DTMA93Q1600033_000001_FY16_GEN_RUDD_DD.pdf

PDF 151 KB Posted

Attached to
FY16 GENERAL RUDDE DRYDOCK AND REPAIRS
Solicitation number
DTMA93Q1600033
Issued by

About this file

AMENDMENT 000001

View the file

Other files

File Type Posted
DTMA93Q1600033-0006_FY16_GEN_RUDD_DD.pdf PDF
Amend_0005.pdf PDF
Shipyard_Bid_Sheet_Am_4_8-17-16.xlsx XLSX spreadsheet
DTMA93Q1600033-0004_FY16_GEN_RUDD_DD.pdf PDF
TSGR_FY16_DD_(8).pdf PDF
DTMA93Q1600033-0003_GEN_RUD_FY16_DD.pdf PDF
Shipyard_Bid_Sheet.xlsx XLSX spreadsheet
DTMA93Q1600033-00002.pdf PDF
revised_specs.pdf PDF
Bidder's_Questions_and_Answers.pdf PDF
53711-259-0000223_DIESEL_EXHAUST.pdf PDF
53711-259-0000223_DIESEL_EXHAUST_PARTS.pdf PDF
excel_quote_sheet.xlsx XLSX spreadsheet
18. Ref. 21-DWG 801-5988702 General Arrangement Main Deck Below .pdf PDF
4. DWG 631-0000119 Paint Schedule.pdf PDF
22. Ref 26-DWG 111-0000007 Scantling Profile.pdf PDF
20. Ref. 24-DWG 835-5988704 Inboard Profile.pdf PDF
6. DWG. Fig. 8.3 Stern Tube Lube Oil Pipieline.pdf PDF
5. DWG BT550.Asm 35431T Bow Thruster.pdf PDF
11. Ref. 14-DWG 114-0000023C Skeg.PDF PDF
8. Ref. 11-DWG_243-0000224 SHAFTING DETAILS -(2 OF 2).pdf PDF
1. DWG No. C9911569 Waukesha Bearings Corp.pdf PDF
15. Ref. 18-DWG 801-0000036 Guidance Docking Plan.pdf PDF
14. Ref. 17-DWG 633-0000120B Cathodic Protection Schedule.pdf PDF
25. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(2 of 3).pdf PDF
27. Tank Vent Locations.pdf PDF
13. Ref. 16-DWG 562-0000030 —
7. Ref. 10-DWG_243-0000224 SHAFTING DETAILS -(1 OF 2).pdf PDF
9. Ref. 12-DWG 243_0000228 Propulsion Shafting Allignment Procedures.pdf PDF
17. Ref. 20-DWG 801 5988703 General Arrangement Above Main Deck.pdf PDF
24. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(1 of 3).pdf PDF
16. Ref. 19-DWG 801-0000155 Inboard Profile Inner Bottom.pdf PDF
12. Ref. 15-DWG 561-0000222F Steering Gear Arrangemnet Details —
26. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(3 of 3).pdf PDF
21. Ref. 25-DWG 835-5988706 Outboard Profile.pdf PDF
23. Ref. 27-DWG 101-0000008 Scantling Profile_C.pdf PDF
3. DWG 131-0000009 Main Deck Plating FR.pdf PDF
19. Ref. 22-DWG 1355-S62-1-1_Electrical One Line Diagram_RevB_80484164.pdf PDF
10. Ref. 13-DWG 506-5987287 Aux Seawater System Sea Valves.pdf PDF
2. 603-0000129 Draft Marks.pdf PDF
DTMA93Q1600033_FY16_GEN_RUDD_DD.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTMA93Q1600033

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

MAR-616

New Orleans LA 70130-3394 500 Poydras Street Suite 1223

U.S.DOT/MARITIME ADMINISTRATION

DIV. of GULF OPERATIONS

New Orleans LA 70130-3396 500 Poydras Street Suite 1223

00093

Hale Boggs Building

MAR 380.3

Gulf Div.Acquisition Office, U.S. DOT/ Maritime Administration

07/21/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/21/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GENERAL RUDDER - FY16 DRYDOCK & REPAIRS

The purpose of this amendment is to:

1. Have another site visit for 2 days at Texas A&M, Galveston.

The days are : 8/10/2016 and 8/11/2016.

2. Provide Questions and Answers.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ALINE SMITH

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTMA93Q1600033/000001

A site visit will be conducted onboard the TS

GENERAL RUDDER, 0800 to 1600 on July 21 and 22, 2016 at Galveston, TX or August 3 and 4, 2016, Mobile, AL . POC: Dennis Rambin, Marine Surveyor, USDOT- Maritime Administration (MARAD), Div. of

Gulf Operations, Beaumont Field Office, e-mail:

Dennis.Rambin@dot.gov, Mobile Phone 504-284-1433.

VENDOR/CONTRACTOR MUST BE REGISTERED IN SAM AND

ACCOUNT MUST BE CURRENT AT TIME OF QUOTE

SUBMISSION TO BE CONSIDERED. GO TO WWW.SAM.GOV.

PLEASE SEE PGS 25-27 FOR EVALUATION FACTORS AND

QUOTE SUBMISSION INSTRUCTIONS.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

QUESTIONS AND ANSWERS

AUGUST 4, 2016

1. 52.212-4 (1) The Government must exercise its post acceptance rights within a reasonable time after defect discovered or should have been discovered; Question( What do you mean by reasonable time ?)

MARAD: To mean as soon as you know you make every effort to notify us immediately.

2. Item 103 Will General Rudder provide mooring lines and gangway? Will the Gangway be an adequate fire escape?

MARAD: Contractor to provide mooring lines and gangway.

3. Item 104 Potable Water Is Malin to provide Item 2.1 5,000 gals and also Item 3.2 100 L/T ?

MARAD: Yes

4. Item 105 Bilges and Drain Wells Would you like a price for 3,000 gallons are do you want price per gallon in reading the notes it asked for both ways.

MARAD: Both

5. Item 107 Protective Floor covering. Is roll cardboard sufficient for floor covering?

MARAD: Yes

6. Item 110 Fire Protection. What do you mean by Total cost for entire availability shall be submitted as an ITEMIZED bid price?

MARAD: Entire Availability

7. Item 113 Cooling Water. What is the size of the cooling water pump onboard the General Rudder?

MARAD: 440 GPM At 70 PSI

8. Item 209 Ballast Tank Cleaning and Inspection . 7.0 Statement of Work 7.1.1 What do you mean by replace all fasteners found missing or defective. What percent how many for bidding purposes and what size and length? We need an amount or % for bidding purpose of mud and sludge?

MARAD: Must be determined at the time of the Ship Check

9. Item 211 Chain Locker Inspection. 5.1.3 if required will this be covered in supplemental labor? 5.1.5 can we use Audio Gauging? 5.2.1 If required what percent for bidding purposes. 5.2.2 Need amount for bidding purposes.

MARAD:

1. No, this is not supplemental labor. If the job grows, then that will be examined.

2. Should be a set cost based on past experience.

3. 11 Shots per side

10. Item 212 Dock and Sea Trails. Will our personnel be required to leave on the Vessel for SeaTrials? If so how long will they be and how many are require.

MARAD: Key personnel during dock trials may be required only to witness and verify or as needed to adjust lines and implement safety protocols required by your facility.

11. Item 214 4.1 For bidding purpose do you want quote for 500 readings?

MARAD 500 should be sufficient. Any less can be credited per shot. Any more, will be charged per shot.

12. item 503 5.5 Is Sand Blasting the tank acceptable instead of Hydro Blasting ?

MARAD: Yes

File details come from the government source that posted it. Updated .