PROJECT
LOCATION
architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
Q
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF8
/2
/2
:3 :5
P
M C
U s e rs
\j k o c a j\ D o c u m e n ts
\B N
L O
C e n tr a l2
P a in ti n g C o n tr a c t_ jk o c a j.
rv t
G 000
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven
National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Brookhaven National Laboratory
Painting of New 500,000 Gallon Water Tower
Upton Road, Upton, New York 11973
BNLO1804
AUGUST 2022
Upton Road, Upton, New York 11973
N
SITE LOCATION MAP
SCALE: 1" = 1,000'
architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF8
/2
/2
:3 :5
P
M C
U s e rs
\j k o c a j\ D o c u m e n ts
\B N
L O
C e n tr a l2
P a in ti n g C o n tr a c t_ jk o c a j.
rv t
G 001
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven
National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
PROJECT SHEET LIST AND
GENERAL NOTES
CONTRACT P - PAINTING
GENERAL CONSTRUCTION AND PROJECT NOTES:
1. CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE PRIOR TO SUBMISSION OF BIDS AND SHALL MAKE NO ADDITIONAL
CLAIMS REGARDING SITE CONDITIONS THEREAFTER.
2. CONTRACTOR SHALL NOTIFY THE OWNER AND H2M ARCHITECTS + ENGINEERS (TELEPHONE 631-756-8000) AT LEAST 24 HOURS PRIOR TO THE COMMENCEMENT OF THE WORK. THE SAME NOTICE SHALL BE REQUIRED WHEN RESUMING WORK
AFTER ANY STOPPAGE OR DELAY.
3. LOCATION OF ALL UNDERGROUND UTILITIES, ELECTRIC AND TELEPHONE CONDUITS, STORM DRAINS AND UNDERGROUND PIPING WERE OBTAINED FROM EITHER OLD MAPS, SURVEYS, DRAWINGS AND RECORDS SUPPLIED BY OTHERS. THE OWNER AND ENGINEER DO NOT GUARANTEE OR ACCEPT RESPONSIBILITY FOR ANY DAMAGE TO SUCH FACILITIES DUE TO DISCREPANCIES IN LOCATION AND SIZE SHOWN ON THE PLANS, NOR WILL ANY COMPENSATION BE MADE TO THE CONTRACTOR FOR ANY INCONVENIENCES CAUSED BY HIM BY ENCOUNTERING THE AFOREMENTIONED UTILITIES WHICH ARE NOT SHOWN, OR ARE INCORRECTLY SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATIONS OF ANY UNDERGROUND UTILITIES, GAS MAINS, ELECTRIC AND TELEPHONE CONDUITS.
4. CONTRACTOR SHALL PERFORM DAILY CLEAN-UP OPERATIONS WHICH INCLUDE REMOVAL OF DEBRIS AND EXCESS
CONSTRUCTION MATERIAL TO THE SATISFACTION OF THE OWNER AND THE ENGINEER.
5. DURING ALL NON-WORKING HOURS, THE CONTRACTOR WILL BE REQUIRED TO STORE ALL EQUIPMENT AND MATERIALS
WITHIN THE DESIGNATED AREAS AT THE PROJECT SITE.
6. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
7. CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODE REQUIREMENTS, THE CONTRACT, AND
SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
8. CONTRACTOR SHALL SECURE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE SAFETY STANDARDS AND
SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
9. CONTRACTOR SHALL COORDINATE ACTIVITIES WITH THE OWNER SO AS TO MINIMIZE INTERRUPTION TO THE WATER
SUPPLY.
10. ALL ELEVATIONS ARE BASED ON N.A.V.D. 1988 DATUM, UNLESS OTHERWISE INDICATED.
11. CONTRACTOR WILL BE REQUIRED TO PROTECT AND MAINTAIN ALL BENCHMARKS AND MONUMENTS. CONTRACTOR WILL BE RESPONSIBLE TO RESTORE ALL BENCHMARKS OR MONUMENTS DISTURBED BY THE CONTRACTOR'S WORK.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT, SURVEY, ETC. AS REQUIRED TO COMPLETE THE WORK.
13. THE DRAWING AND SPECIFICATIONS ARE COMPLEMENTARY, THE PROJECT SEPARATELY BOUND, CONTAINS THE
CONDITIONS OF THE CONTRACT, PROCEDURES AND TECHNICAL SPECIFICATIONS.
14. ALL CONTRACTORS ARE TO VISIT THE SITE AND BECOME FAMILIAR WITH THE CONDITIONS OF THE SITE AND DIFFICULTIES
ATTENDING THE WORK.
15. DO NOT SCALE MEASURE AND DRAWING. VERIFY THE FIGURES, DIMENSIONS AND DESIGN INTENTION SHOWN ON THE
DRAWINGS BEFORE BEGINNING LAYOUT OF THE WORK.
16. REPORT ANY ERRORS, INACCURACIES, MISSING DIMENSIONAL REQUIREMENTS OR CONFLICTS TO THE
ARCHITECT/ENGINEER IN WRITING BEFORE BEGINNING ANY WORK.
17. VERIFY EXACT LAYOUT CAPABILITY WITH ALL EXISTING CONDITIONS AND COORDINATE ALL WORK TO BE UNDERTAKEN PRIOR TO BEGINNING ANY WORK. NOTIFY THE ARCHITECT/ENGINEER IN WRITING BEFORE BEGINNING WORK IF ANY DISCREPANCIES ARE FOUND WITH CONDITIONS ENCOUNTERED, AS WELL AS ITEMS COVERED IN 8 AND 9. CONTRACTOR WILL BE RESPONSIBLE FOR ALL TEMPORARY MEASURES, TIME LOST, CHANGES TO THE WORK SCOPE WITHOUT ANY ADDITIONAL COMPENSATION IF CONTRACTOR FAILS TO PROVIDE AFOREMENTIONED VERIFICATIONS AND COORDINATION
PRIOR TO COMMENCING WORK.
18. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, LAWS, AGENCIES HAVING JURISDICTION, AND STATUS AS
REQUIRED.
