EMG Professional Rate Schedule Instructions 02192021.docx

DOCX document 19 KB Posted

Attached to
Emergency Residential Demolition: 14218 Maiden
Solicitation number
300000150374764
Issued by
Michigan

About this file

This document provides professional rate schedule instructions for EMG (likely a consulting or professional services firm) in connection with an emergency residential demolition project at 14218 Maiden in Michigan. The instructions establish guidelines for submitting and managing professional service rates that will be applied to the demolition contract. The document outlines the framework for rate structures, ensuring consistency and clarity in how EMG's professional staff will be compensated for work performed on this emergency residential demolition initiative. The rate schedule serves as a standardized pricing mechanism for the duration of the project engagement.

The rate schedule instructions detail the specific methodology for calculating and documenting professional labor costs associated with the demolition services. These instructions establish parameters for rate submission, approval processes, and application of rates to project activities. The document provides EMG with clear expectations regarding rate transparency, documentation requirements, and compliance with the established pricing framework, ensuring that all charges related to professional services on the emergency demolition project are properly categorized, justified, and applied according to the predetermined rate structure agreed upon with the Michigan jurisdiction managing the 14218 Maiden demolition contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS ON COMPLETING THE EMERGENCY PROFESSIONAL RATE SCHEDULE

02.19.2021 Respondents must complete the business and contact information at the top of the Professional Rate Schedule. For each of the following Service Types, Respondents must enter a dollar value under the “Unit Rate” which corresponds to the “Unit Type”:

I. Demolition

a. Administration

b. Supervisor

c. Laborer

d. Equipment

e. Trucking: Regulated Material

f. Trucking: Non-Regulated Material

g. Disposal: Asbestos Containing Material (ACM)

h. Disposal: Construction & Demolition Material

II. Backfill, Grade, & Site Finalization

a. Administration

b. Supervisor

c. Laborer

d. Equipment

e. Backfill Material

f. Topfill Material If Respondents need clarification on the Service Types above, they should refer to the applicable sections of the corresponding Scope of Services and/or contact the City of Detroit as directed.

Respondents must enter information into every highlighted cell. Respondents may only enter a mean (average) per unit of measure (i.e. $50 hourly).

The City of Detroit reserves the right to consider Professional Rate Sheets with the following as incomplete and/or non-responsive:

· Unit values expressed as a range (e.g. $60.00 - $90.00);

· Notes or any other text which attempts to qualify the rate(s) provided;

· Alternate Unit Types (i.e. monthly instead of hourly, or yards instead of tons);

· Any blank Unit Rate fields.

The City of Detroit reserves the right to question or request clarification on any Unit Rate for any Service Type provided on the Professional Rate Schedule, and the Respondent must provide clarification within twenty–four hours of request.

Completion of Professional Rate Schedule does not constitute acceptance by the City of Detroit of the Unit Rates contained therein.

File details come from the government source that posted it. Updated .