FIREX_2013_REPORT.pdf

PDF 197 KB Posted

Attached to
STATE OF MAINE FY14 PRECRUISE REPAIRS ONBOARD
Solicitation number
DTMA92Q14010
Issued by

About this file

17. FIREX 2013 Report (24 Pages)

View the file

Other files

File Type Posted
DTMA92Q14010_Amend_1.pdf PDF
LIFERAFT_CERTS_1.pdf PDF
Dwgs_905-72.pdf PDF
Dwg_1007-96-G01.pdf PDF
Dwgs_905-79.pdf PDF
Tech_Manual_Sliding_Watertight_Doors.pdf PDF
DTMA92Q14010_TSSOM_FY14_Precruise_Repairs.pdf PDF
LIFERAFT_CERTS_2.pdf PDF
Dwgs_436-6251918_H_Size.pdf PDF
ASTM_Std_Spec_F1197.pdf PDF
ABS_Guide_for_Cert_of_Lifting_Appliances_2007.pdf PDF
List_ABS_Approved_Drwgs.pdf PDF
ASTM_Std_Spec_F1196.pdf PDF
Dwgs_436-6251918_A_Size.pdf PDF
ASME_B30.2-2005.pdf PDF
Dwg_113-6251976_Rev_C.pdf PDF
Cat_Pumps_Service_Manual.pdf PDF
Dwgs_905-73.pdf PDF
MaK_Self-Cleaning_Filter.pdf PDF
Dwgs_905-74.pdf PDF
Dwg_905-76.pdf PDF
SEARCHLIGHT_LUBRICATION.pdf PDF
Dwg_905-75.pdf PDF
ACCUMULATOR_HYD_CYLINDER_CHARGING.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIREX, INC. 1650 West Main Rd. Portsmouth, RI 02871 401.683.5200 fax

401.683.5205 Janicefirex@gmail.com ABS NO. B984499

YEAR

MONTH

APRIL

DAY

NAME

T/S STATE OF MAINE

IMO NO.

CERTIFICATE NO.

F041013ME

TYPE: Halon 1301 PROTECTING: Main Machinery Room CONSISTING OF: 12 ea. cylinders CAPACITY OF EACH: 550 lb AND PILOT CYLINDER 2 EA. CAPACITY 50 lb.

LOCATION CYLINDERS : Cylinder storage room, 2 deck TYPE & LOCATION OF RELEASE: Remote manual; Two stations. Station #1 – Fire Control Room 1 Deck. Station #2 – Inside Engine Operation Station.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE cylinder release & stop valve X X Two stations

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY 60 second X X 69 sec. final

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X X

13 ALARM(S) VISUAL X X

14 PRESSURE SWITCH(S) 2 ea. X X See note

15 VENTILATION SHUTDOWN X X See note

16 MACHINERY SHUTDOWN X X See note

17 OTHER – PNEUMATIC ACTUATORS FOR HALON CYL 12 X X

18 DIRECTIONAL VALVES X

19 STOP VALVES via manual pull stations X X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

ORDER WITH INSPECTION LABELS ATTACHED.

X

NOTE: All pressure switches tested and mechanically proved with test gas. Electrical function to be inspected independent of this test.

Firex Representative Date

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Halon 1301 PROTECTING: Auxiliary Machinery Room CONSISTING OF: 1 ea. cylinders CAPACITY OF EACH: 550 lb AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Cylinder storage room, 2 deck TYPE & LOCATION OF RELEASE: Remote manual; Two stations. Station #1 – Fire Control Room 1 Deck. Station #2 – At entrance to AMR

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE cylinder release & stop valve X X Two stations

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY 30 second X X 31 sec. final

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X X

13 ALARM(S) VISUAL X X

14 PRESSURE SWITCH(S) 1 ea. X X See note

15 VENTILATION SHUTDOWN X X See note

16 MACHINERY SHUTDOWN X X See note

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES via manual pull and pneumatic post time delay X X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

ORDER WITH INSPECTION LABELS ATTACHED.

X

NOTE: Pressure switch tested and mechanically proved with test gas. Electrical function to be inspected independent of this test.

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Halon 1301 PROTECTING: Paint Locker CONSISTING OF: 1 ea. cylinders CAPACITY OF EACH: 60 lb AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Main deck passage, port.

