About this file

This is an Annual Program Metrics and Impact Report (APR) template instruction document issued by the Connecticut Department of Energy and Environmental Protection for grant recipients participating in the Energy Resilience Construction Grants program. The APR serves as the annual performance reporting mechanism for recipients to submit once yearly at the end of each Federal Fiscal Year throughout their award agreement duration. Grant recipients must populate the template with project-specific data across multiple reporting categories, including general project information, resilience performance metrics, climate policy goals, community benefits, workforce development, cost-effectiveness, and project-specific metrics differentiated by project type (Grid Infrastructure, Distributed Energy Resources, and Microgrids). The reporting template accommodates projects serving critical facilities and tracks impacts across residential, commercial, and industrial customer segments. Recipients must document performance metrics before and after project implementation, comparing actual results against baseline and proposed performance values, with data collection dates required for all entries.

The template utilizes color-coded cells and dropdown menus to facilitate consistent data entry, with most fields requiring manual input of numeric values, selection from predefined options, or narrative descriptions. Grant recipients must report resilience metrics including System Average Interruption Duration Index (SAIDI), Customer Average Interruption Duration Index (CAIDI), System Average Interruption Frequency Index (SAIFI), and outage-related data categorized by cause and grid coverage area. Community engagement reporting requires documentation of up to six events with attendee demographics, engagement types, and outcomes. Workforce development metrics must track full-time employees, apprenticeships, training participation, and demographic information including gender, race, ethnicity, veteran status, disability status, and disadvantaged community affiliation. The template also requires reporting on emissions reductions (CO2, NOx, SO2, PM 2.5), vulnerable community benefits, and project cost data in nominal 2026 dollars, with instructions defining key terms including Major Event Days, critical facilities, community types (vulnerable, environmental justice, tribal, fossil energy, and rural), and engagement levels (inform, consult, involve, collaborate, and defer).

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

FINAL 08/17/2026
Annual Program Metrics and Impact Report - Instructions tab
Introduction
This Annual Program Metrics and Impact Report (APR) serves as the annual performance report template for grant recipients.
The APR is provided for reference and should not be included as part of the response to the RFP.
Grant recipients will populate the APR once a year at the end of each Federal Fiscal Year throughout the duration of the award agreement.
The APR is designed to be consistent with reporting provided in response to the RFP, to allow for comparisons before, during and after project construction.
The APR incorporates and aligns with the federal grant program reporting requirements and also includes state specific reporting requirements.
All inputs are on the Project Title tab and grant recipients should populate all inputs that are relevant to their project. This tab is subdivided into sections as follows:
General Information (Applicable to All Project Types)
Reporting Applicable to All Project Types
Resilience Metrics
Climate Policy Goal Metrics
Community Benefits Metrics
Workforce Development Metrics
Cost-Effectiveness Metrics
Project-Specific Reporting for Grid Infrastructure
Project-Specific Reporting for Distributed Energy Resources
Project-Specific Reporting for Microgrids

Instructions specific to each section are provided below.

This document contains drop-down menus and unchanging elements. The cells on the Project Title tab of this workbook are color coded as follows:

