Electrical_Vehicle_Charging_Station_(Addendum_#3_Revision).pdf
PDF 601 KB Posted
- Attached to
- Electrical Vehicle Charging Station
- Solicitation number
- 25-034-RFP
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This is a Request for Proposal (RFP) issued by the City of Fort Myers, Florida, seeking a comprehensive solution for electrical vehicle charging stations (EVCS) on publicly owned properties. The RFP solicits proposals from qualified firms to fully fund, design, install, operate, maintain, and market EVCS, with a contract term of 10 years (7-year base period with three one-year options). Proposals are due on February 28, 2025, with a selection committee meeting scheduled for March 20, 2025, and potential City Council approval on April 21, 2025. The project requires a turnkey solution that includes all equipment, software, networking, warranties, and support, with preference for stations capable of charging multiple vehicles simultaneously.
The financial model allows the selected firm to establish service charges for EVCS use to recoup costs and generate operating profit, with detailed pricing structures and revenue distribution to be outlined in the proposal. The city seeks a firm with at least five years of experience in EVCS installations, emphasizing site identification, parking reconfiguration, ADA compliance, and adherence to Florida Statute 366.94. Proposers must demonstrate financial stability, technical capabilities, and the ability to provide comprehensive electric vehicle charging infrastructure. The RFP includes local preference and minority business enterprise considerations, with potential additional points for local vendors and minority-owned businesses.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25-034-RFP
Electrical Vehicle Charging Station
The City of Fort Myers Procurement Services utilizes an electronic bidding system to streamline the solicitation process.
City of Fort Myers Procurement Services Website https://procurement.opengov.com/portal/cityftmyers
Electrical Vehicle Charging Station, 25-034-RFP
TABLE OF CONTENTS
I. INTRODUCTION
II. ADVERTISEMENT & TIMELINE
III. PROJECT DETAILS / SCOPE OF WORK
IV. EVALUATION CRITERIA
V. INSTRUCTIONS TO CONSULTANT/CONTRACTORS
VI. GENERAL CONDITIONS
VII. GENERAL CONDITIONS-PAYMENT
VIII. INSURANCE
IX. LOCAL PREFERENCE
X. MINORITY BUSINESS ENTERPRISE PROGRAM
XI. DEFINITIONS
XII. CONSULTANT/CONTRACTOR SUBMISSION QUESTIONNAIRE
XIII. DRAFT CONTRACT (SERVICE, NON-CCNA)
1. INTRODUCTION
1.1. Summary
The City of Fort Myers (City) requests submittals from interested and qualified Respondents to provide Electrical Vehicle Charging Station.
1.2. Background
The City of Fort Myers (the “City”), established in 1886, is located on the southern west coast of
Florida. It is the cultural and trade center for Lee County and the surrounding area. The City was built on the site of Fort Harvie and was named for Colonel Abraham Charles Myers, then
Chief Quartermaster of Florida. The City has approximately 1,000 employees serving a population of approximately 96,755 full time permanent residents with a population growth of
12% between 2020 and 2022. According to the Lee County Visitor & Convention Bureau, nearly 4.5 million people visit Fort Myers each year and spend over $4 billion dollars while in the area. Fort Myers has experienced unprecedented growth in its tax base, as the past (3), year over year percentage increases, were double digit. The City added a total of $5.0 billion to its tax base over the past five years, or 75.6%.
The City is situated between Tampa and Miami along scenic U.S. Highway 41, also known as
Tamiami Trail. Recent accolades for the City of Fort Myers include top ranking for best places to live, to retire, and to start a new business, safest cities in America, #4 college town in
Florida, and most recently the 3rd fastest growing place by U.S News and World Report.
The City of Fort Myers is committed to providing exceptional municipal services to residents, businesses and visitors in a fiscally responsible manner while preserving the City’s rich history, diverse culture, and charming lifestyle.
1.3. OpenGov Portal
The City uses OPENGOV (https://procurement.opengov.com/portal/cityftmyers) to administer the competitive solicitation process, including but not limited to soliciting responses, issuing addenda, posting results and issuing notification of an intended decision. There is no charge to register and download the solicitation from OPENGOV. Consultant/Contractors are strongly encouraged to read the various Guides and Tutorials available in OPENGOV well in advance of their intention of submitting a response to ensure familiarity with the use of OPENGOV. The City shall not be responsible for a Consultant/Contractor’s inability to submit a response by the end date and time for any reason, including issues arising from the use of OPENGOV.
1.4. Contact Information
Direct inquiries to the following:
Procurement Representative Name
Cathy Scott, Senior Procurement Specialist
2200 Second Street
Fort Myers, FL 33901
Email: cscott@cityftmyers.com
Phone: 239-321-7235
Requesting Department:
Public Works
1.5. Pre-Solicitation Conference
The purpose of a Pre-Solicitation Conference is to review and discuss the solicitation (and any addenda) as published. A representative from Procurement Services and a representative from the using department will be present to discuss the solicitation. The date, time, and location can be found in the timeline.
2. ADVERTISEMENT & TIMELINE
REQUEST FOR PROPOSAL
25-034 RFP Electrical Vehicle Charging Station
The City of Fort Myers is seeking submittals for 25-034 RFP Electrical Vehicle Charging
Station which will be uploaded electronically on or before February 17, 2025 at 2:00 p.m.
