This is a Proposal Pricing Sheet (AMS Form 043) for Brookhaven National Laboratory's Request for Proposal No. 472077, soliciting fabricated structural metal support superstructures for the Deep Underground Neutrino Experiment (DUNE) Vertical Drift detector. The procurement requires 16 Charge Readout Plane Support Superstructures (CRP-SSTs) consisting of 4 small frames and 12 large frames, with optional quantities of up to 2 additional small frames, up to 2 additional large frames, and cleaning/degreasing services per frame. Contractors must provide unit pricing for each frame type and calculate extended totals, with a total price exclusive of options and a total price inclusive of options if exercised. The procurement falls under NAICS code 332312 (Fabricated Structural Metal Manufacturing) with a 500-employee small business size standard.

The pricing sheet establishes a milestone-based payment structure with five key deliverables: engineering package for large SSTs (8 weeks after award), large CRP-SST first article with test assembly and survey (16 weeks after drawing approval), engineering package for small SSTs (8 weeks after large frame shipment to CERN), small CRP-SST first article with test assembly and survey (8 weeks after drawing approval), and final delivery of remaining frames by the target date of September 2, 2027. Contractors must propose milestone payment percentages that total 100%, with final delivery schedule to be established prior to award. Delivery terms are FOB Destination with payment terms Net (TBD) Days, and the proposed price must remain firm for 120 days. Contractors must be registered in SAM, confirm current representations and certifications, verify small business size status if applicable, and provide their UEI number upon signature. Questions should be directed to Lisa C. Gonzales, Contracts Specialist, at lgonzales@bnl.gov.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT AND PROPERTY MANAGEMENT DIVISION

BROOKHAVEN NATIONAL LABORATORY

Managed by Brookhaven Science Associates, LLC under contract to the U.S. Department of Energy

ACQUISITION MANAGEMENT SYSTEM FORM

Form No. AMS-Form-043

Revision No. 0.1

APPROVED BY:

L. McKnight / 12/14/2020

PPM Manager/Date

Proposal Pricing Sheet

Reference:BSA Request for Proposal No. 472077
Vertical Drift (VD) Charge Readout Plane (CRP) Support Superstructures for the Deep Underground Experiment (DUNE)

Brookhaven National Laboratory Brookhaven Science Associates, LLC P.O. Box 5000 – Bldg. SUSC 101 Upton, NY 11973

Attention:Lisa C. Gonzales
Contracts Specialist

To whom it may concern:

In compliance with your letter of solicitation dated [insert date], we submit our Proposal No. dated , for the Vertical Drift (VD) Charge Readout Plane (CRP) Support Superstructures for the Deep Underground Experiment (DUNE).

UNIT PRICING

Please input Unit Pricing Below:

Description
QTY
Unit Price
Extended Total
Small CRP-SST Frame
4
$______
$______
Large CRP-SST Frame
12
$______
$______

OPTIONS (If Exercised)

Option
Description
QTY
Unit Price
1
Additional Small CRP-SST Frames
up to 2
2
Additional Large CRP-SST Frames
up to 2
3
Cleaning/Degreasing Prior to Shipment
per frame

Total Price Exclusive of Options $_____________

Total Price with Options $_____________

MILESTONE PAYMENT PLAN

Enter the proposed milestone payment percentages in the chart below. The percentages must equal 100%. Dollar values for each milestone will be calculated by applying the proposed percentages to the applicable total contract price (exclusive of options or inclusive of options, as exercised).

Note: Proposed percentages shall not be construed as accepted by BSA and are subject to negotiation.

Item
Description
Due
Milestone Payment %
1
Engineering package for large SST (includes 3D model, fabrication drawings, and structural engineering calculations)
Eight (8) weeks after ARO (after receipt of order).
2
Large CRP-SST first article

(w/ test assembly & survey) Sixteen (16) weeks after BSA approval of fabrication drawing package.

3
Engineering package for small SST (includes 3D model, fabrication drawings, and structural engineering calculations)
Eight (8) weeks after shipment of first article large SST frame to CERN.
4
Small CRP-SST first article

(w/ test assembly & survey) Eight (8) weeks after BSA approval of fabrication drawing package.

5
Final delivery of remaining CPR-SST frames with all documentation as specified in the SOW.
BSA target date is 2 September 2027. The final delivery schedule will be established prior to award.

This price shall remain firm for (120) days.

The terms of delivery and payment terms are FOB Destination, Net (TBD) Days.

Concurrence:

By signing this Pricing Sheet, our firm hereby acknowledges and agrees to BSA's requirements, terms and conditions, and delivery schedule, and agrees to provide the resources necessary to meet BSA's delivery schedule. We affirm we are registered in SAM and our representations and certifications as well as our small business size status are current and complete. The UEI number associated with our SAM profile is:________.

Company:

Signature:

Address:

Typed Name:

Address Line 2:

Title:

Telephone No.:

Date:

Date Printed 3/16/2026 1 of 1 Date Approved 12/14/2020

File details come from the government source that posted it. Updated .