Svs Contract

SERVICE CONTRACT MAINTENANCE PLAN
w# = weekly (# times per week) - m = monthly - q = quarterly - s = semi-annual - a = annual
EquipDesignationLocationSub-L.Sub-L.JanFebMarAprMayJunJulAugSepOctNovDec
Building 1 HVAC Equip
Packaged Roof Top UnitAHU-2-Bldg1Bldg 1RoofNW Wingqq,aqq
Packaged Roof Top UnitRTU-2b-Bldg1Bldg 1RoofN Centerqq,aqq
Air Handler UnitAHU-1-CUBldg 1RoofAbove Passagewayqq,aqq
Packaged Roof Top UnitPackaged RTUBldg 1RoofCenter WHqq,aqq
Packaged Roof Top UnitPackaged RTU #2Bldg 1RoofAbove Trng Rmqq,aqq
Packaged Roof Top UnitExist Pkd RTUBldg 1RoofSouth WHqq,aqq
Cooling TowerMarley SPX CTBldg 1OutsideBy Mech RmN/A - SEPARATE CONTRACT NOT INCLUDED THIS CONTRACT
BoilerExist Boiler Bldg1Bldg 1Mech Rma
Air Handler UnitAHU StrickerBldg 1Mech Rmqq,aqq
Air Handler UnitAHU-3-Bldg1Bldg 1Mech Rmqq,aqq
ChillerChiller Bldg1Bldg 1Mech Rmqqqq
Chiller ControlsChiller CntrlsBldg 1- -qqqq
Chilled/Hot Water Pumps (6 ea)CW/HW PumpsBldg 1Mech Rma
Building 2 HVAC Equip
Packaged Roof Top UnitPkgd DX RTUBldg 2RoofCenterqq,aqq
Computer Room Split SystemComp Rm Spl SysBldg 2RoofCentera
BoilerExist Boiler Bldg2Bldg 22nd Fl Wa
Air Handler UnitAHU-3Bldg 21st Fl Mech Rmqq,aqq
Air Handler UnitAHU-4Bldg 21st Fl Mech Rmqq,aqq
Air Handler UnitAHU-5Bldg 21st Fl Mech Rmqq,aqq
Air Handler UnitAHU-6Bldg 21st Fl Mech Rmqq,aqq
Coil UnitCU-3Bldg 2Outside Mech Rmss
Coil UnitCU-4Bldg 2Outside Mech Rmss
Coil UnitCU-5Bldg 2Outside Mech Rmss
Coil UnitCU-6Bldg 2Outside Mech Rmss
Water Pumps (2 ea)Pumps Bldg2Bldg 21st Fl Mech Rma
Changes this year
n/a
Note
All air filter changes will be documented on each filter, date replaced
AHU-3, AHU-4, AHU-5, AHU-6 are in tight space Mech Room Bldg 2, caution advised
Water Pumps Annual Maintenance: Check operability, lubricate motors
A/C Window unitBldg 11st Floorrm 144a
A/C Window unitBldg 12nd Floorrm 233a
A/C Window unitBldg 12nd Floorrm 225a
A/C Window unitBldg 21st FloorC109a
A/C Window unitBldg 2cTrailereast walla
A/C Window unitBldg 2cTrailerwest walla
ChillerBldg 1outsideqqqq,a
ChillerBldg 1outsideqqqq,a
ChillerBldg 2outsideqqqq,a
ChillerB secoutsideqq,aqq
ChillerA secoutsideqq,aqq
Chill water pump #1Bldg 11st Floorboiler rmqqqq
Chill water pump #2Bldg 11st Floorboiler rmqqqq
Hot water pump #3Bldg 11st Floorboiler rmqqqq
Hot water pump #4Bldg 11st Floorboiler rmqqqq
Chill water pumpBldg 2outsideqqqq
Chill water pump #8B sec1st Floorrm B107a
Chill water pump #9B sec1st Floorrm B107a
Hot water pump #10B sec1st Floorrm B107a
Hot water pump #11B sec1st Floorrm B107a
Hot wter pmp boosterB sec1st Floorrm B107a
Chill water pump #6A sec1st Floorrm A101a
Chill water pump #7A sec1st Floorrm A101a
Hot wter pmp boosterA sec1st Floorrm A101a
Air HandlerBldg 11st Floorrm 150qqqq,a
Air HandlerBldg 11st Floorrm 146qqqq,a
Air HandlerBldg 12nd Floorrm 233qqqq,a
Air HandlerBldg 12nd Floorrm 227qqqq,a
Air HandlerBldg 2outsideUL roofqq,aqq
Air HandlerB sec1st Floorrm B107qq,aqq
Air HandlerA sec1st Floorrm A101qq,aqq
A/C Package unitBldg 2outsideLL roofa
A/C Package unitBldg 2outsideUL roofa
A/C Split unitB secoutsideby chillera
A/C Split unitA secoutsideby A100a
Liebert unitBldg 11st Floorrm 122mmm,ammmmmmmmm