Plans_NJ_ERFO_GATE_SAHO_2013-1(2).pdf
PDF 11 MB Posted
- Attached to
- Gateway National Recreation Area - Reconstruction of Sandy Hook Unit Sites: NJ ERFO GATE SAHO 2013-1(2)
- Solicitation number
- DTFH71-13-B-00027
About this file
Plans_NJ ERFO GATE SAHO 2013-1(2)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_002_-_NJ_ERFO_SAHO_GATE_2013-1(2).pdf | ||
| Amendment_001_-_NJ_ERFO_SAHO_GATE_2013-1(2).pdf | ||
| VETS-100A-Form.pdf | ||
| DSR_Parking_Lot_C.pdf | ||
| FP03_Errata.pdf | ||
| DSR_Horseshoe_Cove_Bridge.pdf | ||
| Bidder's_Qualifications_Form.doc | DOC document | |
| Synopsis_Notice_NJ_ERFO_GATE_SAHO_2013-1(2).doc | DOC document | |
| DSR_Gunnison_Boardwalk.pdf | ||
| DSR_Parking_Lot_D.pdf | ||
| DSR_Parking_Lot_E.pdf | ||
| DSR_Fisherman's_Parking_Area.pdf | ||
| Subcontracting_plan.doc | DOC document | |
| FP03_Eng_.pdf | ||
| IFB_Solicitation_-_NJ_ERFO_GATE_SAHO_2013-1(2).pdf | ||
| DSR_Visitor_Center_Boardwalk.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manager Lead Designer
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FP-03 U.S.Customary Units.
Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of
SPECIFICATIONS:
NO.
SHEET
SHEETS
TOTAL
INDEX TO SHEETS
PROJECTSTATE
NJ
U.S. DEPARTMENT OF THE INTERIOR
PLANS FOR PROPOSED
NATIONAL PARK SERVICE
GATEWAY NATIONAL RECREATION AREA
Monmouth County, New Jersey
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
516535
NEW
YORK
CITY
BROOKLYN
Island
Staten
NEW YORK
NEW JE
RSEY
Ft. Hancock
Gateway
National
Rec. Area Sandy
Hook
Bay
Sandy Hook
New Brunswick
Plainfield
Amboy
Perth
Nat’l. Mon.
Liberty
Statue of
Gateway
Nat’l.
Rec. Area
Coney Island
S ho re
P kw y.
Pkwy.
Pkwy.
Belt
Belt
E x p w y.
B r o o k ly n
Q u e e n s
S h o r e
P k w y
Gateway
Nat’l.
Rec.
Area Bay
New York
Lower
Richm ond
P k w y.
P k w y
St at e
G a r d en
N ew
J e r s e y
T u r n p ik e
N e w
J e r s e y
G arden
State
Pkwy.
T u r n p ik e1
INTERSTATE
Elizabeth
INTERSTATE
INTERSTATE
Airport
International
John F. Kennedy
0 2 4 62
Scale in Miles
N
Unit
SAHO 2013-1(2)
NJ ERFO GATE
John Wilson Lucero Cano
SAHO 2013-1(2)
NJ ERFO GATE
PROJECT
PROJECT NJ ERFO GATE SAHO 2013-1(2)
Standard Details
Traffic Control
Bridge Plans
Construction Plans
Typical Sections
Tabulation of Quantities
Location Maps
Title Sheet
DESCRIPTION
18-22
12-16
5-11
SHEET NO.
STERLING, VIRGINIA
Devices, 2009 Edition"
"Manual on Uniform Traffic Control
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O tt l.