Interested Consultant/Contractors are encouraged to download the solicitation documents. For more details visit
+https://procurement.opengov.com/portal/cityftmyers
CITY OF FORT MYERS
Marty K. Lawing, City Manager Legal Ad: News-Press/OpenGov
Mary Hagemann, City Clerk RUN DATES: January 17, 2025
TIMELINE
The Proposed timeline for this solicitation (which is subject to change) is:
Solicitation Advertise & Release Date: January 29, 2025
Pre-Submittal Meeting (Non-Mandatory): February 6, 2025, 10:00am
Finance West Conference Room
Question Submission Deadline: February 18, 2025, 2:00pm
Submission Deadline: February 28, 2025, 2:00pm
Selection Committee Meeting: March 20, 2025, 1:00pm
Finance West Conference Room
Presentations (if desired by the committee): April 11, 2025, 1:00pm
Proposed City Council Approval Date: April 21, 2025
3. PROJECT DETAILS / SCOPE OF WORK
3.1. Important Instructions for Electronic Submittal
The City of Fort Myers is accepting electronic submissions. Consultant/Contractors shall create a
FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic response.
3.2. Minimum Qualifications of Respondents
1. The Consultant/Contractor(s) shall hold any necessary license’s authorizing them to do business in the State of Florida.
2. The Consultant/Contractor(s) shall have been in business under the current company/firm name for a minimum of three (3) consecutive years.
3. Neither Consultant/Contractor nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the City, (as a party to a contract, or otherwise); nor have failed to perform faithfully on any previous contract with the City.
4. The Consultant/Contractor(s) are required to inform the City of any relevant legal or ethical issues. Specifically, they need to disclose:
• Judgments: Any current or pending court decisions against Consultant/Contractor.
• Pending Lawsuits: Any legal actions that are currently underway.
• Criminal Activities: Any criminal conduct, especially if it involves moral turpitude (actions that are morally reprehensible).
https://procurement.opengov.com/signup
Consultant/Contractor will be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context.
To demonstrate qualifications to perform the Work, each Consultant/Contractor must be prepared to submit written evidence, such as financial data, previous experience, present commitments, and other such data as may be called for. Each Solicitation must contain evidence of the Consultant/Contractor’s qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
The awardee will be required to maintain the Minimum Qualifications Requirements, as presented during selection, if selected and awarded the contract, during the term of the
Contract and any contract renewals.
3.3. Scope of Work
This comprehensive project requires a firm with a proven record in EVCS implementation and management, with a strong understanding of public infrastructure, compliance, and financial models. The city is looking for a partner who can help drive its sustainability initiatives while ensuring operational efficiency and financial viability.
This project involves the City of Fort Myers seeking proposals from qualified firms to install and maintain electric vehicle charging stations (EVCS) on publicly owned properties. The key objectives and scope of the project include:
Key Project Objectives:
A. Turnkey Solution: The firm must design, fund, install, operate, maintain, and market
EVCS for public use. This includes all required equipment, software, networking, warranties, and support. The solution should be fully comprehensive, ensuring that all aspects of installation and management are handled by the selected firm.
B. Site Identification: The firm will assist the city in identifying ideal city-owned locations for EVCS installations. Locations will be chosen based on factors like electricity availability, security, and economic considerations. The final decisions on locations will be made jointly by the firm and city staff.
C. Service Multiple Vehicles: Preferably, the EVCS should be capable of servicing more than one vehicle at a time.
D. Parking and ADA Compliance: The firm will provide proper parking signage, reconfigure parking stalls to accommodate EVCS, and ensure compliance with ADA regulations and other parking requirements.
E. Financial Model: Proposals must include detailed information on pricing structures, billing practices, revenue distribution, and cost recovery related to electricity usage. The firm may establish a service charge for EVCS use to recoup costs and generate operating profit.
F. Experience Requirement: The City requires the firm to have at least five years of experience with turnkey EVCS installations in the U.S. market.
G. Contract Terms: The city intends to award a contract for a period of 10 years, with a base period of seven years and three one-year options. The contract may be extended by mutual consent for additional one-year periods.
Scope of Work:
• Installation and Maintenance: The selected firm will be responsible for installing the
EVCS, covering all associated costs (including maintenance and electricity), and ensuring the units are well-maintained and attractive.
• Cost Recovery and Profit: The firm can establish service fees and methods of payment collection to cover the costs and potentially generate operating profit from EVCS users.
• Marketing and Advertising: The firm will be responsible for marketing the EVCS project and can provide product advertisements through the EVCS.
• Post-Agreement Options: Upon contract expiration, the firm will provide options such as removal of the EVCS, transfer of ownership to the city, or contract renewal.
• Fire Safety: If installed in parking garages, the firm will provide wall-mounted fire blankets to handle initial EV fires, which will become city property after installation.
• Florida Renewable Energy and Electric Vehicle Policies: The selected firm must ensure that the project complies the Florida Statute 366.94.
• City Use: The city may have dedicated EVCS installed at city-owned facilities for exclusive use by city vehicles, with the equipment purchased and maintained through the vendor as a contract option.