TYPE & LOCATION OF RELEASE: Remote manual at entrance to paint locker, main deck, port.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE cylinder release & stop valve X X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY X

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) 1 ea. X X

15 VENTILATION SHUTDOWN X X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES via manual pull X X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

ORDER WITH INSPECTION LABELS ATTACHED.

X

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Halon 1301 PROTECTING: Flamable Locker Deck 2, aft CONSISTING OF: 1 ea. cylinders CAPACITY OF EACH: 55 lb. AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Outside space protected, 2 Deck, aft. TYPE & LOCATION OF RELEASE: Remote manual located next to cylinder.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE X X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY X

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) 1 ea. X X

15 VENTILATION SHUTDOWN X X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Co2 Fire Suppression PROTECTING: Flammable Stores 2 deck, aft CONSISTING OF: 1 ea. cylinders CAPACITY OF EACH: 100 lb AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Outside space protected, 2 Deck,aft.

TYPE & LOCATION OF RELEASE: Remote manual, outside of entrance to flammable stores room.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE X X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY 30 second X X 30.1 sec. final

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) 1 ea. X X

15 VENTILATION SHUTDOWN X X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES Pneumatically operated post time delay X X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Halon 1301 PROTECTING: Emergency Generator Room 03 Deck CONSISTING OF: 1 ea.

Cylinders CAPACITY OF EACH: AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Outside space protected, 03 Deck Fan Room TYPE & LOCATION OF RELEASE: Remote manual at entrance to EDG

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE cylinder release & stop valve X X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY 30 second X X 33 sec., final

11 PRESSURE OPERATED SIREN X X

12 ALARM(S) AUDIBLE X X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) 1 ea. X X

15 VENTILATION SHUTDOWN X X note

16 MACHINERY SHUTDOWN X X note

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES via manual pull & Pneumatically operated post time delay X X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

ORDER WITH INSPECTION LABELS ATTACHED.

X

Pressure switch tested and mechanically proved with test gas. Electrical function to be tested independent of this test.

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Co2 Fire Suppression PROTECTING: Main Machinery CONSISTING OF: 2 ea. cylinders CAPACITY OF EACH: 50 lb. AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Semi‐portable, hose reel; 50’ w/ shutoff control.

TYPE & LOCATION OF RELEASE: Local Manual

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED hose pressurized X X

8 REMOTE MANUAL RELEASE X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY X

11 PRESSURE OPERATED SIREN X

12 ALARM(S) AUDIBLE X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) X

15 VENTILATION SHUTDOWN X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Co2 Fire Suppression PROTECTING: Electric Propulsion Motor Flat 12 MMR CONSISTING OF: 1 ea.

cylinders CAPACITY OF EACH: 50 lb. AND PILOT CYLINDER EA. CAPACITY N/A LOCATION CYLINDERS : Flat 12 MMR, Electric Propulsion TYPE & LOCATION OF RELEASE: Local Manual.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY X

11 PRESSURE OPERATED SIREN X

12 ALARM(S) AUDIBLE X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) X

15 VENTILATION SHUTDOWN X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

YEAR

MONTH

APRIL

DAY

NAME

TYPE: H20/N2 Propelled (Hi‐Fog) PROTECTING: Storage Locker, 2 Deck, aft. CONSISTING OF: 2 ea. cylinders

CAPACITY OF EACH: N2 @ 2000 PSI; H20 AND PILOT CYLINDER EA. CAPACITY N/A

LOCATION CYLINDERS : Outside space protected. TYPE & LOCATION OF RELEASE: Local Manual.

