FY16 GENERAL RUDDE DRYDOCK AND REPAIRS
Solicitation number
DTMA93Q1600033
Issued by

About this file

Revised Quote Sheet (excel)

View the file

Other files

File Type Posted
DTMA93Q1600033-0006_FY16_GEN_RUDD_DD.pdf PDF
Amend_0005.pdf PDF
Shipyard_Bid_Sheet_Am_4_8-17-16.xlsx XLSX spreadsheet
DTMA93Q1600033-0004_FY16_GEN_RUDD_DD.pdf PDF
TSGR_FY16_DD_(8).pdf PDF
DTMA93Q1600033-0003_GEN_RUD_FY16_DD.pdf PDF
DTMA93Q1600033-00002.pdf PDF
revised_specs.pdf PDF
Bidder's_Questions_and_Answers.pdf PDF
53711-259-0000223_DIESEL_EXHAUST.pdf PDF
53711-259-0000223_DIESEL_EXHAUST_PARTS.pdf PDF
excel_quote_sheet.xlsx XLSX spreadsheet
DTMA93Q1600033_000001_FY16_GEN_RUDD_DD.pdf PDF
18. Ref. 21-DWG 801-5988702 General Arrangement Main Deck Below .pdf PDF
4. DWG 631-0000119 Paint Schedule.pdf PDF
22. Ref 26-DWG 111-0000007 Scantling Profile.pdf PDF
20. Ref. 24-DWG 835-5988704 Inboard Profile.pdf PDF
6. DWG. Fig. 8.3 Stern Tube Lube Oil Pipieline.pdf PDF
5. DWG BT550.Asm 35431T Bow Thruster.pdf PDF
11. Ref. 14-DWG 114-0000023C Skeg.PDF PDF
8. Ref. 11-DWG_243-0000224 SHAFTING DETAILS -(2 OF 2).pdf PDF
1. DWG No. C9911569 Waukesha Bearings Corp.pdf PDF
15. Ref. 18-DWG 801-0000036 Guidance Docking Plan.pdf PDF
14. Ref. 17-DWG 633-0000120B Cathodic Protection Schedule.pdf PDF
25. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(2 of 3).pdf PDF
27. Tank Vent Locations.pdf PDF
13. Ref. 16-DWG 562-0000030 —
7. Ref. 10-DWG_243-0000224 SHAFTING DETAILS -(1 OF 2).pdf PDF
9. Ref. 12-DWG 243_0000228 Propulsion Shafting Allignment Procedures.pdf PDF
17. Ref. 20-DWG 801 5988703 General Arrangement Above Main Deck.pdf PDF
24. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(1 of 3).pdf PDF
16. Ref. 19-DWG 801-0000155 Inboard Profile Inner Bottom.pdf PDF
12. Ref. 15-DWG 561-0000222F Steering Gear Arrangemnet Details —
26. Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(3 of 3).pdf PDF
21. Ref. 25-DWG 835-5988706 Outboard Profile.pdf PDF
23. Ref. 27-DWG 101-0000008 Scantling Profile_C.pdf PDF
3. DWG 131-0000009 Main Deck Plating FR.pdf PDF
19. Ref. 22-DWG 1355-S62-1-1_Electrical One Line Diagram_RevB_80484164.pdf PDF
10. Ref. 13-DWG 506-5987287 Aux Seawater System Sea Valves.pdf PDF
2. 603-0000129 Draft Marks.pdf PDF
DTMA93Q1600033_FY16_GEN_RUDD_DD.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Orig Gov't Est.

..\..\Business Plan\FY 2015\Copy of DGO-SMR15-ABBP Submission by COR-25SEP14.xlsx
TS STATE OF MICHIGAN