4. EVALUATION CRITERIA
1. Qualifications of Consultant/Contractor
To demonstrate qualifications to perform the Work, each Consultant/Contractor must be prepared to submit information pertaining to each criterion. Each Submittal must contain evidence of
Consultant/Contractor's qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
2. Responsiveness
The City will determine whether the Consultant/Contractor complies with the instructions for submitting proposals including completeness of proposal which encompasses the inclusion of all required attachments and submissions. Late proposals will not be accepted. Failure to meet other requirements may result in rejection.
3. Responsibility
The City will determine whether the Consultant/Contractor is one with whom it can or should do business. Factors that the City may evaluate to determine “responsibility” include, but are not limited to: excessively high or low priced proposals, past performance, references (including those found outside the proposal), compliance with applicable laws, Consultant/Contractor's record of performance and integrity – e.g. has the Consultant/Contractor been delinquent or unfaithful to any contract with the City, whether the Consultant/Contractor is qualified legally to contract with the City, financial stability and the perceived ability to perform completely as specified. A Consultant/Contractor must always have financial resources sufficient, in the opinion of the City, to ensure performance of the contract and must provide proof upon request. The
City reserves the right to inspect and review Consultant/Contractor's facilities, equipment, and personnel and those of any identified subcontractors. The City will determine whether any failure to supply information, or the quality of the information, will result in rejection.
4. Best and Final Offers
The City may request best & final offers and will determine the scope and subject of any best & final request. The Consultant/Contractor should not expect that the City will ask for best & finals. The Consultant/Contractor should submit their best offer based on the terms and conditions set forth in this Solicitation.
5. Advisory Committee and Evaluation Process
5.1. Initial Review of Responses
Procurement Services will perform an initial review of all submittals for preliminary qualification and documentation compliance. This review process may include, but is not limited to, forms verification, professional licensing, references, past performance, and other relevant criteria and review of the MBE and Local preference if applicable.
5.2. Selection Committee
A Selection Committee (hereinafter referred to as “the Committee”) consisting of at least three (3) voting members will be established to review, discuss, and evaluate all responsive
Proposals submitted in response to this RFP/RSQ. The Committee may utilize City staff, other subject matter experts, and/or consultants as non-voting members to advise and assist the Committee in its review of the Proposals.
5.3. Preliminary Evaluation; Short Listing
The Committee may conduct a preliminary evaluation of all Proposals on the basis of the information provided and, if the Committee deems desirable in its discretion, it may elect to short list two or more Consultant/Contractors using the evaluation criteria set forth in this solicitation. Upon short listing by the Committee, only those Consultant/Contractors short listed shall remain eligible for further evaluation and consideration by the Committee.
5.4. Presentations
The Committee reserves the right to require oral presentations from and conduct pre-award discussion and/or pre-Contract negotiations with any or all responsive and responsible
Consultant/Contractors who submit Proposals determined to be acceptable of being selected for award. Presentations and pre-award discussions and negotiations may be limited at the discretion of the Committee to short listed Consultant/Contractors.
Discussions may be conducted for the purpose of clarification and to assure full understanding of, and responsiveness to, the solicitation requirements. The City will not be liable for any costs incurred by the Consultant/Contractor in connection with such interviews, presentations, or negotiations (i.e., travel, accommodations, etc.).
5.5. Optional Discussion
At the discretion and in the best interest of the City, the City or Committee may conduct discussions with Consultant/Contractors (or the short-listed Consultant/Contractors, as applicable) or seek revision of Proposals from Consultant/Contractors (or the short-listed
Consultant/Contractors, as applicable) deemed to be responsible and reasonably acceptable to be selected. Such Consultant/Contractor (or short-listed
Consultant/Contractors) will be accorded fair and equal treatment with respect to discussion and revision of the Proposals. Revisions may be permitted after submission of Proposals and prior to award of a Contract for the purpose of obtaining best and final offers.
5.6. Award Without Presentations
The City may evaluate and award a Contract based on responses to this Request for
Proposals without discussions or oral presentations. Therefore, each response to this
RFP/RSQ should contain the Consultant/Contractor's best terms and conditions for consideration.
5.7. Scoring and Final Ranking
Each Selection Committee member will evaluate the proposals based on the factors set forth in the Evaluation Criteria of the Solicitation and assign a score for each criterion ranging from zero (0) points to the maximum points allowed for each rating criteria. The individual criteria scores will then be added to determine the total score. The maximum possible total score from the Committee is one hundred (100), before the MBE and/or Local
Preference is added, if applicable.
The Committee will evaluate and rank the responsive Consultant/Contractors deemed acceptable to be selected (or the short-listed Consultant/Contractors, as applicable) as set forth in the preceding section entitled “Evaluation Criteria”. In the event that the Committee previously elected to short list Consultant/Contractors, any rankings or scores assigned as part of the short-listing process shall not be binding on the Committee or its members as part of final evaluation and Committee members may modify their scores for any and all
Consultant/Contractors and scoring categories as they deem appropriate in their sole discretion. The Committee shall submit the proposed rank order to the Procurement
Manager or designee after the conclusion of scheduled presentations, if any. Upon approval of the ranking by the Procurement Manager or designee, a notice of intended action shall be posted. The notice of intended action may be obtained by the Consultant/Contractors as set forth in the section of this RFP/RSQ titled “Request for Proposals Information”.
5.8. Tiebreaker
In the event of a tie, two or more Consultant/Contractors that have the same ranking, the following steps will be taken to determine the highest ranked Consultant/Contractor. This method shall be used for all (RFP’s and RFQ’s) ties.
