FSM_Section_J-Attachment_5.pdf

PDF 52 KB Posted

Attached to
Field Service Management (FSM) 3. 6 - HUD Management and Marketing Services
Solicitation number
DU-204-SB-12-R-0001
Issued by

About this file

Attachment 5

View the file

Other files

File Type Posted
Attachment 10 Revised MM_3_6_FSM_Price_Proposal.xlsm XLSM spreadsheet
Amendment 0003 to DU204SB-12-R-0001.pdf PDF
Attachment 11.xlsx XLSX spreadsheet
FSM Section J-Attachment 3 Revised.pdf PDF
Attachment 12 MM_3_6_QA_Final.pdf PDF
Amendment 0002 to DU204SB-12-R-0001.PDF PDF
Amendment 0001 to DU204SB-12-R-0001.pdf PDF
DU204SB-12-R-0001-000001.pdf PDF
MM_3_6_FSM_Price_Proposal.xlsm XLSM spreadsheet
FSM_Section_J-Attachment_7.pdf PDF
FSM_Section_J-Attachment_6.pdf PDF
FSM_Section_J-_Attachment_4.pdf PDF
M M 3.6 FSM Price Proposal.xlsm XLSM spreadsheet
FSM_Section_J_Attachment_1B.pdf PDF
Cover Page Standard Form 33.PDF PDF
FSM_Section_J-Attachment_9.pdf PDF
FSM_Section_J-Attachment_8.pdf PDF
FSM_Section_J-Attachment_2.pdf PDF
DU204SB-12-R-0001.pdf PDF
FSM_Section_J-Attachment_3.pdf PDF
FSM_3_6_Area_Map_Attachment_1A.PNG PNG image
FSM_3_6_pws_REV_3-8-2012.pdf PDF
Attachment 1 FSM Area Map.PNG PNG image
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Allowable Pass Through Expenses

All costs of performance under this contract are to be at the expense of the Contractor unless otherwise specifically identified as a pass-through expense in the contract and listed below. The Contracting

Officer or GTR must approve any additional pass-through expenses prior to incurring the expense. The

Contracting Officer shall determine the allowability and reasonableness of all costs in accordance with

FAR Part 31.

Payment for pass-through expenses may not be requested until the Contractor has paid for the service or item. The Contractor shall be reimbursed for the actual cost of the service or item. Actual cost is defined as the amount paid by the Contractor to the billing parties; no administrative costs of the Contractor are to be added. Payments made by the Contractor for penalties, fees or interest incurred by the Contractor due to late payment to other parties are not allowable pass-through expenses.

The Contractor shall receive payment for the actual cost of the following items:

ALLOWABLE PASS-THROUGH EXPENSES

PWS Reference Expense Type

5.2.6.1.1 Lead Based Paint Inspection and Clearance– lead based paint inspection and clearance cost for properties built prior to 1978 and being sold with FHA insurance and for which a work order was issued in P260 by the AM.

5.2.6.1.4 Lead Based Paint Stabilization or Abatement – lead paint stabilization or abatement costs that does not exceed $4,000 for properties built prior to 1978 being sold with FHA insurance. Cost that exceeds $4,000 for properties being sold with FHA insurance must be approved in advance by the GTR.

5.2.6.1.6 Philadelphia, PA Abatement of lead-based Paint Hazards

5.2.6.2 Mold or Other Environmental Hazards - testing and abatement of environmental hazards when approved in advance by the GTR

5.2.7 Termite and Wood Destroying Organisms (WDO) Inspections – inspections for properties mandated by state or local jurisdiction;

inspections for properties that can be sold FHA insured and the appraisal report indicates the presence of pest/organism, and for which a work order was issued in P260 by the AM

5.2.7.2 Termite and WDO Active Infestations – Cost for treatment and, or any necessary repairs that do not exceed $1,000 for properties that can be sold FHA insured and for which a work order was issued by the AM.

Treatment cost that exceeds $1,000 for properties that can be sold FHA insured must be approved in advance by the GTR.

ALLOWABLE PASS-THROUGH EXPENSES

PWS Reference Expense Type

5.2.8.1 Other Vandalism Repairs – Repair of vandalism damage when approved in advance by the GTR.

5.2.8.2 Missing Appliances – the actual cost of repair or replacement of appliances damaged or stolen after contract acceptance will be reimbursed in accordance with the schedule in the contract without prior

GTR approval.

5.2.13

5.2.14

Eviction, Demolition and Repairs – Actual costs of eviction, demolition or repairs performed at the direction of the GTR and with prior approval of the cost.

5.2.5.1 Homeowners association fees, condominium dues, ground rents and non-tax assessments.

5.1.1.6

5.1.1.7

Record Retention, Exit File Delivery – the actual cost of shipping files for record retention or at the termination of the contract, when incurred in accordance with contract requirements will be reimbursed without prior

GTR approval. This includes the cost for the white boxes purchased from HUD.

5.2.4.1 Utility Liens – payments to satisfy utility liens incurred prior to acquisition and incurred in accordance with contract requirements will be reimbursed without prior GTR approval.

5.2.4.4 Utility Charges for Occupied Properties – charges for heating, cooling, water or other essential utilities provide to occupied properties when provision of utilities is approved in advance by the GTR.

5.2.4.4 Utility Charges for Occupied Properties – charges for heating, cooling, water or other essential utilities provide to occupied properties when provision of utilities is approved in advance by the

GTR.

File details come from the government source that posted it. Updated .