The document is a comprehensive set of engineering plans and technical specifications for the 90 North Shared Street Construction project, prepared by Civil Tech Inc. for the Village of Schaumburg in Cook County, Illinois. The project involves roadway improvements for two interconnected sections: a 994.60-foot (0.188-mile) segment of 90 N Shared Street and a 298.47-foot (0.057-mile) section of Landmark Drive. The construction will include new pavement, curb and gutter, sidewalks, landscaping, lighting, underground utilities, storm sewers, and associated infrastructure. The project will feature permeable concrete pavers, native plant landscaping, LED lighting, and various street amenities such as benches, bike racks, and bollards.
The engineering documents detail precise technical specifications, including earthwork quantities, utility relocations, drainage plans, and cross-sections. The project involves significant underground infrastructure work, including sanitary and storm sewers ranging from 12" to 72" in diameter, water main installations, and extensive electrical conduit and lighting infrastructure. Funding and procurement details are not explicitly outlined in the technical documents, but the project is set to be bid through the Village of Schaumburg's e-Procurement Portal, with bids due by February 15, 2024, at 11:00 am. The design incorporates multiple engineering standards, including IDOT highway standards, and includes comprehensive environmental considerations such as erosion control measures and stormwater management strategies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
50'
50'
10' 20' 30'
100'
100' 200' 300'
1''= 50'
1''= 10'
1''= 100'
FULL SIZE PLANS HAVE BEEN PREPARED USING STANDARD
ON REDUCED PLANS, THE ABOVE SCALES MAY BE USED.
ENGINEERING SCALES. REDUCED SIZED PLANS WILL NOT
CONFORM TO STANDARD SCALES. IN MAKING MEASUREMENTS
1''= 20'
J.U.L.I.E.
JOINT UTILITY LOCATION INFORMATION FOR EXCAVATION
1-800-892-0123 OR 811
VILLAGE OF SCHAUMBURG
c b m s c iv il t e c h p w d a v id .k r e e g e r d m s
C o v e r .d g n
:5
:4
A M d j k
PLANS PREPARED BY:
SIONIL
LI
OF
ENGINEER
PROFESSIONAL
LICENSED
062-051308
LL
AM .N KER
E D
CORPORATION
LS/PE/SE
184-000826
C
NI
G
NI
REENIGNE
H
C E
T
LI
VI
C
SIONIL
LI
SHEET NO. DESCRIPTION
INDEX OF SHEETS
GENERAL NOTES
COVER SHEET & INDEX
TYPICAL SECTIONS
ALIGNMENT, TIES AND BENCHMARKS
PROPOSED ROADWAY REMOVAL PLAN
PROPOSED ROADWAY PLAN AND PROFILE
SIGNING & STRIPING PLAN
CROSS SECTIONS
www.civiltechinc.com
Tel: 630.773.3900 - Fax: 630.773.3975
Two Pierce Place Suite 1400 - Itasca, Illinois 60143
37 42
-75 86 LIGHTING PLAN
(NOT TO SCALE)
STA. 110+60.00
LANDMARK DRIVE
IMPROVEMENTS
END ROADWAY
DETAILED LOCATION MAP
LOCATION MAP
DESIGN AND POSTED SPEED:
LANDMARK DRIVE - 25 MPH DESIGN; 25 MPH POSTED
TOM DAILLY
VILLAGE PRESIDENT
BOARD OF TRUSTEES
MARILYN KARR
VILLAGE CLERK
BRIAN TOWNSEND
VILLAGE MANAGER
PROJECT LENGTH:
- 74
PROPOSED DRAINAGE AND UTILITY PLAN
-43 52
CONSTRUCTION DETAILS-88
FOR SHEETS - 86
COUNTY
TOTAL
SHEETS
SHEET
NO.
COVER SHEET
COOK
SIONIL
LI
R E
GEERK .J DI
V
A D
OF
ENGINEER
PROFESSIONAL
LICENSED
062-056261
-87
FOR SHEETS - 7475
NO. 062-056261; EXPIRES 11-30-2025
REGISTERED P.E., STATE OF ILLINOIS
STA. 600+31.31
90 N SHARED STREET
IMPROVEMENTS
BEGIN ROADWAY
STA. 107+61.53
LANDMARK DRIVE
IMPROVEMENTS
BEGIN ROADWAY
TOTAL - 1293.07 FT (0.245 MILE)
LANDMARK DRIVE - 298.47 FT (0.057 MILE)
90 N SHARED STREET - 994.60 FT (0.188 MILE)
90 N SHARED STREET - 25 MPH DESIGN; 25 MPH POSTED
NO. 062-051308; EXPIRES 11-30-2025
REGISTERED P.E., STATE OF ILLINOIS
JACK SULLIVANGEORGE DUNHAM
ESHA PATELJAMIE CLAR
MARK MADEJBRIAN BIESCHKE
GRADING PLAN
24 25
30 32
53 55
101 110
COOK COUNTY
HARDSCAPE AND LANDSCAPE PLANS AND DETAILS
-9 23 SUMMARY OF QUANTITIES
5 MWRD ROUTING MAP
LANDMARK DRIVE
90 N SHARED STREET AND
6 VOLUME CONTROL PLAN
EROSION CONTROL PLAN
33 MAINTENANCE OF TRAFFIC NOTES
87 JUNCTION CHAMBER PLAN
E WMOJobStart@mwrd.org
P (708) 588-4055
BEFORE STARTING WORK.
OF GREATER CHICAGO 2 DAYS
WATER RECLAMATION DISTRICT
CONTACT THE METROPOLITAN
4 MWRD GENERAL NOTES
ADJOINING PROPERTIES.
ACCEPTED ENGINEERING PRACTICES SO AS TO REDUCE THE LIKELIHOOD OF DAMAGES TO
ENGINEER, AND THAT SUCH SURFACE WATERS ARE PLANNED FOR IN ACCORDANCE WITH GENERALLY SURFACE WATERS INTO THE PUBLIC AREA, OR DRAINS APPROVED FOR THE USE BY THE MUNICIPAL
REASONABLE PROVISIONS HAVE BEEN MADE FOR THE COLLECTION AND DIVERSION OF SUCH
BE CHANGED BY THE PROPOSED DEVELOPMENT. IF ANY DRAINAGE PATTERNS WILL BE CHANGED, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE DRAINAGE OF SURFACE WATERS WILL NOT
SIONIL
LI
NO. 062-053291; EXPIRES 11-30-2025
REGISTERED P.E., STATE OF ILLINOIS
OF
ENGINEER
PROFESSIONAL
LICENSED
062-053291
K
EI
SNEILIL SAM
O H
T
-34 36
MAINTENANCE AND MONITORING EXHIBIT
8 DRAINAGE AREA EXHIBIT
-26 27 SCHEDULE OF EARTHWORK
-111 IDOT HIGHWAY STANDARD DETAILS124
N
R o s e ll e
R o a d
Algonquin Rd.
M e a c h a m d
Forest Preserve
Paul Douglas
Euclid Ave
Q u e n ti n
P lu m
G r o v e
Grove Rd.
Old Plum
Road
Hartung
G R
O V
E
O
A D
O L
D
P
L U
ALGONQUIN ROAD
E
A C
H
A D
ZURICH WAY
D R
K A
P
O G
R E
S S
P
A R
K W
A Y
DRIVE
ARBOR
S T
R E
E T
N
S
H A
R E
D
DRIVE
LANDMARK
P A
R K
S I D
D
I V
COUNTY
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
F
W
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E
-G e n
N o te s F
IL
E
N
A M
E
M O
D E
L : 124 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
DJK
12/29/2023
CONTRACT NO. XXXXX
VILLAGE OF SCHAUMBURG COOK 2
1 2
PAVING, CURB & GUTTER, AND SIDEWALK
SPECIFICATIONS, STANDARDS AND SPECIAL PROVISIONS
TREE REMOVAL, CLEARING AND HEDGE REMOVAL
SHALL BE APPROVED BY THE ENGINEER PRIOR TO REMOVAL.
OF THE ENGINEER PRIOR TO THE START OF REMOVAL OPERATIONS. ALL TREES TO BE REMOVED
THE CONTRACTOR SHALL MARK ALL TREES TO BE REMOVED IN A MANNER MEETING THE APPROVAL3.
FENCE ONLY AFTER ALL CONSTRUCTION WORK HAS BEEN COMPLETED.
STORED, DRIVEN, OR DISTURBED INSIDE THE FENCE. REMOVE PROTECTIVE TEMPORARY
WHEN DIRECTED BY THE ENGINEER. AFTER TREES ARE SAFELY FENCED NOTHING IS TO BE
TEMPORARY FENCE SHALL BE ERECTED ALONG THE DRIP LINE OF EXISTING TREES TO REMAIN2.
REMOVE ANY TREES UNLESS SPECIFICALLY DIRECTED BY THE ENGINEER.
OPERATIONS COMMENCE IN ANY AREA. AT NO TIME SHALL THE CONTRACTOR PRUNE OR
TREE REMOVAL, TREE PRUNING AND ROOT PRUNING SHALL BE COMPLETED BEFORE CONSTRUCTION
EXISTING TREES IS OF THE UTMOST IMPORTANCE TO THE VILLAGE. ALL TREE PROTECTION,
THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE PRESERVATION OF 1.
ROADWAY EXCAVATION UTILITIES
INSTALLED AS PART OF THIS PROJECT.
THE STORM SEWERS, DRAINAGE STRUCTURES, VALVE VAULTS, WATERMAIN, AND FIRE HYDRANTS
OPERATIONS. THE COST TO COMPLY WITH THE ABOVE SHALL BE INCLUDED IN THE COST OF
DEWATERING TRENCH EXCAVATIONS AS WELL AS SHORING TRENCH WALLS DURING UTILITY
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY FOR7.
