Plan_Sheets.pdf
PDF 13 MB Posted
- Attached to
- WA NPS OLYM 207(1), Rehabilitate Staircase Road
- Solicitation number
- DTFH7017B00039
About this file
Plan Sheets
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d o ly m a b .d g n
WA NPS OLYM 207(1)
A
M
D e c e m b e r
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. ---/------
NPS PMIS No. 170144
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I -
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 500
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 5,100 5,100
A0160 20103-0000 CLEARING AND GRUBBING SQYD 30 30
A0180 20402-0000 SUBEXCAVATION CUYD 2,660 2,660
A0200 20411-0000 SELECT BORROW TON 3,600 3,600
A0220 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NONWOVEN) SQYD 6,500 6,500
A0240 20703-2000 GEOGRID, STABILIZATION (TYPE II) SQYD 200 200
A0260 20720-0200 REINFORCEMENT GEOSYNTHETIC, TYPE 2 SQYD 10,100 10,100
A0280 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 30 30
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 930 930
A0320 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 1 1
A0340 30302-1000 DITCH RECONDITIONING LNFT 750 750
A0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,400 1,400
A0380 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 wedge and leveling course TON 140 140
A0400 40901-2000 MICRO SURFACING, TYPE 2 SQYD 4,900 4,900
A0420 41201-0000 TACK COAT TON 7 7
A0440 41402-2000 CRACKS, CLEANING AND SEALING and cleaning and filling MILE 1.0
A0460 60201-0600 18-INCH PIPE CULVERT LNFT 36 36
A0480 60201-0800 24-INCH PIPE CULVERT LNFT 250 250
A0500 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 55 55
A0520 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 1 1
A0540 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,400 1,400
A0560 60704-0000 CLEANING CULVERT IN PLACE EACH 13 13
A0580 62901-1300 ROLLED EROSION CONTROL PRODUCT, TYPE 5.B SQYD 400 400
A0600 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0620 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 25,200 25,200
A0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 750 750
A0660 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 10 10
A0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
A0720 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 78 78
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-D ec
-2
:2
A M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
STATE PROJECT
B.1NPS OLYM 207(1)WA
SHEET
NUMBER
NPS Drwg No. ---/-----
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 500
B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 500 500
B0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 5,100 5,100
B0180 20103-0000 CLEARING AND GRUBBING SQYD 30 30
B0200 20103-0000 CLEARING AND GRUBBING SQYD 30 30
B0220 20301-3400 REMOVAL OF WHEELSTOP EACH 42 42
B0240 20402-0000 SUBEXCAVATION CUYD 2,660 2,660
B0260 20411-0000 SELECT BORROW TON 3,600 3,600
B0280 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NONWOVEN) SQYD 6,500 6,500
B0300 20703-2000 GEOGRID, STABILIZATION (TYPE II) SQYD 200 200
B0320 20720-0200 REINFORCEMENT GEOSYNTHETIC, TYPE 2 SQYD 10,100 10,100
B0340 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 30 30
B0360 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 80 80
B0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 930 930
B0400 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 1 1
B0420 30302-1000 DITCH RECONDITIONING LNFT 750 750
B0440 30303-2000 AGGREGATE SURFACE RECONDITIONING SQYD 4,140 4,140
B0460 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,400 1,400
B0480 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 wedge and leveling course TON 140 140
B0500 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 665 665
B0520 40901-2000 MICRO SURFACING, TYPE 2 SQYD 4,900 4,900
B0540 41201-0000 TACK COAT TON 3 3
B0560 41201-0000 TACK COAT TON 7 7
B0580 41402-2000 CRACKS, CLEANING AND SEALING and cleaning and filling MILE 1.0
B0600 60201-0600 18-INCH PIPE CULVERT LNFT 36 36
B0620 60201-0800 24-INCH PIPE CULVERT LNFT 250 250
B0640 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 55 55
B0660 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 1 1
B0680 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,400 1,400
B0700 60704-0000 CLEANING CULVERT IN PLACE EACH 13 13
B0720 62901-1300 ROLLED EROSION CONTROL PRODUCT, TYPE 5.B SQYD 400 400