Manual Input (type in new information or data each year)
Manual Input (copy information or data from proposal)
Manual Input (static after initial entry)
Drop Down Input (select an option from a list)
Populated from entry in another cell
No entry required
Project Title tab
General Information (Applicable to All Project Types)
Grant recipients are responsible for populating:
- Project ID NumberShould align with the project number listed in the quarterly progress report.
- Project Organization or SubawardeeName of recipent performing the project work.
- Project TitleDescriptive name of project work being done. Should be consistent with name used in the proposal,
unless the project has changed.
- Project Performance Period Start DateStart date of project work; remains the same each time this report is submitted.
- Project Performance Period End DateProject end date; may be updated each timet his report is submitted.
- Project StatusFrom drop-down menu of project milestones.
- Utillity or Non-Utility Grant RecipientIndicates if the grant recipient is a utility or not. Should align with the Resilience Metrics populated by the recipient.
Please also provide descriptive information about the project, such as whether the project serves critical facilities, the type of services provided to critical facilities,
major project types and components, how the project performed in the past year, and whether the project was damaged by an event in the past year.
Please describe the project types and components using the Project Types and Eligible Projects descriptions from the table below.
Reporting Applicable to All Project Types
Resilience Metrics
The selections for each of these fields should be consistent throughout the reporting in this section and with selections made in the proposal.
Please note that these fields apply to a subset of the fields in this section and are not relevant to any other section in this report.
- Outage TypeSpecifies the cause(s) of all outages the impact metrics are associated with, including: all causes, vegetation, animals,
vehicles, tornados, thunderstorms, hurricanes, derecho, flooding, wildfire, earthquake, ice/snow storm, operator error,
equipment failure, extreme heat, extreme cold, and other.
- Outage Type
(If 'Other', char lim: 100)Specifies the cause(s) of all outages the impact metrics are associated with, using less than 100 characters.
(To be populated only if Outage Type is identified as 'Other'.)
- CoverageSpecifies which part of the electric grid the impact metric is associated with.
- Coverage Type (If 'Other', char lim: 100)Specifies an area of the system the impact metric is associated with, using less than 100 characters.
(To be populated only if Coverage is identified as 'Other'.)

Grant recipients should assume the following when developing values for the progress, proposal, and baseline sections:

- Does Outage Data include MajorIncludes all days, including MED as defined by IEEE 1366-2001 2.5 Beta Methodology.
Event Days (MED)?(see more detail on Definitions tab)
This section of the report is designed to record the resilience performance of the funded project, and enable comparisons to the baseline and proposed values.
Please use the notes column all the way to the right on each tab to provide any additional useful context or informations about the data provided.
Progress (After Project Implementation): These columns should be updated with each new annual report.
- Actual PerformanceEnter the numeric metric value for the associated FY
- Start Date of Data Collectionmm/dd/yyyy
- End date of Data Collectionmm/dd/yyyy
Proposed Performance:Grant recipients should include data from the project proposal.
Baseline Performance:Grant recipients should include data from the project proposal.
Climate Policy Goal Metrics
These metrics may not be relevant to some types of projects. Please populate all of the relevant metrics for your measures and project types
and insert n/a for those that are not relevant. Grant recipients should provide documentation of the methodology and inputs for calculating these metrics.
Community Benefits Metrics
Grant recipients should report activities that utilize community engagement in deployment and evaluation approach and any examples of planning, open forums,
citizen advisory committees, participatory research and budgeting, memorandums of understanding, letters of support or any other indications of engagement.