REF DESCRIPTION OF INSPECTION INSPECTD TESTED NOT

APPLICABLE

COMMENTS

1 COMPLETE INSPECTION X X

2 CONTENTS CHECKED BY WEIGHING X

3 CONTENTS CHECKED BY LIQUID LEVEL INDICATOR X

4 CYLINDER VALVES VISUALLY INSPECTED X X

5 CYLINDER INTEGRITY X

6 LOCAL MANUAL ACTUATORS X X

7 HOSES/PIPE/MANIFOLD INSPECTED X X

8 REMOTE MANUAL RELEASE X

9 AUTOMATIC RELEASE – TYPE: X

10 TIME DELAY X

11 PRESSURE OPERATED SIREN X

12 ALARM(S) AUDIBLE X

13 ALARM(S) VISUAL X

14 PRESSURE SWITCH(S) X

15 VENTILATION SHUTDOWN X

16 MACHINERY SHUTDOWN X

17 OTHER X

18 DIRECTIONAL VALVES X

19 STOP VALVES X

20 SYSTEM RECONNECTED, SEALED AND LEFT IN OPERATIONAL

YEAR

MONTH

APRIL

DAY

NAME

FIXED FIRE SUPPRESSION CYLINDER RECORD

Description/Serial Number Tare Gross Net Hydro/Mfg Weighed

1 MMR Fixed Halon 45112 326 870 550 2009 Weighed

2 MMR Fixed Halon 57224 318 754 431 2009 Weighed

3 MMR Fixed Halon 50179 336 770 434 1988 Weighed

4 MMR Fixed Halon 57225 334 763 429 1988 Weighed

5 MMR Fixed Halon 57257 335 684 349 1988 Weighed

6 MMR Fixed Halon 57169 335 684 349 1988 Weighed

7 MMR Room Fixed Halon 50188 336 684 348 1988 Weighed

8 MMR Room Fixed Halon 57170 334 665 331 1988 Weighed

9 MMR Room Fixed Halon 57241 332 666 334 1988 Weighed

10 MMR Room Fixed Halon 50183 333 843 510 1988 Weighed

11 MMR Room Fixed Halon 57176 335 834 479 1988 Weighed

12 MMR Fixed Halon 57137 334 635 300 1988 Weighed

13 Co2 actuator 64085 119 169 50 2003 Weighed

14 Co2 actuator 64047 121 171 50 2003 Weighed

15 Spare Co2 40141 110 160 50 Hydro 2009 Hydro 2009

16 AMR Halon 57124 332 784 452 1988 Weighed

17 Paint locker Halon 33321 56 88 32 1986 Weighed

18 Flam Liq. Halon 8077 78 133 55 1988 Weighed

19 Flam liq. Co2 17726 188 288 100 2003 Weighed

20 E. Room Hose Reel 33484 105 155 50 2002 Weighed

21 E. Room Hose Reel 14509 116 166 50 Hydro 2009 Hydro 2009

22 Electric Propulsion 18042 113 163 50 Hydro 2003 Weighed

23 EDGR F6442 Halon 117 171 54 1988 Weighed

YEAR

MONTH

APRIL

DAY

NAME

Fixed Fire Suppression – Pressure Switch

Switch # Main Machinery Space Switch Location

1 Power ventilation 33, 34, 36, 37, 38, 39, 40, 41 Halon room

2 SSDG 1, 2, 2, and SSDG FM Pump 1, 2, 3, Main Engines, F/O Purifiers.

Halon Room

Switch # Auxiliary Machinery Space Location

1 Vent fans 20, 22, DFM Transfer pumps, HFO Transfer Pump

Halon Room

Switch # Paint Locker, Deck 2 aft Location

1 Ventilation Outside paint locker

Switch # Flammable Liquid locker, Deck 2 aft Location

1 Ventilation Outside Flammable Liquid locker

Switch # Paint Locker, Main Deck port Location

1 Ventilation Main deck passage, port

Switch # Emergency Diesel Generator Room Location

1 Ventilation, Machinery Fan Room 03 Deck

Switch # Aft Paint Locker Location

1 Ventilation Shutdown Outside locker in passage

YEAR

MONTH

APRIL

DAY

NAME

TYPE: Ansul Auto Pulse Fire Detection CONSISTING OF: 256 End of Line Devices, 26 Modules Main Panel located at Bridge. Auxiliary Panel located Quarter Deck.

ZONE DESCRIPTION LOCATION TYPE REMARKS

Module 1 04 level forward house

Passageway 04-59-2 ionization 04-60-2 pull Module 2 03 level forward house

Passageway 03-68-2 pull 03-66-2 ionization

03-69-1 Pull 03-67-1 ionization 03-56-0 ionization 03-60-1 pull 03-60-1 ionization 03-60-2 ionization

