NATIONAL PARK BOUNDARY
NATIONAL FOREST BOUNDARY
WILDERNESS
MOUNT SKOKOMISH
Station
Ranger
Staircase
Cop per Cre ek
F iv e
St re am
N o rth
Fork Skokom ish
OLYMPIC NATIONAL FOREST
Lake Cushm an State Park
Standstill
Lake
Skokom ish
River
Dry C ree k
BEGIN PROJECT
END PROJECT
10+00.00
55+98.71
FOREST
OLYMPIC NATIONAL
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
APPROVED:
DATE
DATE
DATE
National Park Service
Regional Director, Pacific West Region, Olympic National Park
Superintendent, Western Federal Lands Highway Division
Chief of Engineering, on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P A
C I F I C
O C
A E
N tS rait ofJuan deFuca
OC
LU
MBIA R
IV
ER
A
SN
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
NORTH
CASCADES
NATIONAL
PARK
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
u n d o S t e g u
P
NATIONAL
PARK
SERVICE
Department of the Interior
WA NPS OLYM 207(1)
REHABILITATE STAIRCASE ROAD
LENGTH 1.649 MILES
K. LOFTSGAARDEN
SCALE IN MILES
0 1 21
N T o S h e lto n m ile s
L a k e C u s h m a n
R 5 W R 4 WR 6 W
T
N
T
N
0.060
25 MPH
e (max)
V
SADT
ADT (2037)
ADT (2017)
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d o ly m a a .d g n
WA NPS OLYM 207(1)
P
M
J u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
Subsurface Stablization, Pavement Marking.
Recondioning with Minor Grading and Paving, Construction, Drainage, Parking Surface
Paving, Pavement Resurfacing, Utilities Trench
WASHINGTON
MASON COUNTY
OLYMPIC NATIONAL PARK
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N ot for
Con str uc tio n
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
A
J u n e
U
S C m y fi le s p w p r o d u c ti o n d o ly m a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 NPS OLYM 207(1) WA
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
BEGIN PROJECT
VICINITY MAP
SCALE IN MILES
1 2 1 4
Ranger Station
Staircase
Rapids
Staircase
Skokom ish
R iv e r
COPPER
CREEK
BEAR
C
REEK
C U S H M A N
L A K E
NATIONAL PARK BOUNDARY
NATIONAL FOREST BOUNDARY
N A
T
IO
N A
L
N A
T
IO
N A
L
P A
R K
F O
R E S T
BO
U
N D
ARY
F O R E S T
N A T I O N A L
O L Y M P I C
F O R E S T
N A T I O N A L
O L Y M P I C
WILDERNESS
SKOKOMISH
MOUNT
C U S H M A N
L A K E
BO
U
N D
ARY
END PROJECT
10+00.00
N
Entry Fee station
55+98.71
End Overlay
Start Micro-Surface Work
Overflow Parking Work
Campground Micro-Surfacing Work
Public Parking Micro-Surfacing Work
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m a d .d g n
WA NPS OLYM 207(1)
J u n e
C h e c k e d b y
D e s ig n e d b y T
P h a n
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N ot for
Con str uc
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m a b .d g n
WA NPS OLYM 207(1)
u ly
T
P h a n
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
MAINLINE, STAIRCASE ROAD
10+00 to 53+78
LC
Existing ground
Tackcoat
TYPICAL SECTION
Varies Varies
Varies Varies
FOOTNOTE:
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O
L Y
M c a .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
[1]
[2]
[3]
QUANTITIES
AND SUMMARY OF
MAINLINE TYPICAL SECTION
[3]
[4]
[1] [1]
[2] [2]
[5]
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
(Shoulder rock)
Roadway aggregate, method 2
[6]
[6] type 1
Asphalt concrete pavement, Wedge and leveling course.
Asphalt concrete pavement, type 1
Va rie s Varies
Specification.
similar method. Do not compact as described in Standard
Compact by tamping excavator or backhoe bucket or
Place as directed by the CO to protect pavement edge.
determined and marked by the CO.
Locations are approximate, final location will be
See Sheet C.2 for details.