Select from the drop-down “Yes”, “No” or “Planning” for each of the community engagement activities. Insert additional rows as needed. To preserve the conditional
formatting and drop-down menus in additional rows: right-click on the row you’d like to copy, select “Copy”, right-click on the row number below the location you’d like
to add the new row, and select “Insert Copied Cells.”
For ideas on how to create a community benefits agreement see: https://www.energy.gov/diversity/community-benefit-agreement-cba-toolkit
Grant recipients are responsible for populating:
The reporting template provides space for up to six events. If more events were held, please copy and paste additional rows into these tables.
- Event # (Unique Identifier):Input a unique identifier (e.g., Event 1, Event 2) for each community engagement event(s) held in support of your project(s),
please use a new row for each event held both in-person or virtual.
- Community Engagement Event NameIdentify the name or title of the community engagement event held including in-person and virtual events.
(virtual or in-person):
- Zip Code:Input the 5-Digit Zip Code as well as the 9-digit Zip Code (Zip Code +4) for each event location.
Please use the Zip Code Lookup (https://tools.usps.com/go/ZipLookupAction_input) and in the note if you are unsure.
- Type of Engagement:Select the type of engagement applicable for each event held.
(see more detail on Definitions tab)
- Degree of Engagement:Select the degree of engagement applicable for each event held.
(see more detail on Definitions tab)
- Did this Event Include an OpenUse drop-down to respond “Yes” or “No.”
Planning Forum with Participant
Polling?:
- Number of Attendees by CommunityInput number of attendees as applicable per community type. Some projects may cross multiple community types
Interest:and some communities may have more than one community of interest identifier. Note: If “Other” is indicated,
please specify what community type. Definitions for Communities of Interest can be found on the “Definitions” tab.
- Total Attendees:Input total number of individual attendees for each event held regardless of their community affiliation.
This does not need to equal the sum of inputs for communities of interest as some individuals may reside
in communities with multiple identifiers or no identifiers.
- Outcomes or Barriers:Narratively describe any community inputs and responses as well as any concerns or barriers that may have materialized
from the event. This should include what your goals were for the event and if it was successful or not.
- Event Links:Provide links, if any, to the community engagement event held.
Workforce Development Metrics
For each question listed, provide a numerical value in Column "Number" (if not greyed out). Use the "Explanation" column when Other is selected, when asked,
and as needed to provide any further information you think is necessary.
As applicable, provide the number of subawardee employees working on the project and the number of trainees in project-specific programs associated with each
demographic category provided. As needed, definitions for disability status and disadvantaged community are provided on the “Definitions” tab.
Cost-Effectiveness Metrics
The data in this section should align with quarterly reporting on spending.
Project-Specific Reporting
The table below maps the Eligible Projects eligible measures to the project types. Proposals that include more than one project type must clearly specify the project
types included in their proposal and submit Project-Specific Metrics for all included project types.
Project TypeEligible Projects
Grid InfrastructureFire-resistant technologies and fire prevention systems
Monitoring and control technologies
The undergrounding of electrical equipment
Utility pole management
The relocation of power lines or the reconductoring of power lines with low-sag, advanced conductors
Adaptive protection technologies
Advanced modeling technologies
Hardening of power lines, facilities, substations, of other systems
The replacement of old overhead conductors and underground cables
Distributed Energy Resources (not part of a Microgrid)Weatherization technologies and equipment
Fuel-load management
The use or construction of distributed energy resources for enhancing system adaptive capacity during disruptive events,
including stand alone energy storage subcomponents
MicrogridsThe use or construction of distributed energy resources for enhancing system adaptive capacity during disruptive events,

