This document is an asbestos abatement and site survey report prepared by Forensic Analytical Consulting Services, Inc. (FACS) for the Midpeninsula Regional Open Space District (MROSD) related to the South Area Demolitions Project within the Sierra Azul Open Space Preserve. The survey, conducted on March 26, 2025, encompassed multiple properties including the Estrada Property, and involved identifying and sampling suspect asbestos-containing materials (ACM) and lead-containing paints that may be disturbed during a planned demolition project. Key findings include the identification of asbestos in rolled composition roofing at multiple sites and yellow linoleum & mastic at the bus site debris, as well as lead-containing tan paint on wood siding at Site 3. The survey also noted the presence of hazardous materials such as propane tanks and liquid acid car batteries that require specialized handling and disposal protocols.

The survey report recommends incorporating its findings into demolition plans and emphasizes compliance with California hazardous waste regulations, specifically addressing the safe management of propane tanks and lead-acid batteries. The laboratory analysis was conducted by SGS-Forensic Laboratories using polarized light microscopy (PLM) and atomic absorption spectrometry (AAS), with samples collected by California Department of Public Health (CDPH) certified technicians. The document provides detailed technical guidance for abatement contractors, including specific procedures for handling and disposing of asbestos-containing and lead-containing materials, and highlights the importance of following Cal/OSHA and EPA regulations during the demolition and remediation process.

View the file

Other files

File Type Posted
Att A- Location.pdf PDF
South Area Demo Bid A-D.pdf PDF
Att E - Waste.pdf PDF
E2_Demo Matrix.pdf PDF
E3 Specifications.pdf PDF
PGE Letter - 23760 Alamitos Rd.pdf PDF
Att 7 - Phyto.pdf PDF
Att C - OSMRP.pdf PDF
D3_Supp..pdf PDF
Att F - Equipment.pdf PDF
APN_562_22_041.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Area Demolitions

E.1 Project Scope Documents Page 1 of

E.1 Abatement

South Area Demolitions Project

Sierra Azul Open Space Preserve Santa Clara County, California

Date: April 23, 2024

Brick and Mortar - RedMaterial:

1HMR #:

0Asb:

Comment:

Black MasticMaterial:

2HMR #:

0Asb:

Comment:

Carpet and Mastic - Beige SquaresMaterial:

5HMR #:

0Asb:

Comment:

Brick and Mortar - Red/WhiteMaterial:

6HMR #:

0Asb:

Comment:

Linoleum and Mastic - Beige SquaresMaterial:

7HMR #:

0Asb:

Comment:

Drywall - Knockdown TextureMaterial:

8HMR #:

0Asb:

Comment:

Material Picture Log Hazard Management Services, Inc.

Client:

Site:

Mid Peninsula Regional Open Space District

McKanney Site

Date Printed: 8/31/2017

Carpet and Mastic - Red/GreyMaterial:

9HMR #:

0Asb:

Comment:

Drywall - SmoothMaterial:

11HMR #:

2Asb:

Comment:

4" Ceramic Tile and Grout - WhiteMaterial:

13HMR #:

0Asb:

Comment:

Beige PaintMaterial:

14HMR #:

0Asb:

Comment:

Cement PipeMaterial:

15HMR #:

0Asb:

Comment:

Attic InsulationMaterial:

16HMR #:

0Asb:

Comment:

Material Picture Log Hazard Management Services, Inc.

Client:

Site:

Mid Peninsula Regional Open Space District

Rock and MortarMaterial:

17HMR #:

0Asb:

Comment:

Brown PaintMaterial:

18HMR #:

0Asb:

Comment:

Brick and Mortar - Brown StoneMaterial:

19HMR #:

0Asb:

Comment:

ConcreteMaterial:

20HMR #:

0Asb:

Comment:

VFT and Mastic - UnknownMaterial:

22HMR #:

0Asb:

Comment:

Red PaintMaterial:

24HMR #:

0Asb:

Comment:

Material Picture Log Hazard Management Services, Inc.

Client:

Site:

Mid Peninsula Regional Open Space District

Hazardous Building Materials Specifications

Sierra Azul Open Space Preserve – Estrada Property

Contacts

Midpeninsula Regional Open Space District – Ayden Sabharwal – (650) 772-3636 Forensic Analytical Consulting Services, Inc. – Tyler Faison – (209) 551-2000

Scope of Work

Midpeninsula Regional Open Space District will be performing a demolition project of various buildings at their Estrada Property. To meet requirements of the NESHAP regulation, the removal of asbestos-containing materials is required to be completed prior to demolition. The contractor awarded the project shall ensure that all applicable aspects of these specifications, as well as Federal, State, and local regulations are followed by either their own firm, or their sub-contractors as applicable for the site work to be completed.

Material Asbestos Content

Location NESHAP Category

Approximate Amount

Rolled Composition Roofing 2% Chrysotile Site 1 - Trailer Category I Non-Friable

400 sq ft

Linoleum & Mastic – Yellow 70% Chrysotile Bus Site RACM / Friable

10 sq ft

Project Requirements

The Contractor performing work must be registered with the Division of Occupational Safety and Health (DOSH) as an asbestos abatement contractor. Contractor must hold the C-22 asbestos abatement license.