B0740 63316-1000 REMOVE AND RESET SIGN EACH 2 2
B0760 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 25,200 25,200
B0780 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 2,500
B0800 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 750 750
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
2)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
A M
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
STATE PROJECT
B.2NPS OLYM 207(1)WA
SHEET
NUMBER
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
B0820 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3
B0840 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
B0860 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 10 10
B0880 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
B0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 78 78
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
3)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
A M
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
STATE PROJECT
B.3NPS OLYM 207(1)WA
SHEET
NUMBER
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
C0020 15101-0000 MOBILIZATION LPSM ALL
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
C0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
C0080 15401-0000 CONTRACTOR TESTING LPSM ALL
C0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
C0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 500
C0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 5,100 5,100
C0160 20103-0000 CLEARING AND GRUBBING SQYD 30 30
C0180 20402-0000 SUBEXCAVATION CUYD 2,660 2,660
C0200 20411-0000 SELECT BORROW TON 3,600 3,600
C0220 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NONWOVEN) SQYD 6,500 6,500
C0240 20703-2000 GEOGRID, STABILIZATION (TYPE II) SQYD 200 200
C0260 20720-0200 REINFORCEMENT GEOSYNTHETIC, TYPE 2 SQYD 10,100 10,100
C0280 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 30 30
C0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 930 930
C0320 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 1 1
C0340 30302-1000 DITCH RECONDITIONING LNFT 750 750
C0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,400 1,400
C0380 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 wedge and leveling course TON 140 140
C0400 40901-2000 MICRO SURFACING, TYPE 2 SQYD 4,900 4,900
C0420 41201-0000 TACK COAT TON 7 7
C0440 41402-2000 CRACKS, CLEANING AND SEALING and cleaning and filling MILE 1.0
C0460 60201-0600 18-INCH PIPE CULVERT LNFT 36 36
C0480 60201-0800 24-INCH PIPE CULVERT LNFT 250 250
C0500 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 55 55
C0520 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 1 1
C0540 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,400 1,400
C0560 60704-0000 CLEANING CULVERT IN PLACE EACH 13 13
C0580 62901-1300 ROLLED EROSION CONTROL PRODUCT, TYPE 5.B SQYD 400 400
C0600 63316-1000 REMOVE AND RESET SIGN EACH 2 2
C0620 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 25,200 25,200
C0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 750 750
C0660 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
C0680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 10 10
C0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
C0720 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 78 78
C0740 63610-1600 CONDUIT, 2-INCH, PVC LNFT 16,875 16,875
C0760 63621-5000 UTILITY BOX, CONCRETE EACH 8 8
C0780 63622-0000 UTILITY TRENCH TYPE A LNFT 4,300 4,300
C0800 63622-0000 UTILITY TRENCH TYPE B LNFT 1,350 1,350
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
4)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
A M
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
STATE PROJECT
B.4NPS OLYM 207(1)WA
SHEET
NUMBER
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
D0020 15101-0000 MOBILIZATION LPSM ALL
D0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
D0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
D0080 15401-0000 CONTRACTOR TESTING LPSM ALL
D0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
D0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 500
D0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 500 500
D0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 5,100 5,100
D0180 20103-0000 CLEARING AND GRUBBING SQYD 30 30
D0200 20103-0000 CLEARING AND GRUBBING SQYD 30 30
D0220 20301-3400 REMOVAL OF WHEELSTOP EACH 42 42
D0240 20402-0000 SUBEXCAVATION CUYD 2,660 2,660