including microgrids and energy storage subcomponents associated with a microgrid

Grid Infrastructure Metrics
Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different
project components. If the project consists of more than four different project components, please copy and paste additional rows into the table.
The life of each project component should include replacement, if the costs of replacement are included in the total costs.
The life of each project is assumed to be the minimum of life of all of the project components.
The miles of lines impacted by the project may or may not be relevant, depending on the Eligible Projects.
Distributed Energy Resources Metrics
Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different
project components. If the project consists of more than four different project components, please copy and paste additional rows into the table.
The life of each project component should include replacement, if the costs of replacement are included in the total costs.
The life of each project is assumed to be the minimum of life of all of the project components.
Microgrid Metrics
Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different
project components. If the project consists of more than four different project components, please copy and paste additional rows into the table.
The life of each project component should include replacement, if the costs of replacement are included in the total costs.
The life of each project is assumed to be the minimum of life of all of the project components.

Project Title

FINAL 08/17/2026
Annual Programs Metrics and Impact Report - Project Title tab
General Information (Applicable to All Project Types)
Project ID Number (Please make sure the project number aligns with the project numbers listed in the quarterly progress report)
Project Organization or Subawardee
Project Title
Project Performance Period Start Date (mm/dd/yyyy)
Project Performance Period End Date (mm/dd/yyyy)
Project Statusselect from list
Utility or Non-Utility Grant Recipientselect from list
Serves Facilities providing Critical ServicesSelect from list
Critical Facilities ServedNumber and description of facilities
Major Project Types & ComponentsDescription of project types and components
How did the project perform in the past year?Description of performance
Was the project damaged during an event in the past year?Description of damage
Reporting Applicable to All Project Types
Resilience Metrics
Impact MetricUnitsProgress (After Project Implementation)Proposed Performance
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection
(mm/dd/yyyy)Notes
Towns Benefited by the ProjectNumber of towns
Number of Residential Customers BenefitedNumber of customers
Number of Commercial Customers BenefitedNumber of customers
Number of Industrial Customers BenefitedNumber of customers
Planned MaintenanceNumber of occurrences
Planned MaintenanceNumber of hours across all occurrences
Unplanned MaintenanceNumber of occurrences
Unplanned MaintenanceNumber of hours across all occurrences
UptimeNumber of hours
Impact Metrics Specific to Utility RecipientsUnitsOutage TypeOutage Type
(If 'Other', char lim: 100)CoverageCoverage Type
(If 'Other', char lim: 100)Progress (After Project Implementation)Proposed PerformanceBaseline Performance (Before Project Implementation)
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection
(mm/dd/yyyy)20202021202220232024Annual AverageNotes
System Average Interruption Duration Index (SAIDI)Numberselect from listselect from list
Customer Average Interruption Duration Index (CAIDI)Number
System Average Interruption Frequency Index (SAIFI)Number
Total Number of Residential Customers in the Coverage AreaNumber of customers
Total Number of Commercial Customers in the Coverage AreaNumber of customers
Total Number of Industrial Customers in the Coverage AreaNumber of customers
Impact Metrics Specific to Non-Utility RecipientsUnitsOutage TypeOutage Type
(If 'Other', char lim: 100)CoverageCoverage Type
(If 'Other', char lim: 100)Progress (After Project Implementation)Proposed PerformanceBaseline Performance (Before Project Implementation)
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection
(mm/dd/yyyy)20202021202220232024Annual AverageNotes
OutagesNumber of outagesselect from listselect from list
Hours of Unmet LoadNumber of hours across all outages
Climate Policy Goal Metrics
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

CO2 Equivalent Emissions ReductionsMetric tons
NOx Emissions ReductionsMetric tons
SO2 Emissions ReductionsMetric tons
PM 2.5 Emissions ReductionsMetric tons
Community Benefits Metrics
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Vulnerable Communities BenefitedNumber of communities
Number of Residential Customers Benefited in Vulnerable CommunitiesNumber of customers
Number of Commercial Customers Benefited in Vulnerable CommunitiesNumber of customers
Number of Industrial Customers Benefited in Vulnerable CommunitiesNumber of customers
Total Project Costs associated with Vulnerable Communities that BenefitNominal 2026 $
Impact Metrics on Community EngagementSelect from List
Does this project operate under a negotiatied Community Benefits Agreement?select from list
Is a Community Based Organization part of the project leadership?select from list
Did this project get approval of tribal governments with authority over impacted areas?select from list
Does this project operate under Memorandums of Understanding with Community-Based Organizations?select from list

Did this project get letters of support or any other indication that they are engaging in consent-based planning? select from list

Did this project engage Citizen Advisory Committees?select from list
Did a representative of the Community Based Organization or Community Advisory Committee review and approve this report?select from list
Community Engagement Event Details
Event # (Unique Identifier)Community Engagement Event Name (Virtual or In-Person)5-Digit Zip CodeZip Code +4Total Attendees
Event 1
Event 2
Event 3
Event 4
Event 5
Event 6
Event # (Unique Identifier)Community Engagement
Type of EngagementDegree of EngagementDid This Event Include An Open Planning Forum with Participant Polling?
Event 1select from listselect from listselect from list
Event 2select from listselect from listselect from list
Event 3select from listselect from listselect from list
Event 4select from listselect from listselect from list
Event 5select from listselect from listselect from list
Event 6select from listselect from listselect from list
Event # (Unique Identifier)Number of Attendees by Community of Interest
Vulnerable CommunityTribal CommunityFossil Energy CommunityRural Community
Event 1
Event 2
Event 3
Event 4
Event 5
Event 6
Event # (Unique Identifier)Community Engagement Event Outcomes
Outcomes or BarriersEvent Links
Event 1
Event 2
Event 3
Event 4
Event 5
Event 6
Workforce Development Metrics
Impact MetricsUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Full Time Employees (FTEs) In-StateNumber of FTEs
FTEs in Vulnerable CommunitiesNumber of FTEs
Businesses In-StateNumber of businesses
Businesses in Vulnerable CommunitiesNumber of businesses
Apprenticeships and Trainings In-StateNumber of apprenticeships and trainings
Apprenticeships and Trainings in Vulnerable CommunitiesNumber of apprenticeships and trainings
Questions/Impact Metrics on TrainingSelect from ListNumberExplanation
Was training offered as part of the project? (specify in "Explanation" field)select from list
Type of training providedselect from list
Does your program target underserved or underrepresented population(s) for training?select from list
If yes, what target population do you serve?select from list
Did the Subaward Entity partner with a community-based organization?select from list
Did the Subaward Entity partner with a labor union?select from list
Number of individuals receiving training (including registered apprenticeships) as part of the project.