Step 1: The Consultant/Contractor that has the highest number of 1st place rankings shall be deemed the first ranked Consultant/Contractor. In the event a tie still exists the
Consultant/Contractor with the highest number of 2nd, place rankings shall be the first ranked Consultant/Contractor. Should a tie remain the method used above will continue with each ranking level, 3rd, then 4th, then 5th rank, will be counted until the tie is broken.
Step 2: At the conclusion of step 1 if all is equal, the local Consultant/Contractor shall be deemed the highest ranked Consultant/Contractor over a non-local Consultant/Contractor.
Local shall be defined by the City of Fort Myers Ordinances Section 38-71 or current revision thereof.
Step 3: At the conclusion of step 1 and step 2 if all is equal, the Consultant/Contractor having a drug-free workplace program, in accordance with Section 287.087, FL §, shall be deemed the first ranked Consultant/Contractor.
Step 4: At the conclusion of steps 1, 2, 3, if all are equal, the 1st place
Consultant/Contractor shall be determined by the flip of a coin.
For non-City funded procurements, if steps 2 & 4 are not permitted they are hereby removed.
When the tiebreaker is determined the highest ranked Consultant/Contractor shall be awarded the contract or receive the first opportunity to negotiate, as applicable.
5.9. Authority to Award
Contracts shall be awarded in accordance with the provisions of the City’s Procurement
Ordinance and Policy.
5.10. Reserved Right
The City, at its sole and absolute discretion, reserves the right to reject any and all, or parts of any and all proposals, to readvertise this solicitation, postpone or cancel, at any time, this solicitation process, or to waive minor irregularities and informalities in this solicitation or in the proposals received as a result of this solicitation. The City does not guarantee the award of any Contract as a result of this solicitation process.
The City reserves the right to request that the Consultant/Contractor provide additional information it deems necessary to evaluate, clarify, or substantiate any area contained in each submitted Proposal and to best meet the needs of the City. This includes information which indicates financial resources as well as ability to provide and maintain the system and/or services. Moreover, the City reserves the right to make investigations of the qualifications of the Consultant/Contractor as it deems appropriate, including but not be limited to, a background investigation conducted by the Fort Myers Police Department.
6. Contract Negotiations and Acceptance
Consultant/Contractor must be prepared for the City to accept the Submittal as presented. If
Consultant/Contractor fails to sign all documents necessary to successfully execute the final contract within a reasonable time, or negotiations do not result in an acceptable agreement, the
City may reject the Submittal or revoke the award and may begin negotiations with the next highest Consultant/Contractor. Final contract terms must be approved or signed by the appropriately authorized City official(s). No binding contract will exist between the
Consultant/Contractor and the City until the City executes a written contract or purchase order.
No. Evaluation Criteria Scoring Method Weight (Points)
1. Experience of the
Consultant/Contractor and
Qualifications of Assigned Personnel
• Experience and capabilities to perform the scope of work;
• Required experience & capabilities in-house;
• Existing workload and ability to meet timeline(s) outlined in the project.
• Academic, training, and licensed credentials of employees assigned to the project.
• Provide 2 examples of completed projects with similar scope and budget within the last 5 years. Preference will be given the public agency work.
Points Based 40 (33.9% of Total)
2. Approach to the Project/Design
• Explain your approach to the scope of services, including a comprehensive representation, demonstrating an understanding and a commitment of how you intend to implement and fulfill the requirements of the scope of services.
• Explain how you will balance staffing needs for this project.
• Describe unique abilities, innovative approaches, and/or special considerations
Points Based 20 (16.9% of Total)
3. Financial Stability
• Provide a narrative description and such other information, if any, as Contractor/Consultant deems necessary to demonstrate financial strength and capacity to provide, implement, and maintain the proposed system for the term of the Contract. The City reserves the right to request such additional financial information regarding Consultant/Contractors as it deems necessary or appropriate from any other party having relevant information, including but not limited to utilizing Dun and Bradstreet or other financial reporting companies’ financial reports for evaluation purposes or to request credit references in its review process.
• Explain any financial issues that may prevent the
Consultant/Contractor from providing, implementing, and maintaining the proposed system for the term of the Contract.
Points Based 15 (12.7% of Total)
4. Price Proposal
This criteria will include, but will not be limited to, evaluation of the pricing information.
Points Based 25 (21.2% of Total)
5. Compliance with Minority Business
Enterprise Ordinance (if City funded only, procurement will score)
• Certified Minority Business by the
State of Florida Office of Supplier
Diversity or proof of submitted application, located within the boundary of Lee County, and registered with the City. (10) or
• Shows Proof
Consultant/Contractor applied for status and are awaiting confirmation (8)
• Partnering with a minimum of two Minority Businesses certified by the State, located within Lee
County and registered with the
City (5)
Points Based 13 (11% of Total)
6. Local Vendor Preference (if City funded only, procurement will score)
• Provide completed Local
Preference Company Affidavit
• Qualified business located in City of Fort Myers (5)
• Qualified business located in Lee
County (3)
Points Based 5 (4.2% of Total)
5. INSTRUCTIONS TO CONSULTANT/CONTRACTORS
PROCUREMENT INFORMATION
Procurement Services is the official source for obtaining information regarding City of Fort Myers solicitations. It is the responsibility of Consultants/Contractors to monitor and obtain solicitation updates and current award information both prior to and after the scheduled opening date.