d g n
-M a y -2
:5
A M
201480A
197268A
197257A
197252A
201465A
197243A
RECONSTRUCTION OF BOARDWALKS
REHABILITATION OF PARKING LOTS C, D AND E
RECONSTRUCTION OF HORSESHOE COVE TIMBER BRIDGE
RECONSTRUCTION OF SANDY HOOK FISHERMAN’S PARKING AREA
Gunnison Boardwalk
Visitor’s Center Boardwalk
Parking Lot E
Parking Lot D
Horseshoe Cove Timber Bridge
Fisherman’s Parking Area
Parking Lot C
MAY, 2013
LOCATION MAP
Route 36
Highlands
Town of
State Historic Site
Twin Lights
Route 36
Fee Plaza
Area B
South Beach
Area C
South Beach
Island
Plum
Cove
Spermaceti
Island
Hill
Skeleton
Area D
South Beach
Area E
South Beach
Fishing Beach
SANDY HOOK BAY
OCEAN
ATLANTIC
Cove
Horseshoe
Beach
Gunnison
Guardian Park
Headquarters
Park
Fort Hancock Museum
Ferry Dock
Lighthouse
Sandy Hook North Beach
Nine Gun Battery
Fort Hancock
Historic
(not open to public)
N a v e s in k
R iv e r
N
H a r ts h o r n e
D r iv e
U.S. Coast Guard
Scenic Overlook
Mt. Mitchill
Trails
Roads
Parking
LEGEND
Gunnison Boardwalk
Area Fisherman’s Parking
Parking Lot E
Boardwalk Visitor’s Center
Parking Lot D
Parking Lot C
Wood Bridge Horseshoe Cove Timber
0 1/2 1
Scale in Miles
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O lo c .d g n
T
IM
E
-M a y -2
:1
3QUANTITIES
TABULATION OF
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O
Q T
Y T
A B .d g n
T
IM
E
-M a y -2
EXISTING PAVEMENT STRUCTURE
TYPICAL SECTIONS
Shoulder Parking
PROPOSED PAVEMENT STRUCTURE
Roadway
22’
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
CL
6" Aggregate Base Grading C or D
6" of Aggregate base
Excavate existing
Parking Lot Parking Lot
3’ 7’
Embankment pavement
Sawcut pavement
Sawcut pavement
" asphalt4 3Remove existing and 4" embankment
6" +/- aggregate base, Excavate existing
Asphalt pavement Remove existing
FULL DEPTH PATCH
FISHERMAN’S PARKING AREA
PARKING LOT C, D, AND E
FULL DEPTH RECONSTRUCTION
Shoulder reconditioning and turf establishment grading C or D
6" Aggregate Surface Course, Class B
3" HACP Grading B or C, according to Section 625.
2. Establish turf on all disturbed area construction.
encountered at the time of of the patches based on conditions
1. The CO will determine the limits
Notes:
Damaged section
Limits as directed by the CO
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O ty p .d g n
T
IM
E
-M a y -2
:2
CONSTRUCTION PLAN
N
NO SCALE
PARKING LOT C
To Beach Area C
’731
’04
Install 100’ of silt fence
Install 350’ of silt fence
CLOSED
ROAD
Mount on barricade, type 3
Limits of disturbance
SYMBOLS
Existing elements
Silt Fence
Limits of disturbance
See note #2 for pavement repair
Reset wheel stops
See note #4
Existing islands
Wheel stops Reset wheel stops
See note #4
Reset wheel stops
See note #4
Reset wheel stops
See note #4
See note # 3 for pavement markings
Full depth patch.
See typical for reference.
R11-2
Possible location for sign post will be determined by CO.
R7-8 signs. Actual locations
Possible locations for of reconstruction: 50 SQYD.
encountered at the time of construction. Estimated area
CO will determine extent of reconstruction based on conditions
5. Reconstruct islands in kind where indicated by the CO. The stops.
See Details E609-02 for reference. Estimated: 170 wheel
4. Reset existing wheel stops between parking stalls.
and 634.03. Refer to Detail E634-05. Estimated: 3600 LNFT.
markings on the new pavement. See Subsections 152.03 (l)
3. Match type, size and spacing of existing pavement
Estimated area of patching: 2840 SQYD.
within limits of disturbance. See typical sheet for reference.
2. Patch sections of the parking lot as directed by the CO
1. Install silt fence 2’ away from the edge of pavement.
NOTES:
H a rth s h o rn e D r
H a rth s h o rn e D r
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
:0
N
F is h e r m a n ’s P a r k in g A r e a
(Do not disturb)
Existing Bunker #1937
(Do not disturb)
Existing Bunker #1938
22’
3’
7’
Roadway CL
To Hartshorne Drive
Existing roadway
NO SCALE
FISHERMAN’S PARKING AREA
Begin roadway construction
End roadway construction silt fence
Install 40’ of
Recondition 600’ of shoulder
Place embankment on parking.
Approximately 78 CUYD.
of silt fence
Install 660’
Install 500’ of silt fence
Install 160’ of silt fence
Limits of disturbance
SYMBOLS
Existing elements
Silt Fence
Remove and dispose bunker roof
Possible location for
R7-8 sign. See note no.5.
sign. See note no.5.