Average number of hours of training per individual (including on-the-job training/work performed by registered apprentices).

Number of individuals receiving raise or promotion as a result of training.
Number of individuals that are placed in new paid positions (including registered apprenticeships) as a result of training.
Questions/Impact Metrics on LaborSelect from ListNumberExplanation
Number of employees a part of this project (specify in "Explanation" field as needed)
Is there a project labor agreement (PLA) for the construction project?select from list
Is there a collective bargaining agreement (CBA) for the project's non-construction work?select from list
Has the Subaward Entity pledged neutrality with respect to union organizing?select from list
Is the Subaward Entity contributing to or otherwise supporting registered apprenticeship programs (e.g., financial support, hiring participants, providing training materials and facilities, etc.)? (specify in "Explanation" field)select from list
Is the Subaward Entity contributing or otherwise supporting non-registered apprenticeship joint-labor management or other training program? (specify in "Explanation" field)select from list

Is the Subaward Entity offering support services to workers or training participants (e.g., child care, transportation) (specify in "Explanation" field)? select from list

Does the project have a formal anti-discrimination or anti-harassment program or plan?select from list
Does the Subaward Entity have a formal Diversity, Equity, Access, and Inclusion (DEIA) Plan?select from list
Does the project have a workplace health and safety plan that was designed and is implemented in partnership with employees? (specify in "Explanation" field as needed)select from list

In support of second chance opportunities, does the Subaward Entity refrain from asking about job applicants' criminal records, arrest history, or any other history with the justice system? select from list