FOR DELAYS CAUSED BY UTILITY RELOCATION OR ADJUSTMENT.
STAGING NECESSARY TO ACCOMMODATE UTILITY RELOCATION OR ADJUSTMENT AND/OR
THE CONTRACTOR SHALL RECEIVE NO ADDITIONAL COMPENSATION FOR CONSTRUCTION6.
AT NO COST.
CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE ENGINEER
ANY EXISTING OR PROPOSED SEWER DAMAGED BY THE CONTRACTOR DURING5.
STRUCTURES INSTALLED AS PART OF THIS PROJECT.
BUT SHALL BE CONSIDERED AS INCLUDED IN THE COST OF THE STORM SEWERS AND DRAINAGE
NECESSARY TO COMPLY WITH THE ABOVE PROVISIONS WILL NOT BE PAID FOR SEPARATELY,
FROM DIRT AND DEBRIS. THE COST OF ALL MATERIALS REQUIRED AND ALL LABOR
CONCLUSION OF CONSTRUCTION OPERATIONS, ALL UTILITY STRUCTURES SHALL BE FREE
IS OBSTRUCTED, IT SHALL BE REMOVED AT THE CLOSE OF EACH WORKING DAY. AT THE
THE FLOW LINE OF DRAINAGE STRUCTURES SUCH THAT THE NATURAL FLOW OF WATER
WHENEVER DURING CONSTRUCTION OPERATIONS ANY LOOSE MATERIAL IS DEPOSITED IN 4.
SEWER AND CABLE TELEVISION FACILITIES. (48 HOURS NOTIFICATION IS REQUIRED.)
1-800-892-0123 FOR FIELD LOCATIONS OF BURIED ELECTRIC, TELEPHONE, GAS, WATER,
BEFORE STARTING ANY EXCAVATION, THE CONTRACTOR SHALL CALL "JULIE" AT3.
DISCUSSED AT THE PRECONSTRUCTION CONFERENCE.
COORDINATION OF ANY UTILITY WORK INVOLVED IN THE CONSTRUCTION AREA WILL BE2.
THEIR ACCURACY.
THE PLANS ARE APPROXIMATE AND THE ENGINEER DOES NOT GUARANTEE
COMPANIES. THE LOCATION OF PUBLIC OR PRIVATE UTILITIES SHOWN ON
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH UTILITY1.
STANDARD NO.
CONCRETE CURB TYPE B AND COMBINATION CONCRETE CURB AND GUTTER
SIDEWALK, CORNER OR CROSSWALK CLOSURE
731001-01
701801-06
606001-08
DESCRIPTIONSTANDARD NO.
STANDARD SYMBOLS, ABBREVIATIONS AND PATTERNS
TEMPORARY EROSION CONTROL SYSTEMS
PERPENDICULAR CURB RAMPS FOR SIDEWALKS
CATCH BASIN TYPE A
604051-04
602601-06
602416-09
602401-07
602001-02
424001-11
000001-08
280001-07
DESCRIPTION
PRECAST REINFORCED CONCRETE FLAT SLAB TOP
602421-09
601001-05 PIPE UNDERDRAINS
602701-02 MANHOLE STEPS
604001-05
IDOT HIGHWAY STANDARDS
ALLOWED THE CONTRACTOR FOR ANY EXPENSE INCURRED BY COMPLYING WITH THE REQUIREMENTS OF THIS NOTE.
OTHER THAN BURNING, SUBJECT TO THE APPROVAL OF THE ENGINEER. NO EXTRA COMPENSATION WILL BE
AND DEPOSITED AT LOCATIONS PROVIDED BY HIM/HER, OR DISPOSED OF WITHIN THE RIGHT-OF-WAY IN A MANNER
ALL EXCESS OR WASTE MATERIAL SHALL BE EITHER HAULED AWAY FROM THE PROJECT SITE BY THE CONTRACTOR
THE CONTRACTOR IS PROHIBITED FROM BURNING ANY MATERIAL WITHIN OR ADJACENT TO THE PROJECT LIMITS.5.
EXISTING IN THE FIELD PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS AND CONDITIONS4.
NOTIFIED BY THE CONTRACTOR AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION.
ALL UTILITY COMPANIES, SCHOOL DISTRICTS, AND LOCAL POLICE AND FIRE DEPARTMENTS SHALL BE3.
NO WORK SHALL COMMENCE UNTIL TRAFFIC CONTROL REQUIREMENTS ARE MET.2.
SPECIAL PROVISIONS AND IDOT STANDARD DRAWINGS INCLUDED IN THE CONTRACT DOCUMENTS.
EDITION, "AMERICAN STANDARDS FOR NURSERY STOCK, 2004 EDITION"; THE DETAILS IN THE PLANS, AND THE
STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS" JUNE 2014 SEVENTH
THE "ILLINOIS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS", (IMUTCD); "THE
SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS", ADOPTED JANUARY 1, 2024; THE LATEST EDITION OF
CONSTRUCTION" ("STANDARD SPECIFICATIONS"), ADOPTED JANUARY 1, 2022; THE "SUPPLEMENTAL
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE1.
DUE TO THE CONTRACTOR.
NOT ENCOUNTERED, THEN THE QUANTITY SHALL BE DEDUCTED, AND NO ADDITIONAL COMPENSATION WILL BE
301.04 OF THE SSRBC AND IDOT SUBGRADE STABILITY MANUAL. IF UNSTABLE AND/OR UNSUITABLE SOILS ARE
BE TESTED WITH A STATIC OR DYNAMIC CONE PENETROMETER AND TREATED IN ACCORDANCE WITH ARTICLE
AT THE TIME OF CONSTRUCTION BY THE GEOTECHNICAL ENGINEER. ALL POTENTIALLY UNSTABLE SOILS SHOULD
UNSUITABLE. THE ACTUAL NEED FOR REMOVAL AND REPLACEMENT WITH ASI WILL BE DETERMINED IN THE FIELD
HAS BEEN PROVIDED FOR USE AT THE LOCATIONS INDICATED FOR SOILS THAT TEND TO BE UNSTABLE AND/OR
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION AND/OR AGGREGATE SUBGRADE IMPROVEMENT (CU YD)3.
ENGINEER.
CONTRACTOR'S VEHICLES AND/OR EQUIPMENT IS TO BE REMOVED AND REPLACED AS DIRECTED BY THE
ANY SUBBASE OR AGGREGATE SUBGRADE IMPROVEMENT CONTAMINATED AND/OR DAMAGED BY THE 2.
THE SUBGRADE STABILITY SHALL BE VERIFIED BY PROOF ROLLING WITH A FULLY LOADED TANDEM-AXLE TRUCK.1.
602402-03
FRAME AND LIDS, TYPE 1
PRECAST MANHOLE TYPE A, 4' DIAMETER
PRECAST MANHOLE TYPE A, 5' DIAMETER
PRECAST MANHOLE TYPE A, 8' DIAMETER
PRECAST MANHOLE TYPE A, 9' DIAMETER
FRAME AND GRATE, TYPE 11
420001-10
420101-07
420111-04
542301-03
PAVEMENT JOINTS
24' JOINTED PCC PAVEMENT
PCC PAVEMENT ROUNDABOUTS
604036-03
701502-09
701601-09
701901-08
720001-01
720006-04
GRATE, TYPE 8
URBAN LANE CLOSURE, 2L, 2W, WITH BIDIRECTIONAL TURN LANE
URBAN LANE CLOSURE, MULTILANE, 1W OR 2W WITH NONTRAVERSABLE MEDIAN
TRAFFIC CONTROL DEVICES
SIGN PANEL MOUNTING DETAILS
GENERAL NOTES
CENTERED OVER THE TRENCH. SIDEWALKS SHALL BE TREATED IN THE SAME MANNER USING THREE #5 REBARS.
ALL CURBS CONSTRUCTED OVER A UTILITY TRENCH SHALL BE REINFORCED WITH TWO #5 REBARS FOR A LENGTH OF 20 FEET 6.
EPOXY COATED, UNLESS NOTED ON THE PLAN.
CURB, GUTTER, COMBINATION CURB AND GUTTER, MEDIAN, AND CHAIR SUPPORTS FOR CRC PAVEMENT, SHALL BE
AND STANDARD SPECIFICATIONS FOR REINFORCEMENT, DOWEL BARS, AND TIE BARS IN PAVEMENT, SHOULDERS, FOR WORK OUTSIDE THE LIMITS OF BRIDGE APPROACH PAVEMENT, ALL REFERENCES IN THE HIGHWAY STANDARDS5.
PLACED.
DUE TO IRREGULARITIES IN THE SURFACE, BINDER, OR BASE UPON WHICH THE HOT-MIX ASPHALT MATERIALS ARE
THE THICKNESSES OF HOT-MIX ASPHALT MIXTURES SHOWN ON THE PLANS ARE NOMINAL. DEVIATIONS MAY OCCUR4.
AND HOT-MIX ASPHALT BINDER COURSE HAVE BEEN COMPLETED TO THE SATISFACTION OF THE ENGINEER.
HOT-MIX ASPHALT SURFACE COURSE SHALL NOT BE PLACED UNTIL ALL EARTH EXCAVATION, TOPSOIL PLACEMENT, 3.
AND GUTTER HAS BEEN PROPERLY CURED AND BACKFILLED TO THE SATISFACTION OF THE ENGINEER.