19. CONTRACTOR SHALL STRICTLY ADHERE TO MANUFACTURER'S PRINTED INSTRUCTION.
20. VERIFY ALL CHANGES TO WORK IN WRITING WITH THE ARCHITECT/ENGINEER AND OWNER BEFORE BEGINNING RELATED
WORK.
21. PROVIDE POSITIVE DRAINAGE AWAY FROM THE FOUNDATION PERIMETER, PITCH 1/4" PER FOOT. NOTIFY
ARCHITECT/ENGINEER OF ANY DISCREPANCIES WITH THIS REQUIREMENT BEFORE PROCEEDING.
22. IF APPLICABLE, ALL CONTRACTS MUST REVIEW ALL DRAWINGS CONTAINED IN THE SET SO AS TO BECOME FAMILIAR WITH THE WORK REQUIRED UNDER THEIR SCOPE AND THE WORK OF ALL OTHER CONTRACTORS. ADDITIONALLY, ALL CONTRACTORS ARE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK WITH ALL OTHER TRADES AND
CONTRACTORS.
23. DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCE RELATIONSHIP CONTAINED ONLY IN THAT
ROOM AT AN OPPOSING OR PARALLEL WALL UNLESS NOTED OTHERWISE.
24. VERIFY AND ADJUST APPROXIMATE DIMENSIONS (+/-) IN THE FIELD. VERIFY WITH ARCHITECT/ENGINEER PRIOR TO
CONSTRUCTION.
25. ALL ITEMS DETAILED OR SPECIFIED TO RUN WITHIN OR ATTACHED TO WALLS AND CEILINGS ARE TO BE CONCEALED OR
RECESSED UNLESS NOTED OTHERWISE.
26. CONTRACTOR SHALL LOCATE ALL PENETRATIONS REQUIRED TO ACCOMMODATE ALL WORK DETAILED OR SPECIFIED FOR
THEIR SCOPE, AND COORDINATE THIS WORK WITH OTHERS.
27. CONTRACTOR SHALL PROTECT ALL ADJACENT EXISTING CONSTRUCTION, ITEMS, FINISHES, ETC. AND SHALL PATCH, REPAIR AND/OR REPLACE, AND REFINISH AS REQUIRED TO RESTORE ANY AND ALL AREAS DAMAGED DURING CONSTRUCTION.
28. CONTRACTOR SHALL PROVIDE, AND COORDINATE THE INSTALLATION OF, ALL ACCESS PANELS THAT ARE NEEDED TO
ACCESS OR SERVICE FOR ALL ITEMS INSTALLED AS PART OF THEIR SCOPE OF WORK.
29. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING CONFORMING TO BNL STANDARDS TO PROTECT WORK AREAS DURING CONSTRUCTION AS PER SPECIFICATION SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS.
30. THE CONTRACTOR IS NOT PERMITTED TO REMOVE ANY EXISTING TREES. IF THE REMOVAL OF ANY TREES IS REQUIRED TO COMPLETE ANY OF THE WORK, OWNER SHALL APPROVE TREES TO BE REMOVED PRIOR TO ACTUAL REMOVALS. REMOVALS SHALL INCLUDE REMOVAL OF COMPLETE STUMP AND ROOT SYSTEM. CONTRACTOR SHALL NOT BE PERMITTED TO GRIND
STUMPS.
31. CONCRETE SIDEWALKS SHALL BE SAWCUT BACK TO EXPANSION/CONTROL JOINTS.
PROJECT SHEET LIST
SHEET
NO.
DRAWING
NO. SHEET NAME
1 G 000 COVER SHEET
2 G 001 PROJECT SHEET LIST AND GENERAL NOTES
3 V 100 EXISTING SITE CONDITIONS AND DETAIL
4 T 001 GENERAL NOTES, ELEVATION, AND ISOMETRIC
5 T 100 FLOOR PLANS
6 T 500 TANK DETAILS
7 E 001 LEGENDS AND SCHEDULES
8 E 100 TANK ELECTRICAL PLAN
9 E 200 TANK ELEVATION ELECTRICAL PLAN
10 E 500 ELECTRICAL DETAILS
SYMBOLS LEGEND
CENTERLINE
Level Name
N
PROJECT
NORTH
G1.0
G1.0
DETAIL KEY
ELEVATION LEVEL
NORTH ARROW
Drawing Title
SCALE:
DRAWING TITLE
SECTION CUT KEY
32. CONTRACTOR SHALL COORDINATE ACTIVITIES WITH OWNER/ENGINEER SO AS TO MINIMIZE
DISTURBANCE TO SITE, EXISTING WATER SUPPLY FACILITIES AND SURROUNDING AREAS.
33. PROTECT EXISTING STRUCTURES DURING EXCAVATION. PROVIDE TEMPORARY SHORING OR
BRACING AS REQUIRED TO PROPERLY AND ADEQUATELY SUPPORT EXISTING STRUCTURES.
34. CONTRACTOR SHALL COORDINATE ALL WORK WITH OWNER SO THAT DAILY OPERATIONS WILL NOT
BE AFFECTED BY NEW CONSTRUCTION.
35. CONTRACTOR SHALL SUBMIT A PLAN FOR THE PROTECTION OF THE POLICE HEADQUARTERS AND RELATED FACILITIES
INCLUDING PROVIDING SAFE INGRESS / EGRESS TO AND FROM THE HEADQUARTERS.
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions
36. EXISTING WATER MAIN VALVES MAY ONLY BE OPERATED BY BNL WATER OPERATORS. IF EXISTING WATER MAIN VALVES REQUIRE OPERATION 48 HOURS' NOTICE MUST BE PROVIDED TO BNL BEFORE THE REQUESTED OPERATION IS REQUIRED.
ALL AREAS DISTURBED BY THE WORK SHALL BE RESTORED TO PREEXISTING OR SPECIFIED NEW CONDITIONS INCLUDING
BUT NOT LIMITED TO ASPHALT PAVEMENT, CONCRETE CURBS, GRASS AREAS, ETC.
37.
