Environmental Questionnaire.pdf
PDF 739 KB Posted
- Attached to
- Energy Resilience Construction Grants
- Solicitation number
- DEEP-2027-003-SW
- Issued by
- Connecticut
About this file
This is an Environmental Questionnaire document related to the Connecticut Department of Energy and Environmental Protection's Energy Resilience Construction Grants program. The questionnaire is designed for eligible applicants—including municipalities, municipal electric utilities, investor-owned utilities, cooperatives, and other qualified entities—to provide environmental and project readiness information as part of their proposal submissions. The document functions as a supplementary application tool to evaluate applicant capacity and environmental compliance preparedness. Proposals are due December 1, 2026, and selected projects will undergo environmental review processes as required by applicable federal and state regulations. The questionnaire likely contains questions addressing the applicant's environmental assessment capabilities, preliminary engineering status, site conditions, and readiness to comply with environmental review timelines and standards.
The Environmental Questionnaire serves to establish baseline environmental information and demonstrate applicant readiness for projects ranging from $10,000 to $6 million in grant funding. Applicants must demonstrate sufficient preliminary environmental assessments and engineering documentation to show project shovel-readiness, with preference given to projects with completed environmental evaluations. The questionnaire requirements support the overall grant program's funding structure, which includes approximately $24 million from Federal Bipartisan Infrastructure Law Section 40101(d) formula funding, Connecticut state bond cost match funding under C.G.S. 16-243y, and Federal Sustainable Energy Program BIL funding. All applicants must comply with prevailing wage requirements, federal and state procurement regulations, and environmental review processes, with the questionnaire serving as a mechanism to pre-screen environmental compliance and readiness status before grant award and project execution.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF ENERGY – NATIONAL ENERGY TECHNOLOGY LABORATORY
ENVIRONMENTAL QUESTIONNAIRE
- -NETL F 451.1-1-3 P.1
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete)
STOP! If all work activities related to this project can be classified and described within categories under Group A, proceed directly to CERTIFICATION BY PROPOSER located on page 14. No additional information is required.
If project work activities are described in either Group(s) B or C; then continue filling out questionnaire.
ENVIRONMENTAL QUESTIONNAIRE
A. PROJECT SUMMARY
1. Solicitation Number: Prime Recipient:
2. This Environmental Questionnaire pertains to a : Prime Recipient Subrecipient or Subcontractor
Name of Prime or Subrecipient:
3. Project Title:
4. Principal Investigator: Telephone Number:
5. Expected Project Duration:
6. Location of Activities covered by this Environmental Questionnaire: (City/Township, County, State):
7. Provide a summary and full scope of activities planned only for the location that is the subject of this Environmental
Questionnaire. Describe physical activities, not overall goals and objectives.
8. List all other locations where work would be performed by the prime recipient of the project and/or subrecipient(s). All locations noted below must have an Environmental Questionnaire specific to each location. If more space is needed, please provide an attachment to this Environmental Questionnaire.
Additional Prime Recipient location(s), or subrecipient/ subcontractor location(s) Location of activities
9. Identify and select the checkbox with the predominant project work activities under Group A, B, or C
Group A
Routine administrative, procurement, training, and personnel actions. Contract activities/awards for management support, financial assistance, and technical services in support of agency business, programs, projects, and goals.
Literature searches and information gathering, material inventories, property surveys; data analysis, computer modeling, analytical reviews, technical summary, conceptual design, feasibility studies, document preparation, data dissemination, and paper studies. Technical assistance including financial planning, assistance, classroom training, public meetings, management training, survey participation, academic contribution, technical consultation, and stakeholders’ surveys.
Workshop and conference planning, preparation, and implementation which may involve promoting energy efficiency, renewable energy, and energy conservation.
This Environmental Questionnaire is subject to public disclosure and review upon request. Proprietary or business-sensitive information should NOT be included in any response within this Environmental Questionnaire. The disclosure of proprietary or business-sensitive information should be discussed with the DOE Project Manager and the NEPA Compliance Officer.