Information is updated as it becomes available. The City reserves the right to issue an award or a recommendation of award at any time following the scheduled solicitation opening date.
APPLICABLE LAW AND APPEALS
This solicitation is issued in accordance with, and governed by, the provisions and procedures outlined in Chapter 38, Articles III and IV of the City of Fort Myers Code of Ordinances. These provisions can be accessed online at:
City of Fort Myers Code of Ordinances - Procurement
Alternatively, contact Procurement Services for further assistance.
https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU
Any appeals related to this solicitation must comply with the requirements specified in the City’s
Code of Ordinances and procurement policies.
AMERICANS WITH DISABILITIES ACT
Persons with disabilities requiring special accommodations to participate in this solicitation process should contact Procurement Services at least seven (7) days before the required accommodation.
Contact Information:
Procurement Services
2200 Second Street, Fort Myers, FL 33901
Email: cfmpurchasing@cityftmyers.com
Phone: (239) 321-7240
SOLICITATION SUBMISSION GUIDELINES
A. Official Submission Portal:
All submissions must be made electronically through the City’s Bid Portal in OpenGov.
The portal will keep all files locked until the solicitation officially closes.
B. Official Time:
The time clock in OpenGov will serve as the “Official Time” for determining the actual closing time of the solicitation. Submissions received after the specified date and time will not be accepted.
C. Consultant/Contractor Responsibilities:
o Consultants/Contractors are solely responsible for ensuring timely electronic submissions.
o The City is not responsible for the distribution of addenda or other solicitation-related information to Consultants/Contractors who fail to register in OpenGov.
D. Addenda Distribution:
All addenda and updates will be made available exclusively via OpenGov.
Consultants/Contractors are advised to regularly check the portal for any updates related to this solicitation.
5.1. Introduction
To be considered, electronic submissions must be completed in accordance with the instructions outlined in this solicitation and submitted within the specified timeframe. The portal will keep all files locked until the solicitation officially closes.
The City reserves the right to accept or reject any or all submissions and to waive minor irregularities or technicalities, as deemed in the best interest of the City. All decisions made by the City regarding these matters shall be final and binding.
5.2. Solicitation Documents
Visit the City of Fort Myers Procurement Services Website and follow the link to Active
Solicitations to access solicitation information. It is the responsibility of the
Consultant/Contractor to ensure correct registration information is provided. The City is not liable for any issues arising from incorrect or incomplete contact information.
A. Use of Official Solicitation Documents:
All submittals must be prepared using the solicitation documents provided by the City.
The City assumes no responsibility for errors or misinterpretations resulting from the use of incomplete or unofficial solicitation documents.
B. Purpose of Solicitation Documents:
Solicitation documents are provided solely to facilitate the preparation and submission of responses.
C. Right to Cancel:
The City reserves the right to cancel any solicitation at any time without obligation.
5.3. Responsibilities of the Consultant/Contractor
Each Consultant/Contractor is responsible for the following actions before submitting an offer:
A. Download Official Solicitation Documents:
o Obtain solicitation documents exclusively from OpenGov. Documents sourced from other platforms or sources are not guaranteed to be accurate.
B. Thoroughly Review Documents:
o Examine all solicitation documents to fully understand the requirements. If additional clarification is needed, submit questions through the OpenGov Q&A module.
C. Consider Applicable Laws and Regulations:
o Evaluate all Federal, State, and Local laws, ordinances, codes, and regulations that could impact the cost, progress, performance, or execution of the work.
D. Correlate Observations with Documents:
o Study and carefully align observations with the solicitation documents to ensure consistency.
E. Report Conflicts or Discrepancies:
o Notify the City of any conflicts, errors, or discrepancies in the solicitation documents by submitting a question through the E-Procurement Q&A module.
▪ Response Timeline: Questions related to document format or processes will be addressed within two (2) business days or the solicitation may be placed on hold.
https://www.cityftmyers.com/1171/Procurement-Services
▪ This timeline does not apply to project-specific questions that require input from project managers or subject matter experts.
F. Review the Draft Contract:
o The draft contract intended for award is included with this solicitation for reference.
▪ This draft contains standard legal language and is not typically modified, except for formatting and enumeration.
▪ Any exceptions to the standard contract should be submitted as a question in the
Q&A module before the question deadline. If the question deadline has passed, exceptions should be clearly noted in the Consultant/Contractor's questionnaire.
▪ Note: Exceptions to the draft contract may impact the evaluation of the submittal.
G. City's Right to Modify Contract:
o The City reserves the right to make minor modifications to the draft contract for specific solicitations before execution. Any modifications or alterations will only be valid if mutually agreed to in writing by both parties.
5.4. Questions and Addenda Guidelines
A. Submission of Questions:
o All questions regarding the meaning or intent of the solicitation documents must be submitted through the OpenGov Portal.
o Only questions received before the deadline specified in the solicitation timeline will be considered.
o Responses to questions will only be binding if provided in writing via addenda or the
"Questions & Answers" feature in OpenGov. Oral or other informal interpretations or clarifications will have no legal effect.
o Any addenda issued electronically during the solicitation period shall become part of the solicitation and will be incorporated into the resulting contract.