" Wedge and Leveling Course2
Quantity estimate based on 50% of the road need
Place wedge and leveling course as directed by the CO.
Match existing roadway cross slope roadway width varies from 14 ft to 23 ft.
Construct to match existing roadway width. Existing
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
NO SCALE
DEEP PATCH, TYPE 2
2" min., typ.
Existing ground
Existing ground
(geogrid lap)
4' typ.
CL
Select borrow 12" compacted lifts, typ.
1.0% min.
m in product, type 5B
Rolled erosion control
Bottom of subexcavation
Top of existing pavement6-inch compacted depth
Roaway aggregate, method 2
M at ch e xi st in g sl op e
DEEP PATCH DETAILS
Varies
Existing ground
(geogrid lap)
4' typ.
CL
Select borrow 12" compacted lifts, typ.
1.0% min.
m in
Bottom of subexcavation
Top of existing pavement 6-inch compacted depth
Roaway aggregate, method 2
2" min.
Geogrid, stablization
Geogrid,stabilization
DEEP PATCH, TYPE 1
Place in two equal lifts.
4-inch compacted depth.
Asphalt concrete pavement
Place in two equal lifts.
4-inch compacted depth.
Asphalt concrete pavement
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
Varies
Varies
[1]
[2]
FOOTNOTE:
[1]
[2]
Width varies as determined by the CO.
Quantity estimate is base on 24 ft.
Width varies as determined by the CO.
Quantity estimate is base on 16 ft.
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
Apply turf esblishment as directed by the CO on disturbed slope
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O
L Y
M c b .d g u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
Construction Limits Construction Limits
Grade Varies Grade Varies
Slope
Variable
Var ies
Varies
TYPICAL SECTION
MICRO-SURFACING
See Summary Tabulation Sheets
For Roadway Width or Parking Lot Dimensions
Existing asphalt surface
NOTE:
Micro-Surfacing, Type 2 or Type 3
OF QUANTITY
SECTION AND SUMMARY
MICRO-SURFACING TYPICAL
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O
L Y
M c c .d g n
WA NPS OLYM 207(1)
J u n e
C h e c k e d b y
D e s ig n e d b y T
P h a n
1. See Sheet D.5 for location.
2. Measure existing roadway widths as per
152.05(m)
3. Patch surface and seal/fill cracks prior to micro-surfacing.
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
PLAN QUANTITIES
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m fa .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
PLAN AND PLAN
Stationing reference line
Stationing reference line
See C Sheets for details and quantity
Deep Patch, type 1 See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 2
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m fb .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
BEGIN PROJECT
WA NPS OLYM 207(1)
10+00
Begin overlay work
Install pipe culvert, 24"
Remove existing culvert
Install pipe culvert, 18"
Remove existing culvert
Install pipe culvert
Remove existing culvert
Install pipe culvert, 24"
Remove existing culvert dao R es acri atS
Stairca se Roa d
P
R
T
C
M P I
N L E
T
C
M P I
N L E
T
" C
M P
IN
L E T
" C
M P
IN
L E T
P
R
T
C
M P I
N L E
T
C
M P I
N L E
T
" C
M P
IN
L E T
" C
M P
IN
L E T
GPS
STAIR1
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
GPS
STAIR1
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
C
M P I
N L E
T
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
PLAN AND PLAN
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
See C Sheets for details and quantity
Deep Patch, type 1
Install gabion outlet headwall
Install pipe cuvert 24'
Remove existing culvert
[details TBD)
Install Gabion
Stationing reference line
Stationing reference line
Install pipe culvert, 24"
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m fc .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