HOT-MIX ASPHALT BINDER COURSE SHALL NOT BE PLACED ADJACENT TO CURB AND GUTTER UNTIL THE CURB 2.
ADDITIONAL WORK, INCLUDING REMOVAL AND REPLACEMENT, SHALL BE DONE AT THE CONTRACTOR'S EXPENSE.
SHOULD THE CONTRACTOR DEFACE ANY EDGE, A NEW SAWED JOINT SHALL BE PROVIDED AND ANY
THE CONTRACTOR SHALL BE REQUIRED TO SAW VERTICAL CUTS SO AS TO FORM CLEAN VERTICAL JOINTS.
INCLUDED IN THE COST OF THE ITEM BEING REMOVED.
TO A DEPTH AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. THIS WORK SHALL BE
TO SEPARATE THE EXISTING MATERIAL TO BE REMOVED BY MEANS OF AN APPROVED CONCRETE SAW
THE CONTRACTOR SHALL SAW CUT PAVEMENT, CURB & GUTTER, MEDIAN, SHOULDER, AND SIDEWALK 1.
TYPICAL PAVEMENT MARKINGS780001-05
BASE FOR TELESCOPING STEEL SIGN SUPPORT
PRECAST REINFORCED CONCRETE FLARED END SECTION
CATCH BASIN TYPE C 602011-02
720011-01 SIGN PANEL MOUNTING DETAILS
METAL POSTS FOR SIGNS, MARKERS & DELINEATORS
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS STA. TO STA.
M
O D
E L
N A
M E
-G e n
N o te s F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
VILLAGE OF SCHAUMBURG COOK
2 2
MISCELLANEOUSSTORM & SANITARY SEWER
LANDSCAPING
AND MAY NOT BE THE CENTERLINE OF RIGHT-OF-WAY.
THE CONSTRUCTION BASELINE HAS BEEN ESTABLISHED FOR STAKING PURPOSES ONLY5.
OF PROPOSED PAVEMENT, UNLESS OTHERWISE INDICATED.
PAVEMENT GRADES: THE ELEVATIONS INDICATED ON THE PLANS ARE FINISHED GRADES4.
TO THE CENTER OF STRUCTURE.
AND GRATE IN THE PROPER LOCATION. ALL OTHER STRUCTURES ARE DIMENSIONED
DETERMINING THE OFFSET NECESSARY FOR EACH STRUCTURE TO SET THE FRAME
PROPOSED EDGE OF PAVEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATED IN THE CURB LINE REFER TO THE POSITION OF THE ADJACENT
THE STATION/OFFSET/ELEVATIONS NOTED FOR ALL DRAINAGE STRUCTURES3.
OTHERWISE NOTED.
ALL RADII FOR PROPOSED CURB AND GUTTER ARE TO THE EDGE OF PAVEMENT UNLESS2.
THEIR LOCATIONS.
ITS AGENT OR AN AUTHORIZED SURVEYOR HAS WITNESSED OR OTHERWISE REFERENCED
SUBSECTION MONUMENTS OR PROPERTY OR REFERENCE MARKERS UNTIL THE VILLAGE,
THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL SECTION OR1.
STAKING
EROSION CONTROL
THE CONTRACTOR AT HIS/HER EXPENSE, AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
LIMITS THAT ARE DAMAGED OR DISTURBED BY THE CONTRACTOR SHALL BE RESTORED BY
THE CONTRACTOR SHALL ADHERE TO LIMITS OF RESTORATION SHOWN. AREAS OUTSIDE THESE4.
INSTALLATION SHALL BE REQUIRED.
BE REQUIRED PRIOR TO THE INSTALLATION OF SOD. A ONE (1) YEAR GUARANTEE FOR SOD
GENERAL CONTRACTOR, AND LANDSCAPE SUB-CONTRACTOR. APPROVAL BY THE ENGINEER WILL
SOD INSTALLATION: A PRE-SOD INSTALLATION INSPECTION SHALL BE HELD WITH THE ENGINEER,3.
NO CIRCUMSTANCES SHALL A CONTRACTOR OBTAIN WATER BY OPENING A VILLAGE FIRE HYDRANT.
AN ACCEPTABLE OUTSIDE SOURCE. VILLAGE POTABLE WATER USE WILL NOT BE ALLOWED. UNDER
FROM EITHER THE SCHAUMBURG PUBLIC WORKS BUILDING AT 714 SOUTH PLUM GROVE ROAD OR
SOD WATERING: THE CONTRACTOR WILL BE REQUIRED TO UTILIZE WATER FOR SOD INSTALLATION2.
AREAS PRIOR TO FINAL ACCEPTANCE AT A RATE SPECIFIED BY THE ENGINEER.
WHEN DIRECTED BY THE ENGINEER, SUPPLEMENTAL WATERING SHALL BE APPLIED TO ALL SODDED1.
SCHEDULED TO BE REMOVED, WITH CONSTRUCTION EQUIPMENT WHICH MAY DAMAGE THE PAVEMENT.
THE CONTRACTOR SHALL NOT CROSS COMPLETED BINDER COURSE, OR EXISTING PAVEMENT NOT 9.
MAINTAINED AT ALL TIMES BY THE CONTRACTOR.
UNLESS OTHERWISE AUTHORIZED BY THE ENGINEER, ALL EXISTING ACCESS POINTS SHALL BE 8.
DAMAGE EXISTING OR PROPOSED PAVEMENTS, OR OTHER ROADWAY APPURTENANCES.
MANNER THAT IN THE OPINION OF THE ENGINEER OR REPRESENTATIVE OF THE ENGINEER MAY
FROM BREAKING UP CONCRETE OR ASPHALT BY DROPPING IT ON PAVEMENT, OR IN ANY OTHER
CIRCUMSTANCE WILL THE USE OF A FROST BALL BE PERMITTED. THE CONTRACTOR IS PROHIBITED
UNDERGROUND PUBLIC AND/OR PRIVATE UTILITES, WILL NOT BE PERMITTED. UNDER NO
DESCRIBED HEREIN. THE USE OF ANY TYPE OF CONCRETE BREAKERS THAT MAY DAMAGE
REMOVALS SHALL BE ACCORDING TO SECTION 440 OF THE STANDARD SPECIFICATION EXCEPT AS
CONCRETE BREAKERS: PAVEMENT, CURB AND GUTTER, SHOULDERS, AND/OR ANY OTHER STRUCTURE7.
AND CONCRETE ITEMS TO BE PLACED.
THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND TO THE HOT-MIX ASPHALT
31, "QUALITY CONTROL/QUALITY ASSURANCE OF CONCRETE MIXTURES,"
ASPHALT. FOR CONCRETE MIXTURES, ATTENTION IS DIRECTED TO RECURRING SPECIAL PROVISION
ATTENTION IS DIRECTED TO SECTION 1030.05(d) OF THE STANDARD SPECIFICATIONS FOR HOT-MIX
THE CONTRACTOR SHALL BE RESPONSIBLE FOR QUALITY CONTROL INSPECTION, CONTRACTOR'S
SAMPLES AS REQUIRED.
THE INSPECTOR ACCESS TO HIS/HER PLANT AREA TO OBSERVE THE OPERATIONS AND TAKE MATERIAL
PLACEMENT OF ANY HOT-MIX ASPHALT OR CONCRETE MIXTURES. THE CONTRACTOR SHALL ALLOW
LOCAL AGENCY SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS IN ADVANCE OF THE
THE LOCAL AGENCY SHALL BE RESPONSIBLE FOR THE QUALITY ASSURANCE FIELD INSPECTION. THE
GUIDELINES (PPG).
ACCORDING TO SECTION 106 OF THE STANDARD SPECIFICATIONS AND THE PROJECT PROCEDURES
MATERIAL INSPECTION: ALL MATERIALS INCORPORATED IN THIS PROJECT ARE TO BE INSPECTED6.
WITHOUT THE FINAL APPROVAL OF THE VILLAGE'S ENGINEERING AND PUBLIC WORKS DEPARTMENT.
VILLAGE AUTHORIZED CONSULTING ENGINEER. PROJECTS WILL NOT BE ACCEPTED BY THE VILLAGE
REPRESENTATIVES OF THE VILLAGE'S ENGINEERING AND PUBLIC WORKS DEPARTMENT, OR
INSPECTION: ALL PHASES OF THE IMPROVEMENTS WILL BE SUBJECT TO INSPECTION BY5.
DEBRIS AND SURPLUS MATERIAL SHALL BE DISPOSED OF BY THE CONTRACTOR OFF-SITE.
MANNER. DEBRIS AND ANY SURPLUS MATERIAL SHALL BE REMOVED AS THE WORK PROCEEDS.
CLEAN-UP AND DISPOSAL: THE CONTRACTOR SHALL MAINTAIN THE SITE IN A CLEAN AND ORDERLY4.
TO THE CONTRACT.
BY THE ENGINEER OR REPRESENTATIVE ON THE ENGINEER. COST TO BE CONSIDERED INCIDENTAL
ON ANY ADJACENT STREETS EVERY WEDNESDAY AND FRIDAY AND ANY OTHER DAY AS REQUIRED
THE CONTRACTOR WILL BE REQUIRED TO SCHEDULE VACUUM CLEANING (STREET SWEEPING)
ON A DAILY BASIS OR WHEN DIRECTED BY THE ENGINEER.
CLEAN OF DIRT, MUD, AND OTHER DEBRIS AND, WHEN NECESSARY, CLEAN SAID PAVEMENTS
EXISTING STREET CLEANLINESS: THE CONTRACTOR SHALL KEEP EXISTING ADJACENT STREETS3.
CONTRACT.
BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER AT NO ADDITIONAL COST TO THE
PUBLIC/PRIVATE PROPERTY. ANY ITEM THAT IS DAMAGED SHALL BE REPLACED OR REPAIRED
EXISTING TREES, SHRUBS, MAILBOXES, FENCES, DRAIN LINES, POWER LINES, AND OTHER
PROTECTIONS OF PUBLIC/PRIVATE PROPERTY: THE CONTRACTOR SHALL PROTECT ALL 2.
FOR RE-USE, OR DISPOSED OF PROPERLY.
DETERMINE IF SUCH ITEMS SHALL BE RETURNED TO THE PROPERTY OWNER, STOCKPILED
"EARTH EXCAVATION." THE CONTRACTOR SHALL CONTACT THE OWNER OF THE ITEMS TO
BRICK PAVER WALKWAYS WITHIN R.O.W. LIMITS SHALL BE INCLUDED IN THE COST OF
TIMBERS, LANDSCAPE ROCKS, FENCES, FENCE POSTS, PLANTERS, VEGETATION, BRICK OR
NOT LIMITED TO, BLOCK RETAINING WALLS, CONCRETE RETAINING WALLS, LANDSCAPE
SITE OBJECTS: REMOVAL OF MISCELLANEOUS PARKWAY IMPROVEMENTS INCLUDING, BUT 1.
ESTABLISHED.
EROSION CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY UNTIL PERMANENT COVER IS
EROSION WITH THE USE OF TEMPORARY EROSION CONTROL SEEDING. TEMPORARY SEDIMENT AND
UNDISTURBED FOR MORE THAN 14 DAYS AFTER INITIAL DISTURBANCE SHALL BE PROTECTED FROM
SOIL EROSION WITHIN 14 DAYS AFTER FINAL GRADE IS REACHED. STRIPPED AREAS THAT WILL REMAIN
THE SURFACE OF ALL STRIPPED AREAS SHALL BE PERMANENTLY OR TEMPORARILY PROTECTED FROM 10.
SHALL BE PAID FOR AT THE UNIT PRICE FOR THE INDIVIDUAL ITEMS USED.
CONTROL MEASURES MEETING THE APPROVAL OF THE ENGINEER SHALL BE PROVIDED. THIS WORK
WHEN A TOPSOIL STOCKPILE IS TO REMAIN IN PLACE FOR MORE THAN THREE DAYS, EROSION 9.
REQUIREMENTS.
SEE STANDARD 280001 FOR ADDITIONAL SOIL EROSION AND SEDIMENT CONTROL DETAILS AND 8.
ADDITIONAL MEASURES MAY BE REQUIRED, AS DIRECTED BY THE ENGINEER.
THE EROSION CONTROL MEASURES INDICATED ON THE PLANS ARE THE MINIMUM REQUIREMENTS. 7.
ON ALL CATCH BASINS, INLETS, AND MANHOLES WITH OPEN GRATES IN LANDSCAPED AREAS.
GRATES IN THE CURB AND GUTTER. INLET AND PIPE PROTECTION SHALL BE PLACED
INLET FILTERS SHALL BE PLACED ON ALL CATCH BASINS, INLETS, AND MANHOLES WITH OPEN 6.
COMPLETED. THE LIMITS OF THE SOD SHALL BE THE LIMITS OF GRADING.
ALL SLOPES SHALL BE COVERED WITH SOD AS GRADING AND PLACEMENT OF TOPSOIL HAS BEEN 5.
BY SHOVELING AND/OR SWEEPING.
SEDIMENT DEPOSITS SHALL BE REMOVED FROM THE ROADWAY AT THE END OF EACH WORK DAY
SHALL BE PROTECTED, FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MUD AND
ALL STORM SEWER FACILITIES THAT ARE OR WILL BE FUNCTIONING DURING CONSTRUCTION4.
THE EFFECTIVENESS OF SAID MEASURES SHALL BE MADE IMMEDIATELY.
EACH RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN
THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER 3.
THE USE OF TEMPORARY OR PERMANENT MEASURES.
SOIL STABILIZATION MEASURES SHALL CONSIDER THE TIME OF YEAR, SITE CONDITIONS AND
SOIL DISTURBANCE SHALL BE CONDUCTED IN SUCH A MANNER AS TO MINIMIZE EROSION. 2.
CONTROL" OF THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY.
CONTROL" AND THE "STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT
THE "ILLINOIS PROCEDURES AND STANDARDS FOR URBAN SOIL EROSION AND SEDIMENTATION
AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF
ALL VEGETATIVE AND STRUCTURAL EROSION CONTROL PRACTICES SHALL BE CONSTRUCTED 1.
GENERAL NOTES
ALL CLASS A STORM SEWERS SHALL BE REINFORCED CONCRETE PIPE.11.
THE BOTTOM OF ALL PAVEMENT, CURBS AND SIDEWALK.
USE CA-6 TRENCH BACKFILL, COMPACTED TO 95% OF MODIFIED PROCTOR, UNDER AND WITHIN A 1:1 SLOPE FROM 10.
DUMP NO WASTE” PERMANENTLY INSCRIBED.
“SANITARY SEWER” CAST INTO THE LID. ALL OPEN LIDS OR GRATES SHALL HAVE THE WORDS “DRAINS TO RIVER, ALL MANHOLES AND VALVE VAULTS SHALL HAVE THE “VILLAGE OF SCHAUMBURG”AND “WATER,”“STORM SEWER,”OR 9.
ADDITIONAL COMPENSATION ALLOWED.
OR PIPES SHALL BE CONSIDERED INCLUDED IN THE COST OF THE ITEM BEING CONSTRUCTED AND NO
CONNECTION OF UNDERDRAINS AND STORM DRAINS TO EXISTING OR PROPOSED STORM SEWER STRUCTURES 8.
THE OUTLET END OF THE FLARED END SECTION.
STATIONS, OFFSETS, AND INVERT ELEVATIONS FOR FLARED END SECTIONS ARE GIVEN AT THE CENTERLINE OF 7.
CLASSIFICATION, PAYMENT WILL BE MADE FOR THE REVISED TYPE OF STORM SEWER.
COST OF THE STORM SEWER BEING INSTALLED. IF THE REVISED GRADE RESULTS IN A CHANGE IN PIPE
THE PIPE CLASSIFICATION, THE ADDITIONAL EXCAVATION OR SHEETING REQUIRED SHALL BE INCLUDED IN THE
ELEVATION DUE TO A UTILITY LINE OR OTHER OBSTRUCTION. IF SUCH A GRADE CHANGE DOES NOT ALTER
THE CONTRACTOR SHALL BE AWARE THAT AT TIMES THE ENGINEER MAY REQUIRE A CHANGE IN STORM SEWER6.
PLACEMENT OF TRENCH BACKFILL.
ONLY METHOD 1 UNDER ARTICLE 550.07 OF THE STANDARD SPECIFICATIONS SHALL BE ALLOWED FOR THE5.
CONFLICT WITH THE PROPOSED STORM SEWER SHALL BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE.
AND PROTECTED DURING CONSTRUCTION. ANY DAMAGE TO SAID SERVICES NOT CONSIDERED TO BE IN
ALL SEWER AND WATER SERVICES CROSSED BY NEW STORM SEWERS SHALL BE PROPERLY LOCATED4.
TO THE CENTERLINE OF THE LANE. ALL FLAT-TOPS AND CONES ARE ASSUMED TO BE ECCENTRIC.
DRAINAGE STRUCTURE FLAT-TOPS AND CONES SHALL BE TURNED SO THAT THE FRAMES ARE CLOSEST3.
NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR THE USE OF FLAT SLAB TOPS.
THE CONTRACTOR SHALL DETERMINE WHEN FLAT SLAB TOPS ARE REQUIRED ON MANHOLES AND CATCH BASINS.2.
SECTIONS 550 AND 601, AND ARTICLE 104.02 OF THE STANDARD SPECIFICATIONS.
THE REPLACEMENT OF A FACILITY, THE NECESSARY WORK AND PAYMENT SHALL BE IN ACCORDANCE WITH
PROVISION SHALL BE REPLACED AT THE CONTRACTOR'S OWN EXPENSE. SHOULD THE ENGINEER HAVE DIRECTED
EXISTING FACILITIES TO BE MAINTAINED THAT ARE DAMAGED BECAUSE OF THE NON-COMPLIANCE WITH THIS
FACILITIES IN SERVICE AND TO PROTECT THEM FROM DAMAGE DURING CONSTRUCTION IF MAINTAINED.
SHALL SO INFORM THE ENGINEER, WHO SHALL DIRECT THE WORK NECESSARY TO MAINTAIN OR REPLACE THE
UNDERDRAINS OR FIELD DRAINS WITHIN THE RIGHT-OF-WAY OTHER THAN THOSE SHOWN ON THE PLANS, HE/SHE
DURING CONSTRUCTION, IF THE CONTRACTOR ENCOUNTERS OR OTHERWISE BECOMES AWARE OF ANY SEWERS, LIMITS.
DETERMINE THE EXACT LOCATIONS OF EXISTING STRUCTURES WHICH ARE WITHIN THE PROPOSED CONSTRUCTION
THE PLANS ARE APPROXIMATE. PRIOR TO COMMENCING WORK THE CONTRACTOR, AT HIS/HER OWN EXPENSE, SHALL
THE PERIOD OF CONSTRUCTION. LOCATIONS OF EXISTING DRAINAGE STRUCTURES AND SEWERS AS SHOWN ON
UNLESS OTHERWISE NOTED ON THE PLANS, THE EXISTING DRAINAGE FACILITIES SHALL REMAIN IN USE DURING1.