Stair Tower #1 03-63-0 ionization Module 3 03 level after house

Stair Tower #3 03-105-0 ionization Passageway 03-103-2 ionization

03-112-2 ionization 03-121-2 ionization 03-129-2 ionization 03-136-2 pull

Stair Tower #4 03-137-0 ionization Passageway 03-139-2 ionization

03-147-2 pull 03-143-0 ionization 03-147-1 pull 03-141-1 ionization 03-136-1 pull 03-129-1 ionization 03-121-1 ionization 03-111-1 ionization 03-107-1 pull 03-100-1 ionization 03-97-1 pull Module 4 02 level forward house

Passageway 02-56-2 ionization

YEAR

MONTH

APRIL

DAY

NAME

02-59-2 pull 02-66-0 ionization 02-73-2 ionization 02-76-2 pull

Stair Tower #2 02-76-4 ionization Passageway 02-78-0 pull

02-79-0 ionization 02-74-1 ionization

Stair Tower #1 02-61-0 ionization Passageway 02-57-1 ionization

02-53-1 pull Module 5 02 level after house

Stair Tower #3 02-109-0 ionization Passageway 02-96-2 pull

02-104-2 ionization 02-108-1 ionization 02-117-1 ionization 02-130-1 ionization 02-132-3 pull 02-133-3 ionization 02-138-0 pull 02-139-0 ionization 02-145-1 ionization

Crew Lounge 02-147-0 ionization 02-155-0 ionization

Passageway 02-158-1 ionization 02-164-1 pull 02-159-0 ionization 02-164-2 pull 02-158-2 ionization 02-145-2 ionization 02-136-2 pull

Stair Tower #4 02-137-2 ionization Passageway 02-133-4 pull

02-132-4 ionization 02-131-2 ionization

02-121-2 ionization 02-113-2 ionization 02-108-2 pull

YEAR

MONTH

APRIL

DAY

NAME

Module 6 01 level forward house Passageway 01-77-2 Fire Pull

01-77-2 ionization Stair Tower #2 01-76-2 ionization Passageway 01-68-2 ionization

01-61-2 pull 01-59-2 ionization

01-53-4 pull 01-53-4 ionization 01-54-0 ionization

Stairway 01-46-1 ionization 01-46-1 pull

Passageway 01-53-1 ionization 01-52-1 pull 01-56-1 pull 01-60-1 ionization

Stair Tower #1 01-61-0 ionization Passageway 01-67-1 ionization

01-75-1 ionization 01-79-1 pull Module 7 01 level after house

Stair Tower #3 01-107-0 ionization Passageway 01-106-2 pull

01-98-2 pull 01-106-2 ionization 01-112-2 ionization 01-117-2 ionization 01-128-1 pull 01-130-2 ionization 01-133-4 ionization 01-133-4 pull 01-137-2 pull

Stair Tower #4 01-137-0 ionization Passageway 01-145-2 ionization

01-159-2 ionization 01-164-2 pull 01-164-1 pull 01-159-1 ionization

Lounge 01-156-0 ionization

YEAR

MONTH

APRIL

DAY

NAME

01-151-0 ionization Passageway 01-144-1 ionization

01-146-0 ionization 01-138-0 ionization 01-137-1 ionization 01-132-3 ionization 01-132-3 ionization 01-131-1 ionization 01-119-1 ionization 01-104-1 ionization 01-98-1 ionization Module 8 Main deck (1 deck)

Passageway 1-44-2 pull 1-49-2 ionization 1-56-2 pull

Stair Tower #1 1-56-0 ionization Passageway 1-59-2 ionization

1-64-0 ionization Galley 1-70-0 ionization

Watch Mess 1-70-2 ionization 1-71-2 ionization 1-76-2 pull 1-78-2 ionization 1-83-2 ionization

Stair Tower #2 1-77-2 ionization Crew Mess 1-82-4 ionization

1-90-4 ionization Passageway 1-90-2 ionization

1-96-4 pull 1-96-2 ionization 1-96-0 ionization

Stores Area 1-86-1 ionization Passageway 1-83-1 ionization

1-84-1 pull 1-97-1 ionization 1-98-1 pull 1-100-1 ionization 1-111-1 ionization 1-122-1 ionization

