E_Market_St_Bridge_Railing_-_Technical_Specifications_2-16-26.pdf
PDF 651 KB Posted
- Attached to
- E. Market St. Bridge Railing
- Solicitation number
- 2026-ITB-118
- Issued by
- Lackawanna County, Pennsylvania
About this file
This is a technical specifications document for the E. Market Street Bridge Railing project prepared by the City of Scranton Department of Business Administration in Lackawanna County, Pennsylvania. The project scope encompasses the removal of an existing parapet protective fence measuring 5 feet 8 inches in height with anti-climb shields and the installation of a new aluminum bridge railing system. The work includes three primary items: removal of the existing fence and surface restoration, installation of post-installed concrete anchors, and furnishing and installation of the aluminum bridge railing with black anodic coating. All work is to be performed as a lump sum contract with substantial completion required within 45 calendar days and final completion within 55 calendar days from notice to proceed. A mandatory pre-bid meeting is scheduled for April 7, 2026, at 1:00 p.m. on-site at the bridge, and sealed bids must be submitted electronically through the City's e-Procurement Portal by 2:00 p.m. on Wednesday, April 22, 2026. All questions and requests for clarifications must be submitted through the portal by 11:59 p.m. on Friday, April 17, 2026.
The specifications require bidders to demonstrate a minimum of five years of experience under their current business name, maintain a valid contractor's license in the City of Scranton, and be prequalified by the Pennsylvania Department of Transportation as prime contractors. Bidders must provide a lump sum bid price with detailed cost breakdowns showing labor, hours, expenses, and reimbursable costs. Performance and Payment Bonds at 100 percent of contract value and a Bid Bond at 10 percent of contract value are required. Comprehensive insurance coverage is mandated, including Workers' Compensation, Employer's Liability ($500,000 minimum), Comprehensive General Liability ($1,000,000 per person/$1,000,000 per occurrence/$2,000,000 aggregate), and Comprehensive Automobile Liability ($300,000 per person/$500,000 per occurrence), with the City named as additional insured. Progress payments will be made monthly at 90 percent of work completed with 10 percent retainage, reducible to 5 percent after 50 percent completion if work is satisfactory. All public works requirements apply, including compliance with the Pennsylvania Prevailing Wage Act with verification through the Pennsylvania Public Works Employment Verification Act using the federal E-Verify system. The City reserves the right to reject any and all bids and will award the contract to the lowest responsible bidder submitting a responsive bid, with liquidated damages assessed at $500 per day for failure to meet project deadlines.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents Page 00010-1 of 00010-1
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
01000 Summary of Work 01000-1 to 01000-5 01020 PennDot Publication Coordination 01020-1 to 01020-2 01271 Lump Sum Prices 01270-1 to 01270-2 01300 Submittals 01300-1 to 01300-4 01570 Maintenance and Protection of Traffic 01570-1 to 01570-4 9000-0001 Remove Existing Parapet Protective Fence, 5’8” 01 to 02 Height with Anti-Climb Sheilds 9000-0002 Post-Installed Concrete Anchors 01 to 05 9013-0001 Aluminum Bridge Railing 01 to 02
SUMMARY OF WORK 01000-1
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01000 – SUMMARY OF WORK
PART 1: GENERAL
1.01 WORK UNDER THIS CONTRACT
Contractor shall furnish all labor, materials, equipment and means to construct the Work as described in the Contract Documents and shown on the Drawings. The Work includes, but is not limited to, the following:
REMOVE EXISTING PARAPET PROTECTIVE FENCE, 5’-8”, WITH ANTI-CLIMB SHIELDS AND
REPLACE WITH ALUMINUM BRIDGE RAILING – E MARKET ST BRIDGE, SCRANTON, PA.
The above general outline of principal features does not in any way limit the responsibility of the Contractor to perform all Work and furnish the required materials, equipment, labor and means as shown or required by the Contract Documents.
Material, equipment and labor, obviously a part of the Work and/or necessary for the proper operation, a complete and/or functioning system and installation of same, although not specifically indicated in the Contract Documents, shall be provided as if called for in detail without additional cost to Owner.
1.02 LOCATIONS
Owner shall furnish the Site as shown or described in the Contract Documents.
Some of the locations or elevations shown or described in the Contract Documents, such as tie-ins, building laterals, pipe connections to existing manholes and inlets are approximate and the Contractor shall be responsible for locating the exact locations and elevations.
PART 2: PRODUCTS
2.01 GENERAL
Specifications for the materials and equipment to be provided by the Contractor are detailed in the respective Specification Sections and/or Drawings.
PART 3: EXECUTION
3.01 LAYING OUT THE WORK
SUMMARY OF WORK 01000-2
As described in the General Conditions, reference points for construction will be provided to enable Contractor to proceed with the Work. Contractor shall verify all reference points for accuracy and consistency prior to use and report any discrepancies to
Engineer. Contractor shall be responsible for laying out the Work including staking out all new construction. Contractor shall employ an experienced Civil Engineer/Surveyor and cause him to determine all baselines, lines and grades and to verify same from time to time during the progress of the work.
For all sanitary sewer, storm sewer, manhole and inlet construction, prior to construction
Contractor shall:
- Set a PK nail at each manhole and inlet and other proposed facility and provide the elevation on the PK nail to the Engineer. The PK nails shall be placed after the existing utilities have been located and marked in the field.
- Review the set PK nail locations in the field with Engineer. Upon review of the field locations, the Engineer may direct shifts and adjustments in the proposed facility locations. Such shifts and adjustments shall be expected and shall be laid out and constructed at no additional cost to the Owner. Contractor may request shifts and adjustments to the manhole or inlet locations to facilitate construction. All Contractor changes shall be subject to approval of Engineer who shall solely determine if a shift is allowed.