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS STA. TO STA.
M
O D
E L
N A
M E
-G e n
N o te s F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
1 1
MWRD GENERAL NOTES
BE IN ACCORDANCE WITH THE ILLINOIS URBAN MANUAL.
ALL DESIGN CRITERIA, SPECIFICATIONS, AND INSTALLATION OF EROSION AND SEDIMENT CONTROL PRACTICES SHALL3.
EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE FUNCTIONAL PRIOR TO HYDROLOGIC DISTURBANCE OF THE SITE.2.
EROSION AND SEDIMENT CONTROL PLAN.
THE CONSTRACTOR SHALL INSTALL THE EROSION AND SEDIMENT CONTROL DEVICES AS SHOWN ON THE APPROVED1.
EROSION AND SEDIMENT CONTROLE.
MWRD GENERAL NOTES
REQUIRED, AS DIRECTED BY THE ENGINEER, SITE INSPECTOR, OR MWRD.
ARE THE MINIMUM REQUIREMENTS. ADDITIONAL MEASURES MAY BE
THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE PLANS24.
STABILIZATION.
BE REMOVED WITHIN THIRTY (30) DAYS AFTER PERMANENT SITE
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL23.
STABILIZATION IS ACHIEVED.
AND ANY PERIODS OF CONSTRUCTION SHUTDOWN UNTIL PERMANENT
AND REPAIRED AS NEEDED ON A YEAR-ROUND BASIS DURING CONSTRUCTION
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED22.
DISTURBING ACTIVITIES.
WITHIN SEVEN (7) DAYS FOLLOWING THE COMPLETION OF SOIL
ALL PERMANENT EROSION CONTROL PRACTICES SHALL BE INITIATED21.
TO WATERWAYS, FLOOD PROTECTION AREAS OR THE COMBINED SEWER SYSTEM.
UPSLOPE AREA. SEDIMENT LADEN WATERS SHALL NOT BE DISCHARGED
DEWATERING INTO A SUMP PIT, FILTER BAG OR EXISTING VEGETATED
EFFECTIVE SEDIMENT CONTROL DEVICE. ALTERNATIVES MAY INCLUDE
SHALL PASS THROUGH A SEDIMENT SETTLING POND OR EQUALLY
APPURTENANCES. ANY TRENCH DEWATERING, WHICH CONTAINS SEDIMENT
SEWERS, WATERMAINS AS WELL AS THEIR SERVICES AND OTHER
EXCAVATION FOR THE INSTALLATION OF SANITARY SEWERS, STORM
THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRENCH DEWATERING AND20.
PRESENT AT THE COMMENCEMENT OF DEWATERING ACTIVITIES.
DURING OPERATIONAL PERIODS. THE SITE INSPECTOR MUST BE
SEDIMENTATION. DEWATERING SYSTEMS SHOULD BE INSPECTED DAILY
DISCHARGE LOCATIONS SHALL BE PROTECTED FROM EROSION AND
IF DEWATERING SERVICES ARE USED, ADJOINING PROPERTIES AND19.
COMBINED SEWER AREA FOR GREEN INFRASTRUCTURE PRACTICES.
SANITARY SEWER OR COMBINED SEWER. DRAIN TILES ALLOWED IN
THE DEVELOPMENT. DRAIN TILES CANNOT BE TRIBUTARY TO A
DRAIN TILES AND INCORPORATE THEM INTO THE DRAINAGE PLAN FOR
THE CONTRACTOR SHALL EITHER REMOVE OR REPLACE ANY EXISTING18.
CONTROL MEASURES.
CONSTRUCTION SHALL BE PROTECTED BY APPROPRIATE SEDIMENT
STORM SEWERS THAT ARE OR WILL BE FUNCTIONING DURING17.
APPROPRIATE EROSION CONTROL BLANKET.
EARTHEN EMBANKMENT SIDE SLOPES SHALL BE STABILIZED WITH16.
FLOOD PROTECTION AREAS OR THEIR BUFFERS.
SEDIMENT CONTROLS. SOIL STOCKPILES SHALL NOT BE PLACED IN
SOIL STOCKPILES, AT A MINIMUM, BE PROTECTED WITH PERIMETER15.
OF THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED.
VOLUME CONTROL FACILITIES SHALL NOT BE CONSTRUCTED UNTIL ALL14.
FENCE (OR EQUIVALENT).
SHALL, AT A MINIMUM, BE PROTECTED WITH A DOUBLE ROW OF SILT
ALL FLOOD PROTECTION AREAS AND VOLUME CONTROL FACITLITIES13.
TEMPORARY OR PERMANENT MEASURES WITHIN SEVEN (7) DAYS.
TEMPORARILY OR PERMANENTLY CEASED SHALL BE STABILITIZED WITH
DISTRUBED AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE12.
SHALL NOT BE USED AS TEMPORARY SEDIMENT BASINS.
APPROPRIATE SEDIMENT TRAP OR BASIN. VOLUME CONTROL FACILITIES
DIRECT ALL RUNOFF FROM HYDROLOGICALLY DISTURBED AREAS TO AN
TEMPORARY DIVERSIONS SHALL BE CONSTRUCTED AS NECESSARY TO10
ENVELOPE CONSTRUCTION ACTIVITIES.
CONCRETE WASHOUT FACILITIES FOR ANY BRICK AND MORTAR BUILDING
MORTAR WASHOUT FACILITIES SHALL BE CONSTRUCTED IN ADDITION TO9.
ANY ON SITE CONSTRUCTION ACTIVITIES INVOLVING CONCRETE.
WITH THE ILLINOIS URBAN MANUAL AND SHALL BE INSTALLED PRIOR TO
CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED IN ACCORANCE8.
CONTROLLED SEDIMENT DISPOSAL AREA.
STREET CLEANING AS ACCUMULATIONS WARRANT AND TRANSPORTED TO A
STREET, ALLEY OR PARKING AREA SHALL BE REMOVED BY SCRAPING OR
SEDIMENT OR SOIL REACHING AN IMPROVED PUBLIC RIGHT-OF-WAY,
TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE.
THE ILLINOIS URBAN MANUAL SHALL BE INSTALLED AT ANY POINT WHERE
A STABILIZED MAT OF CRUSHED STONE MEETING THE STANDARDS OF7.
APPROPRIATE SOIL EROSION AND SEDIMENT CONTROL MEASURES.
ARE TO BE DONE IN PHASES, THE CO-PERMITTEE SHALL PLAN FOR
MINIMIZE EROSION. IF STRIPPING, CLEARING, GRADING, OR LANDSCAPING
SOIL DISTURBANCE SHALL BE CONDUCTED IN SUCH A MANNER AS TO6.
LIQUID EQUIVALENT PRECIPITATION.RAINFALL OR
THE END OF A STORM EVENT WITH GREATER THAN 0.5 INCH OF
ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OFB)
MEASURES, PRIOR TO ANY SOIL DISTURBANCE.
UPON COMPLETION OF INITIAL EROSION AND SEDIMENT CONTROLA)
INSPECTIONS AND DOCUMENTATION SHALL BE PERFORMED, AT A MINIMUM:5.
SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN4.
IN A COMBINED SEWER AREA) SHALL CONFORM TO THE FOLLOWING:
ALL SANITARY SEWER PIPE MATERIALS AND JOINTS (AND STORM SEWER PIPE MATERIALS AND JOINTS7.
ALL DOWNSPOUTS AND FOOTING DRAINS SHALL DISCHARGE TO THE STORM SEWER SYSTEM.6.
ALL FLOOR DRAINS SHALL DISCHARGE TO THE SANITARY SEWER SYSTEM.5.
AND SEWER MAIN CONSTRUCTION IN ILLINOIS (LATEST EDITION).
ALL SANITARY SEWER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR WATER4.
OR MWRD.
OF LINES FOR THE DEFLECTION TEST SHALL BE PROHIBITED WITHOUT PRIOR APPROVAL FROM THE MUNICIPALITY
DISCHARGING ANY UNPOLLUTED WATER INTO THE SANTIARY SEWER SYSTEM FOR THE PURPOSE OF SEWER FLUSHING3.
BY THE MUNICIPALITY AND/OR MWRD AFTER THE SEWERS HAVE BEEN TESTED AND ACCEPTED.
PRIOR TO COMMENCING ANY SEWER CONSTRUCTION. THE PLUG SHALL REMAIN IN PLACE UNTIL REMOVAL IS AUTHORIZED
A WATER-TIGHT PLUG SHALL BE INSTALLED IN THE DOWNSTREAM SEWER PIPE AT THE POINT OF SEWER CONNECTION2.
FROM ENTERING THE EXISTING SANITARY SEWERS.
THE CONTRACTOR SHALL TAKE MEASURES TO PREVENT ANY POLLUTED WATER, SUCH AS GROUND AND SURFACE WATER,1.
SANITARY SEWERSD.
STORM EVENT.
THE PERMITTEE SHALL ENSURE THAT CLEAN UP AND WASH OUT OF SEWAGE TAKES PLACE WITHIN 48 HOURS OF THE
IN THE EVENT OF A SEWER SURCHARGE INTO AN OPEN DETENTION BASIN TRIBUTARY TO COMBINED SEWERS, ENSURE PROPER OPERATION, AND ANY NECESSARY MAINTENANCES SHALL BE PERFORMED TO ENSURE FUNCTIONALITY.
REQUIRED BACKFLOW PREVENTERS SHALL BE INSPECTED AND EXERCISED ANNUALLY BY THE PROPERTY OWNER TO
A BACKFLOW PREVENTER IS REQUIRED FOR ALL DETENTION BASINS TRIBUTARY TO COMBINED SEWERS.18.