US GOVERNMENT ESTIMATE OF DRY DOCK EXPENCES

SUMMER 2015

ITME NO.TITLE/DESCRIPTIONLABORMATERIALTOTAL
Est. Man Hour or QTYRateExt. AmtCost Estmates from ABBP
SECTION 100 – GENERAL SERVICES REQUIREMENTTowing or Sailing to SY$ 150,000
101OFFICE AND ADMINISTRATIVE SERVICES$ -$ -$ -$ 5,500General Services$ 254,410
102SHORE POWER SERVICES36000$ 0.25$ 9,000$ -$ 9,000Hull Items$ 635,000
103WHARFAGE AND LINEHANDLERS$ -$ -$ -$ 16,000Hull Painting$ 95,000
104POTABLE WATER0$ -$ -$ -$ 2,000Machinery items$ 14,000$ 998,410
105BILGES AND DRAIN WELLS0$ -$ -$ -$ 25,000Administration$ 55,000
106GARBAGE AND TRASH REMOVAL0$ -$ -$ -$ 3,000Supplemental Growth$ 85,000.00
107PROTECTIVE FLOOR COVERING0$ -$ -$ -$ 3,000
108SECURITY/WATCHMAN360$ 50$ 18,000$ -$ 18,000TOTALS FOR BASE DRYDOCK:$ 1,288,410
109PAINTING GUIDELINESN/A
110GAS FREE INSPECTIONS AND CERTIFICATES0$ -$ -$ -$ 25,000M&R Regulatory Support$ -
111FIRE PROTECTION0$ -$ -$ -$ 4,500
112SANITARY WASTE0$ 65$ -$ -$ 6,500M&R Repairs$ -
113PORTABLE TOILETS/TEMPORARY FACILITIES0$ -$ -$ -$ 2,000
114COOLING WATER25$ 65$ 1,625$ 1,625M&R Environmental Initiatives
115TEMPORARY LIGHTING0$ -$ -$ -$ 1,500
116CRANE SERVICE100$ 225$ 22,500$ 22,500M&R Safety Program
117STAGING REQUIREMENTN/A
118OFF LOAD OF LIQUIDS AND STORAGE0$ -$ -$ -$ 60,000M&R Security Program
SUB TOTAL SECTION - 100$ 51,125$ -$ 205,125
SECTION 200 - DRYDOCK WORK ITEMSExtended Service Life (ESL)
201DRYDOCKING AND UNDOCKING OF THE VESSEL$ -$ -$ 40,000
202DOCK TRIALS$ -$ -$ 7,500Maint. Sea Trial (DD to Layberth)$ -
203HULL PREPARATION AND COATING$ -$ -$ 95,000
204RENEW ZINC ANODES$ -$ -$ 15,000TOTALS FOR DRYDOCK:$ 1,288,410
205PROPELLER SHAFT WEAR DOWN READINGS, (ABS)$ -$ -$ 2,500
206RUDDER AND STERN FRAME EXAMINATION$ -$ -$ 45,000
207PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS)$ -$ -$ 15,000
208TANK CLEANING AND INSPECTIONS$ -$ -$ 125,000
209PURIFIER SLUDGE TANK CLEANING$ -$ -$ 2,500
210SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG)$ -$ -$ 55,000
211ANCHOR CHAIN PRESERVATION AND CHAIN LOCKER INSPECTION$ -$ -$ 20,000
212TANK CLEANING: STERN TUBE LUBE OIL TANKS$ -$ -$ 3,500
213SHAFT SEAL & LINER REPLACEMENT, TAILSHAFT INSP$ -$ -$ 60,000
214BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS)$ -$ -$ 15,000
215ULTRASONIC/AUDIO HULL GAUGING$ -$ -$ 11,000
216WASTER PIECE: EXAMINATION$ -$ -$ 8,000
217SWITCHBOARD METER CALIBRATION$ -$ -$ 20,000
218PRESSURE VESSEL INSPECTIONS0$ -$ -$ -$ 11,000
219THRUST BEARING(S) INSPECTION/RENEWAL$ -$ -$ 5,000
220RESCUE BOAT: FALL REPLACEMENT$ -$ -$ 5,000
SUB TOTAL SECTION - 200$ -$ -$ 561,000
SECTION 300 - REPAIR ITEMS
301EFFLUENT TANK VENT REPAIRS$ -$ -$ -$ 2,500
302EFFLUENT DISCHARGE LINE REPAIRS$ -$ -$ -$ 2,500
303FUEL OIL TANK VENT REPAIRS$ -$ -$ -$ 3,500
304PORT/STBD STERN TUBE LUBE OIL PIPING$ -$ -$ -$ 10,000
305REPAIRS TO GENERATOR ROOM VOID:$ -$ -$ -$ 20,000
306STARBOARD WINDLASS BREAK LEAK REPAIR$ -$ -$ -$ 35,000
307MISCELLANEOUS STEEL REPAIRS$ -$ -$ -$ 7,500
308FWD MAST RECONFIGURATION & LIGHTING ARRANGEMENT$ -$ -$ -$ 35,000
309AFT MAST RECONFIGURATION AND REPAIRS$ -$ -$ -$ 35,000
310PORT STACK FIRE DAMPER REPAIRS$ -$ -$ -$ 7,500
311FIRE DAMPER REPAIRS$ -$ -$ -$ 10,000
SUB TOTAL SECTION - 300$ -$ -$ 168,500
SECTION 400 - COST ITEMS
401SUPPLEMENTAL WORK: MANHOURS LABOR0$ -$ -$ -$ 60,000
402SUPPLEMENTAL WORK: MATERIAL0$ -$ -$ -$ 55,000
403DRYDOCK AND WET BERTH DAYS0$ -$ -$ -$ -
404PIPING RENEWALS0$ -$ -$ -$ -
SUB TOTAL SECTION - 400$ -$ -$ 55,000
SECTION 500 - OPTIONAL ITEMS
317STRUT BEARINGS: RTD REPLACEMENT$ -$ -$ -$ 1,000
318REVERSE OSMOSSIS PURIFIER INSTALLATION$ -$ -$ -$ 45,000
319PORT / STBD STERN TUBE & TAILSHAFT REMOVAL$ -$ -$ -$ 85,000
320BLAST & COAT ARRAY TANK$ -$ -$ -$ 20,000
321RENEW GYRO COMPASS SYSTEM$ -$ -$ -$ 30,000
Contract Optional Itmes: SUB TOTAL SECTION - 500$ -$ -$ 181,000
Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400$ 51,125$ -$ 989,625
Base Items +5%$ 49,481.25
Total Contract Base Items$ 1,039,106.25
Grand Total$ 1,220,106.25

../../../AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/STATE%20OF%20MICHIGAN/Microsoft/Windows/Temporary%20Internet%20Files/Microsoft/Documents/MARAD/Documents/MARAD/SHIPS/STATE%20OF%20MICHIGAN/Business%20Plan/FY%202015/Copy%20of%20DGO-SMR15-ABBP%20Submission%20by%20COR-25SEP14.xlsx Gov't Est.