Group B
Laboratory Scale Research, Bench Scale Research, Pilot Scale Research, Proof-of-Concept Scale Research, or Field Test
Research. Work DOES NOT involve new building/facilities construction and site excavation/groundbreaking activities. This work typically involves routine operation of existing laboratories, commercial buildings/properties, offices and homes, project test facilities, factories/power plants, vehicles test stands and components, refueling facilities, utility systems, or other existing structures/facilities. Work will NOT involve major change in facilities missions and operations, land use planning, new/modified regulatory/operating permit requirements. Includes work specific to routine DOE Site operations and Lab research work activities, but NOT building construction and site preparation. DOE work typically involves laboratory facilities and lab equipment operations, buildings and grounds management activities; and buildings and facilities maintenance, repairs, reconfiguration, remodeling, equipment use and replacement.
Group C
Pilot Test Facilities Construction, Pilot Scale Research, Field Scale Demonstration, or Commercial Scale Application. Work typically involves facility construction, site preparation/excavation/groundbreaking, and/or demolition. This work would include construction, retrofit, replacement, and/or major modifications of laboratories, test facilities, energy system prototypes, and power generation infrastructure. Work may also involve construction and maintenance of utilities system right-of-ways, roads, vehicle test facilities, commercial buildings/properties, fuel refinery/mixing facilities, refueling facility, power plants, underground wells, and pipelines, and other types of energy research related facilities. This work may require new or modified regulatory permits, environmental sampling and monitoring requirements, master planning, public involvement, and environmental impact review. Includes work specific to DOE Site Operations and Lab operation activities involving building and facilities construction, replacement, decommissioning/demolition, site preparation, land use changes, or change in research facilities mission or operations.
B. PROPOSED PROJECT ALTERNATIVES
1. If applicable, list any project alternatives considered to achieve the project objectives.
C. PROJECT LOCATION
1. Provide a brief description of the project location (physical location, surrounding area, adjacent structures).
2. Provide a project site location map of the project work area as an attachment to this Environmental Questionnaire. This is required for all Group B and Group C projects. Lack of any site map will delay your NEPA review.
Maps can be attached to this Environmental Questionnaire or provided as a separate attachment when submitting this form for review.
Attached maps will appear in this space
NETL F 451.1-1-3 P.2
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete)
D. ENVIRONMENTAL IMPACTS
NEPA procedures require evaluations of possible effects (including land use, energy resource use, natural, historic and cultural resources, and pollutants) from proposed projects on the environment.
1. Land Use
a. Characterize present land use (or zoning) where the proposed project would be located.
Urban Industrial Commercial Agricultural
Suburban Rural Residential Research Facilities
Forest University Campus Other:
b. Identify the total size of the facility, structure, or system and what portion would be used for the proposed project.
c. Describe planned construction, installation, and/or demolition activities, i.e., roads, utilities system right-of-ways, parking lots, buildings, laboratories, storage tanks, fueling facilities, underground wells, pipelines, or other structures.
No construction would be anticipated for this project.
d. Describe how land use would be affected by operational activities associated with the proposed project.
No land areas would be affected.
e. Describe any plans to reclaim areas that would be affected by the proposed project.
No land areas would be affected.
f. Would the proposed project affect any unique or unusual landforms (e.g., cliffs, waterfalls, etc.)?
No Yes (describe)
g. Would the proposed project be located in or near local, state, federal or tribal lands, including parks; forests; monuments;
scenic waterways; wilderness; recreation facilities?
No Yes (describe)
NETL F 451.1-1-3 P.3
Revised: 08.27.2024
2. Construction Activities and/or Operation
a. Identify project structure(s), power line(s), pipeline(s), utilities system(s), right-of-way(s) or road(s) that will be constructed and clearly mark them on a project site map or topographic map as appropriate.
None
b. Would the proposed project require the construction of waste pits or settling ponds?
No Yes (describe and identify location, and estimate surface area disturbed)
c. Would the proposed project affect any existing body of water?
No Yes (describe)
d. Would the proposed project be located in, or impact a floodplain or wetland?
No Yes (describe)
e. Would the proposed project potentially cause runoff/sedimentation/erosion?