Possible location for R7-1
5. Place parking signs where indicated by CO.
4. Establish turf on shoulder area.
approval.
3. Provide grading plans for review and of pavement
2. Install silt fence at least 2’ away from edge structure.
1. See Typical Sections for asphalt pavement
NOTES:
Remove existing asphalt pavement and excavate aggregate base. Place embankment as needed, 6" aggregate base C or D grading.
Estimated Area:1620 SQYD
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
NO SCALE
e vi r
D e n r o h st r a H li a r
T el c y ci B
(Do not disturb)
Existing bicycle trail
To Beach Area D e vi r
D e n r o h st r a H
To Visitor’s Center
N
PARKING LOT D
Limits of disturbance
SYMBOLS
Existing elements
Silt Fence
Install 400’ of silt fence
Install 60’ of silt fence
Install 380’ of silt fence silt fence
Install 320’ of barricade, type 3
Mount on
CLOSED
ROAD
R11-2
Limit of disturbance
Existing islands
Existing islands
Existing islands
Existing islands
Existing islands
Building
Plaza
See note #2 for pavement repair.
11 signs. See detail E634-05 indicated by the CO. Estimated:
5. Place R7-8 signs where
SQYD.
Estimated area of reconstruction: 200 encountered at the time of construction.
of reconstruction based on conditions by the CO. The CO will determine extent
4. Reconstruct islands where indicated
LNFT.
Refer to Detail E634-05. Estimated: 4100
See Subsections 152.03 (l) and 634.03.
pavement markings on the new pavement.
3. Match type, size and spacing of existing patching : 6900 SQYD.
typical sheet for reference. Estimated area of by the CO within limits of disturbance. See
2. Patch sections of the parking lot as directed pavement.
1. Install silt fence 2’ away from the edge of
NOTES:
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
:1
CONSTRUCTION PLAN
To Beach Area E
Drive
To Hartshorne
Building
Existing Bicycle Trail
(Do not disturb)
N
PARKING LOT E
of silt fence
Install 1140’
To Visitor’s CenterLimits of disturbance
SYMBOLS
Existing elements
Silt Fence
See note #2 for pavement repair, and note #3 for pavement markings.
Existing islands
Existing islands
Existing island
Existing islands
Existing islands islands
Existing islands
Existing islands
Existing islands
Existing detail E634-05.
12 signs. See the CO. Estimated:
where indicated by
5. Place R7-8 signs
SQYD.
reconstruction: 250
Estimated area of time of construction.
encountered at the on conditions reconstruction based determine extent of
CO. The CO will where indicated by the
4. Reconstruct islands
Estimated:4310 LNFT
Detail E634-05.
and 634.03. Refer to
Subsections 152.03 (l) the new pavement. See pavement markings on spacing of existing
3. Match type, size and patching : 7070 SQYD.
typical sheet for reference. Estimated area of by the CO within lmits of disturbance. See
2. Patch sections of the parking lot as directed pavement.
1. Install silt fence 2’ away from the edge of
NOTES:
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
Edge of parking lot E pavement
N
NO SCALE
VISITOR’S CENTER BOARDWALK
End of boardwalk li ar
T el c yc i
B
To Parking Lot D
B ic y cle tra il x o r p p
A ’
Parking lot E boardwalk
End of existing
Existing boardwalk
.xorppA ’07 of boardwalk. See note no.2
Replace approximately 70’ plaza
Visitor Center
SYMBOLS
Replacement area
O C y b d e ni m r et e d s a sti mi L
See note no. 2.
Replace approximately 210’ of boardwalk.
timber structures.
4. Refer to Sections 557 and 716, for specifications on according to Subsection 557.03.
3. Provide boardwalk drawings for review and approval
Estimated boardwalk replacement: 280 LNFT on conditions encountered at the time of construction.
will determine limits of boarwalk replacement based
2. Replace existing boardwalk (at grade) in kind. CO
Estimated 280 LNFT.
1. Remove and dispose damaged boardwalk.
NOTES:
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
NO SCALE
GUNNISON BOARDWALK
Parking Area y a w ht a p et er c n o C y a w ht a p et ercnoC
SYMBOLS
Replacement area
OC yb d e ni m r et e d s a sti mi L boardwalk. See note no. 2.