ER
ERER
ER
T
ER ER
E E E E E E E E E
E
E
E
E
E
E E E E
E
E
E
E
E
E
EE
EEE
T T
T T
T T
T T
T
T
T
T
T
T T T T T T T T T T T T T
T T
T
T
E E
E
E
E
E
E E
E E
E
W
W
W
W
W
W
W
W
W
W
W
W
T T T T
T T
T T T T T
D D D D D D D D D D D D D D D
113.55
113.47
113.28
113.40
113.57
113.96
113.21
112.87
112.64
113.17
113.09
113.09
112.89
113.16
112.60 112.01
112.08
112.61 113.03
113.31
113.18 113.16 113.19
113.42 113.29
112.70
112.68
112.76 112.63
2.2
2.2
1.9
113.45113.63113.42
113.55
113.56
113.4
113.0
112.9 112.7
113.1
113.4
113.1
109.8
109.8
112.3 107.8
108.0 106.8
106.4
105.3
105.2 104.6
104.7
114.28 114.20 bc112.90 bc113.94 bc113.96 bc113.94 bc113.90 tc113.96 tc114.36 tc114.42 tc114.38 tc113.49 114.49
114.51 113.47
114.44 114.41
114.11 113.97
4.0
114.08
113.04
113.10
113.84 114.04
114.45 114.50
113.36 bc113.48 bc113.40 bc113.33 tc113.75 tc113.95 tc113.96 bc113.56 bc113.57 bc113.94 bc113.87 bc1 13.
tc1 13.
tc113.97 tc114.31 tc114.02 tc113.94
112.2
111.9
109.5
111.0
110.8
108.6
109.5
111.4
110.3
111.6
109.8
112.7
111.3
110.3
111.3
109.7
108.5
108.1
110.7
103.7
104.8 106.2
107.7
113.4
111.9
110.4
112.6
106.5
106.5
4.0
113.57
113.38
112.65
112.36
113.10
113.04 113.59
113.57
111.9
1 Story Shed
2 Story Frame Building
U pton R oad A sphalt Pavem ent
37.7'
16.8'
16.8'
16.8'
16.8'
Benchmark:
Nail Set in Pole Elevation 114.00
Crosswalk
Parking Lot Asphalt
Existing 300,000 Gallon Elevated Water Tank
E E
E E E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E E E
WWWWWWWWWWWWWWWWWW
W W
W W
W tc113.49 tc113.45 tc1
.57 bc
3.1 bc113.24 bc113.46
Concrete Curb bc113.24 tc113.43
Gravel Path
Cluster
16"
20"
12" 12"
6"
22"
20"
10"
8"
16"
Column on Concrete Footing
(Typ.)
Transformer on Concrete
Pad
8" Iron Pipe Inv. 102.86
Concrete Headwall
Wooden Steps
Concrete W alk
Concrete W alk
Box with Fire Extinguisher
Edge of Pavement
Double Yellow Stripes
Single W hite Stripe
Concrete Curb Single W hite Stripe Concrete Curb
Double Yellow Stripes
Utility Pole With Antenna
E
E
E
E
E E E E E E E E E
E
E
E E
E E
E E
E E
E E
E
E
E
E
D
D
6" Ø
HD
PE
2.
0% (M
IN
112.0 111.3
110.5
112.0 111.0
110.5
109.5
108.5
111 111.0
110.0
110.0
110.0
110.0
110.0
109.8
109.8
109.8
109.7
109.5
EXISTING 500,000 GALLON
WATER TOWER TO BE
PREPARED AND PAINTED
EXISTING OVERFLOW PIPE
DISCHARGE TO BE PREPARED AND
PAINTEDV 100
EXISTING
TRANSFORMER 'TX'
DISCONNECT AND PLUG WEST SIDE
OF EXISTING TEE AND INSTALL
CLEANOUT ASSEMBLY, ABANDON
DRAIN FROM EXISTING 300,000
GALLON TANK TO TEE, BY OTHERS
EXISTING 12"x4" TEE, 4"Ø C.L.D.I.
PIPE, AND 4" GATE VALVE FOR
FUTURE TIE-IN OF WATER
SERVICE TO BUILDING 50
EXISTING HYDRANT ASSEMBLY
AND (2) 12" GATE VALVES
EXISTING 3"Ø PVC WATER
SERVICE TO BUILDING 50
PLUG EXISTING 12"x4" TEE AFTER
EXISTING TANK IS
DECOMMISSIONED AND PRIOR TO
DEMOLITION, BY OTHERS
EXPECTED AZIMUTH OF BNL
LOGO, LOGO TO GENERALLY
FACE THE TRAFFIC CIRCLE ON
PRINCETON AVENUE
270°±
NEW BOLLARD, TYP.
E 500
SCALE: NTS
Overflow Pipe Discharge Modification Detail
CL
EXISTING DUCTILE IRON x ASBESTOS
CEMENT COUPLING
8"
EXISTING 8"Ø TRANSITE TANK OVERFLOW PIPE
EXISTING PRECAST CONCRETE HEADWALL
CL
6" 6"
EXISTING 8" FLANGED STAINLESS STEEL INSECT
SCREEN, REMOVE, PROTECT, AND STORE. REINSTALL
AFTER PREPARATION AND PAINTING IS COMPLETED.
BLAST SSPC SP-10 AND PAINT ALL
EXTERIOR PIPE SURFACES AND
FLANGED FLAPPER VALVE
EXISTING CURB STOP
BOX
EXISTING 3/4'' CURB
STOP AND DRAIN
TAPPED
EXISTING 4'' Ø S.S.
PIPE WITH #4 MESH
SCREEN COVER (BOTH
ENDS)
6''
V 100.00
EXISTING SITE CONDITIONS
AND DETAIL
AMT
MARK DATE DESCRIPTION
CLIENT
\\h 2m
.co m\ sh ar es \P ro jec ts\
BN
LO
(B ro ok ha ve n N ati on al
La b)
\B
NL
O1
4 - N ew
0K E lev ate d S tor ag e T an k\0
2-
BI
M-
CA
DD
\C on -d oc s\m ec h\V
0.d wg La st Mo dif ied
: A ug
, 2
2 -
4:
pm P lot ted on : A ug
, 2
2 - 4:
pm
B y j ko ca j
CONSULTANTS:
Brookhaven National Laboratory
SHEET No.