The site assessment identified propane tanks and liquid acid car batteries, both classified as hazardous materials under California regulations. Propane tanks, containing liquefied petroleum gas (LP-Gas), are subject to stringent storage and handling requirements to prevent leaks and explosions. California Code of Regulations, Title 8, Section 471 mandates that LP-Gas be odorized to detectable levels before transportation or delivery to ensure safety. Similarly, liquid acid car batteries, primarily composed of sulfuric acid and lead, are considered hazardous waste when discarded. The Department of Toxic Substances Control (DTSC) requires that spent lead-acid batteries be recycled or disposed of following specific guidelines to mitigate environmental and health risks. Proper management of these materials includes compliance with handling and disposal protocols as outlined in California's hazardous waste regulations.

SUBMITTAL REQUIREMENTS

A copy of the contractor’s prestart submittal shall be provided to the onsite project monitor and shall include the items listed in the attached Asbestos General Requirements at Sections 2.2, 2.31a, 2.31b, 2.31c, and 2.5. Delays in providing the required submittals may affect the start of the project.

At the start of each workday, the contractor shall be responsible for submitting a paper copy of the previous day’s paperwork (worker roster, regulated area sign-in/sign-out sheets, daily log) to FACS onsite project manager.

Notifications

Contractor shall submit a temporary worksite “report of use” notification to the local Cal/OSHA office at least 24 hours prior to commencing work on site.

A copy of the notification shall be provided to FACS onsite project manager at the start of the project.

No work may take place until the notification is provided.

Work Days and Hours

This project shall be conducted Monday – Friday, 07:00 am to 03:30 pm. Additional days or hours may be worked by the contractor upon request. The request for additional time must be submitted at least 24 hours prior to the work shift commencing and approved by the Owner and FACS.

Worker Training

All workers to be used on the project must have current AHERA Worker training with one worker trained to the AHERA Contractor-Supervisor level. Copies of worker certifications shall be provided to the FACS onsite project manager prior to work commencing.

Personal Protection Equipment

All personnel entering the regulated work area shall wear half-face tight-fitting, negative-pressure air purifying respirators fitted with HEPA (P-100) filters. Disposable coveralls with attached hood and booties and safety glasses shall be worn in addition to respiratory protection.

All personnel wearing respiratory protection shall have a valid asbestos medical with respirator approval and a valid fit test for the respirator being worn. Copies of medical approval and respirator fit test shall be provided to the onsite FACS onsite project manager prior to donning of personal protection equipment.

Equipment

Contractor shall provide all necessary equipment and supplies required to meet the requirements of this specification and complete their scope of work in the allotted schedule. All equipment that arrives onsite shall be clean of all dust and debris and in proper functioning order. This means that HEPA-vacuums have empty bags, negative air machine is sealed and has a clean pre-filter without dust contamination, etc. Ladders must not be missing feet, cords must have grounds and intact insulation/jacketing, etc.

Any equipment that arrives onsite dirty or not in proper functioning order shall be removed at no additional cost to Owner or Owner’s representatives. No additional time will be provided for delays due to failure of contractor to provide necessary equipment and supplies when they are needed for the project.

HVAC, Water, and Electricity

Contractor will be responsible for providing water and electricity at work areas for this project. Neither will be available onsite.

Pre-Cleaning

No pre-cleaning of asbestos-containing materials is required for this project.

Safety / Security

The contractor is responsible for the safety of all employees and following all applicable regulations, namely Cal/OSHA. A tailgate safety meeting shall be held on the first day of the project by the crew supervisor to discuss all safety hazards on the project. A sheet signed by all attendees and the presenter with the topics discussed shall be provided to the FACS onsite project manager.

Safety meetings shall be held at least weekly or in the event that job hazards change on the project or if an accident occurs on the project.

Contractor is responsible for the security of their equipment onsite and work area.

Occupancy

The contractor will have sole access to the work area.

Personal Air Monitoring

The contractor is responsible for the collection of personal air samples during the abatement of asbestos-containing materials in accordance with Cal/OSHA requirements. Contractor shall submit the samples to an AIHA-accredited laboratory daily on a 48-hour turnaround time. Copies of the laboratory results, along with chain-of-custody, shall be provided to the FACS onsite project manager within 72 hours of collection.

Decontamination System

An area outside of the containment area established for the abatement shall be designated as the decontamination station. Water, hand soap and towels shall be available for all workers exiting the containment area to use to wash exposed skin and decontaminate re-usable personal protection equipment. A waste bag shall be at area for disposal of contaminated PPE that will not be cleaned and re-used by workers.

Water or other liquids may not be consumed in any part of the decontamination system. Workers that need to hydrate will need to fully decontaminate themselves and exit the regulated area to access and drink fluids.

Asbestos Roofing Containment and Abatement Requirements

All roof abatement shall be completed within an approved contained work area.

1. One layer of 6-mil poly shall be installed and sealed over all openings leading to interior space of the building. This includes doors, HVAC registers, etc.

2. One layer of 6-mil poly shall be placed extending out 10-feet at the ground level below any roof abatement areas.

3. An airless sprayer or Hudson sprayer, and HEPA-vacuum shall be within the containment area prior to work commencing.

4. A decontamination system shall be adjacent to the containment area. Requirements for this system are detailed above.

5. Materials shall be wetted with amended water during removal.

6. Material shall be removed as intact as possible using hand tools only.

7. Contractor is responsible for cleaning of debris that falls into interior space from asbestos-containing materials. Contractor may opt to prep these areas with poly to assist with cleanup if desired.

8. All asbestos waste shall be placed in 6-mil poly waste bags and all waste must be double-bagged. Details of waste disposal are provided below.

