Enclosure 11_B100 E1-120 GPR Report.pdf

PDF 1 MB Posted

Attached to
Replace Inpatient Robot - PAD 36C261-24-AP-5262 | 640-25-1-5281-0005 | project 640-24-113 |
Solicitation number
36C26125R0014_Solicitation
Issued by

About this file

This document is a Ground Penetrating Radar (GPR) report for Building 100 E1-120 at the Palo Alto VA Hospital Pharmacy. The report summarizes a GPR scan conducted to identify any subsurface features prior to the installation of new equipment. Key findings include the slab composition (pandeck structure with wire mesh reinforcement), detection of uniformly spaced wire mesh, and one possible conduit. The report recommends avoiding the area marked with tape and red marker where the possible conduit is located during the installation of new equipment.

The related federal contract opportunity is for the replacement of an inpatient pharmacy robot at the VA Palo Alto Healthcare System, Building 100, Room E1-120. This is an SDVOSB set-aside solicitation with project constraints including following interim life safety plan, infection control measures, and coordination of utility shutdowns and "hot work" with the contracting officer's representative. The contractor shall follow all applicable federal and local laws, standards, and code requirements when conducting the work.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Antonio Guzman

Safe2core

7/16/2024 | 9 Photos

Building 100 E1-120 GPR Report

Cover Page 1 / 7 3801 Miranda Ave - Building 100 E1-120 GPR Report

Building 100 E1-120 GPR Report 7/16/2024

Section 1

GPR Concrete Scanning Job Summary Report

Client: Bagg Engineers Jobsite Location: Palo Alto VA Hospital Pharmacy, 3801 Miranda Avenue, Palo Alto, CA, Building 110 E1-120 Date of Work: 06/15/2024 Technician: Adrian Novoa Equipment Used: GSSI StructureScan System equipped with a 1.6 MHz antenna

Scope of Work A Ground Penetrating Radar (GPR) scan was conducted over an area of 400 square feet of the concrete slab at the Palo Alto VA Hospital Pharmacy. The purpose of the scan was to identify any subsurface features prior to the installation of new equipment.

Findings

1. Slab Composition:The slab was identified as a pandeck structure with wire mesh reinforcement.

The wire mesh was found to be spaced 6 inches on center.

2. Detected Features:Wire Mesh: Uniformly spaced wire mesh reinforcement detected throughout the scanned area.

Possible Conduit: One possible conduit was detected and marked with tape and red marker for visibility.

Recommendations

1. Avoid Marked Areas:During the installation of new equipment, ensure to avoid the area marked with tape and red marker where the possible conduit is located.

Section 1 2 / 7 3801 Miranda Ave

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶25pm

Creator: Adrian Novoa

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶25pm

Creator: Adrian Novoa

Section 1 3 / 7 3801 Miranda Ave https://img.companycam.com/jP6teM22kmtA4ci-lkBlhX51tcb7B33VMSBeJjys_u4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9mNWJk/YjIxZC0xZTQ1LTQw/NjMtYWMyNS1kM2Y5/OTkxM2E3MmMuanBl/Zw.jpg https://img.companycam.com/XL5uDXcqZS493v_WxnpsQVRcNIyj5Cqj39J_wh1bicM/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9mMTZh/ZDRjMS03MWMwLTQ2/N2MtOTdjMC1iZjQ1/ZGM2YzFlOTAuanBn.jpg

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶25pm

Creator: Adrian Novoa

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶25pm

Creator: Adrian Novoa

Section 1 4 / 7 3801 Miranda Ave https://img.companycam.com/UM51Dst0T5ZxEBXtD3R8BHs-x8wO-wCy5ujpL7zDljI/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9kZDAz/Nzg1MC0xNjljLTQz/YjMtOTM2Yi0xNDNj/M2JkN2NmODIuanBn.jpg https://img.companycam.com/FXa_QEI20uQYxgxLyNlWJ4FgnthZpMSNWpUm1AwW2JU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9kMjI5/Y2UwZi02MjZjLTQ4/YTYtODgyMi1iMmZm/OTQxZTIzYzUuanBl/Zw.jpg

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶26pm

Creator: Adrian Novoa

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶26pm

Creator: Adrian Novoa

Section 1 5 / 7 3801 Miranda Ave https://img.companycam.com/T2dXfJL9LdX3CjwYR86tR053zcumXChHB7W83JZYyAc/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9iMzI5/NWQwYi0xMzM5LTQ2/ODMtOTYwMi0xODEx/NjRmZGEzZDIuanBn.jpg https://img.companycam.com/trh4s3QaVLFZs9FVSYW0a0aoITDzCJryy6zooxvHOnI/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81OGRh/MTI4Zi0yM2EwLTRj/NWMtYTY2MS0xNjZl/Y2JlODQ5MTkuanBn.jpg

Project: 3801 Miranda Ave

Date: 6/15/2024, 3∶29pm

Creator: Adrian Novoa

GPR sample data from the field

Project: 3801 Miranda Ave

Date: 7/16/2024, 7∶57am

Creator: Antonio Guzman

Section 1 6 / 7 3801 Miranda Ave https://img.companycam.com/dSUdTL2gfox2ogDj03jzHwv-qyZQCGlNLZIMK6RhXs0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85MTkx/ZmVlNi00NzcxLTQ5/NzUtOWUwZC1jOTUz/NjhiODIwZTMuanBl/Zw.jpg https://img.companycam.com/qimWMn3lWsRceFpFlUalK14Ynvlplz1lz7SMfRuUccc/rs:fit:4032:4032/q:65/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81YjIz/NzQ5Ni1iYmViLTRm/NzYtYjU4MS01YWM4/NDZlZTc2NTguanBl/Zw.jpg

9 Post Processed image

- shallow flute at 4.5" deep

- deep flute at 7.5" deep GPR are depth readings are +/- 1"

Project: 3801 Miranda Ave

Date: 7/18/2024, 3∶24pm

Creator: Antonio Guzman

Section 1 7 / 7 3801 Miranda Ave https://img.companycam.com/v5fVa4qKcCv7Yi1BSqzBDFq_UB74mRkRou4e2E3Fnws/rs:fit:4032:4032/q:65/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83Mjhl/NjMwNi1iYTU2LTQ0/N2MtYmNkZS01MDRh/NjA1MDMwMjcuanBl/Zw.jpg

File details come from the government source that posted it. Updated .