B. Response Timeframes:
o Answers to questions of substance will be publicly published in the OpenGov Portal.
o Responses to document format or process-related questions will be issued within two (2) business days of receipt, or the solicitation will be placed on hold.
o The two-day response window does not apply to project-specific questions that require input from project managers or Consultant/Contractors.
C. Authority of Addenda and Revisions:
o Revisions to the solicitation and responses provided via the "Questions & Answers" feature are authoritative and shall be considered addenda to the solicitation.
o All information provided in this solicitation, including addenda and answers to questions, will be incorporated into the solicitation and any resulting contract.
o It is the responsibility of the Consultant/Contractor to review all addenda, revisions, and published answers to questions.
o Requests for interpretations must be submitted through the OpenGov Portal. Failure to review and comply with the latest addenda or interpretations will not relieve the
Consultant/Contractor from their obligations under the solicitation or resulting contract.
o No oral interpretations will be provided. All official interpretations will be issued as written addenda and made available via OpenGov.
D. Modification of Solicitation Documents:
o The City reserves the right to issue addenda to modify the solicitation documents as necessary.
o Consultant/Contractors are strongly encouraged to attend any pre-submittal meetings to gain clarity on the solicitation requirements.
5.5. Interpretation of Solicitation and Addenda
The absence of details or the omission of specific descriptions within the Solicitation or any addenda shall be interpreted as requiring adherence to the highest standards of best commercial practices. All interpretations and clarifications of this Solicitation shall be governed by the terms and conditions set forth in this Contract.
5.6. Incorporation of Procurement Ordinance and Policy
The City’s Procurement Ordinance and Policy are hereby incorporated by reference into this solicitation and any contract awarded as a result of this solicitation. By participating in this solicitation, Consultants/Contractors agree to be bound by the City’s Procurement Ordinance and Policy in all matters related to this solicitation and any subsequent contract.
5.7. Submittal Preparation
1. Preparation of Response
Consultants/Contractors must prepare their responses in a clear and concise manner, ensuring that all required content is complete. Special attention should be given to the specific information, instructions, and requirements outlined in the solicitation document to ensure responsiveness. Incomplete responses or those lacking key information may be rejected. To facilitate the review process, each section or tab of the response should be properly labeled to correspond with the solicitation requirements.
2. Incurred Expenses
The City of Fort Myers is not responsible for any expenses incurred by Consultants/Contractors in the preparation and submission of their proposals, including costs associated with presentations or other activities related to the solicitation process.
3. Proprietary Information
1 Public Records Law
In accordance with Chapter 119, Florida Statutes (Public Records Law), and unless otherwise provided by applicable State or Federal Law, all solicitation documents and responses are considered public records, see F.S. 119.071(1)(b)2.
Consultants/Contractors must specifically identify any information in their proposals considered confidential or proprietary and provide the applicable legal exemption for nondisclosure. Generic designations such as “confidential” are insufficient.
Failure to provide Procurement Services with a detailed explanation, including statutory citations and references to specific sections of the response, may result in the entire response being disclosed in accordance with Chapter 119 of the Florida Statutes.
2 Redacted Copy Requirement
If a Consultant/Contractor asserts exemptions from public disclosure for any portion of its response, it must provide:
o A redacted copy of its proposal in an electronic format suitable for public disclosure.
o Only the portions exempt under applicable law should be redacted, with the exemption clearly identified.
3 Defense and Indemnification
By submitting a response, the Consultant/Contractor agrees to:
o Defend, upon the City’s request, the City (including its employees, advisors, agents, Committee members, and elected or appointed officials) against claims or actions related to the designation of materials as confidential or exempt from public disclosure.
o Indemnify and hold harmless the City and its representatives from all claims, suits, judgments, fines, costs, and fees (including attorney’s fees) arising from the
Consultant/Contractor's designation of confidential or exempt materials.
4 City’s Judgment on Disclosure
The City reserves the right to exercise its own judgment regarding the disclosure of records. The City may take any actions it deems necessary, including filing a declaratory action, to comply with Federal or Florida public records laws.
5 Ownership of Submittals
All submittals received in response to this solicitation will become the property of the City of Fort Myers and will not be returned to the Consultant/Contractor.
5.8. Submission Guidelines (RFP and RSQ)
Consultants/Contractors are responsible for uploading their submittals directly into the OpenGov portal:
OpenGov Submission Portal
The authorized representative who binds the Consultant/Contractor to the submittal must sign the qualification statement. A submittal is considered timely only if received through the
OpenGov portal by the precise date and time specified in the solicitation timeline. The official time will be determined by the OpenGov portal's time clock. The portal will not accept submittals after the deadline.
Submission Requirements
A. Document Format:
o A single PDF document, signed by an authorized representative, must be submitted via the OpenGov portal.
B. Title Page – Introduction:
o Include the following:
▪ Name of the individual or firm
▪ Address
▪ Email address
▪ Telephone number
▪ Name of contact person
▪ Date
▪ Solicitation number and title
C. Table of Contents:
o Include page numbers and bookmark each section for easy navigation.
D. Letter of Transmittal:
o Limit: Two (2) pages.
o Content:
1. Briefly state the Consultant/Contractor’s understanding of the services to be provided.
2. Make a positive commitment to perform the work.
3. Provide the names, titles, addresses, and telephone numbers of authorized representatives.
E. Mandatory Minimum Qualification Documentation:
o Provide documentation to verify compliance with the "Minimum Qualifications" section. Ensure all documentation is clear and specific.