No Yes (describe)
f. Would the proposed project include activities located on perma-frost, near fault zones, or involve fracturing, well drilling, geologic stimulation, sequestration, active seismic data collection, and/or deepwater operations?
No Yes (describe)
g. Would the proposed project involve any of the following: nanotechnology; recombinant DNA or genetic engineering;
facility decommissioning or disposition of equipment/materials; or management of radioactive wastes/materials?
No Yes (describe)
NETL F 451.1-1-3 P.4
Revised: 08.27.2024
3. Biological Resources
a. Identify any State or Federally listed endangered or threatened plant or animal species potentially affected by the proposed project.
None
b. Would any designated critical habitat be affected by the proposed project?
No Yes (describe)
c. Describe any impacts that construction would have on any other types of sensitive or unique habitats.
No planned construction No habitats None Impact (describe)
d. Would any foreign substances/materials be introduced into ground or surface waters, soil, or other earth/geologic resource because of project activities? How would these foreign substances/materials affect the water, soil, biota, and geologic resources?
No Yes (describe)
e. Would any migratory animal corridors be impacted or disrupted by the proposed project?
No Yes (describe)
4. Socioeconomic and Infrastructure Conditions
a. Would local socio-economic changes result from the proposed project?
No Yes (describe)
b. Would the proposed project generate increased traffic use of roads through local neighborhoods, urban or rural areas?
No Yes (describe)
NETL F 451.1-1-3 P.5
Revised: 08.27.2024
c. Would the proposed project require new transportation access (roads, rail, etc.)? Describe location, impacts, costs.
No Yes (describe)
d. Would the proposed project create a significant increase in local energy usage?
No Yes (describe)
5. Historical/Cultural Resources
a. Describe any historical, archaeological, or cultural sites in the vicinity of the proposed project; note any sites included on the National Register of Historic Places.
None
b. Would construction or operational activities planned under the proposed project disturb any historical, archaeological, or cultural sites?
No planned construction No habitats None Impact (describe)
c. Has the State Historic Preservation Office been contacted with regard to this project?
No Yes (describe)
d. Would the proposed project interfere with visual resources (e.g., eliminate scenic views) or alter the present landscape?
No Yes (describe)
e. Would the proposed project be located on or adjacent to tribal lands, lands considered to be sacred, or lands used for traditional purposes? Describe any known tribal sensitivities for the proposed project area.
NETL F 451.1-1-3 P.6
Revised: 08.27.2024 Reviewed: 08.27.2024 https://www.nps.gov/subjects/nationalregister/index.htm
6. Atmospheric Conditions/Air Quality
a. Identify air quality conditions in the immediate vicinity of the proposed project with regard to attainment of National
Ambient Air Quality Standards (NAAQS). This information is available under the Green Book Non-Attainment Areas for
Criteria Pollutants website.
b. Would proposed project require issuance of new or modified local, state, or federal air permits to perform project related work and activities?
No Yes (describe)
c. Would the proposed project be in compliance with local and state air quality requirements?
Yes No (please explain)
d. Would the proposed project be classified as either a New Source or a major modification to an existing source?
No Yes (describe)
e. What types of air emissions, including fugitive emissions, would be anticipated from the proposed project, and what would be the maximum annual rate of emissions for the project?
Attainment Non-Attainment
O3 - 1 Hour
O3 - 8 Hour
SOx
PM - 2.5
PM - 10
CO
NO2
Lead
Maximum per Year Total for Project
SOx
NOx
PM - 2.5
PM - 10
CO
CO2
Lead
H2S
This table is continued on next page...
NETL F 451.1-1-3 P.7
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete) https://www.epa.gov/green-book https://www.epa.gov/green-book
...continued from previous page
Organic solvent vapors or other volatile organic compounds
List:
Hazardous air pollutants
List:
Other
List:
None
f. Would any types of emission control or particulate collection devices be used?
No Yes (describe, including collection efficiencies)
g. How would emissions be vented?
7. Hydrologic Conditions, Water Sources, and Wastewater Management
a. What nearby water bodies may be affected by the proposed project?
Provide distance(s) from the project site.
b. Would the proposed project adversely affect the quality or movement of groundwater?
