Duck_Valley_Table.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- TRUST RESOURCE ASSESSMENT & PLANNING Federal contract opportunity
- Solicitation number
- 140A1124Q0070
About this file
This document appears to be a pricing template related to a federal contract opportunity for the Duck Valley Cleanup Project. The template lists various tasks and labor categories with associated costs, including project coordination, data gap analysis, field work planning, groundwater monitoring, and remedial planning. The related federal contract opportunity is for "Trust Resource Assessment & Remedial Planning" and is solicited by the Department of the Interior Bureau of Indian Affairs Western Region. The solicitation number is 140A1124Q0070. The document provides detailed pricing information for the various project elements, as well as optional task items and miscellaneous rates for travel, equipment, and laboratory analysis. However, it does not appear to contain a full Performance Work Statement or Statement of Objectives for the overall contract requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mod_2_-_Questions_and_Answers_Log_-_COR_Answers_08202024_0002.pdf | ||
| Mod_2_-_Questions_and_Answers_Log_-_1_0002.pdf | ||
| Mod_2__-_Questions_and_Answers_Log__-__2_0002.pdf | ||
| Mod_2_-_Questions_and_Answers_Log_-__5_0002.pdf | ||
| Mod_2_-_Questions_and_Answers_Log_-__4_0002.pdf | ||
| Sol_140A1124Q0070_Amd_0002.pdf | ||
| Mod_2_-_Questions_and_Answers_Log_-__3_0002.pdf | ||
| Sol_140A1124Q0070_Amd_0001.pdf | ||
| SCA_Wage_Determination_2015-5601_0001.pdf | ||
| Sol_140A1124Q0070.pdf | ||
| Data_Gap_Assessment_Statement_of_Work_-_finalv2.pdf | ||
| Figure_1_-_Owyhee_Area_Location_Map.pdf | ||
| B09__-_Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| Figure_2_-_Owhee_Community_Layout.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
Task Item Description Cost
| 1 | Project Coordination and Communication |
| Task 1 Subtotal | |
| 2 | Project Scheduling and Organization |
| Task 2 Subtotal | |
| 3 | Records Review |
| Task 3 Subtotal | |
| 4 | Data Gap Analysis |
| 4a | Petroleum Releases from the Heating Oil Line and Storage Tanks |
| 4b | Hydrogeology |
| 4c | Releases from the Use and Storage of Herbicides |
| 4d | Archaeological Monitoring Fieldwork and Reporting (All Tasks) |
| Task 4 Subtotal | |
| 5 | Initial Site Visit and Project Planning |
| Task 5 Subtotal | |
| 6 | Field Work Plan |
| 6a | Field Work Plan |
| 6b | Groundwater Monitoring |
| 6c | Assessment of the School Grounds |
| 6d | Vapor Intrusion |
| 6e | Assessment of Canals, Depositional Areas, and Roadways |
| Task 6 Subtotal | |
| 7 | Project Work Plan |
| Task 7 Subtotal | |
| 8 | Field Work and Data Gap Analysis Report |
| 8 | Data Gap Analysis Report |
| 8a | Soil Sampling - Petroleum Releases |
| 8b | Soil Gas Sampling - Petroleum Releases |
| 8c | Soil Sampling - Herbicide Releases |
| 8d | Surface Water, Soil, and Sediment Sampling - Herbicide Applications |
| 8e | Groundwater Assessment and Monitoring Well Installation |
| Task 8 Subtotal | |
| 9 | Elevation Surveys |
| Task 9 Subtotal | |
| 10 | Groundwater Monitoring and Testing |
| 10a | Groundwater Monitoring |
| 10b | Slug Testing |
| 10c | Aquifer Pump Testing |
| Task 10 Subtotal | |
| 11 | Groundwater Assessment Reporting |
| Task 11 Subtotal | |
| 12 | Remedial Action Plan |
| Task 12 Subtotal | |
| 13 | Remedial Implementation Work Plan |
| Task 13 Subtotal | |
| Bid Total |
Options
Optional Task Item Description Cost Rate Notes
| Duck Valley Cleanup Project Disciplines | ||
| Principal/Program Manager ($/hr) | ||
| Project Manage ($/hr) | ||
| Field Manager ($/hr) | ||
| Chemist ($/hr) | ||
| Reporting Author ($/hr) | ||
| GIS/Graphics ($/hr) | ||
| Geologist ($/hr) | ||
| Geotechnical/Water Resources Engineer ($/hr) | ||
| Design Engineer $/hr) | ||
| CAD Specialist ($/hr) | ||
| Quality Control Manager($/hr) | ||
| Duck Valley Cleanup Project Miscellaneous Rates | ||
| Travel ($/trip) | Airfare or vehicle as applicable | |
| Per Diem ($/day) | Includes all costs | |
| Field Truck per Day ($/day) | ||
| Optional Work | ||
| Analytical/Laboratory | ||
| 8151A/1311 ($/sample) | includes all related costs less labor | |
| 8290A ($/sample) | includes all related costs less labor | |
| 8015D ($/sample) | includes all related costs less labor | |
| 8260D ($/sample) | includes all related costs less labor | |
| 8270E ($/sample) | includes all related costs less labor |
| Drilling | |
| Monitoring Well Installation | per well (includes drilling) |
| Soil borings | daily rate |
| Soil gas | daily rate |
| Escavation and Backfill | |
| Excavation, transportaion and disposal of herbicide contaminated soils (less than industrial concentrations in soils) ($/ton) | includes all costs |
| Backfill of excavations | includes all costs |
File details come from the government source that posted it. Updated .