EMG Professional Rate Schedule Demo 02192021.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- 300000150374741
- Issued by
- Michigan
About this file
This is a contractor rate schedule for Doe Demolition, Inc., a demolition services provider based in Michigan serving state and local government entities. The schedule applies to an emergency residential demolition project at 14053 Liberal Boulevard, Buildings 101 and 102, in Michigan. The contractor offers two primary service categories: demolition services including administration, supervisor oversight, labor, equipment operation, regulated and non-regulated material trucking, and disposal of asbestos-containing materials and construction and demolition debris with air monitoring; and backfill, grade, and site finalization services including administration, supervision, labor, equipment, and material supply for below and above-grade fill work. Point of contact is Jane D. Doe, President, reachable at jane.doe@doedemolition.com or 313.313.3113.
The rate schedule lists all labor, equipment, material, and disposal services with unit pricing structures based on hourly rates for labor and equipment, per-ton rates for materials and disposal, and per-parcel rates for air monitoring. However, all rates are currently listed at $0.00, indicating this is a template or draft rate schedule that has not yet been populated with actual pricing. No information regarding payment terms, contract duration, renewal options, funding sources, or set-asides is provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Rate Schedule
| Organization Name: | Doe Demolition, Inc. |
| Business Address: | 1234 Fifth Street, 48226 |
| Point(s)-of-Contact: | Jane D. Doe, President |
| E-mail Address(es): | jane.doe@doedemolition.com |
| Phone #(s): | 313.313.3113 |
| Service Type | Unit Type | Unit Rate |
| DEMOLITION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Trucking: Regulated Material | Hourly | $0.00 |
| Trucking: Non-Regulated Material | Hourly | $0.00 |
| Disposal: Asbestos Containing Material | Per Ton | $0.00 |
| Disposal: Construction & Demolition | Per Ton | $0.00 |
| Air Monitoring | Per Parcel | $0.00 |
| BACKFILL, GRADE, & SITE FINALIZATION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Backfill Material (Below 12 inches) | Per Ton | $0.00 |
| Topfill Material (Top 12 inches) | Per Ton | $0.00 |
File details come from the government source that posted it. Updated .