F. Required Documents:
o Corporate Submissions:
▪ Must be signed in the corporate name by the President or Vice-President (or other authorized officer with evidence of signing authority).
▪ The corporate seal must be affixed and attested by the Secretary or Assistant
Secretary.
▪ Include the corporate address and state of incorporation.
o Partnership Submissions:
▪ Must be signed in the partnership name by a partner, with the title noted under the signature.
▪ Include the partnership’s official address.
G. Litigation History:
o Provide details of any current litigation or outstanding judgments involving the
Consultant/Contractor.
H. Electronic Pricing Form Instructions:
o The City uses OpenGov to streamline the solicitation process. Submittals must be made electronically; paper responses will be deemed non-responsive.
Pricing Instructions (if applicable)
1 Submission via OpenGov:
• Log into your OpenGov account, navigate to the relevant solicitation, click
“Draft Response,” complete the requested information, upload all required attachments, and submit.
2 Unit and Extended Prices:
• Enter unit prices for each item (if applicable). In case of discrepancies between unit and extended prices, unit prices will prevail.
3 Award Basis:
• The City generally awards bids based on a "lump sum" to the responsive and responsible Bidder submitting the lowest total bid. However, the City reserves the right to award based on a "per group" or "per item" basis. Clearly indicate items bid and items not bid on the provided pricing forms.
4 Additional Charges:
• Prices quoted must include all costs related to verification/coordination of the order, shipping, delivery, unpacking, setup, installation, operation, testing, cleanup, training, and travel. No additional charges will be accepted beyond those listed on the price sheets.
5.9. Submittal Requirements
Except as provided under the Americans with Disabilities Act for individuals requiring special accommodations, all proposals for this solicitation must be submitted electronically.
Paper responses will be deemed non-responsive.
1. Instructions for Uploading Submissions
1 Submission Process:
o Log into your OpenGov account and navigate to the solicitation for which you wish to submit a response.
o Click on “Draft Response”, complete the required information, upload your submission along with all required attachments, and submit your response.
2 Responsibility for Timely Submission:
o Consultants/Contractors are solely responsible for ensuring their submittals are complete, uploaded, and submitted via the e-Procurement Portal before the specified due date and time.
o The City is not responsible for any delays or failures in submission caused by any occurrence.
2. Binding Submissions
All submissions shall remain binding for a period of one hundred eighty (180) calendar days following the opening date.
3. Late Submissions
Late submissions will not be accepted under any circumstances. Consultants/Contractors assume full responsibility for the timely upload of their responses.
5.10. Conformance to Solicitation
1. Compliance with Mandatory Requirements
All submissions must conform to the material and mandatory requirements outlined in this
Solicitation. However, the City reserves the right to waive minor irregularities at its discretion without prior notice or the issuance of a written addendum.
If a Consultant/Contractor wishes to submit an Offer that would require the City to waive, alter, or omit a material or mandatory requirement, the Consultant/Contractor must first submit a written request to the City to amend the Solicitation. Such requests must follow the process outlined in the “Interpretations and Addenda” section of this Solicitation.
If the City agrees, at its sole discretion, to amend, alter, or waive the requirement, the City will issue a written addendum to notify all prospective participants of the change.
2. Submitting Requests for Waivers or Amendments
Requests to waive, alter, or amend a mandatory requirement must be submitted as a written question that can be addressed in an addendum issued to all participants.
Important Note:
This process does not require participants to submit their complete Proposal prior to the due date. Instead, it is a mechanism for requesting a waiver or amendment to a mandatory requirement that is necessary to enable submission of the intended Proposal.
5.11. Modification and Withdrawal of Submissions
1. Modifying or Withdrawing Submissions
Submissions may be modified or withdrawn by Consultants/Contractors through their account on OpenGov at any time before the opening of the Solicitations.
2. Withdrawal Due to Material Mistake
If, within twenty-four (24) hours after Submissions are opened, a Consultant/Contractor files a duly signed written notice with the City and promptly demonstrates to the City’s reasonable satisfaction that a material and substantial mistake occurred in the preparation of its
Submission, the Consultant/Contractor may withdraw its Submission.
In such cases:
• The Submission security, if applicable, will be returned.
• The Consultant/Contractor will thereafter be disqualified from further participation in the
Work to be provided under the Contract.
5.12. Submission Responsibility
It is the sole responsibility of the Consultant/Contractor to ensure that submissions are electronically uploaded through the designated portal before the specified date and time.
Submissions by telephone, email, or hard copy will not be accepted under any circumstances.
5.13. Opening Submissions
Construction-Related Submittals:
Construction-related submittals will be publicly opened and announced by Procurement Services on the due date and time specified in the Solicitation. During the opening, the
Consultant/Contractor’s name and verification of bond submittal, if applicable, will be announced aloud.
1. Instructions to Join the Solicitation Opening Virtual Meeting:
1 Select a Method to Join:
o Choose the preferred method provided in the Solicitation document.
2 Join the Virtual Meeting:
o Use the link or access details provided in the Introduction Section to join the virtual Proposal Opening session.
Note:
• Sessions will be recorded.
