This is Construction Addendum No. 01 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design & Construction Division, for the Allegan State Game Area (SGA) Pole Barn Improvements project (File Number 751/24215.JLM). The addendum, issued on May 13, 2026, incorporates clarifications and federal provisions into the bidding documents for this construction project. The bid opening date is scheduled for June 17, 2026. The addendum includes two primary additions: Appendix IV addressing project signs (noted as not applicable for projects under $50,000) and Appendix V containing prevailing wage schedules and federal provisions. The professional responsible for the project is Schley Nelson Architects, with Project Director Josiah L. Meyers overseeing the work. Bidders are required to acknowledge receipt of this addendum in their bid submissions, as failure to do so may result in bid rejection. No specification sections were replaced, and no bid dates were modified by this addendum.

This addendum incorporates extensive federal compliance requirements applicable to federally-funded construction contracts, including provisions for Equal Employment Opportunity, Davis-Bacon Act prevailing wage compliance (applicable to prime construction contracts exceeding $2,000), Copeland Anti-Kickback Act requirements, Contract Work Hours and Safety Standards Act regulations, Clean Air Act and Federal Water Pollution Control Act compliance (for contracts exceeding $150,000), debarment and suspension verification through the System for Award Management (SAM), and Byrd Anti-Lobbying Amendment certifications (required for awards of $100,000 or more). Contractors must also comply with domestic preference requirements for materials produced in the United States and register with SAM prior to contract execution, obtaining a Unique Entity Identifier (UEI) for payment and federal reporting purposes. These federal provisions take precedence over state contract terms in cases of conflict with federal law requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 01

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

5/13/2026

PROJECT NAME

Allegan State Game Area (SGA) Pole Barn Improvements

FILE NUMBER

751/24215.JLM

PROFESSIONAL

Schley Nelson Architects

PROJECT DIRECTOR

Josiah L. Meyers

BID OPENING DATE:

6/17/2026

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1) The following additions to the specifications are attached:

a. APPENDIX IV PROJECT SIGNS – Not Applicable for 50K

b. APPENDIX V PREVAILING WAGE SCHEDULES AND FEDERAL PROVISIONS

ADDENDUM

2) Included in Appendix V are Davis-Bacon Prevailing Wage Rates

3) No specification sections are replaced

4) No dates have changed

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Frank Pettinati, Schley-Nelson Architects DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: Josiah L. Meyers DATE: 5/13/2026 http://www.michigan.gov/SIGMAVSS

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

Design & Construction Division

APPENDIX IV

PROJECT SIGNS – Not Applicable for 50K

Design & Construction Division

APPENDIX V

PREVAILING WAGE SCHEDULES

AND FEDERAL PROVISIONS ADDENDUM

Federal Provisions Addendum

Design & Construction Division

This addendum applies to purchases that will be paid for in whole or in part with funds obtained from the federal government. The provisions below are required and the language is not negotiable. If any provision below conflicts with the State’s terms and conditions, including any attachments, schedules, or exhibits to the State’s Contract, the provisions below take priority to the extent a provision is required by federal law; otherwise, the order of precedence set forth in the Contract applies. Hyperlinks are provided for convenience only; broken hyperlinks will not relieve Contractor from compliance with the law.

1. Equal Employment Opportunity

If this Contract is a “federally assisted construction contract” as defined in 41 CFR Part 60-1.3, and except as otherwise may be provided under 41 CFR Part 60, then during performance of this Contract, the Contractor agrees as follows:

(1) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:

Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

(2) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.

(3) The Contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Contractor's legal duty to furnish information.

(4) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

(5) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

(6) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

https://www.govinfo.gov/content/pkg/CFR-2019-title41-vol1/pdf/CFR-2019-title41-vol1-part60.pdf https://www.govinfo.gov/app/details/CFR-2019-title41-vol1/CFR-2019-title41-vol1-subtitleB-chap60/summary https://www.dol.gov/ofccp/regs/statutes/eo11246.htm https://www.dol.gov/ofccp/regs/statutes/eo11246.htm

Design & Construction Division

(7) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this Contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

(8) The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance:

Provided, however, that in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.