9. All cleaning shall be completed by wet-wiping, HEPA-vacuuming, and wet-wiping one more time at minimum.

10. Once removal is completed, the containment area shall be cleaned of all debris, dust, and must be dry to conduct a final visual inspection of the containment area. Clearance criteria for abatement is detailed below.

11. Once a clearance visual inspection has been passed by the FACS onsite project manager, the contractor shall remove all containment barriers and regulated area.

Waste Disposal

Contractor is responsible for providing a waste receptacle on site for the storage of all asbestos-containing materials. Waste bins to remain onsite past a work shift must be covered/enclosed with a hard-top lid and lockable to keep waste secured. The waste bins must arrive onsite clean of debris.

Waste bins shall be load-worthy and the contractor is responsible for any costs associated with load loss.

Plywood or similar material shall be installed below the feet / casters of the waste bin to prevent damage to ground surfaces.

The waste bin shall be lined with one layer of 6-mil poly prior to loading of waste. This liner does not count as one layer of packaging for waste. All waste must be double-bagged in 6-mil poly waste bags or “burrito-wrapped” in two separate layers of 6-mil poly. Waste bags shall be sealed in a “goose neck” fashion and “burrito-wraps” shall have staggered tape seals to create a leak-tight container. All waste shall be wet inside waste bags but may not contain “loose” water. Air within waste bags shall be evacuated using a HEPA-vacuum when sealing.

All waste packages shall be labeled in accordance with Cal/OSHA and DTSC requirements as necessary for waste being disposed. Hazardous (regulated) and non-hazardous asbestos waste materials may not be mixed within the same waste container / bin. Contractor shall provide either drums or boxes to segregate wastes in the event all waste will be hauled in the same waste hauler.

All waste must be manifested, even if considered to be non-hazardous. Contractor shall provide at least 24-hour notice of waste manifest needing to be signed to allow coordination with District’s personnel for signatures.

Clearance

At the conclusion of abatement, the crew supervisor shall perform own visual inspection of the regulated work area to ensure all materials have been abated and the work area is clean of all dust and debris. Once they pass their own visual inspection, they may request a visual inspection from the FACS onsite project manager. To pass a final visual inspection, all materials need to be abated, the work area must be dry, and no dust or debris may be present. Once FACS onsite project manager passes the final visual inspection, contractor shall fold poly drop sheets in on itself and remove regulated area signage.

forensicanalytical

Right Right . Right

313 Banner Court, STE B facs

Asbestos Gen. Requirements - Page 1 of 54

GENERAL ASBESTOS REQUIREMENTS

SECTION 1. DEFINITIONS

Abatement - Procedures beyond a special operations and maintenance program to control fiber release from asbestos-containing materials. Includes removal, encapsulation, enclosure, repair.

ACGIH - American Conference of Governmental Industrial Hygienists

AHERA - Asbestos Hazard Emergency Response Act (40 CFR 763)

AIHA - American Industrial Hygiene Association

Air Filtration Device - A portable exhaust system equipped with HEPA filtration and capable of maintaining a constant low velocity air flow into contaminated areas from adjacent uncontaminated areas.

At a minimum, the air intake for the air filtration device, must have a pre-filter on it which can be changed within the containment area.

Airlock - A system for permitting ingress and egress with minimum air movement between a contaminated area and an uncontaminated area. The airlock shall consist of a minimum of two curtained

Z-flap doorways separated by a distance of at least three (3) feet such that one passes through one doorway into the airlock, allowing the doorway sheeting to overlap and close off the opening before proceeding through the second doorway, thereby preventing flow-through contamination.

Air Monitoring - The process of measuring the fiber content of a known volume of air collected during a specific period of time. The procedure normally utilized for asbestos follows the NIOSH Standard

Analytical Method for Asbestos in Air Method 7400. For clearance air monitoring, transmission electron microscopy methods may be utilized for detection of smaller fibers and specific fiber identification.

Air Sampling Professional - The professional contracted or employed by the Owner to supervise and/or conduct air monitoring and analysis schemes. The air sampling professional must be a Cal/OSHA

Certified Asbestos Consultant or Certified Site Surveillance Technician. This individual shall not be affiliated in any way other with the contractor performing the abatement work.

Ambient Air - The air outside buildings and structures or the air as it normally exists in a space prior to abatement.

Amended Water - W ater to which a surfactant has been added.

ANSI - American National Standards Institute

Approval/Acceptance - A written means of approving/accepting a product, containment set-up, work practice. Approval/Acceptance by HMS, Inc. Project Manager may be given verbally, if followed in written format. Failure of HMS, Inc. Project Manager to address an issue either verbally or in writing does not imply Approval/Acceptance.

Asbestos - Means the asbestiform varieties of serpentine (chrysotile), riebeckite (crocidolite), cummingtonite grunerite (amosite), anthophyllite, actinolite, and tremolite.

Asbestos-Containing Construction Material (ACCM) - Cal/OSHA term used to describe construction materials that contain asbestos in amounts greater than one-tenth of one percent (0.1%) either alone or mixed with fibrous or non-fibrous materials. W ith the exception of waste issues, for the purposes of this contract the terms ACM and ACCM shall be interchangeable.

Asbestos-Containing Material (ACM) - Term used by Cal/OSHA, and U.S. EPA to include any material containing more than one-percent (1%) asbestos. W ith the exception of waste issues, for the purposes of this contract the terms ACM and ACCM shall be interchangeable.

