This is a Request for Information (RFI) issued by Brookhaven National Laboratory for specialty equipment to be used in the Clinical Alpha Radionuclide Producer (CARP) project. The RFI seeks detailed information from vendors on various equipment items, including shielded windows, hot cell structures, gloveboxes, manipulators, generators, transformers, HEPA filters, fans, clamshells, transportation casks, and radiation monitoring equipment. Some items require NQA-1 quality assurance accreditation, while others do not.
The RFI requests vendors provide three key deliverables for as many line items as possible: 1) an 80% confidence rough order magnitude (ROM) cost estimate, 2) approximate lead time including design, fabrication, delivery, and installation, and 3) a detailed payment schedule with terms. The questions deadline is 4 PM on April 21, 2025, and the RFI response deadline is 4 PM on April 29, 2025, with responses to be sent to Joe Famiglietti at jfamiglie@bnl.gov. This RFI is for information and planning purposes under the Department of Energy Office of Science, and does not constitute a commitment by the U.S. Government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (JF472025)
April 7, 2025
Scope:
This scope of this analysis includes estimating the approximate lead time, price, and payment schedule for specialty equipment that will be used within the Clinical Alpha
Radionuclide Producer (CARP) at Brookhaven National Laboratory. The lead time for the equipment will include the time required for any design, fabrication, delivery, and if required installation.
The CARP project team requires current information on specialty items to appropriately develop the project budget and schedule. The list of equipment includes a mixture of commercial-off-the shelf items and specially designed equipment. The items that will have an impact on the safety basis of the facility will require the vendor to have a credited NQA-1 compliant quality assurance program.
Equipment Specification ASME NQA-1 Accreditation Required
Shielded Windows (5) ~30” wide x 18” tall x 36” thick Dry type per ASTM C1572
Non browning Concrete Window liner Window barrier shield
Yes
Pre-engineered Hot Cell Steel Structure Fabrication (including sample prep glovebox and airlocks)
Available upon request. Yes
Gloveboxes (small hot cell, polishing box, utility glove box)
Available upon request. No
Manipulators (10) Pistol-grip (motion control) handles
Aluminum tongs Jaws with neoprene pads
Internal laminated shielding with 8” of lead
115-volt electrical system Booting: Polyurethane convoluted section and PVC sleeve section
No
Generator CAT D550 GC Generator set No
3 phase 4 wire, 480Y/277 V, 500kW sound/weather enclosure Transformer oil-filled, 13.8 kV primary, 480/277 V secondary, 3 phase, 500 kVA
No
HEPA Filters 99.97% efficiency No Strobic Fans (2) 2,000 CFM
1 H.P.
No
Clamshells (2)
(NQA-1)
Available upon request. Yes
Transportation Casks (2)
(NQA-1)
Available upon request. Yes
Carriage Frames (2) Available upon request. Yes Misc Radiation Monitoring Equipment See Attachment (A)
Deliverables (for as many line items as possible):
1) An 80% confidence rough order magnitude (ROM) cost estimate.
2) Approximate lead time (include the time required for any design, fabrication, delivery, and if required installation).
3) Payment schedule for the design, fabrication, delivery, and installation (if applicable) of the items listed. Include all payment terms.