Amendment 0001 to solicitation EA133M-11-RP-0150
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
5. PROJECT NO. (If applicable)
CONTRACT ID CODE I PAGE OF PAGES
1 1 3
3. EFFECTIVE DATE
10/31/2011
AJ90073
4. REQUISITION/PURCHASE REQ. NO.
NAAN7200180068
2. AMENDMENT/MODIFICATION NO.
6 ISSUED BY
CODE
Department of Commerce/NOAA Eastern Region Acquisition Division (ERAD) 200 Granby Street, 8th floor Norfolk, VA 23510-1811
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
9A. AMENDMENT OF SOLICITATION
NO.
7. ADMINISTERED BY (If other than Item 6) CODE
EA133M-11-RP-0150
98. DATED (SEE ITEM 11)
10/07/2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
OB. DATED (SEE ITEM 12)
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
0 The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers 111 is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
CODE
CHECK ONE
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B.
THE ABOVE UMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
(such as changes in paying office, appropriation etc) SET N
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) copies to the issuing office.
E. IMPORTANT: Contractor is not, is required to sign this document and return
14. DESCRIPTION OF AMENDMENT/MODIFICATION
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DOCKSIDE REPAIRS TO NOAA SHIP GORDON GUNTER
(See continuation sheet for a complete description of changes)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, CONTRACTINGOFFICER or
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
NSN 7540-01-152-8070
Previous edition unusable
5C. DATE SIGNED 6B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
EA133M-11-RP-0150
AMENDMENT 0001
1. SOLICITATION EA133M-11-RP-0150 IS AMENDED AS FOLLOWS:
A. MODIFY the detailed Specification, as follows:
(1) Delete original specification Section 3.8 entitled "#1 AIR CONDITIONING COMPRESSOR OVERHAUL" in its entirety. The original specification Section 3.9 entitled "GALLOWS FRAME PRESERVATION" is renumbered as Section 3.8 and replaces the deleted
Section.
(2) Under specification Section 3.1, paragraph 3.1.3.3, second sentence, replace the reference to "CuNi" with "steel". The sentence shall now state "Install new steel sleeves at the deck and bulkhead penetrations."
(3) Under specification Section 3.2, paragraph 3.2.3.1, at the beginning of the third sentence add "Renew the cylinder rods or ". The sentence shall now state "Renew the cylinder rods or resurface the cylinder rods using the Advanced Chrome Technologies (ACT) process (see Note 3.2.5.1)."
B. MODIFY the Solicitation, as follows:
(1) Solicitation Section B.1 SCHEDULE OF PRICES, pages 2 and 3 of the solicitation, is revised as a result of paragraph 1.A.(1) of this Amendment. Delete pages 2 and 3 of the solicitation and replace them with revised pages 2 and 3 attached hereto.
(2) On page 34, under L.5, CAR 1352.215-70, PROPOSAL PREPARATION (APR 2010), paragraph (b)(1)(ii)(B), second line: renumber to read "(CLINS) 0001-0016".
(3) On page 35, under L.5, CAR 1352.215-70, PROPOSAL PREPARATION (APR 2010), paragraph (b)(2)(ii), paragraph entitled "Trades", fourth sentence, delete the reference to specification 3.8".+
2. QUESTIONS AND RESPONSES:
All questions raised and responses/clarifications given to date are identified below and, if necessary, have been further addressed in this Amendment. The following questions and answers are provided for informational purposes only.
A. QUESTION: Painting- QPI Companies are called for regarding blasting and coating operations. An alternative we use all the time with the USCG is a NACE inspector coming in
EA133M-11-RP-0150
AMENDMENT 0001
prior to us applying coatings. I would like to know if that is a viable option.
RESPONSE: No. The requirement for QP-1 certification stands.
B. QUESTION: Item 3.1 Ballast Tank Repairs- Para. 3.1.3.3 calls for Copper Nickel Sleeves. This should be Steel Sleeves.
RESPONSE: Agreed. Paragraph 1.A.(2) of this Amendment corrects the error.
C. QUESTION: Item 3.2 A Frame Cylinders- Can we explore renewing the cylinder rods in lieu of resurfacing?
RESPONSE: Yes. Paragraph 1.A.(3) of this Amendment modifies the specification to clarify that the cylinders may be renewed in lieu of resurfacing.
D. QUESTION: Item 3.7 Vent Trunk Preservation- The item calls for 20 square feet of inserts in various locations but does not specify where. The interferences can vary greatly depending upon actual location. Example: If the insert is on the Main Deck, aft side of the trunk, it is on the weather deck and virtually no interferences. If it is on the forward side of trunk it is actually in a state room, with tremendous interferences. This presents an impossible bidding scenario. Can the interferences be addressed with a CFR?
