E0.3 FIRST FLOOR ELECTRICAL COMPOSITE NEW WORK PLAN.pdf

PDF 612 KB Posted

Attached to
Chillers & Chilled Water Pumps & RTU Equipment
Solicitation number
RFQ ABS 260000000444 2
Issued by
Macomb County, Michigan

About this file

This is a construction document plan sheet for the Anchor Bay School District related to the Anchor Bay Middle School North HVAC Upgrade project located at 5280 Ashley Street, New Baltimore, Michigan 48047. The document is a first floor electrical composite new work plan sheet prepared by Peter Basso Associates, a design firm located in Troy, Michigan. The plan sheet is dated August 20, 2026, and is identified as Project Number 2026.0034.56. This document appears to be part of the construction documents package and shows the electrical work required on the first floor as part of the HVAC upgrade project for the school facility.

The document does not contain specific information regarding pricing terms, bidding procedures, set-asides, contract duration, or funding sources. As a technical plan sheet within the construction documents, it serves as a design reference document for contractors and bidders to understand the electrical scope of work associated with the HVAC upgrade project. Additional contract opportunity details including bid due dates, award information, and financial terms would be contained in separate solicitation documents or bid packages associated with this project.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FI

R

ST

F

LO

O

R E

LE

C

TR

IC

AL

C

O M

PO

SI

TE

N

EW

W

O R

K

PL

AN

SH

EE

T

TI

TL

E

PR

O

JE

C

T

TI

TL

E

AN

CH

OR

B

AY

S

CH

OO

L D

IS

TR

IC

T

AN

CH

OR

BA

Y M

ID

DL

E S

CH

OO

L N

OR

TH

HV

AC

U

PG

RA

DE

AS

HL

EY

S T.

N

EW

B

AL

TI

M

OR

E, M I 4

R

EV

IS

IO

N R

EV

IS

IO

N

SHEET No.

DATE

ISSUE

L iv er no is , S ui te

Tr oy

, M ic hi ga n

-3

Te l:

8-

9-ww w.

Pe te rB as so

As so cia te s.

co m

PB

A Pr oj ec t N o.

: 2

6.

.5

P et er

B as so A ss o ci at es

08-20-2026

CONSTRUCTION

DOCUMENTS

File details come from the government source that posted it. Updated .