D0260 20411-0000 SELECT BORROW TON 3,600 3,600
D0280 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NONWOVEN) SQYD 6,500 6,500
D0300 20703-2000 GEOGRID, STABILIZATION (TYPE II) SQYD 200 200
D0320 20720-0200 REINFORCEMENT GEOSYNTHETIC, TYPE 2 SQYD 10,100 10,100
D0340 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 30 30
D0360 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 80 80
D0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 930 930
D0400 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 1 1
D0420 30302-1000 DITCH RECONDITIONING LNFT 750 750
D0440 30303-2000 AGGREGATE SURFACE RECONDITIONING SQYD 4,140 4,140
D0460 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,400 1,400
D0480 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 wedge and leveling course TON 140 140
D0500 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 665 665
D0520 40901-2000 MICRO SURFACING, TYPE 2 SQYD 4,900 4,900
D0540 41201-0000 TACK COAT TON 3 3
D0560 41201-0000 TACK COAT TON 7 7
D0580 41402-2000 CRACKS, CLEANING AND SEALING and cleaning and filling MILE 1.0
D0600 60201-0600 18-INCH PIPE CULVERT LNFT 36 36
D0620 60201-0800 24-INCH PIPE CULVERT LNFT 250 250
D0640 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 55 55
D0660 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 1 1
D0680 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,400 1,400
D0700 60704-0000 CLEANING CULVERT IN PLACE EACH 13 13
D0720 62901-1300 ROLLED EROSION CONTROL PRODUCT, TYPE 5.B SQYD 400 400
D0740 63316-1000 REMOVE AND RESET SIGN EACH 2 2
D0760 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 25,200 25,200
D0780 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 2,500
D0800 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 750 750
SUMMARY OF QUANTITIES - Schedule D
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
5)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
A M
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
STATE PROJECT
B.5NPS OLYM 207(1)WA
SHEET
NUMBER
TYPICAL
SECTIONS PLAN & PLAN
APPROACH
ROADS &
PARKING
UTILITIES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROLL
ALLOWANCE Bid
Schedule
D0820 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3
D0840 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
D0860 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 10 10
D0880 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
D0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 78 78
D0920 63610-1600 CONDUIT, 2-INCH, PVC LNFT 16,875 16,875
D0940 63621-5000 UTILITY BOX, CONCRETE EACH 8 8
D0960 63622-0000 UTILITY TRENCH TYPE A LNFT 4,300 4,300
D0980 63622-0000 UTILITY TRENCH TYPE B LNFT 1,350 1,350
SUMMARY OF QUANTITIES - Schedule D
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A N
PS
O
LY
M
(1
EE
_s um m ar y.
xl sm
]S he et
6)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
A M
MileStone: 100% Date Completed: 11/28/18 Report Date: 12/14/18
STATE PROJECT
B.6NPS OLYM 207(1)WA
SHEET
NUMBER
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m c a .d g n
WA NPS OLYM 207(1)
N o v e m b e r
L a n g e
J
K e tt e lk a m p
C h e c k e d b y
D e s ig n e d b
NO SCALE
NOTE:
slope areas. Refer to deep patch and reinforced soil slope quantities table for pavement quantities
Culverts replacements 13+46, 16+20, and 27+67 are located within deep patch and reinforced soil 2.
determined and marked by the CO.
Locations of deep patch and reinforced soil slope repairs are approximate, final location will be 1.
MAINLINE, STAIRCASE ROAD
10+00 to 61+65
Varies
M at ch e xi st in g sl op e
M at ch e xi st in g sl op e
NO SCALE
Bottom of subexcavation
DEEP PATCH, TYPE 1
C o n s tr u c ti o n l im it
[1]
C o n s tr u c ti o n l im it
3.0% min.
DEEP PATCH, TYPE 2
3.0% min.
Bottom of subexcavationC o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
(Schedule A, B, C, and D)
1V:2.5H 1V:
2.
5H
TYPICAL SECTIONS
Reinforcement geosynthetic, type 2
[1]
Geogrid, stabilization, type II
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m c b .d g n
WA NPS OLYM 207(1)
N o v e m b e r
L a n
K e tt e lk a
C h e c k e d b y
D e s ig n e d b
Existing ground
Varies m in
Underdrain system.
See Sheet G.2 for details
6" compacted depth
Roaway aggregate, method 2
LC
Place in two equal lifts
4" compacted depth.
Asphalt concrete pavement, type 1
Tack coat
Existing ground m in
Underdrain system.