YEAR

MONTH

APRIL

DAY

NAME

1-130-1 ionization 1-138-1 pull 1-137-1 ionization

Stair Tower #4 1-136-2 ionization Passageway 1-136-2 pull

1-132-2 ionization 1-118-2 ionization 1-109-2 pull 1-105-2 ionization

Fwd Mess 1-54-2 ionization 1-65-2 ionization

Stair Tower #3 1-108-0 ionization Passageway 1-137-2 ionization

1-138-4 pull 1-141-2 ionization 1-151-2 ionization 1-158-2 ionization 1-165-2 pull Module 9 2 deck (berthing) Passageway 2-92-2 ionization 2-85-2 ionization 2-78-2 ionization 2-81-0 ionization 2-88-1 ionization 2-95-3 ionization 2-94-1 pull 2-95-1 ionization 2-99-2 ionization Module 10oom 3 deck (classroom/office) 3-96-1 ionization 3-95-1 pull 3-96-2 ionization 3-89-0 ionization 3-82-0 ionization Module 11 4 deck 4-88-4 ionization 4-88-1 ionization 4-80-2 ionization 4-80-1 ionization

YEAR

MONTH

APRIL

DAY

NAME

4-79-2 pull 4-98-2 ionization 4-98-4 ionization 4-95-1 pull 4-95-3 ionization 4-85-3 ionization 4-89-0 pull 4-87-2 ionization 4-81-2 ionization 4-98-1 ionization 4-95-0 ionization Module 12 Wheelhouse pull station

Bridge 04-60-2 Module 13 Emergency Diesel Generator Room 03-70-0 combo 03-70-0 thermal Module 14 Paint Locker 01-76-2 thermal Module 15

Flammable Liquid locker 2-166-2 thermal Aft Paint Locker 2-169-1 thermal

Module 16 Engine Room Pull Stations

Outside ER hatches 1-125-2 1-125-1 01-129-1 02-129-1 Module 17 Main Engine Room Enclosure Module 18 EOS

Outside EOS hatches 2-137-1 2-134-2 Module 19 32' Flat (2nd deck) 2-134-1 thermal 2-128-1 ionization 2-132-2 thermal Machine Shop (2nd deck) 2-118-1 thermal

2-119-0 ionization Engineer's Store Room 2-116-2 ionization

Elect. Work Shop 2-118-2 thermal

YEAR

MONTH

APRIL

DAY

NAME

2-114-4 ionization Module 20 23' Flat (3rd deck) 3-116-1 thermal 3-124-1 ionization Non-operational 3/12/13 3-133-1 thermal 3-130-1 thermal 3-140-1 thermal 3-136-0 ionization 3-133-1 combo 3-138-0 thermal 3-139-2 thermal 3-134-2 thermal 3-134-4 thermal 3-127-2 ionization 3-131-2 ionization 3-124-2 ionization 3-124-2 thermal 3-116-2 thermal 3-117-0 ionization 3-119-0 combo 3-119-1 thermal 3-128-1 combo Module 21 SSDG #1 3-130-1 thermal 3-128-1 combo Module 22 22 SSDG #2 3-124-2 thermal 3-127-2 combo Module 23 23 SSDG #3 3-134-2 thermal 3-131-2 combo Module 24 12' Flat (4th deck) 4-139-2 combo 4-138-2 thermal Module 24 4-129-2 ionization 4-119-2 thermal 4-116-0 ionization 4-118-1 thermal 4-128-1 ionization

YEAR

MONTH

APRIL

DAY

NAME

4-142-1 thermal 4-140-1 thermal Module 25 Machinery Space (Tank Top) Under deck plates 5-140-1 thermal Under deck plates 5-131-1 thermal Under deck plates 5-123-1 ionization Non-operational 3/12/13 Under deck plates 5-118-1 thermal Under deck plates 5-119-2 thermal Under deck plates 5-124-2 ionization Under deck plates 5-133-2 thermal Under deck plates 5-141-2 thermal Module 26 Aux. Machine Rm.

Under deck plates 5-147-0 combo Under deck plates 4-149-1 thermal Under deck plates 4-150-2 ionization Non-operational 3/12/13 Under deck plates 5-149-2 thermal

The above listed End of Line Devices were individually tested and confirmed properly operational, with the exception of three (3) noted. Testing was completed March 12, 2013.