- Set offset stakes or PK nails along with elevations every 50 feet to assist in the payment of various unit price items in regards to depth and to assist the inspector in the location of house laterals.
- Submit cut sheets to Engineer for review and approval. Construction without approved cut sheets shall be solely at the Contractor’s risk. Cut sheets shall list existing grade elevations and proposed invert elevations every 50 feet along each pipe run. Payment for various unit price items shall be determined from the cut sheets and if not submitted and approved payment may be withheld.
- Verify all existing pipe elevations, rim elevations, grate elevations, profiles and connections and provide same on shop drawings and cut sheets prior to ordering precast manhole structures, inlets, vaults and other similar items.
Control the pipe alignment and grade with an electronic laser beam system.
3.02 COORDINATION
Contractor shall coordinate his work, to phase the construction operations, and provide, install and maintain any temporary connections necessary to maintain operation of adjacent property owner facilities and/or the existing/proposed storm and sanitary sewer system whether the sewers are combined or separated systems. Such temporary connection and/or measures may include but are not limited to: piping, inlets, manholes, SUMMARY OF WORK 01000-3 structures, connections to existing piping, connections to existing structures, pumping, pressure piping, excavation, backfill, pavement restoration, and all other related work.
Any Work requiring interruption to such facilities or flows to sewer systems shall be scheduled and performed only at such times to minimize impacts, as approved by
Engineer. It may be necessary that Work will be performed during several overnight periods and/or during periods of premium time payment to accomplish the desired construction. All costs to perform the Work, including premium time payments, shall be the Contractor’s responsibility and shall be included in the Contract Price.
3.03 SEWER SYSTEM MAINTENANCE
The Work may involve replacement or adjustments to separated or combined sewer system facilities. Combined sewer systems may have sanitary flows and storm water flows within the same piping system. Contractor shall plan and perform the Work to handle all separated or combined flows during the construction. Contractor shall ensure prior to crews leaving at the end of each day that all facilities are temporarily or permanently connected to the system so that no flooding or discharge of flows occurs.
3.04 PROTECTION OF SURFACES, STRUCTURES, AND VEGETATION TO REMAIN
Contractor shall avoid damage as a result of his operations to existing sidewalks, streets, curbs, pavements, utilities (except those which are to be replaced or removed), adjoining property, retaining walls, buildings, structures, and other structures and similar features and he shall at his own expense completely repair any damage thereto caused by his operations.
All surfaces, structures, and vegetation in the vicinity of the work which are to remain shall be protected, supported or temporarily moved and replaced by the Contractor.
Items to remain may or may not be shown on the Drawings and shall include but not be limited to signs, business signs, billboards, street signs, mailboxes, shrubs, trees, sidewalks, guy wires, utility poles, fences, wells, basketball poles, walls, flower boxes, cinder block or timber planting beds, light poles, septic tanks, or sheds. If damaged, said items shall be repaired or replaced at the Contractor's expense. All surfaces shall be cleaned and restored to acceptable condition. All such work not specifically listed as an item of Unit Price Work on the Bid Form shall be included in the unit prices as incidental.
Contractor should be aware that there are a number of areas where excavation may occur close to existing buildings or structures. Contractor shall shore, brace, underpin, secure, and protect as may be necessary, all foundations and other parts of existing structures or utilities adjacent to, adjoining, and in the vicinity of the Site, which may be in any way affected by the excavations or the operations connected with the Work.
Contractor shall give any and all required notices to any adjoining or adjacent property owner or other party before the commencement of the Work.
SUMMARY OF WORK 01000-4
3.05 CONSTRUCTION EQUIPMENT
Where Work is located in or adjacent to existing concrete or pavements, all backfilling and materials handling equipment shall have rubber tires. Crawler equipment shall be permitted when all required forms are obtained. It is the Contractor’s responsibility to repair, at his expense, any damages due to the use of any equipment to complete the
Work.
Roadway pavements, asphalt areas, parking lots, sidewalks, stone walks, brick and other similar surfaces may not be able to support construction equipment without damage to the improved surface. Contractor shall consider this in his bid and shall make site investigations of these surfaces during the bid phase as he deems necessary. It is the
Contractor’s responsibility to repair, at his expense, any damages due to the use of any equipment to complete the Work.
3.06 ACCESS AND PROTECTION
Contractor shall coordinate and schedule the Work so as not to obstruct overnight, weekend or daily access to any adjacent business or residences. At no cost to Owner, Contractor shall provide temporary access to properties as necessary.
Suitable sufficient barricades, warning lights, and signs shall be placed and maintained by the Contractor to insure the protection and safety of the public and prevent any unnecessary inconvenience. Warning lights shall be maintained from sunset to sunrise.
Contractor shall control dust, muddy conditions and the overall deterioration of all streets having construction activity, all to the satisfaction of the Owner.
Contractor shall locate, store, and move project materials and equipment as needed to ensure access to thru traffic and residents on the streets that have construction activity, all the satisfaction of the Owner.
3.07 MISCELLANEOUS ITEMS OF WORK
Miscellaneous items of work include but are not limited to furnishing and installing project signs, dust control, pedestrian signage, coordination with utility companies, supervision, and other general items. All such work not specifically listed as a pay item of work on the Bid Form shall be included in the unit prices as incidental.