SHEET TITLE
CONTRACT
STATUS
OF
DESIGNED BY: DRAWN BY:
Q
PROJECT No.:
BNLO1804
DATE:
AUGUST 2022
CHECKED BY: REVIEWED BY:
SCALE:
AS SHOWN
DRAWING No.
Painting of New 500,000 Gallon Water Tower architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL IS ILLEGAL"
CONTRACT P - PAINTING
FINAL BID DOCUMENT
Upton Road, Upton, New York 11973
GRAPHIC SCALE
( IN FEET )
1 inch = ft.
10 2020
JEK
1 07/2022 BNL Review Revisions
D
E
ER
FP
GM
GR
IRIR
L s
T
U
W
WM
w
BENCHMARK
MONUMENT
DRILL HOLE
IRON PIPE
DECIDUOUS TREE
EVERGREEN TREE
STAKE
GPS STATION
GUY WIRE
HOUSE CONNECTION
ROOF LEADER
STORM DRAIN
UNDERGROUND TELEPHONE
OVERHEAD WIRES
UNDERGROUND GAS
WATER MAIN
CURB
TOP/BOT CURB GRADE
FENCE
CONTOUR
HANDICAP PARKING STALL
DECIDUOUS SHRUB
EVERGREEN SHRUB
DROP CURB
WATER SERVICE
SANITARY SEWER
UNDERGROUND ELECTRIC
WETLAND MARKER
INLET
CATCH BASIN
GAS VALVE
IRRIGATION CONTROL BOX
SPRINKLER HEAD
GAS METER
BOLLARD
CLEAN OUT
DRAINAGE MANHOLE
HYDRANT
ELECTRIC MANHOLE
PULL BOX
LIGHT
MONITORING WELL
SIGN
SANITARY MANHOLE
SPOT ELEVATION
TELEPHONE MANHOLE
WATER MANHOLE
UTILITY POLE/GUY POLE
MANHOLE
WELL
WATER METER
WATER VALVE
CURB INLET
ROOF DRAIN\LEADER
EDGE OF PAVEMENT
CONCRETE PAVEMENT
BRICK/PAVER PAVEMENT
ASPHALT PAVEMENT
SANITARY/DRAINAGE FLOW ARROW
SURVEY NAIL
GAS RISER
TWO POST SIGN
CABLE TELEVISION BOX
INLET
TEST BORE/TEST HOLE
GROUND LIGHT
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL BOX
PEDESTRIAN SIGNAL POLE
X X
O/H O/H
T T
E E
G
S
HC HC
L
W W
WS
D D
RUBBERIZED SURFACE
ELECTRIC RISER
FLAG POLE
DETECTABLE WARNING PAD
LEGEND
DESCRIPTION SYMBOL
WV
DESCRIPTION SYMBOL
100.0 tc 100.50 bc 100.00
DESCRIPTION SYMBOL DESCRIPTION SYMBOL
2 08/2022 BNL Review Revisions 2
Finished Grade -0' - 6"
Overflow Elevation 127' - 1 13/16"
Low Water Elevation 89' - 7 13/16"
H E
A D
R A
N G
E
7'
6"
Lower Platform ± 28' - 5 1/4"
Upper Platform ± 74' - 9"
Top of Access Tube Cover 134' - 5 3/4"
ELEV. 110.13'
ELEV. 199.15'
ELEV. 237.65'
First Floor 0' - 0"
ELEV. 110.63'
55' - 10" Ø ±
/4
Overall Height 137' - 9 1/2"
4'
3/ 4"
7'
1/ 2"
7'
4"
BROOKHAVEN NATIONAL LABORATORY LOGO,
ALTERNATE BID ITEM, LOGO SHALL BE FOUR (4)
DIFFERENT FINISH COAT COLORS IN ADDITION
TO THE BASE FINISH COLOR OF THE TANK
TANK ELEVATION GENERAL NOTES:
1. ALL ELEVATIONS PREFACED WITH "ELEV." ARE IN REFERENCE TO NAVD88.
2. THE TANK FIRST FLOOR, OR TOP OF RING WALL, ELEVATION OF 110.63' NAVD88
WAS PROVIDED BY BNL AS PER RECENT SURVEYING INFORMATION.
BLAST SSPC SP-10 AND PAINT ALL
EXTERIOR PIPE SURFACES, TYP.
BLAST SSPC SP-7 AND PAINT EXISTING
CONCRETE FOUNDATION, REMOVE LOOSE
MATERIAL AND APPLY NEW FOUNDATION
COATING SYSTEM T 500
BLAST SSPC SP-6 AND PAINT ALL
EXTERIOR SURFACES
EXISTING 6"Ø FLOOR DRAIN,
TYP., TANK NOTE 3
EXISTING TRENCH DRAIN GRATES,
TANK NOTE 3
CONNECT NEW 3/4"Ø SAMPLING LINE
AND 3/4"Ø PRESSURE SENSING LINE TO
EXISTING 3/4" BALL VALVES, LOCATED
BEFORE ACCESS TUBE
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR DRY SURFACES
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR WET SURFACES
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR DRY RISER SURFACE AND
UNDERSIDE OF WATER CAVITY SURFACE
EXISTING ACCESS LADDER, TYP., TANK NOTE 4
TANK NOTES:
1. INSTALL AFTER PREPARATION AND PAINTING IS COMPLETED.
2. CONTRACTOR SHALL FURNISH AND INSTALL TWO (2) HEAT TRACE CABLES, ONE (1) PRIMARY AND ONE (1) BACK-UP
FOR EACH COPPER LINE. INSTALL PIPE INSULATION AFTER INSTALLATION OF HEAT TRACE CABLES. THE TWO COPPER LINES TO BE HEAT TRACED SHALL BE TRACED WITH ONE CONTINUOUS HEATING CABLE. CONNECT TO THE
HEAT TRACE CONTROLLER IN THE SAMPLING STATION.