The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, That if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract.

The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.

The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings.

2. Davis-Bacon Act (Prevailing Wage)

If this Contract is a prime construction contracts in excess of $2,000, the Contractor (and its Subcontractors) must comply with the Davis-Bacon Act (40 USC 3141-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”), and during performance of this Contract the Contractor agrees as follows:

(1) All transactions regarding this contract shall be done in compliance with the Davis-Bacon Act (40 U.S.C. 3141- 3144, and 3146-3148) and the requirements of 29 C.F.R. pt. 5 as may be applicable. The contractor shall comply with 40 U.S.C. 3141-3144, and 3146-3148 and the requirements of 29 C.F.R. pt. 5 as applicable.

(2) Contractors are required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor.

(3) Additionally, contractors are required to pay wages not less than once a week.

https://www.dol.gov/ofccp/regs/statutes/eo11246.htm https://www.dol.gov/ofccp/regs/statutes/eo11246.htm https://www.dol.gov/ofccp/regs/statutes/eo11246.htm https://www.law.cornell.edu/definitions/index.php?width=840&amp%3Bheight=800&amp%3Biframe=true&amp%3Bdef_id=22edf9acbb0b836eba994727b86adedf&amp%3Bterm_occur=16&amp%3Bterm_src=Title%3A41%3ASubtitle%3AB%3AChapter%3A60%3APart%3A60-1%3ASubpart%3AA%3A60-1.4 https://www.law.cornell.edu/definitions/index.php?width=840&amp%3Bheight=800&amp%3Biframe=true&amp%3Bdef_id=22edf9acbb0b836eba994727b86adedf&amp%3Bterm_occur=16&amp%3Bterm_src=Title%3A41%3ASubtitle%3AB%3AChapter%3A60%3APart%3A60-1%3ASubpart%3AA%3A60-1.4 https://www.govinfo.gov/app/details/USCODE-2018-title40/USCODE-2018-title40-subtitleII-partA-chap31-subchapIV https://www.govinfo.gov/app/details/CFR-2019-title29-vol1/CFR-2019-title29-vol1-part5

Design & Construction Division

3. Copeland “Anti-Kickback” Act

If this Contract is a contract for construction or repair work in excess of $2,000 where the Davis-Bacon Act applies, the Contractor must comply with the Copeland “Anti-Kickback” Act (40 USC 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”), which prohibits the Contractor and subrecipients from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled, and during performance of this Contract the Contractor agrees as follows:

(1) Contractor. The Contractor shall comply with 18 U.S.C. § 874, 40 U.S.C. § 3145, and the requirements of 29 C.F.R. pt. 3 as may be applicable, which are incorporated by reference into this contract.

(2) Subcontracts. The Contractor or Subcontractor shall insert in any subcontracts the clause above and such other clauses as FEMA or the applicable federal awarding agency may by appropriate instructions require, and also a clause requiring the Subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all of these contract clauses.

(3) Breach. A breach of the contract clauses above may be grounds for termination of the contract, and for debarment as a Contractor and Subcontractor as provided in 29 C.F.R. § 5.12.

4. Contract Work Hours and Safety Standards Act

If the Contract is in excess of $100,000 and involves the employment of mechanics or laborers, the Contractor must comply with 40 USC 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable, and during performance of this Contract the Contractor agrees as follows:

(1) Overtime requirements. No Contractor or Subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.

(2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1) of this section the Contractor and any Subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such Contractor and Subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this section, in the sum of $27 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section.

https://www.govinfo.gov/app/details/USCODE-2018-title40/USCODE-2018-title40-subtitleII-partA-chap31-subchapIV-sec3145 https://www.govinfo.gov/app/details/CFR-2019-title29-vol1/CFR-2019-title29-vol1-part3 https://www.govinfo.gov/app/details/USCODE-2018-title40/USCODE-2018-title40-subtitleII-partA-chap37-sec3702 https://www.govinfo.gov/app/details/USCODE-2018-title40/USCODE-2018-title40-subtitleII-partA-chap37-sec3704

(3) Withholding for unpaid wages and liquidated damages. The State shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or Subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2) of this section.