Asbestos Gen. Requirements - Page 2 of 54

Asbestos-Containing Hazardous Waste - Materials defined by the State of California to be packaged, labeled, transported, and disposed of as an asbestos hazardous waste. This includes all friable asbestos-containing material over one-percent (1%) asbestos. This also includes all asbestos-containing material containing less than one-percent asbestos for which one or more bulk samples have not been point counted and found to contain less than one-percent (1%) asbestos.

Asbestos-Containing Waste Material - Asbestos-containing material or asbestos-contaminated objects requiring disposal.

Asbestos Project Manager - An individual who is qualified by virtue of experience and education, designated as the Owner’s representative and responsible for overseeing the asbestos abatement portion of the project. This person is generally the same as the HMS, Inc. Project Manager.

ASTM - American Society for Testing and Materials

Authorized Visitor - The Owner (and any designated representative) and any representative of a regulatory or other agency having jurisdiction over the project.

Bidder - A duly licensed and accredited asbestos contractor who has submitted a bid. If bid walk is mandatory, bidder must attend the walk in order for bid to be considered responsive.

Cal/OSHA - California Division of Occupational Safety and Health. Acronym of DOSH is interchangeable with this term.

Certified Industrial Hygienist (CIH) - An industrial hygienist certified in Comprehensive Practice by the

American Board of Industrial Hygiene.

Cleaning Barriers - Cleaning barriers are used in addition to critical barriers and are primarily to aid in the decontamination of the area after the completion of asbestos removal work. Cleaning barriers are normally comprised of plastic sheeting placed over non-asbestos-containing surfaces (e.g. walls, floors, ceilings, casework, etc.), and asbestos-containing surfaces not scheduled for removal, in the regulated area.

Clean Room - An uncontaminated area or room which is a part of the worker decontamination enclosure system with provisions for storage of workers' street clothes and clean protective equipment. Also, the term includes uncontaminated area or room of a W aste Transfer Airlock.

Competent Person - The Contractor’s employee who meets the requirements of and is responsible for the activities of the Competent Person as described in Title 8 CCR 1529. The includes but is not limited to an individual who has current AHERA Contractor/Supervisor accreditation and has the responsibility and authority to ensure that the Contractor’s employees comply with the contract documents and all relevant

Cal/OSHA regulations.

Containment - The temporary isolation of the work area from the rest of the building to prevent escape of asbestos fibers.

Contract Documents - W ritten contractual agreements between the Owner and the Contractor that pertain to the work on this project.

Contractor - The Contractor is the person or entity identified as such in the Contract Documents;

references to "Contractor" include the Contractor’s authorized representative.

Contractor/Supervisor - A person who successfully completed an initial U.S. EPA and/or state-approved five-day AHERA-accreditation course and who has maintained that training through approved annual refresher training, and possesses current and valid AHERA-accreditation documentation as a AHERA-accredited Contractor/Supervisor

Asbestos Gen. Requirements - Page 3 of 54

Cal/OSHA Class I, II, III, or IV Work- W ork classes described in 8 CCR 1529 that describe different levels of asbestos work.

Critical Barrier - Critical Barriers used to restrict water and air flow. Critical Barriers are the barriers placed over openings in the walls and ceilings of a work area in order to ensure that airborne fibers cannot escape the work area via these openings. The Contractor will construct impermeable barriers at all exits or openings, including doorways, duct chases, mechanical shafts, elevator shafts, floor openings, drains, and the like, so that all possible exit or entrance routes are effectively barricaded and sealed. Unless otherwise specified in the Contract documents, critical barriers shall be constructed of at least one layer of

6-mil thick poly.

Critical Barrier Negative Pressure Test - Required test for negative pressure with only critical barriers and air filtration units installed. This test must be conducted prior to the installation of cleaning barriers, but may be conducted with or without the decontamination unit in place.

Curtained Doorway, Z-Flapped - A device to allow ingress or egress from one room to another while permitting minimal air movement between spaces (such as the various rooms of the decontamination chamber). Each Curtained Doorway will consist of three sheets of poly. The first barrier will be a sheet of poly covering the entire passage and taped to the ceiling, walls, and floor. This sheet will be slit vertically in order for the workers to pass through it. Another sheet of poly will cover the first sheet but be taped only to the ceiling (or top of the first barrier) and down one wall. The third sheet of poly will be placed on the opposite side of the slit poly from the second sheet. The third sheet of poly will be attached in a similar manner as the second sheet except the wall attachment will be to the opposite wall. Each barrier must be weighted at the bottom in order to ensure that it will lay flat against the slit sheet opening should the negative pressure system fail. Please see diagram:

Other designs are permissible, if approved by the HMS, Inc. onsite project manager.

Decontamination Enclosure System - (Also known as Decon or W aste Transfer Decon) A series of connected rooms designed for the decontamination of workers and equipment that is separated from the work area and from each other by z-flapped curtained doorways. This unit shall be constructed with at least two layers of six-mil poly for the floors, walls, and ceiling. The floor of the dirty room shall consist of two layers of six-mil poly plus a third layer of poly, four-mil or thicker, to be used as a removable drop layer. Drop layer is to be removed as needed, but not less than daily. All decontamination enclosure systems used for worker entry and exit shall be equipped with a shower. At no time shall z-flaps of

Decontaminations Enclosure System chambers be taped, held or otherwise blocked open.

DOP - Dioctylphthalate particles which are normally used as an agent for testing the efficiency of HEPA filters.

Demolition - The wrecking or taking out of any load-supporting structural member, casework, items or surfaces of a facility together with any related handling operations and disposal.