3. REMOVE, PROTECT, AND STORE. REINSTALL AFTER PREPARATION AND PAINTING IS COMPLETED.
4. REMOVE, PROTECT, AND STORE EXISTING SAFETY CLIMB DEVICE. REINSTALL AFTER PREPARATION AND PAINTING IS
COMPLETED.
5. REMOVE, PROTECT, AND STORE LADDER HARDWARE CONNECTING THE LADDER TO THE CONCRETE TANK FLOOR
AND CONDENSATE PLATFORM. TEMPORARILY SUPPORT THE LADDER AS REQUIRED. REINSTALL AFTER PREPARATION
AND PAINTING IS COMPLETED.
NO SCALE
PIPE INSULATION ON WELDED STEEL
INLET / OUTLET PIPE, INSULATION
PROVIDED BY OWNER, INSTALLED BY
CONTRACTOR, NOTE 1
T 500
EXISTING 12"Ø INLET /
OUTLET PIPING
T 500
NEW 3/4"Ø SAMPLING LINE AND 3/4"Ø PRESSURE
SENSING LINE, NOTES 1 AND 2. UTILIZE EXISTING
BRACKETS AND ATTACHMENT HARDWARE AS REQUIRED,
NOT SHOWN FOR CLARITY, GENERAL TANK NOTE 16.
EXISTING TANK SHAFT INLET /
OUTLET PIPE BRACKET, TYP. OF 6,
GENERAL TANK NOTE 16
T 500
EXISTING TANK SHAFT OVERFLOW
PIPE BRACKET, TYP. OF 6, GENERAL
TANK NOTE 16
T 500
EXISTING DRY RISER INLET / OUTLET
PIPE BRACKET, TYP. OF 1, GENERAL
TANK NOTE 16
T 500
4 EXISTING DRY RISER OVERFLOW
PIPE BRACKET, TYP. OF 2,
GENERAL TANK NOTE 16
NEW SAMPLE STATION,
ENCLOSURE PROVIDED BY
OWNER, INSTALLED BY
CONTRACTOR, TANK NOTE 1
EXISTING 12"Ø OVERFLOW PIPING
T 500
EXISTING LOWER PLATFORM
ACCESS LADDER, TANK NOTE 5
EXISTING 24"Ø VENT, TANK NOTE 3
EXISTING 30"Ø DRY RISER HATCH
EXISTING 30"Ø WATER CAVITY HATCH EXISTING 36"Ø BOLTED EXHAUST MANHOLE
EXISTING MIXING SYSTEM
VALVES, TANK NOTE 3
EXISTING DRY RISER ACCESS
LADDER, TANK NOTE 4
EXISTING WATER CAVITY
ACCESS LADDER, TANK NOTE 4
EXISTING MIXING SYSTEM
VALVES, TANK NOTE 3
EXISTING 30"Ø MANWAY
EXISTING WATER CAVITY GRATING, TANK NOTE 3
EXISTING 30"Ø WATER CAVITY MANWAY
NEW TANK LIGHTING, SEE 'E' DRAWINGS
T 500
EXISTING WATER CAVITY, CONTRACTOR
SHALL FLUSH DRAIN LINE UPON
COMPLETION AND DISCONNECT AND STORE
DETACHABLE HOSE ACCORDINGLY
EXISTING CABLE RIGGING
COUPLINGS, TYP. AT EACH
PLATFORMT 500
NEW NETWORK RACK
ENCLOSURE, AS
MANUFACTURERED BY DDN
UNLIMITED, MODEL OD-30DDC,
CREAM COLOR, ON
EQUIPMENT PAD
GENERAL TANK NOTES:
1. THE ENGINEER WILL TAKE AND TEST SOIL SAMPLES FOR HEAVY METALS PRIOR TO AND AFTER CONSTRUCTION TO CONFIRM THAT BACKGROUND HEAVY METAL LEVELS ARE NOT EXCEEDED FOLLOWING CONSTRUCTION. THE CONTRACTOR WILL BE REQUIRED TO REMEDIATE ALL AREAS WHERE HEAVY METAL LEVELS EXCEED THE
BACKGROUND LEVELS.
2. AIR MONITORING WILL BE REQUIRED AS OUTLINED IN SPECIFICATION SECTION 015719 - TEMPORARY ENVIRONMENTAL
CONTROLS (CONTAINMENT).
3. CONTRACTOR SHALL PROVIDE INSPECTING ENGINEER(S) WITH FULL FACE RESPIRATOR AND REPLACEMENT
CARTRIDGES.
4. THE CONTRACTOR SHALL PROVIDE FULL CONTAINMENT AS SPECIFIED AROUND TANK DURING ALL INTERIOR & EXTERIOR BLASTING, PREPARATORY WORK, AND PAINTING OPERATIONS TO COMPLY WITH STATE REQUIREMENTS
FOR PARTICULATE EMISSIONS.
5. PRIOR TO COMMENCING BLASTING THE CONTRACTOR SHALL INSTALL PROPERLY SIZED PIPE PLUGS OR CAPS IN TANK
FILL AND DRAIN PIPES WITHIN THE TANK TO PREVENT DEBRIS FROM ENTERING THE PIPES.
6. ALL TANK COATINGS SHALL BE LEAD FREE. REFER TO SPECIFICATION SECTION 099870 - STEEL TANK COATING
SYSTEM FOR PREPARATION AND COATING REQUIREMENTS FOR TANK SURFACES.
7. UPON COMPLETION OF PAINTING OPERATIONS, DISINFECT TANK IN ACCORDANCE WITH 331160 DISINFECTION OF
WATER STORAGE FACILITIES AND ANALYZE WATER QUALITY SAMPLES.
8. WATER QUALITY SAMPLES SHALL BE TAKEN IN ACCORDANCE WITH 331120 - WATER QUALITY SAMPLING.
9. UPON FILLING THE TANK, THE ENGINEER SHALL OBSERVE THE TANK AND APPURTENANT PIPES FOR LEAKAGE. THE
CONTRACTOR SHALL IMMEDIATELY TAKE STEPS TO ELIMINATE ANY LEAKS IN A MANNER APPROVED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
10. CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF SURROUNDING AREAS DAMAGED DURING CONSTRUCTION. AS PART OF SITE RESTORATION, CONTRACTOR SHALL GRADE PERIMETER OF TANK FOUNDATION TO ACHIEVE A MINIMUM OF 2% POSITIVE PITCH AWAY FROM TANK FOUNDATION. PLACE 4" OF TOPSOIL AND HYDROSEED ALL GRASS AREAS
DISTURBED BY CONSTRUCTION.