(4) Subcontracts. The Contractor or Subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1) through (4) of this section and also a clause requiring the Subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1) through (4) of this section.

5. Rights to Inventions Made Under a Contract or Agreement

If the Contract is funded by a federal “funding agreement” as defined under 37 CFR §401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

6. Clean Air Act and the Federal Water Pollution Control Act

If this Contract is in excess of $150,000, the Contractor must comply with all applicable standards, orders, and regulations issued under the Clean Air Act (42 USC 7401-7671q) and the Federal Water Pollution Control Act (33 USC 1251-1387), and during performance of this Contract the Contractor agrees as follows:

Clean Air Act

1. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq.

2. The Contractor agrees to report each violation to the State and understands and agrees that the State will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency or the applicable federal awarding agency, and the appropriate Environmental Protection Agency Regional Office.

3. The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA or the applicable federal awarding agency.

Federal Water Pollution Control Act

1. The Contractor agrees to comply with all applicable standards, orders, or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq.

https://www.govinfo.gov/content/pkg/CFR-2019-title37-vol1/pdf/CFR-2019-title37-vol1-sec401-2.pdf https://www.govinfo.gov/app/details/CFR-2019-title37-vol1/CFR-2019-title37-vol1-part401 https://www.govinfo.gov/app/details/USCODE-2018-title42/USCODE-2018-title42-chap85 https://www.govinfo.gov/app/details/USCODE-2018-title33/USCODE-2018-title33-chap26 https://www.govinfo.gov/app/details/USCODE-2018-title33/USCODE-2018-title33-chap26

Design & Construction Division

2. The Contractor agrees to report each violation to the State and understands and agrees that the State will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency or the applicable federal awarding agency, and the appropriate Environmental Protection Agency Regional Office.

3. The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA or the applicable federal awarding agency.

7. Debarment and Suspension

A “contract award” (see 2 CFR 180.220) must not be made to parties listed on the government-wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (51 FR 6370; February 21, 1986) and 12689 (54 FR 34131; August 18, 1989), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549.

(1) This Contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R. pt. 3000.

As such, the Contractor is required to verify that none of the Contractor’s principals (defined at 2 C.F.R. § 180.995) or its affiliates (defined at 2 C.F.R. § 180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at 2 C.F.R. § 180.935).

(2) The Contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C, and must include a requirement to comply with these regulations in any lower tier covered transaction it enters into.

(3) This certification is a material representation of fact relied upon by the State. If it is later determined that the contractor did not comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R.

pt. 3000, subpart C, in addition to remedies available to the State, the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment.

(4) The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The bidder or proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions.

8. Byrd Anti-Lobbying Amendment

Contractors who apply or bid for an award of $100,000 or more shall file the required certification in Exhibit 1 – Byrd Anti- Lobbying Certification below. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the recipient who in turn will forward the certification(s) to the awarding agency.

9. Procurement of Recovered Materials

Under 2 CFR 200.322, Contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act.

(1) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired— https://www.govinfo.gov/app/details/CFR-2019-title2-vol1/CFR-2019-title2-vol1-sec180-220 https://sam.gov/SAM/pages/public/index.jsf https://www.govinfo.gov/app/details/CFR-2019-title2-vol1/CFR-2019-title2-vol1-part180 https://www.archives.gov/federal-register/codification/executive-order/12549.html https://www.archives.gov/federal-register/codification/executive-order/12549.html https://www.govinfo.gov/content/pkg/FR-1986-02-21/pdf/FR-1986-02-21.pdf https://www.govinfo.gov/content/pkg/FR-1989-08-18/pdf/FR-1989-08-18.pdf https://www.archives.gov/federal-register/codification/executive-order/12549.html https://www.govinfo.gov/app/details/CFR-2014-title2-vol1/CFR-2014-title2-vol1-sec200-322/context

1. Competitively within a timeframe providing for compliance with the contract performance schedule;

2. Meeting contract performance requirements; or

3. At a reasonable price.

(2) Information about this requirement, along with the list of EPA- designated items, is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive- procurement-guideline-cpg-program.

