Gateway National Recreation Area - Reconstruction of Sandy Hook Unit Sites: NJ ERFO GATE SAHO 2013-1(2)
Solicitation number
DTFH71-13-B-00027
Issued by

About this file

Bid Opening date is extended to June 13 2013 at 2 00 pm EST.

View the file

Other files

File Type Posted
Amendment_001_-_NJ_ERFO_SAHO_GATE_2013-1(2).pdf PDF
VETS-100A-Form.pdf PDF
DSR_Parking_Lot_C.pdf PDF
FP03_Errata.pdf PDF
DSR_Horseshoe_Cove_Bridge.pdf PDF
Bidder's_Qualifications_Form.doc DOC document
Synopsis_Notice_NJ_ERFO_GATE_SAHO_2013-1(2).doc DOC document
DSR_Gunnison_Boardwalk.pdf PDF
DSR_Parking_Lot_D.pdf PDF
DSR_Parking_Lot_E.pdf PDF
DSR_Fisherman's_Parking_Area.pdf PDF
Subcontracting_plan.doc DOC document
FP03_Eng_.pdf PDF
IFB_Solicitation_-_NJ_ERFO_GATE_SAHO_2013-1(2).pdf PDF
Plans_NJ_ERFO_GATE_SAHO_2013-1(2).pdf PDF
DSR_Visitor_Center_Boardwalk.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7113B00027

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1406/10/2013002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/21/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: NJ ERFO SAHO GATE 2013-1(2)

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Change the bid opening date to June 13, 2013 at 2:00 pm EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 002

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project NJ ERFO SAHO GATE 2013-1(2) Reconstruction of Sandy Hook Unit Sites

Solicitation: DTFH71-13-B-00027

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Change the bid opening date to June 13, 2013 at 2:00 pm EST.

Questions / Clarifications

The following question and issue were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

Question 1- The detail shown on the drawings for 'SILT FENCE' with wire mesh backing and check dam, is this for all applications requiring silt fence or only in the waterway area for the box culvert at Horse Shoe Cove?

Response: The silt fence detail is for all work that requires silt fence in order to minimize the movement of sediment off-site. The waterway at Horse Shoe Cove will require a diversion berm as noted on Plan Sheet 16.

Question 2- Sandbagging at Horse Shoe Cove, is it the intent to completely close off the waterway during construction or should it be in 2 stages, half the width of the waterway at a time?

Response: The work will be completed in a manner that maintains flow of the waterway into the lagoon. Requests to reduce flow into the lagoon will need to be submitted to the CO for approval during construction.

Question 3- PERMITS, are any permits required?

Response: The project falls under the U.S. Army Corps of Engineers Nationwide Permit 3, for which pre-construction notification is not required. Also, this project is covered under Administrative Order No. 2013-13, which exempts the project from NJ DEP’s permit procedures. Neither of these documents eliminates the Contractor’s obligation to follow best construction practices while completing land disturbing activities. Depending on the Contractor's means and methods to perform the work, other permits may be required for the project, and are the Contractor's responsibility to obtain. See Subsection 107.01 of the mailto:eflhd.contracts@dot.gov

Info Page 2 of 2

FP for further details. Also, please note, Subsection 157.03 which states “Provide permanent and temporary erosion control measures to minimize erosion and sedimentation…”

Amendment 2 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 002
Project NJ ERFO SAHO GATE 2013-1(2)
Solicitation: DTFH71-13-B-00027