LIST_OF_HVAC_EQUIPMENT_SvsContr_MOC-A_2016-05-13.xls
XLS spreadsheet 70 KB Posted
- Attached to
- NOAA OMAO MOC HVAC Preventative Maintenance
- Solicitation number
- EA-133M-16-RQ-0376
About this file
Equipment List
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Svs Contract
| SERVICE CONTRACT MAINTENANCE PLAN | ||||||||||||||||
| w# = weekly (# times per week) - m = monthly - q = quarterly - s = semi-annual - a = annual | ||||||||||||||||
| Equip | Designation | Location | Sub-L. | Sub-L. | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| Building 1 HVAC Equip | ||||||||||||||||
| Packaged Roof Top Unit | AHU-2-Bldg1 | Bldg 1 | Roof | NW Wing | q | q,a | q | q | ||||||||
| Packaged Roof Top Unit | RTU-2b-Bldg1 | Bldg 1 | Roof | N Center | q | q,a | q | q | ||||||||
| Air Handler Unit | AHU-1-CU | Bldg 1 | Roof | Above Passageway | q | q,a | q | q | ||||||||
| Packaged Roof Top Unit | Packaged RTU | Bldg 1 | Roof | Center WH | q | q,a | q | q | ||||||||
| Packaged Roof Top Unit | Packaged RTU #2 | Bldg 1 | Roof | Above Trng Rm | q | q,a | q | q | ||||||||
| Packaged Roof Top Unit | Exist Pkd RTU | Bldg 1 | Roof | South WH | q | q,a | q | q | ||||||||
| Cooling Tower | Marley SPX CT | Bldg 1 | Outside | By Mech Rm | N/A - SEPARATE CONTRACT NOT INCLUDED THIS CONTRACT | |||||||||||
| Boiler | Exist Boiler Bldg1 | Bldg 1 | Mech Rm | a | ||||||||||||
| Air Handler Unit | AHU Stricker | Bldg 1 | Mech Rm | q | q,a | q | q | |||||||||
| Air Handler Unit | AHU-3-Bldg1 | Bldg 1 | Mech Rm | q | q,a | q | q | |||||||||
| Chiller | Chiller Bldg1 | Bldg 1 | Mech Rm | q | q | q | q | |||||||||
| Chiller Controls | Chiller Cntrls | Bldg 1 | - - | q | q | q | q | |||||||||
| Chilled/Hot Water Pumps (6 ea) | CW/HW Pumps | Bldg 1 | Mech Rm | a | ||||||||||||
| Building 2 HVAC Equip | ||||||||||||||||
| Packaged Roof Top Unit | Pkgd DX RTU | Bldg 2 | Roof | Center | q | q,a | q | q | ||||||||
| Computer Room Split System | Comp Rm Spl Sys | Bldg 2 | Roof | Center | a | |||||||||||
| Boiler | Exist Boiler Bldg2 | Bldg 2 | 2nd Fl W | a | ||||||||||||
| Air Handler Unit | AHU-3 | Bldg 2 | 1st Fl Mech Rm | q | q,a | q | q | |||||||||
| Air Handler Unit | AHU-4 | Bldg 2 | 1st Fl Mech Rm | q | q,a | q | q | |||||||||
| Air Handler Unit | AHU-5 | Bldg 2 | 1st Fl Mech Rm | q | q,a | q | q | |||||||||
| Air Handler Unit | AHU-6 | Bldg 2 | 1st Fl Mech Rm | q | q,a | q | q | |||||||||
| Coil Unit | CU-3 | Bldg 2 | Outside Mech Rm | s | s | |||||||||||
| Coil Unit | CU-4 | Bldg 2 | Outside Mech Rm | s | s | |||||||||||
| Coil Unit | CU-5 | Bldg 2 | Outside Mech Rm | s | s | |||||||||||
| Coil Unit | CU-6 | Bldg 2 | Outside Mech Rm | s | s | |||||||||||
| Water Pumps (2 ea) | Pumps Bldg2 | Bldg 2 | 1st Fl Mech Rm | a | ||||||||||||
| Changes this year | ||||||||||||||||
| n/a | ||||||||||||||||
| Note | ||||||||||||||||