(3) The Contractor also agrees to comply with all other applicable requirements of Section

6002 of the Solid Waste Disposal Act.

10. Additional FEMA Contract Provisions.

The following provisions apply to purchases that will be paid for in whole or in part with funds obtained from the Federal Emergency Management Agency (FEMA):

(1) Access to Records. The following access to records requirements apply to this contract:

a. The Contractor agrees to provide the State, the FEMA Administrator, the Comptroller General of the United States, or any of their authorized representatives access to any books, documents, papers, and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts, and transcriptions.

b. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.

c. The Contractor agrees to provide the FEMA Administrator or his authorized representatives access to construction or other work sites pertaining to the work being completed under the contract.

d. In compliance with the Disaster Recovery Act of 2018, the State and the Contractor acknowledge and agree that no language in this contract is intended to prohibit audits or internal reviews by the FEMA Administrator or the Comptroller General of the United States.

(2) Changes.

See the provisions regarding modifications or change notice in the Contract Terms.

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

(3) DHS Seal, Logo, And Flags

The Contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or likenesses of DHS agency officials without specific FEMA pre-approval.

(4) Compliance with Federal Law, Regulations, and Executive Orders

This is an acknowledgement that FEMA financial assistance will be used to fund all or a portion of the contract. The Contractor will comply with all applicable Federal law, regulations, executive orders, FEMA policies, procedures, and directives.

(5) No Obligation by Federal Government

The Federal Government is not a party to this contract and is not subject to any obligations or liabilities to the State, Contractor, or any other party pertaining to any matter resulting from the Contract.”

(6) Program Fraud and False or Fraudulent Statements or Related Acts

The Contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for False Claims and Statements) applies to the Contractor’s actions pertaining to this contract.

Exhibit 1 - Byrd Anti-Lobbying Certification

Contractor must complete this certification if the purchase will be paid for in whole or in part with funds obtained from the federal government and the purchase is greater than $100,000.

APPENDIX A, 44 C.F.R. PART 18 – CERTIFICATION REGARDING LOBBYING

Certification for Contracts, Grants, Loans, and Cooperative Agreements

The undersigned certifies, to the best of his or her knowledge and belief, that:

1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

3. The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The Contractor, , certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.

Signature of Contractor’s Authorized Official

Name and Title of Contractor’s Authorized Official

Date

Design & Construction Division

§ 200.322 Domestic Preferences for Procurements

(a) As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award.

(b) For purposes of this section:

(1) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

(2) “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe;

aggregates such as concrete; glass, including optical fiber; and lumber.

Design & Construction Division

FEDERAL FUNDED CONTRACT REGISTRATION REQUIREMENTS

Each primary contracted contractor with the DTMB must register with the Federal System for Award Management (SAM) must register prior to contract execution. The SAM website is https://sam.gov/content/home. The direct hyperlink for SAM.gov registration is https://sam.gov/content/entity-registration

The Federal government will use a Unique Entity Identifier (UEI) created in SAM.gov as the official subrecipient identifier.

All primary contracted contractors with the DTMB will be required to maintain an active registration on SAM.gov. To receive payment, all primary contracted vendors need to have a Unique Entity Identifier (UEI) number and have the UEI entered in their SIGMA account. Information on the UEI and sign up can be obtained at: https://www.gsa.gov/about-us/organization/federal-acquisition-service/fas-initiatives/integrated-award-environment/iae-systems-information-kit/unique-entity-id-is-here

Contractor is to fill in and provide the following documentation for use in SLFRF reporting prior to Contract Execution for use in the reporting requirements:

Contractor’s UEI _______________________________________________________________________________

Contractor’s Full Legal Name ________________________________________________________________

Primary Point-of-Contact Email Address _________________________________________________________

Business Address _______________________________________________________________________

City Business is located _______________________________________________________________________

State Business is located _______________________________________________________________________

US Zip Code + 4 digits _______________________________________________________________________ https://sam.gov/content/home https://sam.gov/content/entity-registration https://www.gsa.gov/about-us/organization/federal-acquisition-service/fas-initiatives/integrated-award-environment/iae-systems-information-kit/unique-entity-id-is-here https://www.gsa.gov/about-us/organization/federal-acquisition-service/fas-initiatives/integrated-award-environment/iae-systems-information-kit/unique-entity-id-is-here https://www.gsa.gov/about-us/organization/federal-acquisition-service/fas-initiatives/integrated-award-environment/iae-systems-information-kit/unique-entity-id-is-here

��������!���0����$ ����1'� ��0� �� ��������������������������������������%*�)���23�����4������������������������������������������+��������������5���!��%*�).+�&6.+''''''''''''''''''''''7��8'��������������84'��3333333333333333333333333333333333333333333333333333333333333333�%+�����23��8��9��������&)).�&��"*(�#:�/# 0�%�����$<� �=���1����������������������������������+��������������5���!��%+�"6)&:.+'''''''''''''''''''''''7�8�'����������������'8�#�).��.##.+''''''''''''''''''''''7�8�'���������������8'��5**#�*#.������,����?

����$��5 0�-��$<��0�� ��;

0���@���;

�=��!���$�����0 ��������$���'3333333333333333333333333333333333333333333333333333333333333333�%+�����23��9��9��������# 0�&���!��<�"��

;����!�<�A����$�>�B��� �����������������������������������+��������������5���!��%+�"6)&:.+'''''''''''''''''''''''7�8�'����������������'8�#�).��.##.+''''''''''''''''''''''7�8�'���������������8'��3333333333333333333333333333333333333333333333333333333333333333�"&+,����3������������������������������������������������+��������������5���!��"&+,.�#.+�/.C

�<� �$;������?��!��!<�5 ���B 0����5�

��)�$��3"�����1''''''''''''''7�8�'����������������'��3333333333333333333333333333333333333333333333333333333333333333�"&+,����3��4�����������

��� �..���/��$$$$$$$$$$$$$$$$$$$$$$$%�0)$)0������������*,$01++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++��.��)'&'+))*�),-)'-*)*(��� �2 3���4� ����������2��2 �������"���/� ������2����3� �������5������!��������������6� "����7������������ �8������ ����9���"���.�����7�������� � �#$$$$$$$$$$$$$$$$$$%�0*$1:������������*'$:0++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++��.��)*1(+))(�),-)'-*)*&���

�23���4����������������.�����
��.��2��
���5;�������8!�������������������������������������������������������

����9���"���.�����7�������� � �#$$$$$$$$$$$$$$$$$$%�&($,:���������&:<=>$:)++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++���/�)&*0+)*1�),-)'-*)*0��������������������������������������������������� ����5�����?@�� ����5��� �5�A�������/�5@��'$$$$$$$$$$$$$$$$$$$$$%�01$*:������������*($*(�����/�5@��*$$$$$$$$$$$$$$$$$$$$$%�0&$>&������������*($*(�����/�5@��&$$$$$$$$$$$$$$$$$$$$$%�0'$*:������������*($*(�����/�5@��0$$$$$$$$$$$$$$$$$$$$$%�&>$(1������������*($*(�����/�5@��($$$$$$$$$$$$$$$$$$$$$%�&'$*&������������*($*(����� ���3�������� �2��� �6����� "�B 6�&))C������ ���A�%'$()��3���2�����6�;���2������3�'�����$����� ���3�������� �2��� �6����� "�B 6�0))C������ ���A�%&$))��3���2�����6�;���2������3�'�����$��� ����5.��

D!A�����D���C������� �����������������2��4�E������.�6���������2�
���;

"��2� ���������$���5�����?@�� ����5��� �5���.