Staircase Road
Staircase Road
G P S
S T
A
IR
TD
A
M A
G E
D
C
M P O
U T
L E
T
P
R
P
R
W
IL
D L
IF
E A
R E
A B
O U
N D
A R
Y
" C
M
P IN
LE
T
C
M P I
N L E
T
T
L P S
C
M P I
N L E
T
L O
G S
L O
G S
G P S
S T
A
IR
P
R
P
R
W
IL
D L
IF
E A
R E
A B
O U
N D
A R
Y
" C
M
P IN
LE
T
T
C
M P I
N L E
T
C
M P I
N L E
T
T
L P S
C
M P I
N L E
T
L O
G S
L O
G S
5 4
P
R
C
M P I
N L E
T
C
M P I
N L E
T
C
C
R
C
M P I
N L E
T
C
M P I
N L E
T
C
C
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
PLAN AND PLAN
Stationing reference line
Stationing reference line
Install pipe culvert, 36"
Remove existing pipe culvert
END OVERLAY WORK
BEGIN MICRO-SURFACING WORK
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m fd .d g n
WA NPAS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
See C Sheets for details and quantity
Deep Paatch, type 1
Staircase Ro ad
Staircase Road
C P
/8
" IR
W /F
H W
A A
L U
M C
A P
C P
P
R
P
R
E L
E V
C
M P
IN
L E T
E L
E V
N O P
A R
K
IN
G
N O P
A R
K
IN
G S P E E
N L
IM
IT
TS
S
E L E
V
.7
" C
M P
IN
L E T
E L E
V
.6
T
E L
E V
C
M P I
N L E
T
E L
E V
E L
E V
E L
E V
F E E S
C H
E D
U L E
X
' C
M P
C P
P
R
P
R
E L
E V
C
M P
IN
L E T
E L
E V
N O P
A R
K
IN
G
N O P
A R
K
IN
G S P E E
N L
IM
IT
TS
S
E L E
V
.7
" C
M P
IN
L E T
E L E
V
.6
T
E L
E V
C
M P I
N L E
T
E L
E V
E L
E V
E L
E V
F E E S
C H
E D
U L E
X
' C
M P
C P
C P
P
T
S
A C
H N
SPEEDHUMP
SPEEDHUMP
C P
T
T C P
T
C
M P I
N L E
T
" C
O N
C R E T E O
U T L E T
T
X
' C
M P
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
LEGEND:
Micro-surfacing Type 3
Micro-surfacing Type 2
AREA
MICRO-SURFACING
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m fe .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y
Staircase Public Parking
Staircase Road
Connector Road
Staircase Campground
Staircase Campground Loop
1. See Road Inventory Program (RIP) data for
Olympic National Park Cycle 4 Report for additional maps and route information
(except where noted as Cycle 5).
2. Unique colors and shades used to differentiate routes and surface treatment.
No Work Unless Noted Otherwise
2000'1000'0
Scale in Feet
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16101 807656.903 942221.024 801.727 47°30'49.272052"N 123°19'32.670596"W 734.2763 1.00001121 5/8" IR w/FHWA Alum cap 1.
16102 808070.399 941831.738 806.695 47°30'53.212534"N 123°19'38.553477"W 739.2476 1.00001128 5/8" IR w/FHWA Alum cap
17103 808216.931 941495.883 805.126 47°30'54.538898"N 123°19'43.519308"W 737.6753 1.00001146 5/8" IR w/FHWA Alum cap
17104 808398.889 941683.225 830.873 47°30'56.399748"N 123°19'40.887023"W 763.4289 1.00001038 5/8" IR w/FHWA Alum cap
17105 808317.075 941839.643 821.693 47°30'55.648182"N 123°19'38.567176"W 754.2489 1.00001076 5/8" IR w/FHWA Alum cap
STAIR1 805198.967 943807.899 744.434 47°30'25.590696"N 123°19'08.290289"W 676.9571 1.00001208 5/8" IR w/FHWA Alum cap
STAIR2 805340.845 943316.905 756.771 47°30'26.816783"N 123°19'15.510950"W 689.2908 1.00001159 5/8" IR w/FHWA Alum cap
PROJECT : Rehabilitate Staircase Road DATE OF FIELD WORK :Multiple Entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Washington South SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID 12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\W as hi ng to n\
S ta ir ca se \L
G O
St ai rc as e_ co nt ro ls he et
.x ls x] Sh ee t
-J un -2
:5
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.6
SHEET
NUMBER
NPS OLYM 207(1)WA
SURVEY CONTROL
Prel im ina ry
- N uc
Varies
Existing ground
CL
2-inch compacted depth
Roaway aggregate, method 2
Place tack coat between lifts
TYPICAL SECTION, APPROACH ROAD AND PARKING
Va rie s
VariesVaries
VariesVaries
[1][1]
[2] [2]
FOOTNOTE:
[1]
[2] Construct cross slope as shown...