See Sheet G.2 for details
6" compacted depth method 2
Roadway aggregate, [2]Varies
LC
Place in two equal lifts.
4" compacted depth.
Asphalt concrete pavement, type 1
Tack coat
Select borrow 9" compacted lifts, (typ.)
(Schedule A, B, C, and D)
(Schedule A, B, C, and D)
LC
type 1, 2-inch depth
Asphalt concrete pavement, [4] Varies [4]Varies
[3](wedge and leveling course)
Asphalt concrete pavement, type 1, Tack coat
Finished Grade
FOOTNOTE:
Geotextile filter,Class 1, type A (non-woven)
Geotextile filter,Class 1, type A (non-woven)
WRAP DETAIL
overlap 4' (typ.)
ty p
Ditch reconditioning as directed by CO
Ditch reconditioning as directed by CO
See Wrap Detail
See Wrap Detail
Select borrow 9" compacted lifts, (typ.)
Base course
Cover safety edge with aggregate-topsoil.
control product, type 5.B
Rolled erosion
SAFETY EDGE DETAIL
asphalt shoulder finishing (2' typ)
Roadway aggregate, shoulder finishing (2' typ)
Roadway aggregate, Varies
Finished grade
Finished grade
Match existing roadway cross slope.[4] and leveling course.
" wedge 2 1estimate based on 50% of the road area needing
Place wedge and leveling course as directed by the CO. Quantity [3] based on 16-feet.
Width varies as determined by the CO. Quantity estimate is [2] width varies from 14-feet to 23-feet.
Construct to match existing roadway width. Existing roadway [1]
Rolled erosion control product, type 5.B
(Schedule C & D) refer to F.7
Utility Trenching, Geogrid, stabilization, type II
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
Var ies
Varies
NOTE:
Varies Varies
TYPICAL SECTIONS
NO SCALE 2 of 2
Slope
Variable
1. See Sheet D.5 for location.
2. Measure existing roadway widths as per 152.05(m).
3. Patch surface and seal/fill cracks prior to micro-surfacing.
MICRO-SURFACING TYPE 2
for roadway width
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m c c .d g n
WA NPS OLYM 207(1)
P
N o v e m b e r
L a n
K e tt e lk a
C h e c k e d b y
D e s ig n e d b
LC
Micro-surfacing, type 2
See Summary Tabulation Sheets
(Schedule A, B, C, and D)
Asphalt concrete pavement, type 1
4" compacted depth.
Place in two equal lifts
Roaway aggregate, method 2
6" compacted depth Tack coat
New pipe culvert
See G sheets for bedding fill requirements
(Schedule A, B, C, and D)
TYPICAL PAVEMENT SECTION
CULVERT REPLACEMENT
Geogrid, stabilization
Existing pipe culvert
ELEVATION
m in ty p
DEEP PATCH AT PIPE CULVERT CROSSING
Asphalt concrete pavement, type 1
4" compacted depth.
Place in two equal lifts
Roaway aggregate, method 2
6" compacted depth
D e e p p a tc h l im it s
Tack coat
(Schedule A, B, C, and D)
Existing asphalt surface
Select borrow 9" compacted lifts, (typ.)
Finished GradeFinished Grade
MAINLINE, STAIRCASE ROAD
27+50 to 28+50
NO SCALE
NOTE:
18" (typ.)
Top of existing pavement
Reinforcement geosynthetic, type 2
SLOPE SECTION
TYPICAL REINFORCED SOIL
Rolled erosion control product, type 5.B
Geotextile filter,Class 1, type A (non-woven)
Geogrid, stabilization, type II
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m c d .d g n
WA NPS OLYM 207(1)
N o v e m b e r
L a n
K e tt e lk a
C h e c k e d b y
D e s ig n e d b
(Schedule A, B, C, and D)
1. Slope or shore excavation according to Section 208.
2. Extend each course of reinforcement into access ramp areas as reinforced soil slope construction proceeds
3. Back of temporary excavation to extend 1-foot behind back of primary reinforcements.
4. Bevel ends of outlet pipe to match the surrounding finish slopes as directed by the CO. Install approved rodent guards on outlet
5. Place stabilization grid within 1-foot of slope face
6. For culverts located above the reinforcement layer, trim the reinforcement along the length of the pipe if more than half the pipe cross-section is exposed, otherwise place the reinforcement over the pipe as a continuous reinforcement layer.