3.08 DISPOSAL OF EXISTING MATERIALS
SUMMARY OF WORK 01000-5
Satisfactorily remove and dispose of all items noted to be removed, any existing debris found within the Site and materials which are not to remain in place or to be used in the new construction. All such items and material shall become the property of the
Contractor. Unless otherwise directed, Contractor shall properly dispose all such material off the site in accordance with all applicable rules and regulations.
3.09 PROGRESS CLEANING
Maintain areas free of waste materials, debris, and rubbish. Maintain project area in a clean and orderly condition. Broom gravel from paved areas of road and provide dust control weekly or as requested by Owner or Engineer. Remove debris and rubbish from pipes and drainage systems. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust and foreign materials. Remove waste materials, debris, and rubbish from the Site weekly and dispose offsite.
END OF SECTION
PENNDOT PUBLICATION COORDINATION 01020-1
SECTION 01020 – PENNDOT PUBLICATION COORDINATION
1.01 MINIMUM STANDARDS
A. All work in State Highway Right-of-Way shall be constructed in accordance with the requirements of:
1. PennDOT Publication 408 Specifications
2. PennDOT Publication 35 Bulletin 15 – Approved Construction Materials
3. PennDOT Publication 72M – Roadway Construction Standards
B. It is the intent of the Contract Documents that the requirements of the above listed
PennDOT Publications are the minimum quality of work and minimum quantity of work to be provided by Contractor. The Contract Documents, including but not limited to the Drawings and Specifications, may require additional work, additional material, a higher quality material, specialized equipment and/or other additional quantity or quality of work to complete the construction. Accordingly, such additional work, additional material, higher quality material, specialized equipment and/or other additional quantity or quality of work shall be provided by Contractor.
For example:
A PennDOT Publication 72M – Roadway Construction Standard Drawing may have a detail which shows that retained material may be used for backfill, while the
Contract Document Drawings and/or Specifications require that 2A Coarse Aggregate be used for all backfill within all state highway right-of-way limits. Then, in this example, the Contract Documents require that the Contractor use 2A Coarse
Aggregate backfill and remove the excavated material. The PennDOT Publication
72M – Roadway Construction Standard reference to retained material is interpreted as the minimum level of construction and is superseded by the higher quality 2A Coarse
Aggregate material and associated work to fully install and construct 2A Coarse
Aggregate backfill complete in place including any associated work of hauling and disposing of any excavated material.
1.02 REFERENCED PENNDOT SPECIFICATIONS
A. It is the intent of the Contract Documents that the Contract Documents as designated in the Agreement, including but not limited to the Agreement, the Instructions to
Bidders, the General Conditions and Supplementary Conditions, govern the terms and conditions of the Agreement between Owner and Contractor, including but not limited to bidding requirements, contract administrative procedures, contract
PENNDOT PUBLICATION COORDINATION 01020-2
payments, contract times, amending and supplementing contract procedures and other similar administrative items. Any references to PennDOT Publication 408
Specifications shall not be construed to supersede such administrative terms and conditions of the Agreement.
For example:
The Contract Documents shall govern over PennDOT Publication 408 Specifications
Section 100 – General Provisions on administrative matters including but not limited to, reporting and resolving discrepancies, subsurface and physical conditions, differing subsurface and physical conditions, underground facilities, hazardous environmental conditions at the Site, bonds and insurance, changes in the work, claims, claims between contractors, cost of the work, unit price work, changes in contract price, changes in contract time, delays, payments to Contractor, dispute resolution and giving notice.
B. Nothing in Paragraph 1.02.A shall in any way diminish, lessen or eliminate the right and authority of PennDOT and its duly authorized representatives from fully exercising their rights of inspecting, reviewing, rejecting the Work and the materials and suspending the Work for cause in accordance with PennDOT’s requirements.
Nor shall this section relieve Contractor’s responsibilities to adhere to applicable state and federal laws and regulations.
Not Used.
LUMP SUM PRICES 01271-1
SECTION 01271 – LUMP SUM PRICES
1.01 DEFINITIONS
A. Lump Sum is the amount proposed by bidders, stated on the Bid Form, as a price for the complete construction of the item of work as specified.
1.02 PROCEDURES
A. Lump Sum prices shall include all work, labor, equipment, material, plus cost for delivery, installation, insurance, overhead, profit, applicable taxes and all other costs needed to complete the project.
B. Work and materials not specifically described in the Drawings and Specifications but needed to complete the Work shall be included in the lump sum price as incidental.
C. No payment will be made for the correction or removal of defective work.
D. No payment will be made for work in excess of that indicated, shown, or specified unless such additional work is ordered by Owner by a Change Order or a Work Change Directive.
1.03 MEASUREMENT AND PAYMENT
A. Measurement and Payment: All measurement and payment for the items listed on the bid form and the Individual Specification Sections for work shall be Lump Sum unless specifically altered in the following paragraphs of this section. This section shall supersede all measurement and payment sections of the Individual Specifications.
B. Itemized Quantities Marked Lump Sum (LS): The bid form may include line items with estimated quantities as a comment, but indicate a quantity of one (1) and as “lump sum” or “LS” as the unit in the bid form. If provided, THESE QUANTITIES
SHALL BE UTILIZED BY THE BIDDER AS A CHECK FOR THEIR OWN QUANTITY TAKE-
OFFS. The actual scope of work may be vastly different. The contractor is responsible to provide the scope of work shown on the contract documents at the bid price, even if it is vastly different.
C. Unit Price Items: The bid form may have some line items with estimated quantities larger than one (1) and associated units of measure typical for unit price projects.