Does the Subaward Entity have specific goals for the hiring of local workers?select from list
Does the project have specific objective for hiring of underrepresented or disadvantaged groups?select from list
Impact Metrics on Workforce Demographics
GenderNumber of employees working on projectNumber of trainees in project specific programs
Male
Female
Non-Binary
Other
No Designation
RaceNumber of employees working on projectNumber of trainees in project specific programs
American Indian or Alaska Native
Native Hawaiian or Other Pacific Islander
Asian
Black or African American
White
Other
No Designation
EthnicityNumber of employees working on projectNumber of trainees in project specific programs
Hispanic or Latino
Not Hispanic or Latino
No Designation
Veteran StatusNumber of employees working on projectNumber of trainees in project specific programs
Veteran
Not a Veteran
Other Protected Veterans
No Designation
Disability StatusNumber of employees working on projectNumber of trainees in project specific programs
Has Disability
Does Not Have Disability
Disability Status Unknown
No Designation
From Disadvantaged Communities (DACs)Number of employees working on projectNumber of trainees in project specific programs
Cost-Effectiveness Metrics
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Total Project CostsNominal 2026 $
Funding RequestedNominal 2026 $
Ratepayer FundsNominal 2026 $
Other Funding (excluding Ratepayer Funds)Nominal 2026 $
Project-Specific Reporting for Grid Infrastructure
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Component 1: [insert description]Number of measures
Life of Project Component 1Years
Component 2: [insert description]Number of measures
Life of Project Component 2Years
Component 3: [insert description]Number of measures
Life of Project Component 3Years
Component 4: [insert description]Number of measures
Life of Project Component 4Years
Life of ProjectYears
Miles of Lines Impacted by ProjectNumber of miles
Project-Specific Reporting for Distributed Energy Resources
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Component 1: [insert description]Number of measures
Nameplate Rating (Component 1)kW/kWh for storage; kW for non-storage
Life of Project Component 1Years
Component 2: [insert description]Number of measures
Nameplate Rating (Component 2)kW/kWh for storage; kW for non-storage
Life of Project Component 2Years
Component 3: [insert description]Number of measures
Nameplate Rating (Component 3)kW/kWh for storage; kW for non-storage
Life of Project Component 3Years
Component 4: [insert description]Number of measures
Nameplate Rating (Component 4)kW/kWh for storage; kW for non-storage
Life of Project Component 4Years
Life of ProjectYears
Peak GenerationkW
Peak SavingskW
Annual Energy GenerationkWh
Annual Energy SavingskWh
Forward Capacity Market (FCM) ParticipationTextselect from listselect from list
On-Site Fossil Fuel ReplacementTextselect from listselect from list
Annual Natural Gas SavingsTherms
Annual Oil SavingsGallons
Annual Gasoline SavingsGallons
Annual Diesel SavingsGallons
Project-Specific Reporting for Microgrids
Impact MetricUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Component 1: [insert description]Number of measures
Nameplate Rating (Component 1)kW/kWh for storage; kW for non-storage
Life of Project Component 1Years
Component 2: [insert description]Number of measures
Nameplate Rating (Component 2)kW/kWh for storage; kW for non-storage
Life of Project Component 2Years
Component 3: [insert description]Number of measures
Nameplate Rating (Component 3)kW/kWh for storage; kW for non-storage
Life of Project Component 3Years
Component 4: [insert description]Number of measures
Nameplate Rating (Component 4)kW/kWh for storage; kW for non-storage
Life of Project Component 4Years
Life of ProjectYears
Impact Metrics for Grid Parallel OperationUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Average Load of Facilities Served by MicrogridkW
Peak Load of Facilities Served by MicrogridkW
Annual Generation During Normal Operation:
Annual On-Site UsagekWh
Annual Export to GridkWh
Peak ReductionkW
Impact Metrics for Islanded OperationUnitsProgress (After Project Implementation)Proposed PerformanceNotes
Actual PerformanceStart Date of Data Collection
(mm/dd/yyyy)End Date of Data Collection

(mm/dd/yyyy)

Does the microgrid employ load shed technologies?Textselect from listselect from list
Percentage of Normal Operation Load Served by Microgrid%
Percentage of Load Served by Microgrid that is Considered Critical%
Average Critical Loads Served by MicrogridkW or kWh
Peak Critical Loads Served by MicrogridkW or kWh
Annual Critical LoadkWh
Annual Critical Load Served by MicrogridkWh
Maximum Outage Duration that Microgrid is Designed to Ride-ThroughHours
Islanding Response TimeSeconds

Drop Down Lists

Project Status
select from list
Planning Complete
Design Complete
Regulatory Approval Obtained (including NEPA & Required Permits)
Equipment/Materials Purchased
Construction/Installation Started
Construction/Installation 50% Complete
Construction/Installation 100% Complete
Project Complete/Closed Out
Types of Training Provided
select from list
Readiness
Registered apprenticeship
Other earn-as-you-learn-on-the-job training
Upskilling for already employed individuals
Experiential training as part of a degree program
Other (please describe in "Explanation" Field)
Target Population
select from list
Returning citizens (formerly incarcerated/justice system-involved)
Veterans
Residents of disadvantaged communities
Transitional youth (18-24 year-olds)
Displaced or at-risk energy (coal, oil, gas, or automotive) workers
Other (please describe in "Explanation" Field)

