DTMB-0427 Project Statement 26396.pdf
PDF 164 KB Posted
- Attached to
- 472/26396. SAA; WHVCF - HVAC Repairs
- Solicitation number
- RFP 171 260000002683 3
- Issued by
- Washtenaw County, Michigan
About this file
This Project Statement is issued by the Michigan Department of Technology, Management and Budget (DTMB) on behalf of the Michigan Department of Corrections (MDOC) for professional engineering services related to HVAC repairs at the Women's Huron Valley Correctional Facility located at 3201 Bemis Road, Ypsilanti, Michigan. The project encompasses mechanical and electrical repair work at the Calhoun and Dickinson buildings, with the existing HVAC systems having exceeded their anticipated service life and experiencing operational issues. The scope of work includes Phase 100 Study Phase for comprehensive evaluation of existing mechanical and electrical systems, followed by Phase 300-700 services for design, bidding, and construction oversight. A mandatory pre-proposal meeting and walk-through inspection is scheduled for Monday, October 5, 2026, at 10:30 a.m. at the West Administration Lobby. Proposals must be submitted by Thursday, October 22, 2026, at 2:00 p.m. Eastern through the SIGMA VSS platform. The desired project schedule includes contract award in November 2026, completion of the Phase 100 Report and Phase 300-500 design by February 2027, construction contract award in March 2027, and construction commencement in April 2027.
The proposal should include total project costs for all phases as the bid amount, with firms encouraged to combine technical and cost proposals into a single attachment not exceeding 25 megabytes. Professional services must include design submittals at 50% and 90% milestones with cost estimates, bi-weekly construction progress meetings consisting of one virtual Teams meeting and one on-site meeting per month during Phase 600 and 700, all testing throughout construction, and a proposed design schedule. Reimbursable expenses include sub-consultant fees, printing and reproduction, postage, and project travel exceeding 100 miles. Firms must submit Vendor/Contractor LEIN requests five business days prior to the mandatory walk-through meeting. Questions regarding the solicitation must be emailed to the DTMB Project Director, Sheryl Ananich, no later than 2:00 p.m. Eastern on Wednesday, October 14, 2026. The project will comply with all applicable federal, state, and local codes, standards, and regulations administered by agencies including EPA, OSHA, DOT, DCH, EGLE, DNR, and MIOSHA.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 04/26)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
472/26396.SAA
PROPOSAL DUE DATE
Thursday, October 22, 2026, at 2:00 pm EASTERN
CLIENT AGENCY
MDOC
PROJECT NAME AND LOCATION
Women’s Huron Valley Correctional Facility – Calhoun & Dickinson HVAC Repairs
PROJECT ADDRESS (if applicable) 3201 Bemis Rd, Ypsilanti, MI 48197
CLIENT AGENCY CONTACT
Chris Severson
TELEPHONE NUMBER
517-230-9335
DTMB - DCD PROJECT DIRECTOR
Sheryl Ananich
TELEPHONE NUMBER
517-243-7605
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
A MANDATORY PRE-PROPOSAL MEETING will take place on Monday, October 5, 2026, at 10:30 a.m.
We will meet in the West Administration Lobby, have a 30 minute meeting in the Warden’s Conference Room, then go inside the secure perimeter and look at Calhoun and Dickinson.
MANDATORY (Check box if Mandatory)
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
PROJECT DESCRIPTION/SERVICES REQUESTED:
The Department of Technology, Management and Budget (DTMB), on behalf of the Michigan Department of Corrections (MDOC), is requesting professional engineering services for mechanical and electrical repair work at Calhoun and Dickinson. Phase 100 Study Phase is required for undertaking a comprehensive evaluation of the existing mechanical and electrical systems serving each building. The existing HVAC systems have exceeded their anticipated service life and are experiencing numerous operational issues.
The Study Phase will document findings in a Study Report that will include recommendation options with estimates of probable cost. Once the scope of work is determined, Phase 300-700 services are desired to design, bid and oversee construction of the HVAC repairs per the DTMB Sample Billable Rate Contract.
Professional services shall also include, but are not limited to the following:
• Gathering and verifying all base information required for the proper design of the project in Phase 100 Study. All available documents including limited CAD files will be supplied to the successful firm.
• Design submittals for Phases 100, 300, 400, 500 for review at 50% and 90% milestones. Cost estimates are required with each submittal.
mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov
• Phase 600 and 700 construction administration services to include running all construction progress meetings on a bi-weekly basis – one virtual Teams meeting per month and one on-site meeting per month.
• Gathering or preparing all data and design development information that shall ultimately be necessary for plans, submittals, and permit application considerations where required. Include as reimbursable expenses.
• Provide a proposed design schedule. Schedule shall be kept up to date through the project design.
• All testing throughout construction.
• Sub-consultants, printing/reproduction, postage, and project travel (over 100 miles) are to be included as a reimbursable expense.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS.
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
• Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 25mb.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
92531, 92533, 92567, 92595
DESIRED SCHEDULE OF WORK
Award of Design Contract in November 2026. Complete Phase 100 Report and Phase 300-500 design ready to bid in February 2027. Award construction contract March 2027. Construction to begin in April 2027.
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Sheryl Ananich at ananichs@michigan.gov address no later than 2:00 p.m., Eastern on Wednesday, October 14, 2026.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4 mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:ananichs@michigan.gov
File details come from the government source that posted it. Updated .