| All air filter changes will be documented on each filter, date replaced | ||||||||||||||||
| AHU-3, AHU-4, AHU-5, AHU-6 are in tight space Mech Room Bldg 2, caution advised | ||||||||||||||||
| Water Pumps Annual Maintenance: Check operability, lubricate motors | ||||||||||||||||
| A/C Window unit | Bldg 1 | 1st Floor | rm 144 | a | ||||||||||||
| A/C Window unit | Bldg 1 | 2nd Floor | rm 233 | a | ||||||||||||
| A/C Window unit | Bldg 1 | 2nd Floor | rm 225 | a | ||||||||||||
| A/C Window unit | Bldg 2 | 1st Floor | C109 | a | ||||||||||||
| A/C Window unit | Bldg 2c | Trailer | east wall | a | ||||||||||||
| A/C Window unit | Bldg 2c | Trailer | west wall | a | ||||||||||||
| Chiller | Bldg 1 | outside | q | q | q | q,a | ||||||||||
| Chiller | Bldg 1 | outside | q | q | q | q,a | ||||||||||
| Chiller | Bldg 2 | outside | q | q | q | q,a | ||||||||||
| Chiller | B sec | outside | q | q,a | q | q | ||||||||||
| Chiller | A sec | outside | q | q,a | q | q | ||||||||||
| Chill water pump #1 | Bldg 1 | 1st Floor | boiler rm | q | q | q | q | |||||||||
| Chill water pump #2 | Bldg 1 | 1st Floor | boiler rm | q | q | q | q | |||||||||
| Hot water pump #3 | Bldg 1 | 1st Floor | boiler rm | q | q | q | q | |||||||||
| Hot water pump #4 | Bldg 1 | 1st Floor | boiler rm | q | q | q | q | |||||||||
| Chill water pump | Bldg 2 | outside | q | q | q | q | ||||||||||
| Chill water pump #8 | B sec | 1st Floor | rm B107 | a | ||||||||||||
| Chill water pump #9 | B sec | 1st Floor | rm B107 | a | ||||||||||||
| Hot water pump #10 | B sec | 1st Floor | rm B107 | a | ||||||||||||
| Hot water pump #11 | B sec | 1st Floor | rm B107 | a | ||||||||||||
| Hot wter pmp booster | B sec | 1st Floor | rm B107 | a | ||||||||||||
| Chill water pump #6 | A sec | 1st Floor | rm A101 | a | ||||||||||||
| Chill water pump #7 | A sec | 1st Floor | rm A101 | a | ||||||||||||
| Hot wter pmp booster | A sec | 1st Floor | rm A101 | a | ||||||||||||
| Air Handler | Bldg 1 | 1st Floor | rm 150 | q | q | q | q,a | |||||||||
| Air Handler | Bldg 1 | 1st Floor | rm 146 | q | q | q | q,a | |||||||||
| Air Handler | Bldg 1 | 2nd Floor | rm 233 | q | q | q | q,a | |||||||||
| Air Handler | Bldg 1 | 2nd Floor | rm 227 | q | q | q | q,a | |||||||||
| Air Handler | Bldg 2 | outside | UL roof | q | q,a | q | q | |||||||||
| Air Handler | B sec | 1st Floor | rm B107 | q | q,a | q | q | |||||||||
| Air Handler | A sec | 1st Floor | rm A101 | q | q,a | q | q | |||||||||
| A/C Package unit | Bldg 2 | outside | LL roof | a | ||||||||||||
| A/C Package unit | Bldg 2 | outside | UL roof | a | ||||||||||||
| A/C Split unit | B sec | outside | by chiller | a | ||||||||||||
| A/C Split unit | A sec | outside | by A100 | a | ||||||||||||
| Liebert unit | Bldg 1 | 1st Floor | rm 122 | m | m | m,a | m | m | m | m | m | m | m | m | m |