These items are unit price items. The bid will be assessed by multiplying the
LUMP SUM PRICES 01271-2
estimated quantities by the unit prices provided and summing those results with other lump sum items.
D. Allowances: The bid form may have some line items with an allowance. The allowances will only include the cost of purchasing and obtaining that specific item or material or equipment specified. All other costs (such as but not limited to other items, materials, equipment necessary for the allowance to provide a complete operational system, all labor, all installation costs, any overhead and profit and any other costs) shall be included in the most closely associated bid item(s). The bid will be assessed by summing the allowances with the other lump sums and unit price line items.
SUBMITTALS 01300-1
SECTION 01300 – SUBMITTALS
1.01 BEFORE STARTING CONSTRUCTION
A. Record of Existing Conditions: Within 10 days after the Effective Date of the
Agreement, Contractor shall submit to Engineer for record:
1. Pre-construction photographs of all planned construction areas, material storage areas, areas adjacent to these areas, including but not limited to, streets, driveways, sidewalks, curbs, ditches, fencing, railing, visible utilities, retaining structures and adjacent building structures. The purpose of the photographs is to document existing conditions and to provide a fair measure of required restoration. Care should be taken to record all existing conditions which exhibit deterioration, imperfections, structural failures or situations that would be considered substandard.
1.02 PROPOSED ADJUSTMENTS IN THE PROGRESS SCHEDULE
A. If, in the opinion of Engineer, Contractor falls behind the Progress Schedule, Contractor shall submit to Engineer for acceptance proposed adjustments in the
Progress Schedule that will not result in changing the Contract Times in accordance with the General Conditions and as follows:
1. Adjustments shall include such steps as will be necessary to improve the progress.
Engineer may require Contractor to increase the number of shifts and/or overtime operations, days of work, and/or the amount of construction planned, all without additional cost to Owner.
1.03 SHOP DRAWINGS AND SAMPLES
A. Contractor shall submit Shop Drawings and Samples to Engineer for review and approval in accordance with the General Conditions for all items to be furnished and/or installed under the Contract Documents.
B. A sufficient number of copies to allow the Owner to retain five (5) reviewed copies of all drawings; schedules and brochures shall be submitted. Each submittal shall have the job name on it and the appropriate Specification section or Drawing reference.
C. Submittals smaller than 8-1/2 x 11 inches shall be secured to paper 8-1/2 x 11 inches.
SUBMITTALS 01300-2
D. Submittals will be returned, stamped with the following classifications:
a. "Approved" – There are no notations or comments on the submittal and, in
Engineer’s opinion, the submittal appears to generally be in conformance with the requirements of the Contract Documents and Contractor may release the equipment for production.
b. "Approved as Noted" – Notations have been made on the submittals for conformance with the Contract Documents. Contractor may release the equipment for production in accordance with the notations.
c. "Not Approved" – The submittal does not meet the requirements of the Contract
Documents. Contractor must submit the specified product.
d. "Revise and Resubmit" – When the material submitted is incorrect or insufficient to review properly and it is necessary to see the complete package again.
E. Where a submittal indicates a departure from the requirements of the Contract
Document which the Engineer deems to be a minor adjustment in the interest of the
Owner not involving a change in Contract Price or Contract Times, Engineer may approve the submittal but the approval will be subject to the following clause:
- "The modification indicated on the attached submittal is approved in the interest of the Owner to effect an improvement for the Project and is accepted with the understanding that it does not involve any change in the Contract Price or
Contract Times; that it is subject generally to all Contract stipulations and covenants and that it is without prejudice to any and all rights of the Owner under the Contract Bonds".
F. It is emphasized that Engineer’s approval of Contractor’s submitted data is for general conformance to the Drawings and Specifications, but subject to the detailed requirements of the Drawings and Specifications. Although the Engineer may check submitted data in more or less detail, such checking is an effort to discover errors and omissions in Contractor’s drawings and to assist the Contractor in coordinating and expediting his work, and shall in no way relieve the Contractor from the Contractor’s sole responsibility for complying with the requirements of the Contract Documents.
The Contractor’s responsibility shall continue so that even if shop drawings are marked approved and subsequently it is discovered that the Contractor’s submitted item does not fit the work, does not have the required certification, does not meet a certain characteristic, and/or is in any way not in strict compliance with the Contract
Documents, the Contactor shall be fully and solely responsible for removing and replacing the item including paying all related costs.
1.04 CONTRACTOR'S DAILY REPORTS
SUBMITTALS 01300-3
A. Contractor shall prepare and submit daily reports to Engineer at any time during the
Project or for any portion of Project when so requested by Engineer or the Resident
Project Representative. The daily reports shall contain the following information:
- the number of craftsmen and hours worked of each subcontractor,
- the number of hours worked by each trade,
- the number of hours worked of each type of equipment,
- a description of work activities performed,
- a description of any material or equipment deliveries,
- description of obstructions encountered,
- temperature and weather conditions.
B. The daily reports shall be submitted on a daily basis, by the end of the next business day.
C. Information provided on the daily report shall not constitute notice of delay or any other notice required by the Contract Documents. Notice shall be as required herein.
1.05 OPERATING AND MAINTENANCE INSTRUCTION MANUALS
A. Contractor shall prepare complete written Operation and Maintenance Instruction
Manuals covering each item of equipment furnished or modified under this Contract.
Contractor shall submit in duplicate, at least two (2) weeks prior to initial start-up, a draft form of the manual for review by Engineer. After the manual has been approved, four (4) copies of the Operations and Maintenance Manuals shall be furnished to Engineer. The final copies shall be received by Engineer prior to start-up operations.