Replace approximately 210’ of
Gunnison Plaza
Atlantic Drive structures.
4. Refer to Sections 557 and 716, for specifications on timber and acceptance. See Subsection 557.03 for reference.
3. Provide boardwalks drawings for CO’s approval construction. Estimated boardwalk replacement: 210 LNFT.
based on conditions encountered at the time of
CO will determine limits of boardwalk replacement
2. Replace existing boardwalk (at grade) in kind.
Estimated: 210 LNFT.
1. Remove and dispose damaged boardwalk.
NOTES:
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
-M a y -2
:2
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D M is c R e v is e d
S ta in le s s P la n s R 1_
N J
1_
N P
S
G E
N
N O
T E
S .D
G N
REGION
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
INDEX OF DRAWINGS
DRAWING TITLESHEET NO.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03.
SCOPE OF WORK:
GENERAL NOTES:
SPECIFICATIONS:
Construction:
DESIGN LOADS:
Dead Load:
Live Loads:
MATERIALS:
Reinforcing Steel:
Design:
Construction:
between field measurements and dimensions shown on the plans.
the work prior to ordering any materials or starting work. Notify CO of any discrepancies
Field verify those dimensions of the existing structure which are necessary for completion of
Precast Concrete Box Culverts:
Provide 2" cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed.
texture, color, and appearance, as directed by the CO.
Give new precast concrete and repair concrete a finish that matches the existing concrete f’c - 5,000 psi at 28 days.
Furnish class P concrete for precast box culverts.
Remove existing culverts.
AASHTO LRFD Bridge Design Specifications, U.S. Customary Units, 2012.
Not to Scale
A C
T U
A L F I L E R
N J
N P S
G E
N
N O
T E S .D
G N
Timber: 60 pcf.
Concrete: 150 pcf.
HL-93
GENERAL NOTES AND INDEX
Timber Details
Box Culvert Plan
Plan and Elevation
General Notes and Index
R04
R03
R02
R01 the dead and live loads indicated on the plans.
Place new precast concrete box culvert and wingwalls designed to resist
5.
4.
3.
2.
1.
Place riprap.
Place timber beams, timber railing and timber boardwalk.
Salvage gabions and place at the discretion of the Co.
Remove existing railing, timber deck, timber headwalls and gabions.
Metal Fabrications:
Provide stainless steel connection hardware conforming to ASTM 304 or ASTM 316.
R01
STATE PROJECT
SHEET
NO.
REGION
NJNE
PMIS NO.
NPS
NO.
XXXXXX
XXX
197252A
NJ ERFO GATE
SAHO 2013-1(2)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
EMA Roger LuPCB RE
BRIDGE DRAWING
of
DATE DRAWING NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
4 BRP-1189
GATEWAY NATIONAL RECREATION AREA
SANDY HOOK
HORSESHOE COVE BOX CULVERT
May, 2013
[Not for commercial use]
EROSION CONTROL
HORSESHOE COVE BRIDGE
SYMBOLS
Temporary Diversion Berm
Hor se sh oe C ov e
Br id ge
N
NO SCALE
Install 50 LNFT of temporary diversion berm. See Detail E157-08.
Install 80 LNFT of temporary diversion berm.
See Detail E157-08.
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
TRAFFIC CONTROL
CLOSED
ROAD
Har tsho rne Dri ve
Har tsho rne Dri ve
Construction area
600’
Mount on barricade, type 3
30"x48"
R11-2
FISHERMAN’S PARKING AREA
liart elcyciB e vi r D e n r o h st r a H e vi r D e n r o h st r a H
Construction Area
Parking Lot E
N
CLOSED
ROAD
30"x48"
R11-2 barricade, type 3
Mount on
PARKING LOT E
sign dimensions.
Control Devices, 2009 Edition" for
1. See "Manual on Uniform Traffic
Notes:
STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NO.
SHEET
SHEETS
TOTAL
GATEWAY NATIONAL RECREATION AREA
NJ 2013-1(2)
NJ ERFO SAHO
M
P R
O J E
C T
S g a te n j s a h o -1 (2
P r o j
D e v C
A D
D 1- S
A H
O p la n .d g n
T
IM
E
-M a y -2
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
File details come from the government source that posted it. Updated .