YEAR

MONTH

APRIL

DAY

NAME

PORTABLE FIRE EXTINGUISHER RECORD

NO. LOCATION/DESCRIPTION TYPE SERIAL STATUS

111 04‐54‐0 wheelhouse 10#DC 385109 6yr 09

131 04‐59‐1 chartroom 15#Co2 88175 Hydro 12

112 04‐59‐2 chartroom 15#Co2 414733 Hydro 12

1 03‐55‐2 passageway fwd 10#DC 841489 6yr 09

45 03‐69‐1 cadet navigation lab 15#Co2 379836 Hydro 12

119 03‐72‐2 @ emergency gen room 20#DC 4827 Mfg 12

2 03‐71‐1 passageway forward 10#DC 841430 6yr 09

4 03‐112‐1 passageway aft 10#DC 841488 6yr 09

5 03‐142‐1 passageway aft 10#DC 841506 6yr 09

3 03‐112‐2 passageway aft 10#DC 841423 Hydro 12

82 03‐142‐2 passageway aft 10#DC 841539 6yr 09

6 02‐69‐2 passageway fwd 10#DC 841531 6yr 09

7 02‐69‐1 passageway fwd 10#DC 841411 6yr 09

9 02‐112‐1 passageway aft 10#DC 841502 6yr 09

10 02‐146‐2 passageway aft 10#DC 841537 Hydro 12/rch 13

11 02‐146‐1 passageway aft 10#DC 273885 6yr 13

8 02‐113‐2 passageway aft 10#DC 849499 6yr 09

12 01‐60‐1 passageway fwd 10#DC 385172 6yr 09

13 01‐55‐2 passageway fwd 10#DC 841432 6yr 08

14 01‐81‐2 paint locker 20#DC D249200 Mfg 09

15 01‐109‐2 passageway aft 10#DC 841435 6yr 09

16 01‐109‐1 passageway aft 10#DC 841511 6yr 09

18 01‐143‐1 passageway aft 10#DC 385155 6yr 09

17 01‐143‐2 passageway aft 10#DC 841407 6yr 09

19 1‐15‐2 passageway 10#DC 841521 6yr 09

20 1‐23‐1 passageway 10#DC 385104 6yr 09

21 1‐26‐1 misc. steward stowage 10#DC 841516 6yr 09

22 1‐28‐2 passageway 10#DC 841524 6yr 09

23 1‐37‐1 misc. safety storeroom 10#DC 841538 6yr 09

24 1‐36‐2 passageway 10#DC 841507 Hydro 12

25 1‐52‐2 passageway 10#DC 385164 6yr 09

40 1‐65‐2 forward mess 10#DC 841415 6yr 09

41 1‐48‐0 4/C lounge 10#DC 841417 6yr 09

27 1‐63‐1 dry provision storeroom 15#Co2 86464 Hydro 12

26 1‐69‐1 galley 15#Co2 01484 Hydro 12

29 1‐76‐2 servicing annex 15#Co2 02566 Hydro 12

YEAR

MONTH

APRIL

DAY

NAME

28 1‐76‐1scullery 15#Co2 01486 Hydro 12

30 1‐86‐1 commercial laundry 10#DC 841491 6yr 09

36 1‐129‐1 passageway 10#DC 841418 6yr 09

34 1‐127‐1 stewards store room 10#DC 385159 6yr 09

35 1‐128‐2 passageway 10#DC 385099 6yr 09

135 1‐105‐1 passageway 10#DC 841412 6yr 09

32 1‐90‐1 passageway 10#DC 385106 6yr 09

38 1‐165‐0 Stock room 10#DC 385145 6yr 10

31 1‐96‐2 passageway 10#DC 299543 6yr 12

33 1‐98‐2 Server room 10#DC 841397 6yr 09

39 1‐143‐2 passageway 10#DC 385138 6yr 09

83 1‐78‐2 passageway 10#DC 35453 6yr 09

84 1‐161‐2 passageway 10#DC 385147 6yr 08

FW 1‐140‐1 Fire watch 15#Co2 101720 Hydro 09

43 1‐140‐1 store room 10#DC 385165 6yr 09

46 2‐98‐0 passageway 10#DC 385097 6yr 09

42 2‐83‐2 passageway 10#DC 299530 6yr 12

120 2‐81‐0 passageway 10#DC 385167 6yr 09

44 2‐96‐1 passageway 10#DC 385160 6yr 09