Definitions

FINAL 08/17/2026
Annual Programs Metrics and Impact Report - Definitions tab
TermResilience Metrics Definitions
Major Event DayDays where the system operational and/or design limits exceed a threshold established by:
1. Collecting values for five sequential years ending on the last day of the last complete reporting period.
If fewer than five years of historical data are available, use all available historical data.
2. Excluding any day in the data set has a value of zero.
3. Taking the natural logarithm (ln) of each daily value in the data set.
4. Finding α (Alpha), the average of the logarithms (also known as the log-average) of the data set.
5. Finding β (Beta), the standard deviation of the logarithms (also known as the log-standard deviation) of the data set.
6. Computing the major event day threshold, TMED, using the equation: ( ) α+2.5β T = e MED
7. Classifying any day with daily value greater than the threshold value TMED that occurs during the subsequent reporting period is classified as a major event day.
Outage TypeSpecifies the cause(s) of all outages the impact metrics are associated with.
CoverageSpecifies the part(s) of the electric grid the impact metrics are associated with.
Critical FacilitiesAny hospital, police station, fire station, water treatment plant, sewage treatment plant, public shelter, correctional facility or production and transmission facility of a television or radio station, whether broadcast, cable or satellite, licensed by the Federal Communications Commission, any commercial area of a municipality, a municipal center, as identified by the chief elected official of any municipality, or any other facility or area identified by the Department of Energy and Environmental Protection as critical.
Critical ServicesEssential public safety, health, and disaster recovery services, including: emergency medical services (hospitals, clinics), public safety (fire stations, police departments), essential infrastructure (water treatment, power utilities), and government functions (town halls, emergency operations centers) or any other services identified as critical by the Department of Energy and Environmental Protection.
SAIDIThe average length of time customers experience a power outage over a specific period, calculated as the total duration of all customer interruptions within the year divided by the total number of customers served during the year.
CAIDIHow long, on average, a customer is without power after an outage occurs, calculated as the total duration of all customer interruptions divided by the total number of customer interruptions.
SAIFIThe average number of sustained interruptions (typically lasting more than 5 minutes) that a customer experiences over a year or other given time frame, calculated as the total number of customers served divided by the total number of sustained customer service interruptions during that period.
Residential customersCustomers who would be served by one of the utilities' Residential rate classes.
Commercial customersCustomers who would be served by one of the utilities' Commercial rate classes. Includes municipal government buildings.
Industrial customersCustomers who would be served by one of the utilities' Industrial rate classes.
Project typesIncluding Grid Infrastructure, Distributed Energy Resources, and Microgrids.
Project componentsComponents of the Grid Infrastructure, Distributed Energy Resources, and Microgrids project types, as shown in the table on the Instructions tab.
UptimeThe number of hours the equipment is operational, excluding planned and unplanned maintenance.
TermCommunity Definitions
Vulnerable CommunityPopulations that may be disproportionately impacted by the effects of climate change, including, but not limited to, low and moderate income communities,
environmental justice communities pursuant to section 22a-20a (https://www.cga.ct.gov/current/pub/chap_439.htm#sec_22a-20a), communities eligible
for community reinvestment pursuant to section 36a-30 (https://www.cga.ct.gov/current/pub/chap_664a.htm#sec_36a-30) and the Community Reinvestment
Act of 1977, 12 USC 2901 et seq., as amended from time to time, populations with increased risk and limited means to adapt to the effects of climate change,
or as further defined by the Department of Energy and Environmental Protection in consultation with community representatives.
Environmental JusticeEnvironmental justice communities pursuant to section 22a-20a (“Environmental justice community” means (A) a United States census block group,
(EJ) Communityas determined in accordance with the most recent United States census, for which thirty per cent or more of the population consists of low income persons
who are not institutionalized and have an income below two hundred per cent of the federal poverty level; or (B) a distressed municipality, as defined in subsection (b)
of section 32-9p (https://www.cga.ct.gov/current/pub/chap_578.htm#sec_32-9p), communities eligible for community reinvestment pursuant to section 36a-30
(https://www.cga.ct.gov/current/pub/chap_664a.htm#sec_36a-30) and the Community Reinvestment Act of 1977, 12 USC 2901 et seq. as amended from time
