E0.3 FIRST FLOOR ELECTRICAL COMPOSITE NEW WORK PLAN.pdf
PDF 612 KB Posted
- Attached to
- Chillers & Chilled Water Pumps & RTU Equipment
- Solicitation number
- RFQ ABS 260000000444 2
- Issued by
- Macomb County, Michigan
About this file
This is a construction document plan sheet for the Anchor Bay School District related to the Anchor Bay Middle School North HVAC Upgrade project located at 5280 Ashley Street, New Baltimore, Michigan 48047. The document is a first floor electrical composite new work plan sheet prepared by Peter Basso Associates, a design firm located in Troy, Michigan. The plan sheet is dated August 20, 2026, and is identified as Project Number 2026.0034.56. This document appears to be part of the construction documents package and shows the electrical work required on the first floor as part of the HVAC upgrade project for the school facility.
The document does not contain specific information regarding pricing terms, bidding procedures, set-asides, contract duration, or funding sources. As a technical plan sheet within the construction documents, it serves as a design reference document for contractors and bidders to understand the electrical scope of work associated with the HVAC upgrade project. Additional contract opportunity details including bid due dates, award information, and financial terms would be contained in separate solicitation documents or bid packages associated with this project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FI
R
ST
F
LO
O
R E
LE
C
TR
IC
AL
C
O M
PO
SI
TE
N
EW
W
O R
K
PL
AN
SH
EE
T
TI
TL
E
PR
O
JE
C
T
TI
TL
E
AN
CH
OR
B
AY
S
CH
OO
L D
IS
TR
IC
T
AN
CH
OR
BA
Y M
ID
DL
E S
CH
OO
L N
OR
TH
HV
AC
U
PG
RA
DE
AS
HL
EY
S T.
N
EW
B
AL
TI
M
OR
E, M I 4
R
EV
IS
IO
N R
EV
IS
IO
N
SHEET No.
DATE
ISSUE
L iv er no is , S ui te
Tr oy
, M ic hi ga n
-3
Te l:
8-
9-ww w.
Pe te rB as so
As so cia te s.
co m
PB
A Pr oj ec t N o.
: 2
6.
.5
P et er
B as so A ss o ci at es
08-20-2026
CONSTRUCTION
DOCUMENTS
File details come from the government source that posted it. Updated .