11. ALL TANK MODIFICATIONS SHALL CONFORM TO PART 7 OF THE 2018 EDITION OF THE RECOMMENDED STANDARDS FOR
WATER WORK.
12. ALL MATERIAL DEEMED HAZARDOUS SHALL BE HANDLED AND DISPOSED OF IN ACCORDANCE WITH SECTION 099870-
STEEL TANK COATING SYSTEMS.
13. THE CONTRACTOR SHALL SUBMIT FOR THE ENGINEER'S REVIEW ANY AND ALL PROPOSED PERMANENT OR TEMPORARY TANK ATTACHMENTS, CONSTRUCTION AIDS, ETC. THE ENGINEER SHALL DETERMINE WHETHER THESE PROPOSED ATTACHMENTS, CONSTRUCTION AIDS, ETC. SHALL BE PERMITTED TO BE PERMANENTLY INSTALLED OR BE REQUIRED TO BE REMOVED. THE INSTALLATION, REMOVALS, TOUCH-UP PAINTING, ETC. PROCESS SHALL BE
APPROVED BY THE ENGINEER PRIOR TO ANY INSTALLATIONS.
14. ALL INTERIOR PIPING AND CONDUIT SHALL BE PROPERLY SUPPORTED TO WALLS, CEILING AND OTHER STRUCTURES.
ALL MATERIALS USED FOR PIPE SUPPORT SHALL BE STAINLESS STEEL.
15. CONTRACTOR SHALL REMOVE AND PROTECT ALL EXISTING GASKETS AND HARDWARE ON ALL HATCHES OF THE TANK. CONTRACTOR SHALL REINSTALL THESE GASKETS AFTER PREPARATION AND PAINTING IS COMPLETED.
16. ALL U-BOLTS, NUTS, AND WASHERS SHALL BE REMOVED, PROTECTED, AND STORED FROM EXISTING BRACKETS AND
REINSTALLED AFTER PAINTING IS COMPLETED.
architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF8
/2
/2
:3 :1
P
M C
U s e rs
\j k o c a j\ D o c u m e n ts
\B N
L O
C e n tr a l2
P a in ti n g C o n tr a c t_ jk o c a j.
rv t
T 001
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven
National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
GENERAL NOTES, ELEVATION,
AND ISOMETRIC
CONTRACT P - PAINTING
SCALE: 1/8" = 1'-0"
Tank Elevation
SCALE:
Tank Isometric
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions
EXISTING 12"Ø INLET /
OUTLET PIPE
EXISTING SHAFT ACCESS LADDER
FROM LOWER PLATFORM TO UPPER
PLATORM
EXISTING ACCESS
LADDER FROM TANK
FLOOR TO LOWER
PLATFORM
EXISTING FLOOR DRAIN
90°
EXISTING 12"Ø
OVERFLOW PIPE
T 500
EXISTING CONDUIT ROUTING
PENETRATION, TYP.
270°
0°
180°
54° 35°
55°
50°
40°
EXISTING STEEL DRAINLINE
EXISTING PIPE
BRACKET, TYP.
EXISTING CONDUIT
ROUTING PENETRATION
UPPER PLATFORM ACCESS
LADDER FROM LOWER
PLATFORM
EXISTING DRY RISER ACCESS
LADDER TO TANK ROOF
EXISTING 12"Ø INLET / OUTLET PIPE
EXISTING 12"Ø OVERFLOW PIPE
EXISTING CAMLOCK FITTING TO
4"Ø STEEL DRAINLINE (BELOW)
EXISTING TANK ACCESS MANHOLE
AND ACCESS LADDER (MANHOLE NOT
SHOWN FOR CLARITY)
EXISTING FLOOR DRAIN
CONNECTED TO 4"Ø STEEL
DRAINLINE (BELOW)
EXISTING 30"Ø HINGED
ACCESS HATCH
90° 270°
0°
180°
EXISTING CONDUIT ROUTING
PENETRATION, TYP.
5°
20° 43°
47°
15°
30°
EXISTING LAYFLAT HOSE
BRACKET
T 500
EXISTING LOWER PLATFORM
ACCESS LADDER
EXISTING 4"Ø STEEL
DRAINLINE (FROM ABOVE)
EXISTING 42"x80" BELL
ACCESS DOOR (TYP. OF 2)
EXISTING 12"Ø
OVERFLOW PIPE
EXISTING 12"Ø INLET /
OUTLET PIPE
EXISTING 6"Ø
HDPE DRAIN
EXISTING FOUNDATION
FOOTING PERIMETER
EXISTING 2"Ø AND
1-1/4"Ø CONDUITS
EXISTING 4"Ø CONDUIT
TO CONTROL MANHOLE
T 100
18°
18°
32°
23°
32°
23°
90°
0°
90°
180°
270°
T O
O V
E R
F
LO
W
TO
D
R Y
W E
LL
TO
FR
O
M S
YS
TE
M
(8) NEW CONDUIT MOUNTING
BRACKETS ALONG THE TANK WALL
FROM THE FOUNDATION PENETRATION
FOR THE FIBER CABLE TO THE
NETWORK CABINET, ±20" TO MIDPOINT
OF BRACK A.F.F.