Construct as point layout shown on Sheet E.__
TABULATION OF QUANTITIES
TYPICAL SECTION AND
APPROACH ROAD AND PARKING
Aggregate surface reconditioning
Asphalt concrete pavement, type 1
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O
L Y
M e a .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n ti mil n oit c u rt s n o C ti mil n oit c u rt s n o C
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc berm to berm water from hillside, 4' wide, Proposed ditch to collect
Parallel Parking?
11'
5'
11'11'
22'
51.5'
Existing edge of graval
11'
PARKING LAYOUT
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m e b .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
.5
1" = 20"
Scale in Feet
40200
Proposed edge of pavement will be included once concept is hatched out.
the mainline. Approach road alignment
Note--This location start 100 feet from
6" D
IA
C
OVER
NUT
ELE
V
7.
NUT
ELE
V
4.
CP
CP
TU
P
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W
ATE
R
W A R N I N G
B U R I E D
U T I L I T Y
W
ATE
R
W A R N I N G
B U R I E D
U T I L I T Y
W
ATE
R
NUT
ELE
V
7.
6" D
IA
C
OVER
NUT
ELE
V
7.
6" D
IA
C
OVER
PROPANE
" F
IR
" F
IR
" F
IR
" F
IR
6" D
IA
C
OVER
W V
W V
W V
W V
W V
W F
W V
"X
" C
OVER W
V
"X
" C
OVER
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u a .d g n
WA NPS OLYM 207(1)
J u n e
C h e c k e d b y
D e s ig n e d b y T
P h a n
UTILITIES QUANTITIES
TABULATION OF
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
Stationing reference line
Stationing reference line
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u b .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
BEGIN PROJECT
WA NPS OLYM 207(1)
Utilities trench 10+00
Begin utilites trench work
PLAN AND PLAN
UTILITIES
Utilites trench one box per 1000 ft, plus 1 box for sharp turn, and 1 box for the end.
Utilites box location TBD. Current estimate based on
Owner will be identified.
Any existing utilites will need to be located, Note to reviewer:
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
Stationing reference line
Stationing reference line
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u c .d g n
WA NPS OLYM 207(1)
J u n e
C h e c k e d b y
D e s ig n e d b y T
P h a n
Utilites trench
PLAN AND PLAN
UTILITIES
Utilities trench
5 4
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
Stationing reference line
Stationing reference line
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u d .d g n
WA NPAS OLYM 207(1)
J u n e
C h e c k e d b y
D e s ig n e d b y T
P h a n
END UTILITIES TRENCH
Utilites trench
Utilites trench
PLAN AND PLAN
UTILITES
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
DETAILS
UTILITY VAULT
LOADBREAK VAULT LID
ring and lock (typ.)
Recessed lifting m in ty p
BB
6'-10"
C C
5'-0"
2" Ø drain hole
6" Ø sump with knockout
Ground rod
(4 required)
1 @ each corner
Galvanized pulling iron rack (typ.)
Hardware mounting
8 each wall
8" Ø knockout (typ.)
Existing ground surface
Top of paved
3'-0"
3'-0"
SECTION C-C
SECTION A-A
SPLICE VAULT LID
cover and ductile iron locking
38 1/2" ø Cast iron ring
6"
6'-10"
AA
System identification
5/8" Ø Threaded insert (typ.)
Diamond pattern
Diamond pattern
System identification
Ground stud
1-2" Ø
Lift hole (typ.), 12" 12"
30"
PLAN VIEW
Concrete collar
6'-0" 4'-0"
SECTION B-B
(SHOWN WITH LOADBREAK LID)
SPLICE VAULT and LOADBREAK VAULT BASE m in m a x
7.
6.
5.
4.
3.
2.
1.
Install Splice vault lid on vaults placed within the roadway.
the manufacturer's recommendations.
Paint vault lids with flat black epoxy coating, according to
Install top of vault lids to 1/2" below pavement grade.
