About this file

This document comprises a preliminary design study and architectural services solicitation for the Pinellas County Board of County Commissioners' proposed East Lake Community Library expansion project located at 4125 East Lake Road, Palm Harbor, Florida. The Construction and Property Management Department, Construction Services Division is seeking professional architectural consulting services to develop comprehensive plans and specifications, prepare cost estimates, and provide all associated professional architectural consulting services for an approximately 8,000-square-foot addition to the existing library building. The project consists of a ground floor addition of approximately 3,650 square feet to be added to the east end of the building and a second floor addition of approximately 4,350 square feet to be constructed above the new ground floor addition and a portion of the existing 2017 structure. The preliminary design study includes renderings and floor plans depicting the proposed expansion, featuring an early childhood area, enlarged teen room with emergency exit, a bank of study rooms for private study and tutoring, lobby seating with vending machines and bistro tables, and expanded parking with a bioretention area for green stormwater infrastructure on the south side of the building.

The preliminary design materials indicate additional considerations for the project including the feasibility of a two-level parking garage, rooftop solar panels to reduce energy costs, and provisions for the library to function as a disaster relief center with backup generator capabilities. The design study also addresses modifications needed to the east side of the building to accommodate staff entrance for employees and shipping/receiving operations. Project contact information is provided through Library Director Lois Eannel (lois-e@eastlakelibrary.org) and Assistant Director Anne Maire Nurnberger (annemarie@eastlakelibrary.org). No specific pricing terms, contract term duration, response deadlines, or funding source information is detailed in the preliminary design study document itself.

View the file

Other files

File Type Posted
P2.1-_Plumbing_Floor_Plan.pdf PDF
P2.0-_Underground_Plumbing.pdf PDF
P1.1-_Plumbing_Demo.pdf PDF
M2.1-_Mech_Floor_Plan.pdf PDF
E4.1_Systems_Floor_Plan.pdf PDF
E2.1-_Lighting_Floor_Plan.pdf PDF
S2.3-_Structural_Details.pdf PDF
S1.1_Foundation_Plan.pdf PDF
M1.1-_Mech_Demo.pdf PDF
A2.1-_Exterior_Elevations.pdf PDF
A1.4-_Roof_Plan.pdf PDF
A1.2-_Dimension_Plan.pdf PDF
LS1.1-_Life_Safety_Plan.pdf PDF
C-4-_Paving_Grading_Drainage.pdf PDF
C-3-_Horizontal_Control_Plan.pdf PDF
C-2-_Existing_and_Demo_Plan.pdf PDF
A1.1-_Floor_Plan.pdf PDF
A0.1-_Site_Plan.pdf PDF
26-0124-RFQ-CCNA.pdf PDF
Sample_Agreement.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Renderings and Floor

Plans for East Lake Community Library

Phase II Expansion/Renovation

First Floor

1999 20172012

2nd Floor

Site Plan with Expanded Parking in Southeast Corner

Note bioretention area as a form of green stormwater infrastructure on the south side of the library.

East Side (rear of library building) Note: Will need modification to accommodate staff entrance for employees and shipping/receiving.

Early Childhood Area

2nd Floor

ADDITIONAL CONSIDERATIONS:

• Bank of Study Rooms to support private study, tutoring, small groups

• Enlarging Teen Room with Emergency Exit

• Seating/Vending Machines/Bistro Tables in Lobby

• Could the property support a two-level parking garage?

• Solar panels on roof to reduce energy costs?

• The library as a disaster relief center (backup generator?)

Thank you for your support on this project!

Lois Eannel, Library Director lois-e@eastlakelibrary.org Anne Maire Nurnberger, Assistant Director annemaire@eastlakelibrary.org

East Lake Community Library 4125 East Lake Road, Palm Harbor, FL 34685 eastlakelibrary.org

(727) 773-2665 mailto:annemaire@eastlakelibrary.org

Slide 1: Preliminary Renderings and Floor Plans for East Lake Community Library Phase II Expansion/Renovation
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17

File details come from the government source that posted it. Updated .