B. The Operation and Maintenance Manual shall include, but not be limited to, the following information: detailed description of the process and operating procedures as applicable; instruction for all components of the equipment whether manufactured by the supplier or not, including valves, controllers and other miscellaneous components; recommended lubrication and maintenance procedures and schedules including a detailed schedule of the manufacturer's preventative maintenance requirements; appropriate parts lists; exploded and/or sectional views; internal and external wiring and piping diagrams numbered to correspond to the installation; and all other pertinent information of value to obtain peak performance.
C. Equipment manufacturer's Operation and Maintenance Manuals which Contractor shall procure from the manufacturer shall include the following:
1. Operating Instructions.
2. Maintenance and Lubrication Schedules and Lubricant. Recommendations including recommended preventive maintenance schedules listed as daily, weekly, monthly, quarterly, semi-annually and annually.
3. Recommended Spare Parts List.
SUBMITTALS 01300-4
4. Troubleshooting guides with solutions recommended.
5. Start-up Procedures.
6. Shut-down Procedure including extended shut-down recommendations.
7. Emergency Operations.
8. Overhaul Procedures.
9. Selected drawings and exploded views.
10. Internal wiring and piping diagrams.
11. Complete catalog of parts used in final assembly of equipment.
12. Service Centers List.
13. Manufacturer's name, contract number, model number and serial number of the equipment on the cover of each manufacturer's manual.
14. Other pertinent information of value to obtain peak performance.
D. Equipment manufacturer's manuals shall be written for average journeymen mechanics without prior knowledge of the specific equipment.
E. The Manuals shall be assembled in two (2) sets and bound in 3 or 4 inch post type, first quality, hard cover, heavy duty three post binders. One or more numbered volumes shall be provided as required. Each item of equipment shall be placed in a logical sequential order, as listed or ordered in the Contract Documents.
F. Provide a table of contents at the front of each volume showing the equipment items in the order in which they appear in the volume. Each equipment item shall include the functional name, applicable specification section(s) and the sheet listing, if any.
G. The preventive maintenance schedule shall be bound in the front of each section immediately following the index tab sheet. The schedule shall be identified with respect to the piece of equipment it is referring to.
H. Sheet size shall be 8-1/2 x 11-inches.
I. Drawings may be on 11 x 17 inch sheets folded to 8-1/2 x 11-inches.
J. Prior to release of Final Payments, revise and resubmit copies of the instructions to accord with any changes in procedures or equipment made during start-up or initial operation. Re-submittals are also required for changes made during the guarantee period.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-1
SECTION 01570 – MAINTENANCE AND PROTECTION OF TRAFFIC
1.01 DESCRIPTION
This work is the furnishing, installing, maintaining, and relocating of traffic control devices for vehicular and pedestrian traffic. This work may include flagging and pilot car operation for guidance of traffic through the temporary traffic control zone and dust control. All work shall be done as specified in these Specifications, PennDOT
Publication 212, PennDOT Publication 213, and the FHWA Manual on Uniform Traffic
Control Devices (MUTCD), PennDOT Standard Drawings, the Drawings and as directed.
2.01 MATERIAL
In accordance with PennDOT Publication 408 Specifications Section 901.2 and as noted on the Drawings.
3.01 CONSTRUCTION
In accordance with PennDOT Publication 408 Specifications Section 901.3 and as noted on the Drawings and as follows.
3.02 GENERAL
Contractor shall furnish and install all traffic barricades, markers, signs, lighted signs, message boards, controls and provide flagmen, traffic police and other facilities required by the Federal, State and local government authorities or the Engineer to protect general public and maintain the existing roads, streets and highways. The Contractor shall be solely and fully responsible for all traffic control, maintenance and protection of traffic and protection of pedestrians and no direction or lack of direction by the Owner or
Engineer shall diminish in any way the Contractor’s sole responsibility.
The Contractor shall provide the services of uniformed traffic men/traffic directors and traffic signs at such locations and for such periods as may be necessary for safety or as the applicable Local Regulatory Agencies, and/or PennDOT or Engineer may order for the control and direction of vehicular traffic and pedestrians.
Uniformed traffic men/traffic directors shall be acceptable to the Local Regulatory
Agencies and/or PennDOT and Engineer and clothed in a suitable uniform including headgear and equipped so as to be readily distinguishable as a traffic man/traffic director.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-2
Competent uniformed traffic directors shall be employed at every location where
Contractor's equipment is working immediately adjacent to, or is entering, leaving or crossing, active traffic lanes. The traffic directors shall be employed continuously for the full time such conditions exist.
Special attention shall be given for the protection of pedestrians and, in particular, children going to and coming from school. Ingress and egress shall be maintained for all properties abutting the contractors’ work.
The Contractor shall notify the State and local police, ambulance services, fire departments, and local school district school bus traffic of daily traffic diversions.
The Owner or Engineer make no warranty or representation that the Contractor will be permitted to divert or barricade traffic and the Contractor shall be fully responsible to complete all obligations of the Contract regardless of any restrictions which may be imposed by Federal, State or local authorities.
Traffic control diagrams shown in the Contract Document are general in nature.
Contractor is responsible for providing all traffic control signage, flaggers, equipment or vehicles for local or PennDOT highway work. This work shall include all work for pedestrian control such as signage for closed sidewalks and similar situations.
In the event that traffic gets congested in the work area during construction, the
Department reserves the right to restrict the Contractor from working during certain hours of the day in order to lessen the impact on traffic.
