Duck_Valley_Table.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
TRUST RESOURCE ASSESSMENT & PLANNING Federal contract opportunity
Solicitation number
140A1124Q0070
Issued by
Department of the Interior Bureau of Indian Affairs Western Region

About this file

This document appears to be a pricing template related to a federal contract opportunity for the Duck Valley Cleanup Project. The template lists various tasks and labor categories with associated costs, including project coordination, data gap analysis, field work planning, groundwater monitoring, and remedial planning. The related federal contract opportunity is for "Trust Resource Assessment & Remedial Planning" and is solicited by the Department of the Interior Bureau of Indian Affairs Western Region. The solicitation number is 140A1124Q0070. The document provides detailed pricing information for the various project elements, as well as optional task items and miscellaneous rates for travel, equipment, and laboratory analysis. However, it does not appear to contain a full Performance Work Statement or Statement of Objectives for the overall contract requirements.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

Task Item Description Cost

1Project Coordination and Communication
Task 1 Subtotal
2Project Scheduling and Organization
Task 2 Subtotal
3Records Review
Task 3 Subtotal
4Data Gap Analysis
4aPetroleum Releases from the Heating Oil Line and Storage Tanks
4bHydrogeology
4cReleases from the Use and Storage of Herbicides
4dArchaeological Monitoring Fieldwork and Reporting (All Tasks)
Task 4 Subtotal
5Initial Site Visit and Project Planning
Task 5 Subtotal
6Field Work Plan
6aField Work Plan
6bGroundwater Monitoring
6cAssessment of the School Grounds
6dVapor Intrusion
6eAssessment of Canals, Depositional Areas, and Roadways
Task 6 Subtotal
7Project Work Plan
Task 7 Subtotal
8Field Work and Data Gap Analysis Report
8Data Gap Analysis Report
8aSoil Sampling - Petroleum Releases
8bSoil Gas Sampling - Petroleum Releases
8cSoil Sampling - Herbicide Releases
8dSurface Water, Soil, and Sediment Sampling - Herbicide Applications
8eGroundwater Assessment and Monitoring Well Installation
Task 8 Subtotal
9Elevation Surveys
Task 9 Subtotal
10Groundwater Monitoring and Testing
10aGroundwater Monitoring
10bSlug Testing
10cAquifer Pump Testing
Task 10 Subtotal
11Groundwater Assessment Reporting
Task 11 Subtotal
12Remedial Action Plan
Task 12 Subtotal
13Remedial Implementation Work Plan
Task 13 Subtotal
Bid Total

Options

Optional Task Item Description Cost Rate Notes

Duck Valley Cleanup Project Disciplines
Principal/Program Manager ($/hr)
Project Manage ($/hr)
Field Manager ($/hr)
Chemist ($/hr)
Reporting Author ($/hr)
GIS/Graphics ($/hr)
Geologist ($/hr)
Geotechnical/Water Resources Engineer ($/hr)
Design Engineer $/hr)
CAD Specialist ($/hr)
Quality Control Manager($/hr)
Duck Valley Cleanup Project Miscellaneous Rates
Travel ($/trip)Airfare or vehicle as applicable
Per Diem ($/day)Includes all costs
Field Truck per Day ($/day)
Optional Work
Analytical/Laboratory
8151A/1311 ($/sample)includes all related costs less labor
8290A ($/sample)includes all related costs less labor
8015D ($/sample)includes all related costs less labor
8260D ($/sample)includes all related costs less labor
8270E ($/sample)includes all related costs less labor
Drilling
Monitoring Well Installationper well (includes drilling)
Soil boringsdaily rate
Soil gasdaily rate
Escavation and Backfill
Excavation, transportaion and disposal of herbicide contaminated soils (less than industrial concentrations in soils) ($/ton)includes all costs
Backfill of excavationsincludes all costs

File details come from the government source that posted it. Updated .