Dust or Debris - Material visible to the HMS, Inc. Project Manager. Dust and debris may be contaminated with asbestos, and may affect the asbestos work practices, containment or clearance air samples required on this project, whether contaminated with asbestos or not.

Encapsulant, Bridging/Penetrating - A liquid material which can be applied to asbestos-containing

Asbestos Gen. Requirements - Page 4 of 54 material to control the possible release of asbestos fibers from a material either by creating a membrane over the surface (bridging encapsulant) or by penetrating into the material and binding its components together (penetrating encapsulant).

Encapsulant, Lock-down - A liquid product designed to mist the air within a contained area after the containment has passed visual clearance by the HMS, Inc. Project Manager. Lock-down encapsulant is designed to bind asbestos fibers together and to create a tacky surface causing non-visible asbestos fibers, settling out of the air, to adhere to containment poly.

U.S. EPA - U.S. Environmental Protection Agency

Equipment Decontamination Enclosure System - That portion of a decontamination enclosure system designed for controlled transfer of materials and equipment into or out of the work area, consisting of a clean room, washroom and holding area.

Equipment Room - A contaminated area or room which is part of the worker/equipment decontamination enclosure system with provisions for storage of contaminated clothing and equipment.

Exterior of Containment HEPA Filtered Pressure Differential Unit - An air-purifying unit positioned outside, rather than inside the regulated work area. The face, or filter portion of the unit is integrated within the work area, and the remainder of the unit (housing, wheels, rivets, control panel, etc.) is located outside of the work area. This allows filters on the air intake to be changed from within the regulated area but access to the machine itself is available to those outside the area. Pressure differential units which pass

DOP testing across the HEPA filter, but fail at rivets, control panels, wheels, etc. may be used in this fashion as long as the failure point of the unit can remain on the exterior of containment while the face of the unit and filters are inside containment.

Facility - Any institutional, commercial or industrial structure, installation, or building.

Facility Component - Any item (pipe, duct, boiler, tank, reactor, turbine, furnace, etc.) at or in a facility, any portion of a facility or any structural member in or at a facility.

Federal OSHA or OSHA - Federal Occupational Safety and Health Administration.

Fixed object - A piece of equipment or furniture in the work area which cannot be removed, or will not be removed by Owner’s decision, from the work area.

Friable asbestos - Asbestos-containing material which, when dry, can be crumbled to dust by hand pressure.

Glovebag Technique - A method with limited applications for removing small amounts of friable asbestos-containing materials from ducts, short piping runs, valves, joints, elbows, and other non-planar surfaces. The glovebag assembly is a manufactured or fabricated device consisting of a glovebag

(typically constructed of 6 mil transparent polyethylene or polyvinylchloride plastic), two inward projecting long sleeves, an internal tool pouch, and an attached, labeled receptacle for asbestos waste. The glovebag is constructed and installed in such a manner that it surrounds the object or material to be removed and contains all asbestos fibers released during the process. Glovebags must meet the specification requirements for glovebags as listed in 8 CCR 1529. All workers who are permitted to use the glovebag technique must be highly trained, experienced and skilled in this method. All techniques and procedures employed by the contractor shall be approved by the HMS, Inc. Project Manager.

HVAC - Heating, ventilation and air conditioning system.

HEPA Filter - A high efficiency particulate air filter capable of removing particles 0.3 microns in diameter from an air stream with 99.97% efficiency.

HEPA Vacuum - A vacuum system equipped with HEPA filtration.

HMS, Inc. Project Manager - An individual, employed by (or sub contracted to) Hazard Management

Asbestos Gen. Requirements - Page 6 of 54

Prior experience - Experience required of the contractor on asbestos projects of similar nature and scope to ensure capability of performing the asbestos abatement in a satisfactory manner. Similarities shall be in areas related to material composition, project size, abatement methods required, number of employees and the engineering, work practice and personal protection controls required.

Regulated Area - An area established by a contractor to demarcate areas where the contractor’s employees may conduct Class 1, 2, or 3 work as described in 8 CCR 1529 or airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.

Additionally, “regulated area” means any measure used to restrict access to an area where personnel impacting asbestos-containing materials are required to wear respiratory protection and/or protective clothing by the project specifications, or applicable regulations, regardless of airborne asbestos concentration levels.

Regulations - shall include all relevant federal, state, and local regulations including but not limited to:

a. U.S. Environmental Protection Agency Regulations for Asbestos (Title 40, Code of

Federal Regulations, Part 61, Subparts A & B)

b. Title 8, Chapter 4, Subchapters 1 through 21, California Administrative Code, General

Industry Safety orders, Section 5208 "Asbestos" or the applicable sections of the Federal

Asbestos Regulations. Cal/OSHA Construction Safety Orders, Section 1529.

c. "Asbestos Hazard Emergency Response Act", U. S. Environmental Protection Agency, 40

CFR, Part 763. Final Rule and Notice.

d. Applicable local county Air Pollution Control Districts and Air Quality Management

Districts or other local NESHAPs Enforcement.

Removal - The stripping of any asbestos-containing materials from surfaces, substrates or components of a facility. As per various regulations, the ground is considered a substrate.

Regulated Area- An area where asbestos-containing materials are going to be disturbed and may release asbestos fibers into the air and whose entrances have been posted. A regulated area is required for all

Class I, II, or III work as described in 8 CCR 1529 or whenever the work may release asbestos in concentrations over the OSHA Permissible Exposure Limit (PEL) or Excursion Limit.

Renovation - Altering in any way one or more facility components.