47 2‐108‐2 halon room 10#DC 841503 6yr 09

59 2‐123‐2 electrical workshop 15#Co2 88253 Hydro 12

61 2‐124‐1 engine machine shop 20#DC 714095 6yr 09

FW Engine machine shop Fire Watch 15#C02 114434 Hydro 10

FW Engine machine shop Fire Watch 15#Co2 S9C379249F1 Hydro 09

67 Engine machine shop Fire Watch 15#Co2 01810 Hydro 10

FW Engine machine shop Fire Watch 15# Co2 864561 Hydro 13

FW Engine room Fire Watch 15#Co2 142771 Hydro 10

FW Engine room Fire Watch 15#Co2 S9C379125 Hydro 08

87 2‐121‐0 engineer storeroom 20#DC 714266 6yr 09

124 2‐134‐2 engine operating station 15#Co2 87566 Hydro 12

125 2‐134‐2 engine operating station 20#DC 714275 Hydro 12

129 2‐137‐1 32 flat 15#Co2 01168 Hydro 12

130 2‐132‐2 32 flat 15#Co2 01959 Hydro 12

55 2‐162‐2 marine spikes lab 10#DC 841413 6yr 09

54 2‐167‐2 bosun storeroom 3 10#DC 841492 6yr 09

58 2‐169‐1 engine lab 15#Co2 02232 Hydro 12

60 2‐160‐3 paint locker 15#Co2 00268 Hydro 12

56 2‐162‐1 engine lab 10#DC 841505 6yr 09

51 2‐158‐1 engine lab 10#DC 841529 6yr 09

YEAR

MONTH

APRIL

DAY

NAME

52 2‐160‐1 engine lab 10#DC 385137 6yr 09

57 2‐167‐2 flammable liquid stores 15#Co2 02233 Hydro 12

53 2‐165‐2 passageway 10#DC 841509 6yr 09

50 20158‐2 marine spikes lab 10#DC 841532 6yr 09

128 2‐192‐2 steering gear 10#DC 385169 6yr 09

127 2‐190‐2 steering gear 15#Co2 01359 Hydro 12

121 3‐83‐0 passageway 10#DC 841512 6yr 09

68 3‐86‐2 classroom multi media 10#DC 385143 6yr 09

69 3‐96‐2 passageway 10#DC 385100 6yr 09

65 3‐96‐2 classroom 15#Co2 00160 Hydro 07

126 3‐99‐1 passageway 10#DC 385139 6yr 09

70 3‐88‐1 lecture hall 10#DC 841419 6yr 09

62 3‐119‐0 23 flat 15#Co2 86457 Hydro 10

64 3‐124‐1 23 flat 20#DC 714164 6yr 09

66 3‐128‐2 23 flat 20#DC 714251 6yr 09

63 3‐139‐2 23 flat 15#Co2 87543 Hydro 10

115 3‐134‐1 23 flat 20#DC 714265 6yr 09

116 3‐141‐1 23 flat 15#Co2 86477 Hydro 12

72 4‐78‐2 4th deck/hold 10#DC 841527 6yr 09

73 4‐78‐2 gray water transfer 15#Co2 00523 Hydro 12

81 4‐87‐1 10#DC 841494 6yr 09

80 4‐88‐2 10#DC 385163 6yr 09

79 4‐92‐0 4th deck/hold 15#Co2 02546 Hydro 12

97 4‐92‐2 weight room 10#DC 841501 6yr 09

91 4‐95‐1 weight room 10#DC 841517 6yr 09

104 4‐118‐1 machinery room 15#Co2 86682 Hydro 12

103 4‐119‐2 machinery room 15#Co2 02573 Hydro 12

102 4‐135‐2machinery room 15#Co2 87568 Hydro 12

132 4‐139‐1 machinery room 20#DC 714281 6yr 09

136 4‐146‐2 aux machinery room 20#DC 714283 6yr 09

Auxiliary machinery room 15#Co2 01878 Hydro 10

133 4‐153‐1 aux machinery room 20#DC 714097 6yr 09

71 3‐139‐1 machinery (2) 50#Co2 Hose reel Hydro 03

DC1 01‐75‐1 DC1 15#Co2 85807 Hydro 12

DC2 1‐158‐2 DC2 15#Co2 87556 Hydro 12

DC2 1‐158‐2 DC2 10#DC 385144 6yr 08