T 500
35°
NEW NETWORK RACK
ENCLOSURE, AS
MANUFACTURERED BY DDN
UNLIMITED, MODEL OD-30DDC,
CREAM COLOR, ON
EQUIPMENT PAD
T 500
EXISTING 2"Ø AND 3/4"Ø CONDUITS
EXISTING 12"Ø INLET / OUTLET PIPE
EXISTING 3/4"Ø CONDUITS FROM
INLET / OUTLET PIPE TO NEW
ELECTRICAL PANELS
90° 270°
0°
180°
EXISTING MIXING
SYSTEM CONNECTED TO
12"Ø INLET / OUTLET PIPE
EXISTING INTERIOR
BOWL ACCESS LADDER
EXISTING DRY RISER
ACCESS LADDER TO
TANK ROOF
EXISTING WEIR BOX AND
OVERFLOW PIPE
47°
70°
43°
85°
5° architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF8
/2
/2
:3 :1
P
M C
U s e rs
\j k o c a j\ D o c u m e n ts
\B N
L O
C e n tr a l2
P a in ti n g C o n tr a c t_ jk o c a j.
rv t
T 100
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven
National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
FLOOR PLANS
CONTRACT P - PAINTING
SCALE: 1/4" = 1'-0"
Lower Platform Floor Plan
SCALE: 1/4" = 1'-0"
Upper Platform Floor Plan
SCALE: 1/4" = 1'-0"
First Floor Plan
SCALE: 1/2" = 1'-0"
First Floor Conduit Plan
N
PROJECT
NORTH
N
PROJECT
NORTH
N
PROJECT
NORTH
N
PROJECT
NORTH
SCALE: 1/4" = 1'-0"
Bowl Plan N
PROJECT
NORTH
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions
6"
4" M
IN
5" M
IN
A S
R E
Q U
IR
E
D
GRADE (TOP OF
ASPHALT/GRASS)
NEW FOUNDATION
COATING (TYP)
APPLY POLYESTER FABRIC TAPE AT CONCRETE
FOUNDATION BASEPLATE/INTERFACE AFTER
SPECIFIED EPOXY COATING HAS BEEN APPLIED
M
IN
CONTRACTOR SHALL EXCAVATE A
MINIMUM OF 12" AROUND FOUNDATION
AS REQUIRED FOR NEW FOUNDATION
COATINGS APPLICATION. BACKFILL AND
RESTORE AS REQUIRED
3/4" CHAMFER
CONCRETE FOUNDATION
NOTES:
1. PREPARE CONCRETE FOUNDATION AND STEEL TANK
SURFACES AS PER SPECIFICATIONS.
STEEL TANK SIDEWALL
EXTERIOR COATING, TYP.
2. COATINGS APPLICATION PROCEDURE:
APPLY ZINC RICH PRIMER TO STEEL TANK SURFACES.A.
APPLY EPOXY INTERMEDIATE COATING TO ALL
STEEL AND CONCRETE FOUNDATION SURFACES.
B.
APPLY POLYESTER FABRIC TAPE AT CONCRETE
FOUNDATION/ BASEPLATE INTERFACE.
C.
APPLY (2) COATS OF ELASTOMERIC COATING TO
CONCRETE FOUNDATION AND 18-INCHES UP
STEEL TANK SURFACES.
D.
APPLY STEEL TANK FINISH COATING(S) TO ALL
PREVIOUSLY COATED STEEL SURFACES.
E.
3. REFER TO SPECIFICATION 099870 - STEEL TANK
COATING SYSTEM FOR ALL PREPARATION AND
COATING REQUIREMENTS.
INTERIOR PEDESTAL
FLOOR NOT SHOWN
FOR CLARITY
Finished Grade -0' - 6"
EXISTING 12" BUTTERFLY
VALVE, TYP.
EXISTING 12"Ø
INLET/OUTLET PIPE
NEW SAMPLING
STATION
EXISTING 12"Ø OVERFLOW PIPE
EXISTING TRENCH DRAIN
PIPE INSULATION ON WELDED
STEEL INLET / OUTLET PIPE
First Floor 0' - 0"
T 500
TO
O
V E
R
FL
O W
TO
F R
O M
S Y
S
TE
M
WELDED STEEL
C.L.D.I.
EXISTING FACTORY INSTALLED
TAP ON TEE FACING BELL WALL
EXISTING 3/4"Ø CONDUITS FROM INLET /
OUTLET PIPE TO NEW ELECTRICAL PANELS
NOTES:
1.
30°, TYP.
3"x3"x3/8" ANGLE
2' - 4′′
12"Ø INLET/OUTLET/
12"Ø OVERFLOW PIPE
2'
8"
3"x3"x3/8" ANGLE, TYP.
1"Ø THREADED STAINLESS STEEL U-
BOLT, NUTS AND WASHERS
TANK SIDEWALL
DOUBLE JAM NUT, TYP.
1/4" THICK RUBBER ISOLATING STRIP
ALL U-BOLTS, NUTS, WASHERS, AND RUBBER ISOLATING
STRIPS SHALL BE REMOVED, PROTECTED, STORED, AND
REINSTALLED AS REQUIRED FOR ALL SURFACE PREPARATION
AND PAINTING WORK.
3/8"
TYP.
20°, TYP.
3"x3"x3/8" ANGLE
2' - 4′′
12"Ø INLET/OUTLET/
12"Ø OVERFLOW PIPE
3"x3"x3/8" ANGLE
1"Ø THREADED STAINLESS STEEL U-
BOLT, NUTS AND WASHERS
DRY RISER
DOUBLE JAM NUT, TYP.
1/4" THICK RUBBER ISOLATING STRIP
3/8"
TYP.
2'
8"
TANK SHAFT PIPE BRACKET DRY RISER PIPE BRACKET
2. CONTRACTOR SHALL INSTALL PIPE INSULATION AROUND PIPE
SUPPORT BRACKETS AS REQUIRED.
NEW 100 W ELECTRIC HEATER
AS MANUFACTURED BY
HOFFMAN. MODEL NO.
DAH1001A. PROVIDE HEATER
WITH STANDARD OUTLET PLUG,
TYP. OF 2
NEW 3/4"Ø TANK
SAMPLE LINE
NEW 3/4"Ø BALL
VALVE, TYP.
EXISTING 12"Ø INLET / OUTLET
PIPE
NEW HEAT TRACE CONTROL
PANEL, AS MANUFACTURED BY
RAYCHEM MODEL ELEXANT
4010i-EMR-IS-FW
NEW 6"x2" PVC FUNNEL
NEW GFCI RECEPTACLE
FOR HEATERS
NEW PIPING
INSULATION, TYP.