7. Refer to G.7 for culvert replacement at 27+67.
See Wrap Detail
3.0% min.
See Sheet G.2 for details
Underdrain system.
13' (min.)
Bench Width 14' (min)
4" to 6" (typ.)
all courses top and bottom
4' (min) t o ty p all courses 2' (min)
WRAP DETAIL
6" compacted depth
Roaway aggregate, method 2
Place in two equal lifts
4" compacted depth.
Asphalt concrete pavement, type 1
Subgrade for overlay
Tack coat type A (non-woven)
Geotextile filter,Class 1, LC
Finished grade
M a tc h E x is ti n g
TYPICAL SECTION
REINFORCED SOIL SLOPE
(Schedule C & D) refer to F.7
Utility Trenching, m in
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16101 807656.903 942221.024 801.727 47°30'49.272052"N 123°19'32.670596"W 734.2763 1.00001121 5/8" IR w/FHWA Alum cap 1.
16102 808070.399 941831.738 806.695 47°30'53.212534"N 123°19'38.553477"W 739.2476 1.00001128 5/8" IR w/FHWA Alum cap
17103 808216.931 941495.883 805.126 47°30'54.538898"N 123°19'43.519308"W 737.6753 1.00001146 5/8" IR w/FHWA Alum cap
17104 808398.889 941683.225 830.873 47°30'56.399748"N 123°19'40.887023"W 763.4289 1.00001038 5/8" IR w/FHWA Alum cap
17105 808317.075 941839.643 821.693 47°30'55.648182"N 123°19'38.567176"W 754.2489 1.00001076 5/8" IR w/FHWA Alum cap
STAIR1 805198.967 943807.899 744.434 47°30'25.590696"N 123°19'08.290289"W 676.9571 1.00001208 5/8" IR w/FHWA Alum cap
STAIR2 805340.845 943316.905 756.771 47°30'26.816783"N 123°19'15.510950"W 689.2908 1.00001159 5/8" IR w/FHWA Alum cap
PROJECT : Rehabilitate Staircase Road DATE OF FIELD WORK :Multiple Entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Washington South SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID 12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\W as hi ng to n\
S ta ir ca se \L
G O
St ai rc as e_ co nt ro ls he et
.x ls x] Sh ee t
-J un -2
:5
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.6
SHEET
NUMBER
NPS OLYM 207(1)WA
SURVEY CONTROL
UTILITIES
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u a .d g n
WA NPS OLYM 207(1)
N o v e m b e r
L a n
K e tt e lk a
C h e c k e d b y
D e s ig n e d b
R
T
N
N
10+00.00
BEGIN OVERLAY WORK
10+00 to 24+50
PLAN AND PLAN
UTILITIES
50 10002550
Scale in feet
NOTE:
approved by CO.
Utility vault locations are approximate. Final locations as 3.
remain in place, install conduit below the culvert.
When utility trench location conflicts with a culvert that is to 2.
disturbing activities management practices shall be installed prior to ground waters, appropriate soil erosion and sediment control best
When excavation for utility or vaults is within 50 ft of surface 1.
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u b .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y M
L a n g e
D e s ig n e d b y J
K e tt e lk a m p
Stationing reference line
Stationing reference line
BEGIN PROJECT
3 conduit, 2-inch, PVC
Install Utility Trench
3 conduit, 2-inch, PVC
Install Utility Trench
(splice vault) Box 1
Install Utility box, concrete
(splice vault) Box 2
Install Utility box, concrete
T
T
N N
24+50 to 43+50
PLAN AND PLAN
UTILITIES
NOTE:
50 10002550
Scale in feet
CO.
Utility vault locations are approximate. Final locations as approved by 3.
place, install conduit below the culvert.