No Yes (describe)
c. What sources would supply potable and process water, and how much water would be required, for the proposed project?
d. Quantify the wastewater that would be generated by the proposed project.
Gallons/day Gallons/year Total for Project
Non-contact cooling water
Process water
Sanitary
Other
Describe
None
NETL F 451.1-1-3 P.8
Revised: 08.27.2024
e. What would be the major components of each type of wastewater (e.g., coal fines)?
No wastewater produced
f. Describe how wastewater and/or sewerage from the project location would be collected and treated, and point discharge where wastewater would be received by Waters of the United States.
No wastewater produced
g. Identify the local treatment facility that would receive wastewater from the proposed project.
No discharges to local treatment facility
h. Would any run-off or leachates be produced from storage piles or waste disposal sites?
No Yes (describe source)
i. Would project require issuance of new or modified water permits to perform project work or site development activities?
No Yes (describe)
j. Would the proposed project be permitted to discharge effluents into an existing body of water?
No Yes (describe discharge location)
k. Would a new or modified National Pollutant Discharge Elimination System (NPDES) permit be required?
No Yes (describe discharge)
l. Would the proposed project require issuance of an Underground Injection Control permit? See EPA’s Underground
Injection Control website for more details.
No Yes (describe discharge location)
NETL F 451.1-1-3 P.9
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete) https://www.epa.gov/uic
m. Would the proposed project be located in or near a wellhead protection area, drinking water protection area, or above a
No Yes (describe discharge location)
8. Solid and Hazardous Wastes
a. Identify and estimate all solid and hazardous wastes that would be generated from the project. Solid wastes are defined as any solid, liquid, semi-solid, or contained gaseous material that is discarded, has served its intended purpose, or is a manufacturing or mining by-product. (See EPA’s Land, Waste, and Cleanup Topics website for more details)
b. Would project require issuance of new or modified solid waste and/or hazardous waste related permits to perform project work activities?
No Yes (explain)
Solid Waste
c. How and where would solid waste disposal be accomplished?
None generated
On-site (identify and describe location)
Off-site (identify location and describe facility and treatment)
d. How would solid wastes for disposal be transported?
Annual Quantity Total for Project
□ Municipal solid waste (e.g., paper, plastic, etc.)
□ Coal or coal by-products
□ Other
Identify:
□ Hazardous waste
Identify:
□ None
Hazardous Waste
e. Describe hazardous wastes that would be generated, treated, handled, or stored under this project. Hazardous waste information can be found at EPA’s Land, Waste, and Cleanup Topics website.
None sole source aquifer or underground source of drinking water (USDW)?
NETL F 451.1-1-3 P.10
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete) https://www.epa.gov/environmental-topics/land-waste-and-cleanup-topics https://www.epa.gov/environmental-topics/land-waste-and-cleanup-topics
f. How would hazardous or toxic waste be collected and stored?
None used or produced
g. If hazardous wastes would require off-site disposal, have arrangements been made with a certified TSD (Treatment, Storage, and Disposal) facility?
Not required
Arrangements not yet made
Arrangements made with a certified TSD facility (identify)
9. Health/Safety Factors
a. Identify hazardous or toxic materials that would be utilized in the proposed project.
No Hazardous or toxic materials that would be utilized (identify)
b. Describe the potential impacts of this project’s hazardous or toxic materials on human health and the environment.
None
c. Would there be any special physical hazards or health risks associated with the project?
No Yes (describe)
d. Does a worker safety program exist at the location of the proposed project?
No Yes (describe)
e. Would additional safety training be necessary for any new laboratory, equipment, or processes involved with the project?
No Yes (describe)
NETL F 451.1-1-3 P.11
Revised: 08.27.2024
f. Describe any increases in ambient noise levels to the public from construction and operational activities.
None Increase in ambient level (describe)
g. Would hearing protection be required for workers?
No Yes (describe)
h. Would project construction result in the removal of natural or other barriers that act as noise screens?
No construction planned No Yes (describe)
10. Environmental Monitoring, Restoration and Waste Storage
a. Would the proposed project include CERCLA removals or similar actions under RCRA or other authorities?