Scope of Work - Job specific information and specifications used in combination with these Asbestos

General

Requirements. If conflicts exist between the Scope of W ork and these specifications, the stricter requirement will be enforced unless the conflict is specifically addressed in wirting in the Scope of W ork for this project.

Shower Room - A room between the clean room and the equipment room in the decontamination enclosure with hot and cold or warm running water controllable at the tap and suitably arranged for complete showering during decontamination. The shower room must be equipped with an overflow pan to contain water splashed, leaked or spilled out of the shower unit.

Staging Area - The secured area outside of containment where clean equipment and supplies are stored.

W aste must not be stored within the staging area unless placed within an additional lockable container or area approved by the HMS, Inc. Project Manager.

Strip - To take off friable asbestos materials from any part of a facility.

Structural Member - Any load-supporting member of a facility, such as beams and load-supporting walls or any non-load-supporting member, such as ceilings and non-load supporting walls.

Submittals - Pre, in-progress and post job documents submitted by contractor to Owner’s representative as indicated in General Requirements and Bidding Requirements.

Surfactant - A chemical wetting agent added to water to improve penetration.

Asbestos Gen. Requirements - Page 7 of 54

Temporary Enclosure System - A system by where the regulated work area is isolated from the rest of the building or structure in a manner that prevents the escape of airborne asbestos fibers. Also see

“Containment”

TEM - Transmission Electron Microscopy according to AHERA specifications for Level II analysis on all

AHERA projects. Non-AHERA projects may employ other levels of TEM analysis.

Visible Emissions - Any emissions, whether containing particulate asbestos material or not, that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.

Waste Load-out/Transfer System - A decontamination system utilized for transferring containerized waste from inside to outside of the work area. A series of three connected rooms used for the load-out of asbestos-containing materials that have been properly containerized. The waste loadout chamber system shall normally consist of three connected chambers adjacent to the work area. Each chamber shall be constructed with at least two layers of six-mil thick poly for the floors, walls, and ceiling. The chamber located closest to the work area is known as the dirty chamber, and in addition to the two layers of six-mil thick poly on the floor, shall also have a third layer of poly, four-mil or thicker, to be used as a removable drop layer. The drop layer is to be removed as needed but at least daily. The chamber located closest to the outside the work area is known as the clean chamber. See Section 15 for proper use of waste Load-out/Transfer System.

Wet cleaning - The process of eliminating asbestos contamination and visible dust and debris from building surfaces and objects by using cloths, mops, or other utensils which have been dampened with water and afterwards thoroughly decontaminating them or disposing of them as asbestos contaminated waste.

Work area - Designated rooms, spaces, or areas of the project in which asbestos abatement actions are to be undertaken or which may become contaminated as a result of such abatement actions. A contained work area or temporary enclosure is a work area that is isolated from the rest of the facility by the use of critical barriers and cleaning barriers, a decontamination system, and additional means of signs and barriers to reduce access by unauthorized persons. A contained work area is a work area which has been sealed, polyed, and equipped with a decontamination enclosure system. The work area includes all decontamination chambers, waste transfer system and the abatement area. A non-contained work area is an isolated or controlled-access work area which has not had poly installed nor been equipped with a decontamination enclosure system.

Worker - A person who successfully completed an initial U.S. EPA and/or state-approved four-day AHERA-accreditation course and who has maintained that training through approved annual refresher training, and possesses current and valid AHERA-accreditation documentation as a AHERA-accredited asbestos worker.

Asbestos Gen. Requirements - Page 8 of 54

SECTION 2. NOTIFICATIONS, SUBMISSIONS, POSTINGS

2.1 Site Investigations

By submitting a bid to the primary contractor, and being listed by the primary contractor as the sub-contractor for asbestos related work, the asbestos abatement contractor acknowledges that they have investigated and satisfied themselves as to:

A) the conditions affecting the work, including but not limited to, physical conditions of the site which may bear upon site access, handling, and storage of tools and materials, access to water, electric, or other utilities, or otherwise affect performance of required activities.

B) the character and quality of all surface and subsurface materials or obstacles to be encountered, in so far as, this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the District or a designated consultant, as well as, information presented in drawings and specifications included with this contract. Any failure by the asbestos abatement contractor to acquaint themselves with available information will not relieve them from the respon-sibility for estimating properly the difficulty or cost of successfully performing the work. The District is not responsible for any conclusions or interpretations made by the asbestos abatement contractor on the basis of the information made available by the District.

2.2 Notification

Prior to commencement of work the Contractor shall send notices of the work to be completed to the agencies listed below with a copy of each to be provided to the Owner or its representative at the pre-start meeting.

For compliance with 40 CFR part 61.146 of Subpart M, send notice at least ten (10) working days prior to start of work to the all of the following appropriate agencies:

EPA, Region 9

Asbestos Program Enforcement

75 Hawthorne Street

San Francisco, CA 94105

Chief Compliance Division

California Air Resources Board

P.O. Box 2815

Sacramento, CA 95812

(for non-EPA delegated counties)

Local Air Pollution Control District (APCD) or Local Air Quality Management District (AQMD)

For compliance with 8 CCR 1529 and 8 CCR 5203, send written notice at least one day prior to start of work to:

State of California

Department of Occupational Safety and Health

District Office

These notices shall include, at a minimum, the name and address of the contractor, the name and address of the worksite, the type of work to be done including the percent asbestos content of the material, the methods used to prevent migration of the fibers, personal protective measures, the number of his workers involved, any union representation of the workers and the methods of disposal including the names and EPA numbers of both the certified hauler and the waste disposal site. The notices shall also include start and finish dates.