• To ensure a smooth process, participants are asked to turn off their cameras and mute their microphones before joining the meeting.
2. Opportunity to Speak:
• Attendees will be given an opportunity to speak during the meeting.
• When called by the name, email, or phone number listed in the attendance log, unmute your device and state your name and address for the record.
Non-Construction-Related Submittals:
Non-construction-related submittals will be opened privately. Results will be posted in accordance with Florida Statute 119.07(1) and Article I, Section 24(a) of the Florida
State Constitution.
5.14. Irrevocable Offer
By submitting a response to this Solicitation, the Consultant/Contractor agrees that their submission constitutes an irrevocable offer to the City of Fort Myers. This offer shall remain valid for a period of one hundred eighty (180) calendar days from the date of the opening. The
Consultant/Contractor agrees to provide the goods and services described in this Solicitation under the terms, conditions, and pricing outlined in their submission.
The City, at its sole discretion, reserves the right to release any submission from this commitment during the validity period.
5.15. Evaluation of Submittals (RFP/RSQ)
A. Initial Review of Submissions
Procurement Services will conduct an initial review of all submissions to ensure preliminary qualification and documentation compliance. This review may include, but is not limited to:
o Verifying responses to required questions.
o Confirming professional licensing.
o Ensuring compliance with other relevant criteria.
B. Overview to Selection Committee
Procurement staff will prepare an overview of all responsive submissions and forward it with the responsive submissions to the Selection Committee for further analysis. This analysis may include evaluation of scope requirements and price, if applicable as stated in this solicitation.
C. Selection Committee Evaluation
A Selection Committee, appointed in accordance with the City’s policies and procedures, will individually review and evaluate all eligible submissions during a public meeting. The
Committee will rank the short-listed Consultant/Contractor(s) based on the Evaluation
Criteria outlined in the section titled Evaluation Criteria for Short-Listing.
D. Assessment of Consultant/Contractor(s)
The City reserves the right to evaluate the financial capability, reputation, integrity, skill, business experience, and quality of performance under similar operations for each
Consultant/Contractor(s) prior to making an award.
E. Research and Due Diligence
The City may conduct additional research as necessary to assist in evaluating submissions and to establish the responsibility, qualifications, and financial ability of the
Consultant/Contractor(s), as well as proposed Subcontractors, Suppliers, and other relevant parties. This research ensures their ability to perform and furnish the work in accordance with the contract documents within the required timeframe.
F. Presentations and Interviews
At the discretion of the Selection Committee, short-listed Consultant/Contractor(s) may be invited to:
o Make presentations or attend interviews.
o Provide additional written documentation, either prior to or as a result of the presentations/interviews.
o Failure to promptly supply requested information, such as records of past performance, financial stability, or the ability to meet project schedules, may result in a determination of non-responsiveness.
o During the presentation/interview, Consultant/Contractor(s) must demonstrate their understanding of the project scope and discuss their approach to successfully completing the project.
G.
H. Final Ranking and Negotiations
After the interviews, the Selection Committee will rank the short-listed
Consultant/Contractor(s) using the criteria outlined in the Evaluation Criteria for
Final Ranking section. The rankings will then be submitted to City Council for approval.
o Upon City Council approval, the Department Director or designee will initiate negotiations with the top-ranked Consultant/Contractor(s) with the intention of entering into a contract.
o If negotiations with the top-ranked Consultant/Contractor(s) fail, they will be terminated, and negotiations will begin with the next-ranked
Consultant/Contractor(s).
o This process will continue until a successful contract is negotiated or the solicitation is terminated.
o Once a contract is finalized, it will be executed by the Mayor and City Manager.
5.16. Reserved Rights
A. Request for Additional Information:
The City reserves the right to request additional information from
Consultants/Contractors after the closing date. This may include, but is not limited to:
o Information necessary to evaluate, clarify, or substantiate any aspect of the submittal.
o Evidence of financial resources and the ability to provide and maintain the required system and/or services.
Additionally, the City may conduct investigations into the qualifications of any
Consultant/Contractor, which may include background checks performed by the Fort
Myers Police Department.
B. Flexible Award Options:
The City reserves the right to:
o Make awards based on individual items, groups of items, all-or-none, or a combination thereof, potentially involving one or more suppliers.
o Reject any or all submittals or waive informalities or technicalities in the submittals received.
C. Rejection of Submittals:
The City reserves the right to:
o Reject any and all Solicitations.
o Waive any and all informalities.
o Negotiate contract terms with the Successful Consultant/Contractor.
o Disregard nonconforming, non-responsive, unbalanced, or conditional submittals.
o Reject any submittal if it is determined that awarding to the Consultant/Contractor is not in the City’s best interest, including cases where:
▪ The Solicitation is not responsive.
▪ The Consultant/Contractor is unqualified or has questionable financial ability.
▪ The Consultant/Contractor fails to meet any other relevant standards or criteria established by the City.
5.17. Protest Procedure
The City’s protest policy and procedure are outlined in the City of Fort Myers Procurement
Policy, which can be accessed at the following link:
City of Fort Myers Procurement Policy (PDF)
For details, refer to Page 20, Item F of the policy document.
5.18. Award of Contract
A. Purchase Order:
The Purchase Order (PO) issued by the City to the selected Consultant/Contractor within the time specified for acceptance establishes a binding contract without further action by either party.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .