Pipe_and_Steel_Quote_Sheet.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- TS GOLDEN BEAR Piping and Steel Work
- Solicitation number
- DTMA9417Q00001
About this file
Quote Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3_SF30.pdf | ||
| Revised_Pipe_and_Steel_Engine_Ship_Check_Notes.pdf | ||
| Pipe_and_Steel_Engine_Ship_Check_Notes.pdf | ||
| Amendment_2_SF30.pdf | ||
| Pipe_and_Steel-_Engine_T C.pdf | ||
| SF1449.pdf | ||
| wage_determination_Solono_Co_2005_rev_17.pdf | ||
| ATTCH_CLAUSES.pdf | ||
| Pipe_and_Steel_-_Engine_-Quote_Sheet.xlsx | XLSX spreadsheet | |
| amendment_1.pdf | ||
| SOW_Pipe_and_Steel-Engine.pdf | ||
| SOW_Pipe_and_Steel.pdf | ||
| Pipe_and_Steel_T C.pdf | ||
| wage_determination_Solono_Co_2005_rev_17.pdf | ||
| ATTCH_CLAUSES.pdf | ||
| SF1449.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Piping and Steel Quote Sheet | ||
| SR No | Description | Est Costs |
| 5187345 | Deferred items from 2016 for 5187345 | |
| 5186732 | Fwd House Deep Sink Drain | |
| 5186717 | Saltwater flushing Isolation Valves | |
| 5189581 | Reserve Feed Tank -2-139-3 Coating | |
| 5189812 | Fwd MSD Vent Reroute | |
| 5186731 | Boiler Room Gray Water piping | |
| 5188988 | Heating 35# Isolation and drains | |
| 5185662 | Inspection ports BME JW Head Tanks | |
| 302097 | Clean 3 Pee traps & 6 Grease Traps | |
| 302118 | House-Deck Steel Repairs | |
| Supplementary Labor 100hrs @ $____/hr | ||
| Supplementary Material | $ 20,000.00 |
Total Amount
Sheet2
Sheet3
File details come from the government source that posted it. Updated .