TS GENERAL RUDDER

SOLICITATION DTMA93Q1600033

2016 - REPAIR AND DRYDOCK

COMPANY NAME:

ITME NO. TITLE/DESCRIPTION SY Quote

SECTION 100 – GENERAL SERVICES REQUIREMENT
101OFFICE AND ADMINISTRATIVE SERVICES$ -
102SHORE POWER SERVICES$ -
103WHARFAGE AND LINEHANDLERS$ -
104POTABLE WATER$ -
105BILGES AND DRAIN WELLS$ -
106GARBAGE AND TRASH REMOVAL$ -
107PROTECTIVE FLOOR COVERING$ -
108SECURITY/WATCHMAN$ -
109GAS FREE INSPECTIONS AND CERTIFICATES$ -
110FIRE PROTECTION$ -
111SANITARY WASTE$ -
112PORTABLE TOILETS/TEMPORARY FACILITIES$ -
113COOLING WATER$ -
114TEMPORARY LIGHTING$ -
115CRANE SERVICE$ -
116STAGING REQUIREMENT$ -
117OFF LOAD OF LIQUIDS AND STORAGE$ -
SUB TOTAL SECTION - 100$ -
SECTION 200 - DRYDOCK WORK ITEMS
201DRY-DOCKING AND UNDOCKING OF THE VESSEL$ -
202DOCK TRIALS$ -
203HULL PREPARATION AND COATING$ -
204RENEW ANODES$ -
205ANTI-BIOFOULING SYSTEM MAINTENANCE$ -
206PROPELLER SHAFT WEAR DOWN READINGS, (ABS)$ -
207RUDDER AND STERN FRAME EXAMINATION$ -
208PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS)$ -
209BALLAST TANK CLEANING AND INSPECTIONS$ -
210SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG)$ -
211CHAIN LOCKER INSPECTION$ -
212BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS)$ -
213BOW THRUSTER MOTOR$ -
214ULTRASONIC/AUDIO HULL GAUGING$ -
215WASTER PIECE: EXAMINATION$ -
216PRESSURE VESSEL INSPECTIONS$ -
217MAIN PROPULSION MOTORS MAINTENANCE$ -
218GENERATOR MAINTENANCE$ -
219ELECTRIC MOTOR MAINTENANCE (7)$ -
220SWITCHBOARD CLEANING$ -
221INSTALL NEW HIGH TEMP DISHWASHER$ -
222VENTILATION FAN MAINTENANCE$ -
223AFT MAST MAINTENANCE$ -
224FORWARD MAST MAINTENANCE$ -
225RELOCATE SHIP’S WHISTLE AND PURCHASE NEW SPARE$ -
226GENERATOR PRELUBE PUMP CONTROLLER
SUB TOTAL SECTION - 200$ -
SECTION 300 - REPAIR ITEMS
301PORT & STARBOARD STERN TUBE LUBE OIL PIPING$ -
302REPAIR DECK DRAINS AND PIPING$ -
303REPAIR AFT BULWORKS$ -
304REMOVE FORWARD DAVITS$ -
305REPAIR REFURBISH VARIOUS DECK GUSSETS, PIPE PENETRATIONS AND VENT COVERS, EXTERIOR BHD(S)$ -
SUB TOTAL SECTION - 300$ -
SECTION 400 - COST ITEMS
401SUPPLEMENTAL WORK: MANHOURS LABOR$ -
402SUPPLEMENTAL WORK: MATERIAL$ -
403NOT USED
404NOT USED
405NOT USED
SUB TOTAL SECTION - 400$ -
Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400$ -
SECTION 500 - OPTIONAL ITEMS
501STRUT BEARINGS: RTD REPLACEMENT$ -
502PORT / STBD STERN TUBE & TAILSHAFT REMOVAL$ -
503BLAST & COAT ARRAY TANK$ -
504NOT USED
505REPLACE FOUR (4) SILENCERS - MAIN DIESEL GENERATORS$ -
506TOP END - MAIN GENERATOR NO. 1$ -
507UPPER DECK BLAST COAT
508GALLEY EXHAUST VENT DUCTING RENEWAL$ -
Contract Optional Items: SUB TOTAL SECTION - 500$ -
Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400$ -
Total Optional Items'$ - 0
Total ALL Itmes$ - 0