Enclosure 1 - Qualification Criteria.docx

DOCX document 29 KB Posted

Attached to
419151 Preparation and Painting of 500k Gallon Water Tower
Solicitation number
419151DH
Issued by

View the file

Other files

File Type Posted
Enclosure 4 - Attachment 2 - Painting of New 500K Gallon Water Tower _Tank Drawings.pdf PDF
Enclosure 4 - Attachment 10 - BSA General Terms and Conditions for Construction and Labor Hour Agreements Rev. 21.0.pdf PDF
Enclosure 4 - Attachment 11 - BSA Supplemental Terms and Conditions Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.pdf PDF
Enclosure 4 - Attachment 3 - Painting of New 500K Gallon Water Tower _ Electrical Drawings.pdf PDF
Enclosure 3 - AMS-Form-050 Annual Representations and Certifications.pdf PDF
Enclosure 4 - Attachment 8 - Payment Bond Form No. AMS-Form-025.docx DOCX document
Enclosure 4 - Attachment 7 - Performance Bond Form No. AMS-Form-024.docx DOCX document
419151 Water Tower Invitation for Bid.pdf PDF
Enclosure 4 - 419151 Preparation and Painting of The Upton Road Water Tower Draft Contract.docx DOCX document
Enclosure 2 - Bid Sheet.docx DOCX document
Enclosure 4 - Attachment 1 - Painting of New 500K Gallon Water Tower _Contract Specifications.pdf PDF
Enclosure 4 - Attachment 4 - Brookhaven National Laboratory Supplier Quality Assurance Requirements (BNL-QA-101).pdf PDF
Enclosure 4 - Attachment 5 - Construction Wage Rate General Decision No. NY20220012.pdf PDF
Enclosure 4 - Attachment 6 - SF-1444.pdf PDF
Enclosure 4 - Attachment 9 - Final Release of Claim Form No. AMS-Form-022.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 1

QUALIFICATION CRITERIA

Preparation and Painting of The Upton Road Water Tower

J/N419151Company Name:
A.QUALIFICATION STATEMENT
1.Contractor has successfully completed work on at least two projects of similar scope, size and complexity as the Preparation and Painting of The Upton Road Water Tower project in the last five years.
____YesNo
2.Proposed Project Supervisor has supervised work on a project of similar scope, size and complexity as the Preparation and Painting of The Upton Road Water Tower project in the last seven years.
____YesNo
*3.Contractor’s 2019, 2020, and 2021 insurance Experience Modification Ratings are equal to or less than 1.0 for each year.
____YesNo

4. Contractor has a written Corporate Construction Safety and Training program.

____Yes No

B.SUBMITTALS
1.Submit two similar projects constructed during the last five years to demonstrate compliance with Qualification Criteria A.1. Indicate:
a)Project Title
b)Contract Amount
c)Detailed Description of Work
d)Name, Address and Telephone Number of Owner or Contracting Officer

2. Submit resume for the proposed Project Supervisor to demonstrate compliance with Qualification Criteria A.2. Include:

a)Project Title
b)Contract Amount
c)Detailed Description of Work
d)Name, Address and Telephone Number of Owner or Contracting Officer
3.Submit the following Contractor rating information:
201920202021Average
a)Lost time frequency rate (DART)=( )+( )+( )3 =( )
b)Recordable Incidence Rate=( )+( )+( )3 =( )
c)Experience Modification Rate=( )( )( )

Provide backup documentation from an independent source, such as insurance carrier, to verify ratings.

4. Submit copy of Contractor’s OSHA 300 logs and total number of hours worked for 2019, 2020, and 2021.

5. Submit Contractor’s Corporate Construction Safety and Training Program.

This attachment addresses the Qualification Criteria the Contractor must meet to qualify to receive award. Failure to acknowledge ‘Yes’ to any of the Qualification Criteria, and provide the required substantiating submittals with your bid, may result in your bid being considered non-responsive. BSA reserves the right to accept or reject any bid based on the Qualification Criteria requirements.

COMPANY NAME:

SIGNED/TITLE:

DATE:

File details come from the government source that posted it. Updated .