Apply emulsified asphalt to exposed concrete surfaces after final paving.
and the actual arrangement.
to the approved manufacturer's shop drawings for all dimensions shown. Each manufacturer's Cable Vault assembly will vary. Refer
This drawing depicts a typical Vault assembly. Reinforcing not
Final vault location to be approved by CO.
Place concrete collar around manhole rim.
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u e .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NO SCALE
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
PLAN
PLAN
(3) Separable splice with overall jacket
EPR insulationwith overall jacket
EPR insulation insulated protective cap with bracket, ground lead and with insulated standoff bushing
Loadbreak elbow and junction, END VIEWSECTION
"2 145'-10""2
1 each side, 2 sides
" Ø Lift hole,2
Galvanized "C" channel 6"
6"
2 each end, 2 ends 6" x 8" Knockout, FOOTNOTE:
NOTE:
2" PVC conduit (4)2" PVC conduit (4)
" ground rod with clamps4 3 " ground rod with clamps4 electrical vault
Precast concrete electrical vault
Precast concrete
2" Conduit (4) 2" Conduit (4)
3'-1"
LOADBREAK VAULT WIRING DIAGRAM
SPLICE VAULT WIRING DIAGRAM
VAULT DETAILSCOMMUNICATIONS VAULT
Install fault indicators.
Section 636.05A.
Install compatible cable hangers in accordance with according to the manufacturer's recommendations.
When located in the roadway, install with circular vault lid
Set vault lids 1/2" below pavement surface.
Top of vault to match existing slope.
All vault locations are to be approved by the CO prior to excavating.
4.
3.
2.
1.
F.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u f.
d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NO SCALE
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
DETAILS
UTILITY TRENCH
NOTE:
24"
Saw cut
Existing finished gradeSaw cut
Undisturbed native material
Bedding material
2" PVC conduit (3)
3"
Existing pavement structure, depth varies marker tape Telecom
8" compacted depth
Crushed Aggregate, 6" min.
6" min.
4" compacted depth
Asphalt Concrete, Power marker tape
UTILITY TRENCH
(TBD)
Backfill material
Saw cut pavement at all trench locations.1.
F.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o ly m u g .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
10.4 x 16 25101 -0300
25301 -0000
60201 -0600
60201 -0800
60201 -1000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
G A B
IO
N S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD SQFT LNFT LNFT LNFT Lt Rt 10+51 55 For UT Trenching conf 111+90 50 For UT Trenching conf 13+46 70 For UT Trenching conf 16+20 60 For UT Trenching conf 27+67 6 200 45 For Road Mtn 41+50 50 For Road Mtn 52+84 55 For UT Trenching conf
PROJECT TOTAL 0 6 200 55 230 100
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D ra in ag e.
xl sx ]S he et
9- Ju l-
2:
P M
T.
P ha n
6/
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
G.1
SHEET
NUMBER
NPS OLYM 207(1)WA
NPS PMIS No. 170144 NPS Drwg. No. --/----
Note: The quantities shown hereon are approximate and are subject to field adjustments.
Prel im ina ry
- N uc
1.
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
NPS Drwg. No. ---/------
NPS PMIS No. 170144
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m g b S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Prel im ina ry
- N uc
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
NPS Drwg. No. ---/------
NPS PMIS No. 170144
602-2
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
STATE PROJECT
NUMBER
SHEET
G.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m g c S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
Prel im ina ry
- N uc
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
NPS Drwg. No. ---/------
NPS PMIS No. 170144
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O
L y m g d S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
Prel im ina ry
- N uc
6.
5.
4.
3.
2.
1.
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
CONCRETE ROUND PIPE CULVERT LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
SIZE
PIPE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
adjusted to tie into impervious material.
material is used for backfill. Width may be material at the pipe inlet where granular
Construct a piping plug of impermeable backfill
Roadway embankment
Limits of pipe compaction
SECTION A-A
install the pipe culvert according to the limits of pipe
Where unyielding or unstable material is encountered, the compaction limits shall be the walls of the trench.
in an embankment. For pipe installation in a trench, Pipe compaction limits shown are for pipe installation and rigid pavements.
pipe to the top of the pavement for both flexible
Measure maximum fill height from the top of the to the top of the pavement for rigid pavements.
culvert to the subgrade for flexible pavements, and
Measure minimum cover from the top of the pipe of camber or increase the pipe culvert gradient.
the elevation of the inlet invert, reduce the amount elevation on the parabolic curve as designed exceeds
Develop camber on a parabolic curve. If the midpoint ordinate amount equal to 1% of the pipe length.
a chord through the inlet and outlet inverts an
When directed, camber pipe culverts upwards from in the contract documents.