STORM SEWERS TRIBUTARY TO COMBINED SEWERS.
SHALL BE PLUGGED OR REMOVED, AND SHALL NOT BE CONNECTED TO COMBINED SEWERS, SANITARY SEWERS, OR
IS PROHIBITED; AND ALL EXISTING DRAIN TILES AND PERFORATED PIPES ENCOUNTERED WITHIN THE PROJECT AREA
TRIBUTARY TO COMBINED SEWERS IN COMBINED SEWER AREAS. CONSTRUCTION OF NEW FACILITIES OF THIS TYPE
ALLOWED TO BE CONNECTED TO OR TRIBUTARY TO COMBINED SEWERS, SANITARY SEWERS, OR STORM SEWERS
WITH VOLUME CONTROL FACILITIES, DRAIN TILES/FIELD TILES/UNDERDRAINS/PERFORATED PIPES ARE NOT
EXCEPT FOR FOUNDATION/FOOTING DRAINS PROVIDED TO PROTECT BUILDINGS, OR PERFORATED PIPES ASSOCIATED17.
CONCRETE OR MORTAR PLUG.
ALL ABANDONED SANITARY SEWERS SHALL BE PLUGGED AT BOTH ENDS WITH AT LEAST 2 FEET LONG NON-SHRINK16.
GROOVE TONGUE AND RUBBER GASKET TYPE JOINTS.
THAT CONFORM TO ASTM C-923 FOR ALL PIPE CONNECTIONS. PRECAST SECTIONS SHALL CONSIST OF MODIFIED
ALL SANITARY MANHOLES, (AND STORM MANHOLES IN COMBINED SEWER AREAS), SHALL HAVE PRECAST "RUBBER BOOTS"15.
DIAMETER OF 48 INCHES, AND SHALL BE CAST IN PLACE OR PRE-CAST REINFORCED CONCRETE.
ALL SANITARY MANHOLES, (AND STORM MANHOLES IN COMBINED SEWER AREAS), SHALL HAVE A MINIMUM INSIDE14.
MATERIAL OR REMOVED.
ALL EXISTING SEPTIC SYSTEMS SHALL BE ABANDONED. ABANDONED TANKS SHALL BE FILLED WITH GRANULAR13.
PIPE WITH THE ENDS SEALED.
SHALL BE CONSRUCTED TO WATERMAIN STANDARDS OR IT SHALL BE ENCASED WITH A WATER MAIN QUALITY CARRIER
DISTANCES DESCRIBED ABOVE CANNOT BE MAINTAINED, OR THE SEWER CROSSES ABOVE THE WATERMAIN, THE SEWER
UNDISTRUBED EARTH, KEEPING A MINIMUM 18" VERTICAL SEPARATION. IF EITHER THE VERTICAL OR HORIZONTAL
SEWER IS LAID IN THE SAME TRENCH WITH THE WATERMAIN LOCATED AT THE OPPOSIDE SIDE ON A BENCH OF
UNLESS: THE SEWER IS LAID IN A SEPARATE TRENCH, KEEPING A MINIMUM 18" VERTICAL SEPARATION; OR THE
HORIZONTAL DISTANCE OF 10 FEET BETWEEN SANITARY/COMBINED SEWERS AND WATERMAINS SHALL BE MAINTAINED
THE TOP OF THE SEWER TO THE BOTTOM OF THE WATERMAIN SHALL BE 18 INCHES. FURTHERMORE, A MINIMUM
WHENEVER A SANITARY/COMBINED SEWER CROSSES UNDER A WATERMAIN, THE MINIMUM VERTICAL DISTANCE FROM12.
FITTING, USING "BAND SEAL" OR SIMILAR COUPLINGS TO HOLD IT FIRMLY IN PLACE.
WITH PIPE CUTTER, NEATLY AND ACCURATELY CUT OUT DESIRED LENGTH OF PIPE FOR INSERTION OF PROPERC)
OR TEE BRANCH SECTION.
REMOVE AN ENTIRE SECTION OF PIPE (BREAKING ONLY THE TOP OF ONE BELL) AND REPLACED WITH A WYEB)
INSTALLATION OF HUBWYE SADDLE OR HUB-TEE SADDLE.
A CIRCULAR SAW-CUT OF SEWER MAIN BY PROPER TOOLS ("SHEWER-TAP" MACHINE OR SIMILAR) AND PROPERA)
MANHOLE, ONE OF THE FOLLOWING METHODS SHALL BE USED:
WHEN CONNECTING TO AN EXISTING SEWER MAIN BY MEANS OTHER THAN AN EXISTING WYE, TEE, OR AN EXISTING11.
WITH A CONCEALED PICKHOLE AND WATERTIGHT GASKET WITH THE WORD "SANITARY" CAST INTO THE LID.
ALL MANHOLES SHALL BE PROVIDED WITH BOLTED, WATERTIGHT COVERS. SANITARY LIDS SHALL BE CONSTRUCTED10.
NON-SHEAR FLEXIBLE-TYPE COUPLINGS SHALL BE USED IN THE CONNECTION OF SEWER PIPES OF DISSIMILAR MATERIALS.9.
USING PVC.
MATERIAL SHALL BE CA-7 AND SHALL BE EXTENDED AT LEAST 12" ABOVE THE TOP OF THE PIPE WHEN
DIAMETER OF THE SEWER PIPE, BUT NOT LESS THAN FOUR (4) INCHES NOR MORE THAN EIGHT (8) INCHES.
STONE BEDDING WITH STONE 1/4" TO 1" IN SIZE, WITH MINIMUM BEDDING THICKNESS EQUAL TO 1/4 THE OUTSIDE
ALL SANITARY SEWER CONSTRUCTION (AND STORM SEWER CONSTRUCTION IN COMBINED SEWER AREAS), REQUIRES8.
D3212, F-477ASTM F-276430-INCH TO 60-INCH TRIPLE WALL
D-3212, F-477ASTM F-273612-INCH TO 24-INCH DOUBLE WALL
POLYPROPYLENE (PP) PIPE
JOINT SPECIFICATIONSPIPE SPECIFICATIONSPIPE MATERIAL
IS USED FOR SEWER CONSTRUCTION OR A CONNECTION IS MADE
PRIOR TO PERMIT ISSUANCE. A SPECIAL CONDITION WILL BE ADDED TO THE PERMIT WHEN THE PIPE MATERIAL BELOW
THE FOLLOWING MATERIALS ARE ALLOWED ON A QUALIFIED BASIS SUBJECT TO DISTRICT REVIEW AND APPROVAL
ASTM D-3212AWWA C90514-INCH TO 48-INCH
ASTM D-3212AWWA C9004-INCH TO 12-INCH
ASTM D-3139ASTM D-22414-INCH TO 36-INCH
WATER MAIN QUALITY PVC
ASTM D-3212,F-477 (GASKETED)ASTM D-3035
ASTM D-3261, F-2620 (HEAT FUSION)ASTM D-3350HIGH DENSITY POLYETHYLENE (HDPE)
ASTM D-3212ASTM F-67918-INCH TO 27-INCH DIAMETER F/DY=46
ASTM D-3212ASTM D-30346-INCH TO 15-INCH DIAMETER SDR 26
POLYVINYL CHLORIDE (PVC) PIPE
ANSI A21.11ANSI A21.51DUCTILE IRON PIPE
ASTM C-564ASTM A-74CAST IRON SOIL PIPE
ASTM C-443ASTM C-76REINFORCED CONCRETE SEWER PIPE
ASTM C-425ASTM C-700VITRIFIED CLAY PIPE
JOINT SPECIFICATIONSPIPE SPECIFICATIONSPIPE MATERIAL
PRECEDENCE AND SHALL CONTROL ALL CONSTRUCTION.
*IN CASE OF CONFLICT BETWEEN THE APPLICABLE ORDINANCES NOTED, THE MORE STRINGENT SHALL TAKE
ORDINANCE AND TECHNICAL GUIDANCE MANUAL;
*THE METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO (MWRD) WATERSHED MANAGEMENT
*VILLAGE OF SCHAUMBURG MUNICIPAL CODE;
(SSWS) FOR SANITARY SEWER AND WATER MAIN CONSTRUCTION;
*STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS, LATEST EDITION
WATER MAIN CONSTRUCTION;
DEPARTMENT OF TRANSPORTATION (IDOT SS) FOR ALL IMPROVEMENTS EXCEPT SANITARY SEWER AND
*STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (JANUARY 1, 2022), BY THE ILLINOIS
EXCEPT AS MODIFIED HEREIN OR ON THE PLANS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FOLLOWING,1.
REFERENCED SPECIFICATIONSA.
NOTIFY THE ENGINEER SO THAT THE CONFLICT CAN BE RESOLVED. CALL J.U.L.I.E. AT 1-800-892-0123.
UTILITIES ARE ENCOUNTERED THAT CONFLICT IN LOCATION WITH NEW CONSTRUCTION, IMMEDIATELY
THE EXACT LOCATIONS OF UTILITIES AND FOR THEIR PROTECTION DURING CONSTRUCTION. IF EXISTING
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION FOR3.
EACH WORK PHASE.
CONTRACTOR SHALL DETERMINE ITEMS REQUIRING INSPECTION PRIOR TO START OF CONSTRUCTION OR
AT LEAST 24 HOURS PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO EACH PHASE OF WORK.
THE VILLAGE OF SCHAUMBURG ENGINEERING AND PUBLIC WORKS DEPARTMENT MUST BE NOTIFIED2.
