BONNET IN KIND.
ANCHOR EXTENSION BONNET TO WALL
PER VALVE MANUFACTURER'S
RECOMMENDATION.
PROTECT IN PLACE
EXIST 36" STEEL ELBOW
TEMPORARILY REMOVE 36" (FLG X PE)
SPOOL TO ALLOW ACCESS FOR REMOVAL
AND INSTALLATION OF THE NEW 36" BFV.
AFTER INSTALLATION IS COMPLETE,
REINSTALL EXISTING 36" (FLG X PE) SPOOL.
REMOVE AND REPLACE
EXIST 36" VICTAULIC
CPLG IN KIND
2'-10"±
(VARIES)
(SEE NOTE NO. 9)
PROTECT IN PLACE
EXIST BUILDING
M-009
VALVE 4-V-X04
REPLACEMENT
REMOVE AND REPLACE
EXIST 36" BFV (4-V-X04)
07/29/2026 wadepew Image wadepew
120° CUTOUT
" I
.D
6" 2'-0"
3'-0"
NOTE: GALVANIZE AFTER FABRICATION
24" STEEL RING FLANGE
AWWA CLASS 'D' STANDARD
3/8" STEEL PLATE 1" DIA. DRILLED HOLE
3/8" STEEL PLATE
GRIND WELD SMOOTH
1/4
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
WD-05-25
DATE 4/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAT-224
DATE
DATE
B. ANATOLE FALAGAN
GENERAL MANAGER
LONG BEACH UTILITIES GROUNDWATER TREATMENT PLANT
FILTER GALLERY VALVE
REHABILITATION PROJECT - PHASE 2
JRC
NG 4/26
N/A
MUNIS PROJECT: 6003040030
4/
/2
:1 5:
A
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
L
BU
D V
AL
VE
R
EH
AB
P
H 2\
PR
O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\M -0
VA
LV
E V-
X0 1.
D W
G
C
LA
R K, J U
ST
IN
www.tetratech.com 17885 Von Karman Ave, Suite 500
Irvine, CA 92614
(949) 809-5000
WATER, GAS, SEWER
04/17/26
TYPICAL VALVE 4-V-X01 REPLACEMENT
SCALE: NTS
NOTES TO CONTRACTOR:
1. CONTRACTOR SHALL SUBMIT TO LBU A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2)
WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBU WILL BE RESPONSIBLE FOR CLOSING
ALL THE DESIGNATED SHUT-DOWN VALVES AND DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL EXPECT TO PUMP OUT ANY REMAINING NUISANCE WATER IN THE PIPE