DC3 1‐138‐3 DC3 10#DC 841422 6yr 09

SPARES

1 Spare 15#Co2 01493 Hydro 12

YEAR

MONTH

APRIL

DAY

NAME

2 Spare 15#Co2 01350 Hydro 09

3 Spare 15#Co2 00314 Hydro 12

4 Spare 15#Co2 01054 Hydro 12

5 Spare 15#Co2 01902 Hydro 12

6 Spare 15#Co2 87530 Hydro 12

7 Spare 15#Co2 00150 Hydro 12

8 Spare 15#Co2 00125 Hydro 12

9 Spare 15#Co2 00561 Hydro 12

10 Spare 15#Co2 87539 Hydro 12

11 Spare 15#Co2 V377642 Hydro 12

12 Spare 15#Co2 V601637 Hydro 10

13 Spare 15#Co2 85829 Hydro 12

14 Spare 15#Co2 86691 Hydro 12

15 Spare 15#Co2 162568 Hydro 09

16 Spare 15#Co2 01042 Hydro 12

17 Spare 20#DC 638165 6yr 09

18 Spare 20#DC 638128 6yr 09

19 Spare 20#DC 638119 6yr 09

20 Spare 20#DC 00714257 6yr 09

21 Spare 20#DC 644731 6yr 09

22 Spare 20#DC 550804 6yr 13

23 Spare 20#DC 714100 6yr 09/rch 10

24 Spare 20#DC 714091 6yr 09

25 Spare 10#DC 385108 6yr 09/rch 10

26 Spare 10#DC 299556 6yr 12

27 Spare 10#DC 697090 6yr 11/rch 12

28 Spare 10#DC 385102 6yr 08

29 Spare 10#DC 385161 6yr 09/rch 11

30 Spare 10#DC 726186 6yr 09

31 Spare 10#DC 299550 6yr 12

32 Spare 10#DC 385175 6yr 09

33 Spare 10#DC 299545 6yr 12

34 Spare 10#DC 299557 6yr 12

35 Spare 10#DC 299547 6yr 12

36 Spare 10#DC 299542 6yr 12

37 Spare 10#DC 299546 6yr 12

38 Spare 10#DC 299548 6yr 12

39 Spare 10#DC 299537 6yr 12

40 Spare 10#DC 841510 6yr 09

YEAR

MONTH

APRIL

DAY

NAME

The above listed fire extinguishers have been inspected and re‐certified according to NFPA standards.

April 10, 2013

41 Spare 10#DC 385173 6yr 09

42 Spare 10#DC 385168 6yr 09

43 Spare 10#DC 385149 6yr 09

44 Spare 10#DC 385105 6yr 09

45 Spare 10#DC 385150 6yr 09

46 Spare 10#DC 385140 6yr 09

47 Spare 10#DC 385152 6yr 09

48 Spare 10#DC 385171 6yr 09

49 Spare 10#DC 385162 6yr 09

50 Spare 10#DC 841533 6yr 09

51 Spare 10#DC 601118 Hydro 13

52 Spare 10#DC 841420 6yr 09

53 Spare 10#DC 841434 6yr 09

54 Spare 10#DC 299549 6yr 12

55 Spare 10#DC 841526 6yr 09

56 Spare 10#DC 299544 6yr 13

57 Spare 10#DC 385157 6yr 11

58 Spare 10#DC 841498 6yr 09

59 Spare 10#DC 841530 6yr 09

60 Spare 2.5#DC 101403 6yr 11

61 Spare 2.5#DC 109959 6yr 11

62 Spare 2.5#DC 114280 6yr 11

63 Spare 2.5#DC 340886 6yr 13

64 Spare 2.5#DC 341219 6yr 13

65 Spare 2.5#DC 325039 Mfg 09

66 Spare 2.5#DC 325050 Mfg 09

67 Spare 2.5#DC 238388 Mfg 09

68 Spare 2.5#DC 325038 Mfg 09

LIFE BOATS

1 Life Boat 2#DC 206530 Mfg 10

2 Life Boat 2#DC 206525 Mfg 10

3 Life Boat 2#DC 206526 Mfg 10

4 Life Boat 2#DC 206524 Mfg 10

5 Life Boat 2#DC 206529 Mfg 10

6 Life Boat 2#DC 206528 Mfg 10

7 Life Boat 2#DC 118321 Mfg 10

8 Life Boat 2#DC 118324 Mfg 10

File details come from the government source that posted it. Updated .