PROJECT NAME, LOCATION AND PERMIT NUMBER TO WMOJOBSTART@MWRD.ORG).
PRIOR TO THE COMMENCEMENT OF ANY WORK (CALL 708-588-4055 OR SEND EMAIL NOTIFICATION WITH
THE MWRD LOCAL SEWER SECTION FIELD OFFICE MUST BE NOTIFIED AT LEAST TWO (2) WORKING DAYS1.
NOTIFICATIONSB.
BE TIED TO A FIRE HYDRANT.
OR BENDS SHAL BE LOCATED FROM THE DOWNSTREAM MANHOLE. ALL VALVES, B-BOXES, TEES OR BENDS SHALL
THEY ARE RECEIVED. ANY CHANGES IN LENGTH, LOCATION OR ALIGNMENT SHALL BE SHOWN IN RED. ALL WYES
UNDERGROUND IMPROVEMENTS ARE COMPLETED. FINAL PAYMENTS TO THE CONTRACTOR SHALL BE HELD UNTIL
RECORD DRAWINGS SHALL BE KEPT BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER AS SOON AS10.
BE ADJUSTED TO FINISH GRADE PRIOR TO FINAL INSPECTION.
ALL NEW AND EXISTING UTILITY STRUCTURES ON SITE AND IN AREAS DISTURBED DURING CONSTRUCTION SHALL9.
THE UNDERGROUND CONTRACTOR SHALL MAKE ALL NECESSARY ARRANGEMENTS TO NOTIFY ALL INSPECTION AGENCIES.8.
MUNICIPALITY, MWRD, AND OWNER.
MATERIAL AND COMPACTION TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE7.
FOR TO BE REMOVED SHALL BE REPLACED AT THE EXPENSE OF THE CONTRACTOR.
ANY EXISTING PAVEMENT, SIDEWALK, DRIVEWAY, ETC., DAMAGED DURING CONSTRUCTION OPERATIONS AND NOT CALLED6.
TO BEGINNING THE CONSTRUCTION OPERATIONS.
ONLY AND REPRESENT THE BEST KNOWLEDGE OF THE ENGINEER. VERIFY LOCATIONS AND ELEVATIONS PRIOR
THE LOCATION OF VARIOUS UNDERGROUND UTILITIES WHICH ARE SHOWN ON THE PLANS ARE FOR INFORMATION5.
PROPER CONSTRUCTION TECHNIQUES MUST BE FOLLOWED ON THE IMPROVEMENTS INDICATED ON THE PLANS.
OR AUTHORIZED AGENT. THE CONSTRUCTION DETAILS, AS PRESENTED ON THE PLANS, MUST BE FOLLOWED.
APPORVED BY MWRD AND THE MUNICIPALITY UNLESS CHANGES ARE APPROVED BY MWRD, THE MUNICIPALITY, THE PROPOSED IMPROVEMENTS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE ENGINEERING PLANS AS4.
ON THE PROJECT.
ETC., FROM ALL LIABITILTY INVOLVED WITH THE CONSTRUCTION, INSTALLATION, OR TESTING OF THIS WORK
THE CONTRACTOR(S) SHALL INDEMNIFY THE OWNER, ENGINEER, MUNICIPALITY, MWRD, AND THEIR AGENTS,3.
INSPECT, APPROVE, AND REJECT THE CONSTRUCTION IMPROVEMENTS.
MWRD, THE MUNICIPALITY AND THE OWNER OR OWNER'S REPRESENTATIVE SHALL HAVE THE AUTHORITY TO2.
ALL ELEVATIONS SHOWN ON PLANS REFERENCE N.G.V.D. 29. CONVERSION FACTOR IS NAVD88 = NGVD29 - 0.29'.1.
GENERAL NOTESC.
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E
-M
W R
D
R o u ti n g a p
F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
1 100+00 101 102 103 104 105+00 106
109 110+
112 113 114 115+00
MWRD ROUTING MAP
1 1
LEGEND
PROJECT AREA
P R
O G
R E S S
P
A R
K W
A Y
8" SANITARY SEWER
CONNECTION TO 60" MWRD INTERCEPTOR
10" SANITARY SEWER
D R
IV
E
P A
R K
S
ID
MWRD UPPER SALT CREEK 60"
SANITARY SEWER
SCHAUMBURG
8" VILLAGE OF
SANITARY SEWER
SCHAUMBURG
12" VILLAGE OF
PROJECT LOCATION
54" STORM SEWER
24" STORM SEWER
12" STORM SEWER
15" STORM SEWER
12" STORM SEWER
STORM SEWER (72" TO 78")
VILLAGE OF SCHAUMBURG
(MWRD PERMIT 21-142)
NORTH POND
OUTLET NORTH OF BASIN
36" STORM SEWER
TRIBUTARY D
SALT CREEK
(UPPER REACH)
SALT CREEK
600+00 601 602 603 604 605+00 606 607 608 609
610+00
WV
COUNTY
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E
-s h t-v o lu m e c o n tr o l
F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
0 50 100
SCALEKDC
KDC
PROGRESS PARKWAY
PROGRESS PARKWAY
P A R K S
ID
E
D R
IV
E
P A R K S
ID
E
D R
IV
E
LEGEND
90 N SHARED STREET
LANDMARK DRIVE
VOLUME CONTROL PLAN
PERVIOUS AREA
IMPERVIOUS AREA
PERMEABLE PAVER AREA
VOLUME CONTROL CALCULATION
CURVE NUMBER
90 N SHARED STREET
LOCATION CURVE NUMBER ADJ. CURVE NUMBER
PERVIOUS AREA
IMPERVIOUS AREA
PERMEABLE PAVER AREA
TOTAL AREA
0.43 AC
1.15 AC
0.80 AC
2.38 AC
SEASONALLY HIGH GROUNDWATER:
SEPARATION:
728.41
0.082
0.082
BELOW UNDERDRAINS UNLESS OTHERWISE NOTED.
BOTTOM OF AGGREGATE DEPTH SET AT 6"1)
NOTES:
VOLUME CONTROL REQ. - 90 N SHARED STREET = 0.096 AC-FT
90.68 86.66
LOCATION
[AC-FT]
BELOW INVERT
V , COARSE AGGREGATEB
[AC-FT]
ABOVE INVERT
V , COARSE AGGREGATE
APAVER SECTION
0.000
>0.096
>0.096
TWO NORTHERNMOST PARKING BAYS
ALL OTHER PARKING BAYS
TOTALS: 0.055
0.055
0.068
0.365
0.433-
2- 30% VOID SPACE ALLOWED PER VILLAGE REQUIREMENTS; 100% OF VOID SPACE CREDITED BELOW INVERT
1- 30% VOID SPACE ALLOWED PER VILLAGE REQUIREMENTS; 50% OF VOID SPACE CREDITED ABOVE INVERT
VOLUME CONTROL TABLE FOR 90 N SHARED STREET
AREA [AC]
PAVER SURFACE
[AC-FT]
VOLUME CONTROL
TOTAL AVAILABLE
24" ABOVE UNDERDRAIN
CONTROL DUE TO NON-ELEVATED UNDERDRAIN
N/A - THIS SECTION NOT PROVIDING VOLUME
91.79 86.30LANDMARK DRIVE
AREA TABLE - 90 N SHARED STREET
BOTTOM OF VOLUME CONTROL FACILITY:
>2.0 FT
PERVIOUS AREA
IMPERVIOUS AREA
TOTAL AREA
0.38 AC
0.20 AC
0.58 AC
AREA TABLE - LANDMARK DRIVE
SEPARATION DISCUSSION
SEE NARRATIVE FOR GROUNDWATER
(PROVIDED ON SITE VIA PERMEABLE PAVERS)
VOLUME CONTROL PROV. - 90 N SHARED STREET = 0.096 AC-FT
VOLUME CONTROL REQ. - LANDMARK DRIVE = 0.032 AC-FT
IN THIS PARKING BAY. NO VOLUME CONTROL CREDITED
PERMEABLE PAVER UNDERDRAIN NOT ELEVATED
IN THIS PARKING BAY. NO VOLUME CONTROL CREDITED
PERMEABLE PAVER UNDERDRAIN NOT ELEVATED
6" BELOW
18" ABOVE UNDERDRAIN
AND EVENTUALLY TO NORTH POND.
FLOW NORTH ALONG PARKSIDE DRIVE
SITE. 100-YEAR OVERFLOW WILL
100-YEAR OVERFLOW ROUTE FROM
PER MWRD PERMIT NO. 2021-0142)
(PROVIDED OFF SITE VIA NORTH POND REGIONAL BMP,
VOLUME CONTROL PROV. - LANDMARK DRIVE = 0.032 AC-FT
600+00 601 602 603 604 605+00 606 607 608 609
610+00
WV
COUNTY
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E
-s h t-m a in te n a n c e .d g n
F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
0 50 100
SCALEKDC
KDC
PROGRESS PARKWAY
PROGRESS PARKWAY
P A R K S
ID
E
D R
IV
E
P A R K S
ID
E
D R
IV
E
LEGEND
90 N SHARED STREET
LANDMARK DRIVE
PROPOSED ROW
PROPOSED ROW
PROPOSED ROW
PROPOSED ROW
EXISTING ROW
EXISTING ROW
(PERMEABLE PAVERS)
VOLUME CONTROL FACILITY
PROPOSED STORM SEWER
(SANITARY SEWER)
PROPOSED QUALIFIED SEWER
PROPOSED ROW
EXISTING ROW
PROJECT SITE SUMMARY
STORMWATER SUMMARY TABLE
REMOVE ANY OBSTRUCTIONS PLACED IN MAINTENANCE EASEMENTS THAT MAY IMPEDE MAINTENANCE EQUIPMENT ACCESS.___
PERFORM REGULAR CLEANING SO THAT EACH SEWER SEGMENT IS CLEANED ONCE EVERY FIVE YEARS.___
PERFORM SEWER INSPECTIONS ONCE EVERY FIVE YEARS, MAKE REPAIRS AS NECESSARY.___
PERFORM MANHOLE INSPECTIONS ONCE EVERY FIVE YEARS, MAKE REPAIRS AS NECESSARY.___
QUALIFIED SEWER CONSTRUCTION6.