No Yes (identify)
b. Would the proposed project include siting, construction, and operation of temporary pilot-scale waste collection and treatment facilities or pilot-scale waste stabilization and containment facilities?
No Yes (identify)
c. Would the proposed project involve operations of environmental monitoring and control systems?
No Yes (describe)
d. Would the proposed project involve siting, construction, operation, or decommissioning of a facility for storing packaged hazardous waste for 90 days or less?
No Yes (describe)
NETL F 451.1-1-3 P.12
Revised: 08.27.2024
E. Environmental Monitoring, Restoration and Waste Storage
For the following laws, describe any existing permits, new or modified permits, manifests, responsible authorities or agencies, contacts, etc., that would be required for the proposed project
a. Resource Conservation and Recovery Act (RCRA):
None New Required Modification Required
b. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA):
None New Required Modification Required
c. Toxic Substance Control Act (TSCA):
None New Required Modification Required
d. Clean Water Act (CWA):
None New Required Modification Required
e. Underground Storage Tank Control Program (UST):
None New Required Modification Required
f. Underground Injection Control Program (UIC):
None New Required Modification Required
g. Clean Air Act (CAA)
None New Required Modification Required
NETL F 451.1-1-3 P.13
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete) https://www.epa.gov/laws-regulations/summary-resource-conservation-and-recovery-act https://www.epa.gov/laws-regulations/summary-comprehensive-environmental-response-compensation-and-liability-act https://www.epa.gov/laws-regulations/summary-toxic-substances-control-act https://www.epa.gov/laws-regulations/summary-clean-water-act https://www.epa.gov/ust https://www.epa.gov/laws-regulations/summary-clean-air-act
h. Endangered Species Act (ESA):
None New Required Modification Required
i. Floodplains and Wetlands Regulations:
None New Required Modification Required
j. Fish and Wildlife Coordination Act (FWCA):
None New Required Modification Required
k. National Historic Preservation Act (NHPA):
None New Required Modification Required
l. Coastal Zone Management Act (CZMA):
None New Required Modification Required
m. Identify any other environmental laws and regulations (Federal, state, and local) for which compliance would be necessary for this project, and describe the permits, manifests, and contacts that would be required.
F. DESCRIBE ANY ISSUES THAT WOULD GENERATE PUBLIC CONTROVERSY REGARDING THE PROPOSED
PROJECT.
G. WOULD THE PROPOSED PROJECT PRODUCE ADDITIONAL DEVELOPMENT, OR ARE OTHER MAJOR
DEVELOPMENTS PLANNED OR UNDERWAY, IN THE PROJECT AREA?
None
None
NETL F 451.1-1-3 P.14
Revised: 08.27.2024 Reviewed: 08.27.2024 (previous editions obsolete) https://www.epa.gov/laws-regulations/summary-endangered-species-act https://www.epa.gov/green-infrastructure/manage-flood-risk https://www.epa.gov/wetlands https://www.fws.gov/law/fish-and-wildlife-coordination-act#:~:text=The%20Fish%20and%20Wildlife%20Coordination,on%20fish%20and%20wildlife%20resources.
https://www.nps.gov/subjects/historicpreservation/national-historic-preservation-act.htm https://coast.noaa.gov/czm/act/
H. SUMMARIZE THE SIGNIFICANT IMPACTS (ADVERSE AND BENEFICIAL) THAT WOULD RESULT FROM THE
None (provide supporting detail) Significant impacts (provide supporting detail)
I. PROVIDE A DESCRIPTION OF HOW THE PROJECT WOULD BE DECOMMISSIONED, INCLUDING THE
DISPOSITION OF EQUIPMENT AND MATERIALS.
CERTIFICATION BY PROPOSER
I hereby certify that the information provided herein is current, accurate, and complete as of the date shown immediately below.
Signature: Date (mm/dd/yyyy):
Printed Name:
Title:
Organization:
REVIEW AND APPROVAL BY DOE FEDERAL PROJECT MANAGER
I hereby certify that I have reviewed the information provided in this questionnaire, have determined that all questions have been appropriately answered, and judge the responses to be consistent with the efforts proposed.