RESPONSE: Yes. Due to the fact that the exact location of the steel renewal is unknown, handling removal of interferences as additional work is considered reasonable.
E. QUESTION: During ship check it was noticed that the Quincy air compressor was already repaired, is it still a work item?
RESPONSE: No. Paragraph 1.A.(1) of this Amendment modifies the Specification to delete Section 3.8 entitled "#1 AIR CONDITIONING COMPRESSOR OVERHAUL" in its entirety. The original specification Section 3.9 entitled "GALLOWS FRAME PRESERVATION" is renumbered as Section 3.8 and replaces the deleted Section. Paragraph 1.B.(1) through (3) of this Amendment makes corrections to the Solicitation document as a result of this item.
F. QUESTION: Various painting specifications calls out for a company with QP-1 certification. However, another acceptable industry standard is having a NACE coating inspector to confirm verify acceptable application of coating systems (which is the goal). Please confirm that a NACE coating inspector is a acceptable alternative to QP-1.
RESPONSE: This question is similar to the one at paragraph 2 A of this Amendment.
The answer is No. The requirement for QP-1 certification stands.
NOTE: Offerors are reminded of the requirement to acknowledge all Amendments.
END OF AMENDMENT 0001
SECTION B
SUPPLIES OR SERVICES AND PRICES
UNIT
PRICE UNIT
JOB
OTV
EXTENDED
PRICE
B.1 SCHEDULE OF PRICES BASE ITEMS
CL1N
SPECIFICATION
WORK ITEM SPECIFICATION WORK ITEM TITLE
000 1 301 4-86-W and 3-94-W BALLAST TANK REPAIRS
JOB 1
0002 302 A-FRAME HYDRAULIC CYLINDER OVERHAUL
JOB 1
0003 303 TRAWL WINCH OVERHAUL
JOB SSDG # 1 AND #3 RESILIENT MOUNT
0004 304 REPLACEMENT
JOB 1 #2 AIR CONDITIONING PLANT CONDENSER
0005 305 RENEWAL
0006 306 SHIPS SERVICE AIR COMPRESSOR OVERHAUL
JOB
0007 307 MOTOR ROOM VENT TRUNK PRESERVATION JOB
JOB 1
0008 308 GALLOWS FRAME PRESERVATION
Note (1): These CLINS (0009 -I contract if growth work is added 1 1352.271-72). If Additional Item
The modification. ouan1 contract
CLIN
SPECIFICATION
WORK ITEM
0009 400
ADE
GI:2i
0010 400
ADC
GRI
FEE
TOTAL BASE
ADDITIONAL ITEMS - GROVVTH
010) relate to Growth Work. The Unit Price o the scope of the contract (reference Commerce
Requirements (AIRs) are issued, these items ity shown is an estimate only and may be exceeded
SPECIFICATION WORK ITEM TITLE
ITIONAL ITEM REQUIREMENTS (AIRS)/
WTH LABOR RATE
ITIONAL ITEM REQUIREMENTS (AIRS)/
VVTH MATERIAL MARK UP/HANDLING
ITEMS
Column will Acquisition will be awarded at the
UNIT
PRICE
(0001 - 0008):
be used throughout Regulation at the unit prices
UNIT
HRS
0/0
(CAR)
quantities needed offere .
QTY
EST.
EST.
$25,000 the life of the clause via a
EXTENDED
PRICE
0/0
TOTAL ADDITIONAL ITEMS (ITEMS 0009 - 0010): $_
OPTION ITEMS
Acquisition
UNIT
PRICE
Regulation (FAR)
UNIT
JOB
JOB
JOB
JOB
dause 52.217-7
QTY
°OPTION
EXTENDED
PRICE
Note (2) These items (0011 - 0016) may be exercised in accordance with Federal
FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS".
CLIN
SPECIFICATION
WORK ITEM SPECIFICATION WORK ITEM TITLE
00 1 1 501 PORT LIGHT RENEWAL
502 MAIN CONTROL STATION VENT DUCT RENEWAL
0013 503 HVAC SYSTEM BALANCING
0014 504 #1 HPU HEAT EXCHANGER RENEWAL
0015 505 NET REEL REFURBISHMENT
JOB 1
EA133M-11-RP-0150
Amendment 0001
Page - 2
SECTION B
SUPPLIES OR SERVICES AND PRICES
| 4-60-3-FF OILY WASTE TANK GOOSENECK VENT I 1 | JOB 1 | 1 |
| 0016 I | 506 RENEWAL |
TOTAL OPTION TEMS (ITEMS 0011 - 0016):
TOTAL ALL ITEMS (BASE, ADDITIONAL, AND OPTION ITEMS 0001 - 0016):
EA133M-11-RP-0150
Amendment 0001
Page - 3
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
File details come from the government source that posted it. Updated .