to time, populations with increased risk and limited means to adapt to the effects of climate change.
Tribal CommunityFor the purposes of this guidance, "tribal communities" should be inclusive of organizations that identify as Indian/Native American Tribal Designated Organization,
including Tribal Colleges and Universities; and Indian Nations and American Indian and Alaska Native Trival Governments as defined by DOE Order 144.1 -
"Indian Nation. Any American Indian or Alaska Native Tribe, Band, Nation, Pueblo or other organized group or community, including any Alaska Native village
[as defined or established pursuant to the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.)], which is acknowledged by the Federal government to
constitute a tribe with a government-to-government relationship with the United States and eligible for the programs, services, and other relationships
established by the United States for indigenous peoples because of their status as American Indian and Alaska Native tribes, Bands, Nations, Pueblos or
communities."
"American Indian and Alaska Native Tribal Government. The recognized government of an Indian nation or any affiliated or component band government
of such nation that has been determined eligible for specific services by Congress or officially recognized pursuant to 25 CFR Part 83, in the most recent
Bureau of Indian Affairs Federal Register Notice, Indian Entities Recognized and Eligible to Receive Services from the United States. Those who self-identify as
American Indian or Alaskan Native, but are non-tribal residents, sholud still be considered part of their self-identified community.
Fossil Energy CommunityFor the purposes of this guidance, "fossil energy communities" are cities, towns, and regions that have significant economic ties to fossil energy production
through the extraction, processing, transport, or storage of coal, oil, and/or gas, or power geneation from these fuels, specifically those included in
1) the "Covered Census Tract" definition in Section 40209 of H.R. 3684, which is based on census tracts that had coal miles that have closed or coal-fired power
plants that have retired after a certain date; and 2) the Bureau of Labor Statistics Areas listed by the Interagency Working Group on Coal & Power Plant
Communities & Economic Revitalization. This definition should be uped to reflect any new definition established by the Interagency Working Group on Coal
& Power Plant Communities & Economic Revitalization.
Rural CommunityFederal agencies do not have a standard definition for rural therefore for the purposes of this guidance a "rural community" will be defined according to the
definition of 'rural and remote areas' in BIL 40103 - "a city, town, or unincorporated area that has a population of not more than 10,000 inhabitants."
TermWorkforce Demographics Definitions
Disability StatusDisabilities include but are not limited to: Alcohol or other substance use disorder (not currently using drugs illegally), autoimmune disorders such as lupus,
fibromyalgia, rheumatoid arthritis, HIV/AIDS, blind or low vision, cancer (past or present), cardiovascular or heart disease, celiac disease, cerebral palsy, death
or serious difficulty hearing, diabetes, disfigurement caused by burns, wounds, accidents, or congenital disorders, epilepsy or other seizure disorder,
gastrointestinal disorders including Crohn's Disease, irritable bowel syndrome, intellectual or developmental disability, mental health conditions
such as depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD, missing limbs or partially missing limbs, mobility impairment benefitting from the use
of a wheelchair, scooter, walker, leg braces, and/or other supports, nervous system condition including migraine headaches, Parkinson's disease,
multiple sclerosis (MS), neurodivergence such as attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia,
other learning disabilities, partial or complete paralysis (any cause), pulmonary or respiratory conditions such astuberculosis, asthma, emphysema,
short stature (dwarfism), and traumatic brain injury.
TermType of Engagement Defintions
Content Based SitingThe event sought or worked toward community consented siting of project.
Research & DesignThe event engaged in co-design with the community on the project or related research.
ReportingThe event shared back data or progress with the community.
Project Decision MakingThe event involved shared decision making on th eproject.
Community InputThe event gathered input from the community participants.
TermDegree of Engagement Definitions
InformProvide the community with relevant information.
ConsultGather input from the community.
InvolveEnsure community needs and assets are integrated into process & inform planning.
CollaborateEnsure community capacity to play a leadership role in implementation of decisions.
Defer toFoster democratic participation and equity through community-driven decision making. Bridge divide between community and governance.

File details come from the government source that posted it. Updated .