DOE Project Manager
Signature: Date (mm/dd/yyyy):
Printed Name:
PROPOSED PROJECT.
NETL F 451.1-1-3 P.15
Revised: 08.27.2024
The purpose of this form is to document details of site conditions, environmental considerations, and potential significant environmental impacts for a project location to support a National Environmental Policy Act (NEPA) review determination.
Instructions
The proposer shall prepare this Environmental Questionnaire (EQ) as accurately and completely as possible.
Supporting information can be provided as attachments. The proposer must identify the location of the project and specifically describe the activities that would occur at that location. The proposer must provide specific information and quantities, regarding air emissions, wastewater discharges, solid wastes, etc., to facilitate the necessary review. In addition, the proposer must submit with this EQ a FINAL copy of the project’s statement of work (SOW) or statement of project objective (SOPO) that will be used in the contract/agreement between the proposer and the U.S Department of Energy (DOE).
U.S. DEPARTMENT OF ENERGY – NATIONAL ENERGY TECHNOLOGY LABORATORY
ENVIRONMENTAL QUESTIONNAIRE
- -NETL F 451.1-1-3 P.16
Revised: 08.27.2024
| Solicitation Number: |
| Prime Recipient: |
| Name of Prime or Subrecipient: |
| Project Title: |
| Principal Investigator: |
| Telephone Number: |
| Expected Project Duration: |
| Provide a summary and full scope of activities planned only for the location that is the subject of this Environmental: |
| List all other locations where work would be performed by the prime recipient of the project andor subrecipients All: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow1: |
| Location of activitiesRow1: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow2: |
| Location of activitiesRow2: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow3: |
| Location of activitiesRow3: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow4: |
| Location of activitiesRow4: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow5: |
| Location of activitiesRow5: |
| Additional Prime Recipient locations or subrecipient subcontractor locationsRow6: |
| Location of activitiesRow6: |
| If applicable list any project alternatives considered to achieve the project objectives: |
| If applicable list any project alternatives considered to achieve the project objectives_2: |
| Other: |
| Identify the total size of the facility structure or system and what portion would be used for the proposed project: |
| No construction would be anticipated for this project: |
| No land areas would be affected: |
| No land areas would be affected_2: |
| No: |
| No_2: |
| None: |
| No_3: |
| No_4: |
| No_5: |
| No_6: |
| No_7: |
| No_8: |
| None_2: |
| No_9: |
| No planned construction: |
| No_10: |
| No_11: |
| No_12: |
| No_13: |
| No_14: |
| No_15: |
| None_3: |
| No planned construction_2: |
| No_16: |
| No_17: |
| traditional purposes Describe any known tribal sensitivities for the proposed project area: |
| No_18: |
| Yes: |
| No_19: |
| Maximum per YearSOx: |
| Total for ProjectSOx: |
| Maximum per YearNOx: |
| Total for ProjectNOx: |
| Maximum per YearPM 25: |
| Total for ProjectPM 25: |
| Maximum per YearPM 10: |
| Total for ProjectPM 10: |
| Maximum per YearCO: |
| Total for ProjectCO: |
| Maximum per YearCO2: |
| Total for ProjectCO2: |
| Maximum per YearLead: |
| Total for ProjectLead: |
| Maximum per YearH2S: |
| Total for ProjectH2S: |
| Organic solvent vapors or other volatile organic compounds List: |
| Hazardous air pollutants List: |
| Other List: |
| No_20: |
| How would emissions be vented: |
| Provide distances from the project site: |
| No_21: |
| project: |
| GallonsdayNoncontact cooling water: |
| GallonsyearNoncontact cooling water: |
| Total for ProjectNoncontact cooling water: |
| GallonsdayProcess water: |
| GallonsyearProcess water: |
| Total for ProjectProcess water: |
