Equipment_List.pdf

PDF 18 KB Posted

Attached to
NOAA OMAO MOC HVAC Preventative Maintenance Federal contract opportunity
Solicitation number
EA-133M-16-RQ-0376
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Equipment List

View the file

Other files for this federal contract opportunity

Other files attached to NOAA OMAO MOC HVAC Preventative Maintenance, newest first.
File Type Posted
SF_30_Quote_Due_Date.pdf PDF
Qs_and_As_for_EA-133M-16-RQ-0376.pdf PDF
SF_30_Amendment_Questions_and_Answers_HVAC_OMAO-A.pdf PDF
LIST_OF_HVAC_EQUIPMENT_SvsContr_MOC-A_2016-05-13.xls XLS spreadsheet
www.wdol.gov_wdol_scafiles_std_15-4341.pdf PDF
Site_Investigation_Report_No_Pricing.pdf PDF
HVAC_SOW_MOC-A__2016-03-31.pdf PDF
RFQ_Combined_Synopsis_Solicitation_-_HVAC_Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

s = semi-annual - a = annual Designation Location Sub-L. Sub-L. Required Service

AHU-2-Bldg1 Bldg 1 Roof NW Wing Quarterly and Annually RTU-2b-Bldg1 Bldg 1 Roof N Center Quarterly and Annually

AHU-1-CU Bldg 1 Roof Above

Passageway Quarterly and Annually

Packaged RTU Bldg 1 Roof Center WH Quarterly and Annually Packaged RTU #2 Bldg 1 Roof Above Trng Rm Quarterly and Annually Exist Pkd RTU Bldg 1 Roof South WH Quarterly and Annually Exist Boiler Bldg1 Bldg 1 Mech Rm SEE SOW AHU Stricker Bldg 1 Mech Rm Quarterly and Annually AHU-3-Bldg1 Bldg 1 Mech Rm Quarterly and Annually Chiller Bldg1 Bldg 1 Mech Rm Quarterly and Annually Chiller Cntrls Bldg 1 - - Quarterly and Annually CW/HW Pumps Bldg 1 Mech Rm Annually Marley SPX CT Bldg 1 Outside By Mech Rm Quarterly, SA, and Annually

Pkgd DX RTU Bldg 2 Roof Center Quarterly and Annually Comp Rm Spl Sys Bldg 2 Roof Center Quarterly and Annually Exist Boiler Bldg2 Bldg 2 2nd Fl W See SOW

AHU-3 Bldg 2 1st Fl Mech Rm

Quarterly and Annually

AHU-4 Bldg 2 1st Fl Mech Rm

Quarterly and Annually

AHU-5 Bldg 2 1st Fl Mech Rm

Quarterly and Annually

AHU-6 Bldg 2 1st Fl Mech Rm

Quarterly and Annually

CU-3 Bldg 2 Outside Mech Rm

Quarterly and Annually

CU-4 Bldg 2 Outside Mech Rm

Semi-Annually

CU-5 Bldg 2 Outside Mech Rm

Semi Annually

CU-6 Bldg 2 Outside Mech Rm

Semi Annually

All air filter changes will be documented on each filter, date replaced AHU-3, AHU-4, AHU-5, AHU-6 are in tight space Mech Room Bldg 2, caution advised CWPs Annaul Maintenance: Check operability, lubricate motors

Note

Coil Unit

Coil Unit

Coil Unit

Air Handler Unit

Air Handler Unit

Air Handler Unit

Coil Unit

Building 2 HVAC Equip Packaged Roof Top Unit Computer Room Split System Boiler

Air Handler Unit

Air Handler Unit Chiller Chiller Controls Chilled/Hot Water Pumps (3 ea) Cooling Tower

Packaged Roof Top Unit Boiler Air Handler Unit

Packaged Roof Top Unit Packaged Roof Top Unit

Air Handler Unit

Packaged Roof Top Unit Packaged Roof Top Unit

SERVICE CONTRACT MAINTENANCE PLAN

k) - m = monthly - q = quarterly -

Equip

Building 1 HVAC Equip

Table 1