3.03 VEHICULAR TRAFFIC
A. Traffic Diversion
Whenever it is necessary to divert traffic from its normal channel into another channel, such diversion shall be clearly marked by cones, drums, barricades or temporary guardrail. If the markers are left in place at night, suitable lights shall be provided and maintained.
B. One-Way Traffic
Whenever one-way traffic is established, at least two (2) flagmen shall be provided.
C. Street Closing
When permitted by Federal, State or local authorities having jurisdiction, the
Contractor may close streets to through traffic for minimum periods of time.
Contractor must notify and secure the permission of the local police and fire departments and such other public authorities and, if required by any law, ordinance or regulation, the occupants of all premises bordering the streets. Contractor must give all occupants reasonable notice with respect to the closing of any street, in whole
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-3
or in part, even when not required by any law, ordinance, or regulation. Contractor shall so schedule his work that the time the street is closed is kept to a minimum and shall, whenever possible, make suitable preparations for access by local residents, school buses, and mail delivery vehicles. Contractor shall provide access for police, fire, ambulance and emergency vehicles at all times. Fire hydrants and other public utility valves shall be kept accessible at all times by the Contractor.
3.04 PEDESTRIAN TRAFFIC CONTROLS AND FENCING
Furnish and construct highly visible weather resistant fence at various locations within the project to establish and delineate safe and satisfactory pedestrian walkways as required and as directed by Engineer. Reset fences as required for the various construction phases. Maintain fences for the duration of the project or as directed by
Engineer. Remove all fences at the conclusion of the project or as otherwise directed by
Engineer.
Install and maintain all signs, barricades, detours as required for pedestrian traffic.
Construct temporary walkways, ramps, crossings, and entrances as needed.
3.05 TRAFFIC SIGNALS AND CONTROLS
The installation and operation of all traffic signals and traffic control devices shall conform to the requirements of Federal, State and local government highway departments.
To protect persons from injury and to avoid property damage, adequate barricades including flasher and reflectorized construction signs and guards as required shall be placed and maintained during the progress of the construction work and until it is safe for traffic and pedestrians to use the trenched area.
When the Contractor is permitted to close a street or road to traffic, the Contractor shall furnish, erect, maintain and remove barricades, suitable and sufficient red lights, and other lights or reflecting material at the limits of the project, where side streets intersect, and at other points of public access to the project. The Contractor shall furnish, erect and maintain advance warning signs and barricades on side streets at the first street intersection beyond the one closed by construction indicating "Street Closed, One Block
Ahead". The Contractor shall furnish, erect, maintain and remove detour-marking signs on temporary routes.
3.06 TRENCH AND STORED MATERIAL MARKINGS
Before completion of each day's work, in traveled areas, trenches shall be completely backfilled and tamped, and when required, the necessary temporary paving installed. ¾-inch stone will be used in sidewalk and walkway areas and blacktop in driveways. These areas are not to be left open, impassable or unsafe through the night. In the event that a trench cannot be completely backfilled and tamped, temporary bridges (street plates) and
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-4
crossings shall be used to accommodate through traffic and the general public only after the approval from the state, county, and/or municipality. The job site will be left in a neat and satisfactory condition at the end of each day. The requirements of this Section are in addition to any requirements of Federal, State or local laws, rules, regulations or ordinances or any requirements found elsewhere in the Contract Documents.
Equipment and material stored on the street shall be marked at all times. At night any such material or equipment stored between the side ditches, or between lines 5 feet behind any raised curbs, shall be clearly outlined with light or other dependable warning devices that are approved by the Engineer. In addition, the Contractor shall provide any other lights, barricades, etc., that may be needed for the protection of pedestrian traffic.
3.07 PENNDOT HIGHWAY OCCUPANCY PERMITS (IF APPLICABLE)
For any required revisions to the Highway Occupancy Permit due to changes initiated or requested by Contractor during construction, Contractor shall be responsible for preparing all sketches and drawings and obtaining approval from PennDOT for the changes, including revisions to the Traffic Control Plan, at no additional cost to Owner.
No additional compensation will be due the Contractor for the direct costs of additional traffic control or the costs related to construction for any conditions of the plan including but not limited to cost of night time work, weekend or holiday work, over-time work, detours or temporary lighting, sign boards, temporary traffic lights or special scheduling.
PART 4: MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT – Lump Sum
If no item of work is provided in the contract, this work is incidental to the other contract items.
ITEM 9000-0001 – REMOVE EXISTING PARAPET PROTECTIVE FENCE, 5'-8" HEIGHT, WITH ANTI-
CLIMB SHIELDS
1. DESCRIPTION
This item shall consist of removing the existing parapet-mounted protective fence, approximately 5 feet 8 inches in height, including anti-climb shields, from the E. Market Street Bridge in the City of
Scranton, Lackawanna County, Pennsylvania, complete and in accordance with the contract drawings, these speci8ications, and the applicable PennDOT standards.
Work shall include removal of fence panels, posts, brackets, anchorages, fasteners, and all associated components, as well as handling and retention of removed materials by the Contractor.
Removal of the existing fence shall be coordinated with installation of the new bridge railing system to maintain continuous pedestrian and vehicular safety.
2. REFERENCES
The work shall conform to the latest editions of the following publications, standards, and speci8ications, except as modi8ied herein:
• PennDOT Publication 408 – Speci8ications
• PennDOT Publication 219M – Bridge Construction Standards (as applicable)
• OSHA Regulations, 29 CFR Part 1926 – Safety and Health Regulations for Construction
• Applicable provisions of AASHTO standards referenced therein
3. MATERIALS
3.1 Existing Fence Components
The existing parapet protective fence and anti-climb shields shall be removed in their entirety. All removed materials shall become the property of the Contractor and shall be retained, recycled, or disposed of in accordance with applicable regulations.