| GallonsdaySanitary: |
| GallonsyearSanitary: |
| Total for ProjectSanitary: |
| GallonsdayOther describe: |
| GallonsyearOther describe: |
| Total for ProjectOther describe: |
| GallonsdayNone: |
| GallonsyearNone: |
| Total for ProjectNone: |
| No wastewater produced: |
| No wastewater produced_2: |
| No discharges to local treatment facility: |
| No_22: |
| No_23: |
| No_24: |
| No_25: |
| No_26: |
| No_27: |
| Annual QuantityMunicipal solid waste eg paper plastic etc: |
| Total for ProjectMunicipal solid waste eg paper plastic etc: |
| Annual QuantityCoal or coal byproducts: |
| Total for ProjectCoal or coal byproducts: |
| Annual QuantityOther Identify: |
| Total for ProjectOther Identify: |
| Annual QuantityHazardous waste Identify: |
| Total for ProjectHazardous waste Identify: |
| Annual QuantityNone: |
| Total for ProjectNone_2: |
| Offsite identify location and describe facility and treatment: |
| How would solid wastes for disposal be transported: |
| None_5: |
| None used or produced: |
| Arrangements made with a certified TSD facility identify: |
| No_28: |
| None_6: |
| No_29: |
| No_30: |
| No_31: |
| None_7: |
| No_32: |
| No construction planned: |
| No_33: |
| No_34: |
| No_35: |
| No_36: |
| None_8: |
| None_9: |
| None_10: |
| None_11: |
| None_12: |
| None_13: |
| None_14: |
| None_15: |
| None_16: |
| None_17: |
| None_18: |
| None_19: |
| necessary for this project and describe the permits manifests and contacts that would be required: |
| None_20: |
| None_21: |
| None provide supporting detail: |
| DISPOSITION OF EQUIPMENT AND MATERIALS: |
| Date mmddyyyy: |
| Printed Name: |
| Title: |
| Organization: |
| Date mmddyyyy_2: |
| Printed Name_2: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Text93: |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box111: Off |
| Check Box112: Off |
| Check Box113: Off |
| Text114: |
| Text115: |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Check Box119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Check Box122: Off |
| Check Box123: Off |
| Check Box124: Off |
| Check Box125: Off |
| Check Box126: Off |
| Check Box127: Off |
| Check Box128: Off |
| Check Box129: Off |
| Check Box130: Off |
| Check Box131: Off |
| Check Box132: Off |
| Check Box133: Off |
| Check Box134: Off |
| Check Box135: Off |
| Check Box136: Off |
| Check Box137: Off |
| Check Box138: Off |
| Check Box139: Off |
| Check Box140: Off |
| Check Box141: Off |
| Check Box142: Off |
| Check Box144: Off |
| Check Box145: Off |
| Check Box146: Off |
| Check Box147: Off |
| Check Box148: Off |
| Check Box149: Off |
| Check Box150: Off |
| Check Box93: Off |
| Check Box114: Off |
| Check Box115: Off |
| Check Box143: Off |
| Check Box151: Off |
| Check Box152: Off |
| Check Box153: Off |
| Check Box154: Off |
| Check Box155: Off |
| Check Box156: Off |
| Check Box157: Off |
| Check Box158: Off |
| Check Box159: Off |
| Check Box160: Off |
| Check Box161: Off |
| Check Box162: Off |
| Check Box163: Off |
| Check Box164: Off |
| Check Box165: Off |
| Check Box166: Off |
| Check Box167: Off |
| Check Box168: Off |
| Check Box169: Off |
| Check Box170: Off |
| Check Box171: Off |
| Check Box172: Off |
| Check Box173: Off |
| Check Box174: Off |
| Check Box175: Off |
| Check Box176: Off |
| Check Box177: Off |
| Check Box178: Off |
| Check Box179: Off |
| Check Box180: Off |
| Check Box181: Off |
| Check Box182: Off |
| Check Box183: Off |
| Check Box184: Off |
| Check Box185: Off |
| Check Box186: Off |
| Check Box187: Off |
| Check Box188: Off |
| Check Box189: Off |
| Check Box190: Off |
| Check Box191: Off |
| Check Box192: Off |
| Check Box193: Off |
| Check Box194: Off |
| Check Box195: Off |
| Check Box196: Off |
| Check Box197: Off |
| Check Box198: Off |
| Check Box199: Off |
| Check Box200: Off |
| Check Box201: Off |
| Check Box202: Off |
| Text1: |
File details come from the government source that posted it. Updated .