Use Supplemental Concrete Pipe Tie when specified
AASHTO Standard Specifications for Highway Bridges.
structural pipe designs meeting the criteria of may be increased on approval of site-specific
Maximum fill heights for pipe culvert installations
A
A lean concrete backfill in accordance with Section 614
Compacted backfill material placed in layers
Bedding (See table)Bedding (See table)
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast
Tapered holes permitted over pipe joint
Do not install fastener
O Ring if required
2H2H
602-7
STANDARD APPROVED FOR USE 12/1993
DRAFT: 6/2008
REVISED: 4/1994 6/2005
CULVERT INSTALLATION
CONCRETE PIPE
compaction shown on Standard 602-3.
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H
" min.2 12'-6 not exceeding 6" compacted depth.
not exceeding 6" compacted depth, or
1'-0" (min.)
" dia. hole for4
" max.2 12'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
1" dia. Joint tie
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m g f_
S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
H H
H H
Prel im ina ry
- N uc
TRAFFIC CONTROL QUANTITY
TUBULATION OF TEMPORARY
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O ly m n a .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
C
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
NPS Drwg. No. ---/------
NPS PMIS No. 170144
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m n b S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Prel im ina ry
- N uc
PROCEED
WHEN
CLEAR
NO SCALE
PROCEED
WHEN
CLEAR
PROCEED
WHEN
CLEAR
Traffic flow
Traffic flow
R1-1
See Note 4
G20-2
W3-1
(optional)
W1-4
Special sign
R1-1
Special sign
Spacing Table)
(See Length and
8.
7.
6.
5.
4.
3.
2.
1.
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Use the "STOP AHEAD" (W3-1) sign when approach speeds exceed
Section 3B.16 of the MUTCD.
If the roadway surface is paved, install stop lines that comply with
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field
Place devices similar to those depicted for the opposite direction of travel.
Advance warning area signs are shown for one direction of travel only.
sufficient visibility of approaching vehicles.
approaching vehicular traffic through and beyond the work site and have
Use this layout only if road users from both directions are able to see in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored
STOP
STOP
See Note 4
W20-1 W20-4
(optional)
W13-1P
See Note 7
(optional)
W16-2P
WORK SPACE
(optional) (optional)
LENGTH
BUFFER SPACE
NOTE:
reflective white background
Black lettering on
SPECIAL SIGN
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
ROAD WORK
END
xxx
FEET
ABC
ADVANCE WARNING AREA (See Sign Spacing Table) (See Length and Spacing Table) VARIABLE TERMINATION AREA
BUFFER SPACETAPER AREA
Device spacing
BUFFER SPACE TAPER AREA A
See Note 6
STOP LINE
light (optional)
Type B warning to provide access to work space downstream taper if necessary
Reduce or eliminate drums in
Channelizing devicesSee Note 6
STOP LINE
NPS Drwg. No. ---/------
NPS PMIS No. 170144
635-8
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
(WITH STOP SIGN)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
MPH FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50 MPH.
50' - 100' (optional)50' - 100'
" Black border2
165' - 230'
See Note 5
10' min.
15'
D
D
D
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m n c S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
24"
R
Prel im ina ry
- N uc
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS Drwg. No. ---/------
NPS PMIS No. 170144
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m n d S td
.d g n u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
Prel im ina ry
- N uc
TRAFFIC CONTROL QUANTITY
TUBULATION OF PERMANENT
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d O ly m ta .d g n
WA NPS OLYM 207(1)
u ly
C h e c k e d b y
D e s ig n e d b y T
P h a n
TABULATION TO BE DEVELOPED
LEFT BLANK INTENTIONALLY
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Prel im ina ry
- N uc
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
WOOD POST SELECTION TABLE
Direction of traffic flow
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
5.