3.2 Temporary Protection
Temporary fencing, barriers, coverings, or other protection required to maintain public and worker safety during removal operations shall be furnished by the Contractor and shall be incidental to this item.
4. REMOVAL OPERATIONS
Removal operations shall be performed in a controlled manner using methods that prevent damage to the existing parapet, bridge deck, sidewalk, or adjacent structures.
The existing parapet protective fence shall not be removed until the new bridge railing system is on site and ready for immediate installation, unless otherwise approved in writing by the Engineer.
Fence removal and new railing installation shall be sequenced such that no portion of the bridge is left without required edge protection at the end of a work shift.
Cutting, unbolting, or disassembly shall be conducted such that embedded anchorages or fasteners are removed or cut 8lush with the surface, unless otherwise directed by the Engineer.
Any damage to existing concrete or structural elements caused by removal operations shall be repaired by the Contractor at no additional cost to the Owner.
5. SURFACE RESTORATION
Following removal of the fence system:
• All exposed anchor holes, inserts, or surface irregularities shall be patched with an approved non-shrink grout or concrete repair material compatible with the existing parapet.
• Repaired areas shall be 8inished 8lush with adjacent surfaces and match the surrounding concrete texture as closely as practicable.
Surface restoration shall be completed as part of this item and prior to installation of the new railing system, unless otherwise directed by the Engineer.
6. QUALITY CONTROL
The Contractor shall ensure that removal operations are performed in accordance with these speci8ications and in a manner acceptable to the Engineer.
Work shall be subject to inspection by the Engineer. Any unsatisfactory removal, damage to existing structures, or incomplete restoration shall be corrected by the Contractor at no additional cost to the Owner.
7. INCIDENTAL WORK
All labor, materials, equipment, tools, traf8ic control, temporary protection, surface repairs, handling and retention of removed materials, and coordination required to complete the removal of the parapet protective fence shall be considered incidental to Item 9000-0001.
No separate payment will be made for patching, surface restoration, temporary safety measures, sequencing constraints, or material disposal.
8. MEASUREMENT
Removal of the existing parapet protective fence will be measured by the linear foot (LF), measured horizontally along the centerline of the fence from end to end.
No separate measurement will be made for posts, anchorages, anti-climb shields, surface repairs, or other incidental work required to complete the removal.
9. PAYMENT
Lump Sum
Payment shall constitute full compensation for all labor, materials, equipment, sequencing, removal operations, surface restoration, retention or disposal of removed materials, traf8ic control, and all incidental work necessary to complete the work in accordance with the contract documents, PennDOT Publication 408, and these speci8ications.
ITEM 9000-0002 POST-INSTALLED CONCRETE ANCHORS
This work is the furnishing and installing of post-installed concrete anchors intended for attaching structural members/components to existing concrete.
These requirements apply to permanently installed anchors not under sustained tension loads.
The requirements in this Section do not apply to anchors used for temporary concrete barriers, structure mounted, and anchors drilled in the downward direction.
2. MATERIALS
(a) Ordering Information. Provide the following information on orders and packaging for post-installed concrete anchors:
1. Project title or reference.
2. Size, type, and overall length of the anchor.
3. Corrosion protection means identi6ied.
4. The expiration date for the adhesive anchor system(s), if applicable.
5. Quantity and type of attachment hardware.
(b) Product Evaluation Reports and Listings. Provide anchors and related materials listed by one of the following agencies, as applicable:
International Code Council Evaluation Service (ICC-ES). Manufacture anchors under an approved quality assurance program with follow-up inspections by an inspection agency under ISO/IEC
17020 by a recognized accreditation body conforming to the requirements of ISO/IEC 17011.
(c) Adhesive Anchors. Supply adhesive anchors as an entire system. The system includes but is not limited to: threaded rod or reinforcing bar insert, adhesive formulation in a new adhesive cartridge or capsule dispenser, clean static mixing nozzle, extension tube, dispensing gun, piston plug, setting tools/wrenches, and the recommended supplies listed in the manufacturer’s printed installation instructions (MPII) for drilling and cleaning the drilled hole.
Ensure that the adhesive has an uncracked characteristic bond strength as shown on the working drawings and is approved for use in sustained tension applications.
Use injectable, two-component, cartridge-type adhesive systems dispensed and mixed through a static mixing nozzle. Before installation verify the adhesives meet acceptable installation and performance temperature ranges according to the MPII. As an alternative, adhesives may be supplied in a small sacri6icial glass capsule or foil container.
The use of bulk adhesive components supplied in industrial quantities contained in either barrels or 1 to 5-gallon cans, metered, mixed, and delivered manually are prohibited.
Provide an evaluation report issued by ICC-ES or IAPMO-UES verifying that the adhesive anchors have been tested and quali6ied for performance in cracked and uncracked concrete according to
ICC-ES AC 308.
(d) Fasteners and Anchors. Conforming to the following requirements:
1. Bolts and Studs: ASTM A307, ASTM A449, or ASTM F1554.
2. Carbon and Alloy Steel Nuts: ASTM A563.
3. Carbon Steel Washers: ASTM F436.
4. Carbon Steel Threaded Rod: ASTM A36, ASTM A193 Grade B7, or ISO898 Class 5.8.
5. Wedge Anchors: ASTM A510 or ASTM A108.
6. Stainless Steel Bolts, Hex Cap Screws, and Studs: ASTM F593.
7. Stainless Steel Nuts: ASTM F594.
8. Zinc Plating: ASTM B633.
9. Hot-Dip Galvanizing: ASTM A153.
3. CONSTRUCTION—
(a) Quali6ications.