��5�!������/�5@��'A���� ���3�������� �2��� �6����� "�B 6�0))C��&))C������**)C������ ���$��/�5@��*A���� ���3�������� �2��� �6����� "�B 6�'0)C������� ���F���������� �F���

"��2�����"�������/�5@��&A�G���2��-�9��;����F����
�F�.��"��F���;��F�!���3��F��!�44�.���������/�5@��0A�G�6���-!�"�.��"��/�5@��(A�5���
�����������������������������������������������������������������������������
������������������������������������������
�������������� ��������������!"�#�"#�$%��������������
�������������� ����������������������������������������������������������������������������� ��&������������������������������������������

)���*+�),�������-��.����)/�������������������������������0�&������������������������������������������������������������������%$*��� ��� ��������������������%$*������������.11.��.������� )2������!

�,3) ������������������������0������������������& �����( �.��"��,�����*��-42������(

�.��"��,������������1�����.�-����������������������0���������������������5�6�)
/���������������������������&���������������7�����������������������������������������������������������������5%$!���

��������������������5%$!"����������������������������������7���������������&������������������������������������������������������������������5%#(��0&������0������� ".8��9�6��.:�;.��'���))1.��'�% 4��.8�'�%���9�.�'��<�����)�=!

)�1����������������������������������� ��������������������5�5���""�����>-)+,����?@$����5�6��=�!/���1����� ��.����������&0�&����������������� 5�5���""����?@$��5�6�������� ��.����)/������������������&0�&����������������� 5%#(*�����>-)+,����?@$��5�6����=�!/���1����� ��.���������������&0�&����������������� �����������������������������������������������������������������5%#(�� 0������0������� �>-)+,���".8��9�6��.:�;.��'���))1.��'�% 4��.8�'�%���9�.�'�<�����)�=�!

)�1����������������������������������� ��������������������5�5���""�����>-)+,���?@$����5�6��=�!/���1����� ��.������������� ��������������&� 05�5���""����?@$��5�6�������� ��.����)/��������������������� ��������������&� 05%#(*�����>-)+,����?@$��5�6����=�!/���1����� ��.������������������ ��������������&� 0�����������������������������������������������������������������!�(��

����".'/�0,+��1��2���3���� ������� 4 �������������������������������������������$��"����&��'��()������".'/�0,+����1��2���3�� ������� 4 ����������������������������������$�!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!���5&��#��!#� �#�%��%�#����������������������������������������������������� ���'�6���)��()����%"�'��1���)��������5�'�)���������������������������� �7��������������������/'� ���������44������2 �2������������������ �$ ���������������$���/�&����&'�)�%/)�/����������"��������$����������������������8�'9��������������������������������:� $��������������������'6)���;���� -�+����1������ ��� 4 ����������������������������7��������������#�##��) ��'�)�;��6,��-4<�����������������������������������������) ��'�)�;���4��� =������������������$����������������������) ��'�)�;��8��-��%6��-����������������#��������������:�#���) ��'�)�;���4�����������������������7�#����������������#���) ��'�)�;�����+�4������������������� �:#��������������������))���������������������������������$������������������������5/��0��.��>�� +�,-���0,3�����

-�3���,+���������������������$�:$���������������������5/��0��.��;������?�-���,+���������:�7#��������������� �!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!(��0����!���+�@�����������+�?�-�=4��+��=�����=4�3
�4�����4
��4�AB+B�A��-
����
+-�
����CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC�4��;��*�+,�@��)�-�����)�����#:>�����?��B
�-��+�����@�=4����-�����/4
���+�4�����������4�����+4
���+����,?D�+���4��B�0�@�!6�+4
�'+��=4��AB+B��B��+4
���+�����A��-�-���
2�4�+���4
�A�����,�-��4

�4���=����E�

,��2��>��#������=��B�+4
���+����+4@���-�?2��B���)>��B��+4
���+�4��3,�����4@-��3��42����A�B���B4,��4=���-��+�����@��=4���@��2��#�B4,���B�2�A4��>�,���4�$:�B4,���4=���-��+�����@����+B�2�����3��42����3,���?�����3���-��4�,�����-��+�����@��=4���B��4A
���

D,�2�4��4�B���B����B!������-�

���������������
�����������
�����������
������!��������
�����
%���%���������������
�
�&���$�"��������#�����'()*+������
��������
�

���'��/0'*� ���/1��/0//�� ���(0��/0//��"�� �����#�����'()*+����

������������
�
���2��
�����

�����3��

�����
���
���������"��������#�����'()*+���������
������

��4'(�(0�����������������

��������������������������
�����/0/*���5���
������������
������!��������
�������������������
������"��������#�����'()*+��
������������%���%�������
�

�6���

���������������������������������������
������������
�����
���

�/1782�*�*�� ���'�������������������������������������������������������������������������5������������

�������
��������

������5��� �

���6�����2 ���3��������� �99:699��996 ;<99��=: =�����=:7=�������

����$>?6@0'1+�00*�0A%0'%/0/B��>?6@��

�0'1+����� ��0'1+��5���������������00*����������

������5���� ����0A%0'%/0/B��������� ���6���������

��������������
����

���������������CD,���������

����������7- ��������������� �

�����6����� ��� ���2 ���3���������

����
��������������������������������
���������������� !"�#����$%&$�������'��'(�()��������
�����������������������*�����
��������������������%&��
����������+������
�%���������,����-�����������������,�-��������������������-������
������
���������*����
����-�����������
�������'��'(�()�������,�-������
����������
��������.�����������.���/�����.������
�������*�����

�+����.�0����1 �������22+�22�

����
����������������������������$����������������

�3���

��
���(4�560���(7�
�����������
�����������������.������������������*���
����
��.��-��������*�����
������������*�����
�����������������
������������.����-�.����
��������������
����$�������������,�-���#�+�6"(�(($��89'(8'(�()��+���
����������������������������$�����������������������*�����
�������6"��
����������+������

�6���

���(�((������.�����
����������.����*���������������
���������
��������,����-�������8��������,�-�������������������-�������
������
���������*����
����-�����������
����9'(8'(�()��������,�-������
���������������.���-�������
�&����<�����3;&<7��������
�������������

���(4�560���93�73�7�+������ �0����1 �������22+�22�

����
��������������������
���������
���������*���������������.���������3��������7�������-����*����

���(4�5�6�0���=3�7$3�7����,�-���#�+� �(�(=$��8��'�='(�()��+����

� �����(�(=�������.����
�����*���������������-�����
����������.����*������������
��������,����-�������8��������,�-�������������������-�������
������
���������*����
����-����������
�������'�='(�()��������,�-�������
�������*������������
���������
�����������*�������������
��-�*��������������*����
�$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$;����<���0 1?��1%?��!!��"+�!0%5�++�7�&����������������������
������������-�����:����������#������������7��������.���
���.�����*����
����-�����������������7�����,������������
����-������7���������;&<���������������
������������������*����
����-������-�����
7������������

��-�����3�

�����������
�������

�����7�

�������������
��� ����������������������������������������������������
�������������������
"����.�������������
�������������,������

������������.����$/�&0��1����)�2��� �$/�&0��1����3,�������������������*��� �����������������������!������"�����������#����������������$%%�&������������'�������(����������������������������&�$%$)%4���������������

�"���5��"����������
����������������.*����"�����

�����"��6���� �������������������7,�-������ ������������!������"�����������#����������������$%%�&������������'�������(����������������������������&�$%$)%�8888888888888888888888888888888888888888888888888888888888888888����������9(���0�:9(9�'#��9&-�-�(;��������

50K Spec.pdf
APPENDIX IV
PROJECT SIGNS – Not Applicable for 50K
APPENDIX V
PREVAILING WAGE SCHEDULES
AND FEDERAL PROVISIONS ADDENDUM
(2) Changes.
(3) DHS Seal, Logo, And Flags
(5) No Obligation by Federal Government
(6) Program Fraud and False or Fraudulent Statements or Related Acts