DEAD OR DAMAGED NON-NATIVE GRASSY AREAS - REPAIR WITH SEEDING WITH FERTILIZATION OR SEEDING TO MATCH.___
REGULAR MOWING TO CONTROL VEGETATION; IT IS RECOMMENDED THAT NATIVE VEGTATION REMAIN UNCUT.___
CHECK FOR INVASIVE VEGETATION, REMOVE WHEN POSSIBLE.___
EVIDENCE OF GRAZING, MOTORBIKES, OR OTHER VEHICLES, REPAIR.___
SUCCESSFULLY STABLISHED.
(50% OF THE SURFACE AREA AFTER SECOND GROWING SEASON). RESEED WITH ALTERNATIVE NATIVE GRASS SPECIES IF ORIGINAL GRASS COVER HAS NOT
NEED FOR PLANTING, RESEEDING, OR SODDING. SUPPLEMENT ALTERNATIVE NATIVE VEGETATION IF A SIGNIFICANT PORTION HAS NOT ESTABLISHED___
VEGETATED AREAS5.
REGULAR MOWING TO CONTROL VEGETATION.___
REGRADE TO PROVIDE POSITIVE DRAINAGE AS NECESSARY.___
RESTORE RIPRAP AS NECESSARY.___
SEED AND SOD ANY ERODED AREAS.___
REMOVE ANY OBSTRUCTIONS THAT HAVE BEEN PLACED IN THE DRAINAGE PATH.___
THE SLOPE AND CROSS-SECTIONAL AREA OF THE DITCH/SWALE SHALL BE VERIFIED DURING THIS INSPECTION.
ANNUAL VISUAL INSPECTIONS SHALL BE PERFORMED THAT VERIFY THE DESIGN CAPACITY OF THE OVERLAND FLOW ROUTES IS MAINTAINED.___
OVERLAND FLOW ROUTES (DITCHES/SWALES)
REPLANT AND RESEED ANY ERODED AREAS.___
RESTORE RIPRAP AT OUTFALLS.___
RESTORE RIPRAP AT OUTFALLS IF EROSION OBSERVED.___
OUT AS NECESSARY.
STORM SEWERS AND CULVERTS SHALL BE CHECKED FOR SILTATION DEPOSITS AT INLETS, OUTLETS, AND WITHIN THE CONDUIT, CLEAN___
VISUALLY INSPECT PIPES BY REMOVING MANHOLE LIDS, MAKE REPAIRS AS NECESSARY.___
STORM SEWERS/CULVERTS
CONSERVATION AREA/DEED RESTRICTED AREA: 0.00 ACRES
PROJECT AREA: 2.96 ACRES (2.38 ACRES 90 N SHARED, 0.58 ACRES LANDMARK)
TOTAL CONTIGUOUS OWNERSHIP: 2.96 ACRES (2.38 ACRES 90 N SHARED, 0.58 ACRES LANDMARK)
07-02-400-001-0000, 07-02-400-003-000PROPERTY INDEX NUMBER(S):
90 N SHARED STREET BETWEEN PROGRESS PARKWAY AND LANDMARK DRIVEPROPERTY ADRESS:
SECTION 2, TOWNSHIP 41N, RANGE 10E, SECTION 11, TOWNSHIP 41N, RANGE 10EPROPERTY LEGAL DESCRIPTION:
STORMWATER/FLOODPLAIN SUMMARY
VOLUME CONTROL
COMPENSATORY STORAGE VOLUME (0-10 YEAR)
COMPENSATORY STORAGE VOLUME (10-100 YEAR)
(AC-FT)
REQUIRED
90 N
PROVIDED
90 N
(AC-FT) (AC-FT) (AC-FT)
REQUIRED
LANDMARK
PROVIDED
LANDMARK
0.096
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
0.096 0.032 0.032
REMOVE ACCUMULATED SEDIMENT FROM MANHOLE BOTTOM WHEN 50% OF SUMP IS FILLED.___
RESET COVERS/LIDS ON AS-NEEDED BASIS.___
REMOVE ACCUMULATED LEAVES AND OTHER DEBRIS FROM GRATES.___
STORM INLETS/MANHOLES
INSPECTION SHALL OCCUR BETWEEN MARCH AND NOVEMBER AND INCLUDE THE FOLLOWING SPECIFIC AREAS OF CONCERN:
THE VILLAGE SHALL PERFORM MONTHLY INSPECTIONS OF ALL COMPONENTS OF THE STORMWATER COLLECTION SYSTEM. THE MONTHLY
STORMWATER COLLECTION SYSTEM4.
APPROPRIATE SIGNAGE SHALL BE REPAIRED IF DAMAGED OR ILLEGIBLE.___
ACCUMULATED SEDIMENT FROM SURFACE SHALL BE VACUUMED OUT AND DISPOSED OF PROPERLY.___
SURFACE OF PERMEABLE PAVEMENT SHALL BE CLEANED WITH LOW POWER PRESSURE WASHER.___
FACILITY SHALL BE INSPECTED YEARLY USING THE MONITORING WELLS TO VERIFY THE SYSTEM IS FUNCTIONING PROPERLY.___
AS-NEEDED BASIS. SPECIFIC ITEMS OF CONCERN INCLUDE:
ROUTINE INSPECTIONS AND MAINTENANCE OF VOLUME CONTROL FACILITIES SHALL BE PERFORMED BY THE VILLAGE ON A YEARLY OR
VOLUME CONTROL FACILITY3)
ROADS SHALL BE SWEPT, VACUUMED AND/OR WASHED ON A REGULAR BASIS.___
RIPRAP AREAS SHALL BE REPAIRED WITH THE ADDITION OF NEW RIPRAP, AS NECESSARY, OF SIMILAR SHAPE AND SIZE.___
ACCUMULATED SEDIMENT SHALL BE DISPOSED OF PROPERLY, ALONG WITH ANY WASTES GENERATED DURING MAINTENANCE OPERATIONS.___
AS NECESSARY.
LANDSCAPED AREAS SHALL BE MAINTAINED WITH REGULAR MOWING AND RESTORED WITH APPROPRIATE SEEDING/ VEGETATION ___
LITTER AND DEBRIS SHALL BE CONTROLLED.___
SPECIFIC ITEMS OF CONCERN INCLUDE:
REGULAR INSPECTIONS AND ROUTINE MAINTENANCE OF GENERAL AREAS SHALL BE PERFORMED ON A MONTHLY OR AS-NEEDED BASIS.
GENERAL2)
RESPONSIBILITY FOR THE FOLLOWING PERPETUAL MAINTENANCE ACTIVITIES:
THE VILLAGE OF SCHAUMBURG, WITH FACILITIES AS SHOWN ON THIS EXHIBIT (EXHIBIT R) SHALL ASSUME1)
NOTES:
MAINTENANCE AND MONITORING EXHIBIT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E
-s h t-d r a in a g e a r e a .d g n
F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
1 1
8DRAINAGE AREA EXHIBIT
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E s h t_
S O
Q .d g n
F
IL
E
N
A M
E
M O
D E
Itasca, Illinois 60143
Two Pierce Place, Suite 1400 www.civiltechinc.com
Tel: 630.773.3900 Fax: 630.773.3975
Itasca, Illinois 60143
Two Pierce Place, Suite 1400
-DATE
KDC
KDC
SUMMARY OF QUANTITIES
O
V
IS
IO
N S P
E C
IA
IT
M
S P
E C
IA
L T
Y
NO.ITEM NO.CODE ITEM UNIT
QUANTITY
TOTAL
X 1 20100110 DIAMETER) UNITS 15 TO (6 REMOVALTREE UNIT 13
2 20101000 FENCETEMPORARY FOOT 1724
3 20200100 EXCAVATIONEARTH YDCU 10584
4 20201200 MATERIAL UNSUITABLE OF DISPOSAL ANDREMOVAL YDCU 2385
5 20400800 EXCAVATIONFURNISHED YDCU 90
X 6 20700220 EMBANKMENT GRANULARPOROUS YDCU 1932
7 20800150 BACKFILLTRENCH YDCU 3219
8 21001000 STABILIZATION GROUND FOR FABRICGEOTECHNICAL YDSQ 544
9 21101505 PLACEMENT AND EXCAVATIONTOPSOIL YDCU 452
X X 10 21101615 4" PLACE, AND FURNISHTOPSOIL YDSQ 200
X 11 25000400 NUTRIENT FERTILIZERNITROGEN POUND 73
X 12 25000500 NUTRIENT FERTILIZERPHOSPHORUS POUND 65
X 13 25000600 NUTRIENT FERTILIZERPOTASSIUM POUND 60
X X 14 25200110 TOLERANT SALTSODDING, YDSQ 4070
X X 15 25200200 WATERINGSUPPLEMENTAL UNIT 221
16 28000250 SEEDING CONTROL EROSIONTEMPORARY POUND 85
TOTAL
SHEETS
SHEET
NO.
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N O
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED SHEET OF SHEETS
M
O D
E L
N A
M E s h t_
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .