DTMB0414 Construction Addendum #1.pdf

PDF 73 KB Posted

Attached to
472/24263. SAA; WHVCF - Roof Replacement Phase 2
Solicitation number
RFQ 171 260000000336 2
Issued by
Washtenaw County, Michigan

About this file

This is a Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration, Design & Construction Division for the Women's Huron Valley Correctional Facility (WHVCF) Roof Replacements Phase 2 project located at 3201 Bemis Road, Ypsilanti, Michigan. The addendum was issued on June 15, 2026, with a bid opening date of July 8, 2026. The addendum incorporates 13 items including clarifications, revisions, and supporting documentation. Key revisions include increased standing seam metal siding mansard panel square footage (3,400 SF for PSB Building and 2,700 SF for Fieldhouse Building), incorporation of a new exterior roof access ladder at the Fieldhouse Building into the base bid, increased walkpad quantities and revised locations on Roof Plans RP1 and RP2, an increase in bid quantity for a specific item to 50 units, addition of masonry control joint sealant replacement at thru-wall flashing repair locations, and clarification that the sallyport gate opening measures approximately 14 feet 5 inches in width by 15 feet in height. Supporting materials including a pre-bid meeting attendance record, agenda, and site photos are attached.

The addendum requires that all bidders acknowledge receipt of the addendum in the bid summary and bid form, with failure to acknowledge potentially resulting in bid rejection. The professional firm overseeing the project is Intertek-ATI, with Sheryl Ananich serving as the Project Director. The addendum was approved by John J. Sheehan on June 15, 2026. All revisions and clarifications become part of the contract documents upon acceptance of the bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

6/15/2026

PROJECT NAME

Women’s Huron Valley Correctional Facility Roof Replacements - Phase 2 - 3201 Bemis Road, Ypsilanti, MI 48197

FILE NUMBER

472/24263.SAA

PROFESSIONAL

Intertek-ATI

PROJECT DIRECTOR

Sheryl Ananich

BID OPENING DATE:

7/8/2026

ADDENDUM ITEMS: (Reference attached sheets and drawings)

1. Pre-Bid Meeting Attendance Record

2. Pre-Bid Meeting Agenda

3. Pre-Bid Meeting Site Photos

4. CLARIFICATION: Sallyport gate opening measures approximately 14’-5” in width by 15’-0” in height.

5. REVISION: Specification Section 01010_1.01_C standing seam metal siding mansard panel square footages have been increased to 3,400 SF for the PSB Building, and 2,700 SF for the Fieldhouse Building.

6. REVISION: Specification Section 01010_1.01_C added verbiage to incorporate new exterior roof access ladder at the Fieldhouse Building into Base Bid.

7. REVISION: Detail 5/D2 standing seam metal siding mansard height dimension has been increased to approximately 72-inches.

8. REVISION: Specification Section 00300, Article 7, Item No. 5.5 Bid Quantity has increased to (50) each.

9. REVISION: Roof Plans RP1 & RP2 walkpad quantities have increased and locations have been revised.

10. REVISION: Specification Section 01010_3.09_D added to incorporate installation of new exterior roof access ladder at Fieldhouse Building to Base Bid.

11. REVISION: Roof Plan RP2 exterior roof access ladder has been added to Base Bid.

12. REVISION: Details 8/D2 & 9/D2 note added to include masonry control joint sealant replacement at thru-wall flashing repair locations.

13. REVISION: LARA Record Number added to Cover Sheet of Drawings.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: John J. Sheehan DATE: 6/15/2026

APPROVED BY:

PROJECT DIRECTOR: Sheryl Ananich DATE: 6/15/2026