DSR_Horseshoe_Cove_Bridge.pdf
PDF 37 KB Posted
- Attached to
- Gateway National Recreation Area - Reconstruction of Sandy Hook Unit Sites: NJ ERFO GATE SAHO 2013-1(2)
- Solicitation number
- DTFH71-13-B-00027
About this file
DSR_Horseshoe Cove Bridge
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_002_-_NJ_ERFO_SAHO_GATE_2013-1(2).pdf | ||
| Amendment_001_-_NJ_ERFO_SAHO_GATE_2013-1(2).pdf | ||
| VETS-100A-Form.pdf | ||
| DSR_Parking_Lot_C.pdf | ||
| FP03_Errata.pdf | ||
| Bidder's_Qualifications_Form.doc | DOC document | |
| Synopsis_Notice_NJ_ERFO_GATE_SAHO_2013-1(2).doc | DOC document | |
| DSR_Gunnison_Boardwalk.pdf | ||
| DSR_Parking_Lot_D.pdf | ||
| DSR_Parking_Lot_E.pdf | ||
| DSR_Fisherman's_Parking_Area.pdf | ||
| Subcontracting_plan.doc | DOC document | |
| FP03_Eng_.pdf | ||
| IFB_Solicitation_-_NJ_ERFO_GATE_SAHO_2013-1(2).pdf | ||
| Plans_NJ_ERFO_GATE_SAHO_2013-1(2).pdf | ||
| DSR_Visitor_Center_Boardwalk.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet No: 1 of 4
DSR No:
Disaster No:
County: Latitude:
State: Longitude:
Road Name: Mile Post:
Maint. Level:
Type: N/A Traveled Way Width: N/A Surface Type: N/A Thickness: N/A ADT:
ID#: N/A Shoulder Width: N/A Surface Type: N/A Thickness: N/A Inspection Date:
Unit Unit Price
Unit Unit Price
LPSM
LPSM
LPSM
LNFT 0
LPSM
LNFT
CUYD
CUYD
LNFT
MFDM 0
LNFT
LPSM
LNFT
Eligible Ineligible
Eligible Ineligible
FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway
DAMAGE SURVEY REPORT * SAHO 007
(Title 23, Federal-Aid System/Federal Domain) * NJ-2013-1-NPS
COST ESTIMATE for EMERGENCY REPAIRS* Quantity Item Description Cost
11/14/2012
Classification:Road Data:Bridge Data:
-73.997940°
3.6 M (from gate)
Monmouth
New Jersey
Sandy Hook - Horseshoe CoveTimber Bridge
Applicant:
Agency:
Road No.
Gateway National Recreation Area
National Park Service
N/A
$0
Description and Cause of Damage:
Heavy storms from hurricane Sandy caused the timber wood pedestrian bridge to be damaged. Due to the strong winds the the deck is gone, the west end is destroyed and the culverts below the structure are broken. It seems that these culverts were providing some kind of support to the structure (refer to the pictures attached).
Scope/Description of Repair:
Remove existing railing, timber deck, timber headwalls. Remove existing culverts. Place new precast concrete box culvert and wingwalls designated to resist the dead and live loads indicated on the plans. Place Timber beams, timber railing and timber boardwalk. Place riprap.
$0
$0
$0
$0
Proposed: Force Account Contract Total Emergency Repairs $0
COST ESTIMATE for PERMANENT REPAIRS* Quantity Item Description Cost
$0
$0
100 Removal of Pipe Culvert
1 Mobilization (10%)
1 Survey and Staking (4%)
1 Contractor Testing (2.5%)
114 Structural Excavation 0
104 Fence (16 Gauge, galvanized, vinil coated, 2"x3" Welded Wire Mesh)
1 Removal of Bridge Superstructure (removing and resetting beams)
1.1 Structural Timber and Lumber, Treated (HCB) 0
16 10 Feet Span, 6 Feet Rise Reinforced Concrete Box Culvert, Double Barrel
67 Place Riprap, Class 4
64 Bridge Railing,Timber
*Attach Supplemental Sheets if necessary * Must be filled in
40.448740°
Signature: Date:
Reviewed By: (Name and Title) Signature: Date:
Identify Betterment, if any, and provide justification*
Submitted By: (Name and Title)*
Preliminary Engineering
Construction Engineering
Right-of-Way $0
Other
TOTAL ESTIMATED COST
(Emergency and Permanent Repairs)
Subtotal Permanent Repairs (continuation sheet) $0
1 Structural Timber and Lumber, Treated (reset timber beams)
130 Soil Erosion Control, Temporary Diversion Berm
Recommended By:* Eric Wright, EFLHD ERFO Coordinator
Signature: Date:
Proposed: Force Account Contract Total Permanent Repairs
$0
$0
File details come from the government source that posted it. Updated .