4.
3.
2.
1.
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Location
Rural Districts
Residence Districts
Business or
See table for hole size post, parallel to sign face.
Field drill holes through a secondary sign mounted below another sign.
exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Finish ground line
NO SCALE
rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil fit field conditions.
indicate overall post length. Select post lengths to 4 thru H1H is vulnerable to being struck when placed outside the clear zone.
Traffic barrier protection is required for all posts larger than
CL post
Backfill material
W
0.15X0.35X0.35X0.15X ty p
Z
.5
Y
H
H
H
V Y
Backfill material
W
0.125X0.25X0.25X0.25X0.125X
.5
Y Z
H
H
H
H ty p
D
V Y
V Y
H
Z ty p
D
Same post size
Same post size
Bottom of sign
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
H
Same post size
Backfill material
(See Post Selection table)
Notch depth (where required)
W
W
Backfill material
.5
Y
Z ty p
D
V Y
H
.5
Y
0.2X0.6X0.2X NPS Drwg. No. ---/------
NPS PMIS No. 170144
W633-7
REVISED:
DETAIL APPROVED FOR USE 10/2009
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
Product of X-Y-Z in CUFT
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
For all retroflectorized signs where W > 25'
6 ft 5 ft
7 ft 2 ft
V may be reduced by 1 foot in rural districts for
22 ft (max.)
X=14 ft (min.) to maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
WOOD POSTS
INSTALLATION
PERMANENT SIGN
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
" oversized washer16 5" lock nut16
" bolt16
" bolt thru the post8
6" x 8" when located within the clear zone or if the post
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
I.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m tb
W
.d g n u ly
NOTE:
all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum
Prel im ina ry
- N uc
Striping Plans.
accessibility symbol unless a border is indicated in the
The Accessibility Parking Space marking only includes the
"Standard Highway Signs", current edition.
All letters, numerals and symbols shall conform with the current edition.
with the ''Manual on Uniform Traffic Control Devices'' (MUTCD), Place pavement word and symbol markings in accordance
3.
2.
1.
TYPE
ACCESSIBILITY PARKING SPACE MARKING
"AHEAD" WORD MARKING "SCHOOL" WORD MARKING
"ONLY" WORD MARKING"YIELD" WORD MARKING"STOP" WORD MARKING
TURN LANE-USE ARROW PAVEMENT MARKING AREASLANE-USE ARROW
THROUGH
LANE-USE ARROW
TURN AND THROUGH
TRIANGLE SYMBOL
YIELD AHEAD
NOTE:
NO SCALE
Turn and Through Lane-Use Arrow
Turn Lane-Use Arrow
Through Lane-Use Arrow
YIELD Word Marking
STOP Word Marking
SCHOOL Word Marking
ONLY Word Marking
AHEAD Word Marking
Accessibility Marking w/ border (Blue)
Accessibility Marking w/ border (White)
Accessibility Marking (symbol only) specified in the Striping Plans
Blue background when border in the Striping Plans
White border when specified
W634-1
REVISED: 11/2006 10/2007
DETAIL APPROVED FOR USE 3/2003
WESTERN FEDERAL LANDS HIGHWAY DIVISION
6'
(V
M
P H
(V
M
P H
(V
M
P H
(V
M
P H
8"
.5
.5
14"12"14"
12"30"30"
33"
R
R
12"30"30"
.7
.7
33"
R
14"
6.75'
4" Typical
4" Minimum
T y p
4" Minimum
4" Typical
Yield Ahead Triangle (V≥45 MPH)
Yield Ahead Triangle (V≤40 MPH)
7'
9.75'8'
6'
27"
R
27"
T y p
SQFT
M in im u m
6" R
SYMBOLS AND WORDS
PAVEMENT MARKINGS
3" Minimum
9" R
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
I.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d O ly m td
W
.d g n u ly
NPS Drwg. No. ---/------
NPS PMIS No. 170144
45"
3"R
3"R
3"R
24" Minimum
Prel im ina ry
- N uc
File details come from the government source that posted it. Updated .