Changes in start and completion dates shall be reported immediately to the proper agency. Use forms provided by agency whenever possible.

Asbestos Gen. Requirements - Page 9 of 54

2.31a Prestart Submittals - Contractor

A. Contractor shall provide a copy of the notification for NESHAP compliance along with a receipt of fees paid.

B. Contractor shall provide a copy of the notification for Cal/OSHA compliance along with the fax confirmation receipt.

C. Contractor Notification to Local Hospital, Police, and Fire Department

D. Contractor shall provide a copy of their active CSLB License with Asbestos Certification.

E. Contractor shall provide a copy of their active Cal/OSHA (DOSH) registration.

F. The asbestos abatement contractor shall submit a statement, signed by an officer of the company, containing the following information:

1. A record of any citations issued by Federal, State, or Local regulatory agencies within the last 3 years, relating to asbestos abatement activity. Include projects, dates, and resolutions.

2. A list of penalties incurred through non-compliance with asbestos abatement project specifications, including liquidated damages, overruns in scheduled time limitations, and resolutions.

3. Situations in which an asbestos-related contract has been terminated including projects, dates, and reasons for terminations.

4. A list of any asbestos-related legal proceedings/claims in which the Contractor (or employees scheduled to participate in this project) has participated or is currently involved. Include descriptions or role, issue, and resolution to date.

G. Submit copies of insurance certificates which meet requirements as outlined below:

Contractor shall purchase and maintain insurance that will protect them from claims that may arise out of or result from the activities under this Contract, whether those activities are performed by the asbestos abatement contractor, by any subcontractor, or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable.

Contractor shall submit proof of coverage for the asbestos abatement contractor and subcontractors under the W orker's Compensation insurance system of the State of California or other similar benefit acts.

Contractor shall submit a certificate of general liability insurance protecting against liability for bodily injury and property damage arising from the asbestos abatement contractor’s activities under this contract.

Such certificate of insurance must contain the following provisions:

(a) The limit of liability shall not be less than $1,000,000.00 per occurrence for bodily injury and property damage liability combined.

(b) The Owner, Owner’s Agents, and Hazard Management Services, Inc. (HMS, Inc.) must be named as additional insured, but only in respect to liability arising or resulting from activities under this contract.

Asbestos Gen. Requirements - Page 10 of 54

(c) In the event of cancellation of the insurance policy, the Owner and HMS, Inc. shall be given thirty days advance written notice.

(d) The insurance certificate must state that the insurance includes liability coverage for asbestos abatement work.

H. Copy of Contractor’s Bonding for Project

I. Submit proof satisfactory to the Owner that required permits have been acquired applicable to the project being performed and specific to the project site and location. If no city, county, or other permits for parking, waste bin location, or variances for scheduled work hours are required, this should be stated in writing and submitted to the Owner.

J. Submit Subcontractors information or statement that subcontractors will not be required or used during this project. This statement should also include that if it becomes necessary to use a subcontractor during this project that the subcontractor will not be allowed to perform work until all required documentation has been submitted for review by the Owner or HMS, Inc., and the

Contractor receives written approval for use of the subcontractor on this project.

K. Submit a complete list of all rented equipment, or equipment expected to be rented from an outside contractor for use in “Regulated Areas,” “W ork Areas,” or “Containments,” where the equipment may be exposed to elevated levels of airborne asbestos. If no equipment is to be rented a statement should be submitted stating no rental equipment will be used on the project. The statement should also include that, if it becomes necessary to use rented equipment, written statements from each rental company will be provided to the Owner prior to its use, indicating the rental company’s acknowledgment that the equipment is provided for and may be used in areas where airborne levels of asbestos may be present.

L. Submit emergency and non-emergency telephone numbers for the appropriate Police, Hospital, and

Fire Departments. This list of numbers shall also include the name, pager or cell phone numbers of the onsite supervisor and his immediate company supervisor.

M. Submit detailed written directions from the project site to the medical facility to be used in case of an emergency. Also include a map which sufficiently shows the route to be taken from the site to the designated medical facility.

N. Submit written emergency procedures pertinent to the work to be performed and which can be implemented by site personnel if the need arises.

O. Submit detailed information on preparation of work area, personal protective equipment, employee experience, training and assigned responsibilities during the project. Also list decontamination procedures for personnel, work area and equipment, abatement methods and procedures, required air monitoring program, procedures for handling and disposing of waste materials and procedures for final decontamination and cleanup.

P. Submit a detailed work schedule. The schedule shall have, as a minimum, the work area and the day/month for beginning and terminating work in each work area. During progress of work, it shall be the Contractor's responsibility to keep the schedule current and up to date.

Q. Submit to the Owner shop drawings, on projects where requested in the Scope of W ork, for layout and construction of decontamination enclosure systems and barriers for isolation of the work area as detailed in this specification and required by applicable regulations.

R. Submit Material Safety Data Sheets (MSDS) for any and all applicable materials, supplies, etc.

These documents must be legible and completely reveal information required to be communicated to the Contractor’s employees, visitors, and Owner Representatives.

Asbestos Gen. Requirements - Page 11 of 54

S. Submit manufacturers' certifications that high efficiency particulate air (HEPA) vacuums, pressure differential units and other local exhaust ventilation equipment conform to ANSI Z9.2-79.

Submit manufacturer’s documentation pertaining to the capability of waste water filters to filter particles of 1.0 micron in size.