1. Post-Installed Anchor Designer. Employ a Professional Engineer registered in the State, with at least 3 years of experience in the design of post-installed anchors.
2. Certi6ied Installers. When applicable or indicated on the contract drawings, post-installed adhesive concrete anchors are only to be installed by ACI Certi6ied installers. Have anchor installers working on the project carry and provide their valid ACI Certi6ication Card upon request.
3. Installer Training. Conduct annual training with the manufacturer or the manufacturer's representative for the installer on the project. Have the training consist of a review of the complete installation process for drilled-in anchors. The training is to include but not limited to the following:
a. Hole drilling procedure.
b. Hole preparation and cleaning technique.
c. Adhesive injection technique and dispenser training/maintenance.
d. Reinforcing bar dowel preparation and installation.
e. Proof loading/torquing.
Installer training is supplemental to the installer certi6ication program and is not considered equivalent.
(b) Hole Drilling and Cleaning Equipment. As required by the anchor system’s MPII. At a minimum equipment, should meet the following:
1. Hammer-Drill with Drill Bits. Drill holes with rotary impact hammer drills using carbide-tipped bits or a hollow drill-bit system. Provide drill bits of diameters as required by the MPII. Carbide-tipped drill bits conforming to ANSI B212.15-1994.
2. Cleaning Equipment. Use hole cleaning equipment and devices as required by the MPII. This may include steel wire brushes or nylon brushes.
3. Compressed Air. Use air nozzles and air pumps capable of removal of dust and dirt from concrete repair areas and exposed concrete surfaces. Use compressed air free of oil; use 6ilters and/or driers to achieve this requirement.
4. Vacuum. Use a vacuum capable of removing dust or other concrete spoil from hole drilling without allowing dust particles to enter the ambient air and meeting OSHA silica requirements.
(c) Submittals. For the anchors used on the project, have the Post-Installed Anchor Designer complete and submit Form CS-698. Form CS-698 is to identify the assumed conditions used in design that will be encountered at the time of anchor installation that effect capacity and will be veri6ied by the Inspector in the 6ield. Have the Post-Installed Anchor Designer submit signed and sealed post-installed anchor design calculations. Submit a letter of procedure stating method of drilling, the product proposed for use, and the complete installation procedure. The letter of procedure must incorporate all manufacturer recommendations for installation. Along with the letter of procedure submit a sketch with enough detail to support the Post-Installed Anchor
Designer’s calculations. Submit an inspection procedure that includes how the inspection will be completed by a certi6ied anchor inspector and how often the inspections are to be performed. Also, submit the following information:
1. Adhesive Anchors:
• Product name, type, diameter, and length.
• Product speci6ications with recommended design values and physical characteristics.
• Type of anchor installed in the adhesive and its mechanical and physical characteristics.
• Test Reports: Certi6ied mill test reports showing compliance with speci6ied performance characteristics and physical characteristics used in the manufacture of the anchors.
• Most recent ICC ES or IAPMO-UES Evaluation Report(s) - ESRs.
• MPII.
2. Anchor Installer Certi6ication. Record the names and ACI Registration Numbers of the certi6ied installers performing work on the project on a form acceptable to the Representative.
3. Submittal Procedures. Unless noted otherwise, provide the submittals to the Representative before the start of construction to allow a 14-calendar day review period. Submittals not accepted and requiring resubmission are subject to the 14-calendar day review period before the start of construction, with the review time beginning anew for each such submittal. Provide copies of the submittals to the contractors, manufacturers, Engineer of Record, and Inspector. Do not install anchors until the submittals have been accepted by the Engineer of Record.
4. Lots and Identi6ication. Provide traceable, individual lot numbers for anchors used on the project.
Submit records to the Representative identifying assigned lot numbers to the material represented.
Unidenti6ied material received at the site will be rejected. Loss of positive identi6ication of materials will be cause for rejection.
5. Approval of Materials. The approval of materials by the Representative does not preclude subsequent rejection if the material is damaged in transit or later damaged or found defective for any reason.
(d) Pre-Installation Meeting. Before starting anchor installation work, coordinate a pre-installation meeting.
Include the Inspectors and installers in the meeting to review the installation process and requirements.
(e) Project Conditions. Field conditions are to meet or exceed the conditions given in the MPII or on the accepted Form CS-698 whichever is more restrictive. The Inspector will verify the 6ield conditions meet or exceed the MPII or the conditions indicated on the accepted Form CS-698 and document the current 6ield and installation conditions on Form CS-698.
Concrete must have a minimum compressive strength (f'c) of 3,000 pounds per square inch or according to the design value on Form CS-698 at the time of anchor installation.
Store and deliver materials in unopened and undamaged containers according to the storage conditions in the MPII. Discard adhesive anchor materials that have become expired or have been exposed to temperatures exceeding the MPII.
The anchor or fastener coating, plating, or steel type must provide suitable corrosion protection for the environment in which the anchor or fastener is installed.
Protect and handle materials according to MPII recommendations to prevent damage or deterioration.
Prevent contact between carbon steel tool surfaces and stainless steel. As necessary, use special wrenches fabricated from stainless steel to mitigate contamination of the nuts and anchor steel.
Clean and re-passivate stainless-steel parts suspected of being contaminated or compromised during shipment, storage, handling, or from nearby construction activities with citric acid.
(f) Substrate Conditions. Meet or exceed the MPII or the conditions indicated on given on the accepted Form…