NEW 2"Ø SCH. 40 PVC
TO TRENCH DRAIN
INSTALL 36"x36"x12" TYPE
304 S.S. ENCLOSURE
NOTES:
1. 3/4"Ø SAMPLE LINE AND PRESSURE SENSING LINE SHALL EXTEND UP TO 4'-0" ABOVE THE TANK BOTTOM CAPACITY LINE. INSTALL 3/4" TEE AT END OF SAMPLING LINE. UTILIZE EXISTING BRACKETS AND ATTACHMENT HARDWARE AS REQUIRED TO SUPPORT THE SAMPLE LINE, PRESSURE SENSING LINE, AND SAMPLE STATION ENCLOSURE. PROVIDE TWO (2) ±4' LONG S.S. CHANNEL SUPPORTS AND ASSOCIATED HARDWARE TO MOUNT
THE SAMPLE STATION ENCLOSURE TO EXISTING ANGLE SUPPORT BRACKETS.
2. ALL WIRING ON THE "WET SIDE" OF THE ENCLOSURE SHALL BE SUPPLIED WITH MANUFACTURER'S WATERPROOF CABLING SYSTEM OR INSTALLED IN LIQUID-TIGHT FLEXIBLE CONDUIT. WHERE WIRING OR CONDUIT PENETRATES TO THE "DRY SIDE" INSTALL WATERPROOF CONNECTION OR PROPERLY SIZED RUBBER
GROMMETS.
NEW PRESSURE GAUGE
NEW LEVEL TRANSMITTER
NEW 3/4"Ø TANK
PRESSURE SENSING
NEW PRESSURE SWITCH
NEW BLOCK & BLEED
VALVE, TYP.
NEW SNUBBER
NEW 1/4" PLEXIGLASS, SEAL
WITH ASTM C-920, CLASS 35
SILICONE
"WET SIDE" "DRY SIDE"
LOW WATER ELEVATION
EXTEND SAMPLING LINE 4' ABOVE
LOW WATER ELEVATION WITH TEE
EXTEND PRESSURE SENSING LINE
12" ABOVE LOW WATER
ELEVATION WITH TEE
EXISTING 3/4" THREADED
COUPLING, TYP. OF 2
EXISTING 3/4" COPPER NIPPLE,
TYP. OF 2
EXISTING 3/4" BRASS BALL VALVE,
TYP. OF 2
NEW 3/4"Ø PRESSURE SENSING LINE
NEW 3/4"Ø SAMPLING LINE
S P
SP
P S
PS
DRY RISER
WATER CAVITY
PS: PRESSURE SENSING LINE
SP: SAMPLINE LINE
11" OUTSIDE DIAMETER
8 1/4" DIAMETER CUTOUT
EXISTING PLATFORM, TYP.
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH
ENGINEER FOR FINAL LOCATION OF
BRACKETS.
2. BRACKETS SHALL BE INSTALLED EVERY 4' - 0"
ON CENTER AS SHOWN ON THE FLOOR PLAN.
5/
8"
5/16"Ø PRE-DRILLED HOLES, TYP. OF 6
1/4" THICK FLATBAR, LENGTH AS SHOWN
1/4"Ø RUBBER-COATED STAINLESS
STEEL U-BOLT (1-3/8x2-3/8), NUTS, AND
WASHERS, TYP. OF 3
T A
N K
W A
LL
1/4"
TYP.
5/
8"
5/ 8"
5/
8"
1/4" THICK FLATBAR, LENGTH AS
REQUIRED, TYP.
5/
8"
5/ 8"
1/
8"
2"
/8
4"
VERIFY IN FIELD
9/16"Ø PRE-DRILLED HOLES, TYP. OF 2
1/2"Ø RUBBER-COATED STAINLESS STEEL
U-BOLT (4-9/16x3), NUTS, AND WASHERS
6x6 W2.9xW2.9
X
CONCRETE FLOOR
X X X
3/4" CHAMFER
1/2"∅ DOWELS x 5" LONG AT
2'-0" O.C. ALONG PAD
PERIMETER IN HILTI HVA
ADHESIVE OR EQUAL
EXTEND PAD 4" BEYOND
EDGE OF EQUIPMENT
ON EACH SIDE
CONTRACTOR SHALL PRIME AND PAINT (SAFETY YELLOW) CONCRETE PAD
BEFORE NETWORK ENCLOSURE IS INSTALLED.
1.
NOTE:
X
4" P
A D
NETWORK ENCLOSURE
12" CLR.
2'
7" architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF8
/2
/2
:3 :1
P
M C
U s e rs
\j k o c a j\ D o c u m e n ts
\B N
L O
C e n tr a l2
P a in ti n g C o n tr a c t_ jk o c a j.
rv t
T 500
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven
National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
TANK DETAILS
CONTRACT P - PAINTING
SCALE: 3/4" = 1'-0"
Foundation Coating Detail
SCALE: 3/4" = 1'-0"
Tank Inlet / Outlet Pipe Detail
SCALE: 3/4" = 1'-0"
Pipe Bracket Detail
SCALE: 1" = 1'-0"
Sample Station Enclosure
SCALE: NO SCALE
Sampling Line and Pressure Line Small Piping Detail
SCALE: 6" = 1'-0"
Cable Hole Cover Detail
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions
2 08/2022 BNL Review Revisions 2
SCALE: 3" = 1'-0"
Conduit Mounting Bracket
SCALE: NO SCALE
Equipment Pad
| Sheets |
| G 000 - COVER SHEET |
| G 001 - PROJECT SHEET LIST AND GENERAL NOTES |
| T 001 - GENERAL NOTES, ELEVATION, AND ISOMETRIC |
| T 100 - FLOOR PLANS |
| T 500 - TANK DETAILS |
| 2022-08-23T10:30:59-0400 | |
| JJT PE Stamp |
| 2022-08-23T10:31:21-0400 | |
| JJT PE Stamp |
| 2022-08-23T10:31:51-0400 | |
| JJT PE Stamp |
| 2022-08-23T10:33:15-0400 | |