T. Submit name of laboratory/person to be used for Phase Contrast Microscopy (PCM) analysis and copy of current NVLAP Certificate of Accreditation (if applicable), and most recent NIOSH Proficiency

Analytical Testing Program results.

U. Submit a written statement that OSHA monitoring will be performed for all asbestos-related activities performed during this project. This statement must be on company letterhead, dated, include name of the site or project being worked on, and signed by an authorized agent of the company performing the asbestos-related work.

V. W ith the Owner's representative, inspect the premises wherein all abatement and abatement related activities will occur and submit a statement signed by both, agreeing on building and fixture condition prior to the commencement of work.

W . Submit a copy of the Contractor’s Injury and Illness Prevention Program

X. Submit a copy of written Respiratory Protection Program

2.31b Pre-Start Submittals-Contractor Waste Documentation

Section 7, C. Submit copy of waste transporters Department of Toxic Substances Control, Hazardous

W aste Transporter Registration if hazardous asbestos-containing waste is to be removed during the project. If hazardous asbestos-containing waste will not be generated submit the name, address, and registration information for the waste hauler to be used for transporting the waste.

Section 7, D. Submit documentation listing the name and site address of the waste facility designated to receive asbestos-containing waste generated during this project. This documentation shall also include the EPA identification number, and a copy of the current permit authorizing the waste facility to accept and dispose of asbestos-containing waste.

2.31c Pre-Start Submittals-Worker Certifications (Section 5, Letter B)

Submit documentation satisfactory to the Owner that the Contractor's employees, including foremen, supervisor, and any other company personnel or agents who may be exposed to airborne asbestos fibers or who may be responsible for any aspects of abatement activities, have received required US EPA AHERA training.

Submit documentation from physician that all employees or agents who may be exposed to airborne asbestos in excess of background levels, action level, or the PEL have been provided with an opportunity to be medically monitored to determine whether they are physically capable of working while wearing the respirator required without suffering adverse health effects. In addition, document that personnel have received medical monitoring as required by Cal/OSHA regulations. The Contractor must be aware of and provide information to the examining physician about unusual conditions in the workplace environment (e.g., high temperatures, humidity, chemical contaminants) that may impact on the employee's ability to perform work activities.

Submit documentation of respirator fit-testing for all Contractor employees and agents who must enter any work area where asbestos-containing materials may or will be impacted. This fit-testing shall be in accordance with qualitative or quantitative procedures as required by OSHA regulations or be quantitative in nature. Documentation pertaining to NIOSH approvals for all respiratory protective devices utilized on site shall also be included.

Asbestos Gen. Requirements - Page 12 of 54

Submit each of the following and other pre-abatement documents required above, unless exempted in the scope of work or the bidding requirements, prior to the start of abatement. This list is to be used a checklist only and specific requirements are outlined in Sections 2.31a, b, and c of the General Requirements.

2.31a Checklist

A. ________ Notification to Regional Air Resource Board, Regional EPA, or local

APCD/AQMD

B. ________ Notification to CAL/OSHA (prior to start)

D. ________ Contractor notification to Local Police, Hospital, Fire Department

E. ________ State Contractor's license with asbestos certification

F. ________ Contractor Cal/OSHA Registration

G. ________ Notification of Prior Environmental Citations/LegalProceedings/ContractTermination

H. ________ Insurance Certificate

a) General liability

b) Asbestos liability certificate

c) Automobile Insurance

d) Workers' compensation insurance

e) Client and HMS, Inc. named as additional insured

H. ________ Payment or Performance Bonds (if required)

I. ________ City permits e.g. parking or dumpster (when required)

J. ________ Names of all Subcontractors, license numbers and copies of general liability insurance with a minimum coverage of $1,000,000.00. Client & HMS, Inc.

named as additional insured.

K. ________ List of Rental Equipment and acknowledgment from Rental Company

L. ________ Emergency and non-emergency phone list

M. ________ Written Directions/Map to nearest Hospital

N. ________ Written emergency plan

O. ________ Written Work Plan

P. ________ Project Schedules

Q. ________ Contractor Map/Drawings for Containment Setup

Asbestos Gen. Requirements - Page 13 of 54

R. ________ Material Safety Data Sheets

S. ________ Manufacturers’ Equipment Specification Sheets

T. ________ Contractor Laboratory Accreditations

U. ________ Contractor OSHA Air Monitoring Statement

V. ________ Pre-Start Site Condition Statement

W. ________ Contractor Injury and Illness Prevention Program

X. ________ Contractor Written Respiratory Program

2.31b Checklist

________ Name and number of transporters

________ Name and EPA number of Waste Sites

2.31c Checklist

________ Training records - AHERA (Supervisor and worker)*

________ Respiratory fit tests for each employee*

________ Medical records for each employee*

Note *No contractor worker will be allowed inside containment prior to verification of AHERA, respirator and medical documentation. This verification must either be onsite or faxed to

HMS, Inc.'s office prior to entry.

2.32 Prestart Submittals - Owner

Owner shall provide to the Contractor prior to commencement of work:

a. Any available pre-abatement air sampling data to Contractor.

b. List of Owner's employees/agents who will or may require worksite access.

c. Data on equipment access protection and/or shutdown procedures.

2.4 Submittals During the Work Process

The following documentation shall be submitted to the HMS, Inc. Project Manager:

A. The contractor shall submit daily- a copy of the worker roster identifying all employees onsite and the hours worked.

Asbestos Gen.