When utility trench location conflicts with a culvert that is to remain in 2.
practices shall be installed prior to ground disturbing activities appropriate soil erosion and sediment control best management
When excavation for utility or vaults is within 50 ft of surface waters, 1.
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u c .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n
5 4
Stationing reference line
Stationing reference line
(splice vault) Box 3
Install utility box, concrete
(splice vault) Box 4
Install utility box, concrete
(splice vault) Box 5
Install utility box, concrete
3 conduit, 2-inch, PVC
Install Utility Trench
3 conduit, 2-inch, PVC
Install Utility Trench
TS
S
T
N U T E
L E V
.2
T
S
A C
H N
TU
P
W A
R N I
N G
B U
R I
E
T I
L I
T Y
W A T E R
W A
R N I
G
B
R I
E
T I
L I
T Y
W A T E R
N U T E
L E V
.2
" D
IA
C
O V E R
N U T E
L E V
.2
" D
IA
C
O V E R
"X
"X
W V
W V
W V
W V
"X
" C
O V E R
T
T
N
N
43+50 to 61+38
PLAN AND PLAN
UTILITES
NOTE:
CO.
Utility vault locations are approximate. Final locations as approved by 3.
place, install conduit below the culvert.
When utility trench location conflicts with a culvert that is to remain in 2.
practices shall be installed prior to ground disturbing activities appropriate soil erosion and sediment control best management
When excavation for utility or vaults is within 50 ft of surface waters, 1.
30 6001530
Scale in feet
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u d .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n
Stationing reference line
Stationing reference line
(splice vault) Box 6
Install utility box, concrete
(splice vault) Box 7
Install utility box, concrete
3 conduit, 2-inch, PVC
Install Utility Trench
3 conduit, 2-inch, PVC
Install Utility Trench
T
TU
P
W A
R N I
N G
B U
R I
E D
U T I
L I
T Y
W A
R N I
N G
B U
R I
E D
U T I
L I
T Y
W A
R N I
N G
B U
R I
E D
U T I
L I
T Y
W A
R N I
N G
B U
R I
E D
U T I
L I
T Y
" F
IR
" F
IR
" F
IR
" F
IR
W V
W V
W V
W V
W V
W F
W V
W V
N
NOTE:
CO.
Utility vault locations are approximate. Final locations as approved by 3.
place, install conduit below the culvert.
When utility trench location conflicts with a culvert that is to remain in 2.
practices shall be installed prior to ground disturbing activities appropriate soil erosion and sediment control best management
When excavation for utility or vaults is within 50 ft of surface waters, 1.
30 6001530
Scale in feet
Generator Building
61+38 to END
PLAN
UTILITES
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u e .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
END UTILITIES TRENCH
Stationing reference line
(splice vault) Box 8
Install utility box, concrete
3 conduit, 2-inch, PVC
Install Utility Trench
NOTE:
LOADBREAK VAULT LID
ring and lock (typ.)
Recessed lifting m in ty p
6'-10"
5'-0"
2" Ø drain hole
6" Ø sump with knockout
Ground rod
(4 required)
1 @ each corner
Galvanized pulling iron rack (typ.)
Hardware mounting
8 each wall
8" Ø knockout (typ.)
Existing ground surface
Top of paved
3'-0"
3'-0"
SECTION C-C
SECTION A-A
6"
6'-10"
System identification
Diamond pattern
Diamond pattern
System identification
Ground stud
1-2" Ø
Lift hole (typ.), 12" 12"
30"
PLAN VIEW
Concrete collar
6'-0" 4'-0"
SECTION B-B
(SHOWN WITH LOADBREAK LID)
SPLICE VAULT and LOADBREAK VAULT BASE
NO SCALE
cover and ductile iron locking
" Ø Cast iron ring2
" Ø Threaded insert (typ.) 8
C
C
BB
AA
m in m a x
DETAILS
(SPLICE VAULT)
UTILITY BOX, CONCRETE
F.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u f.
d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n
SPLICE VAULT LID
Install Splice vault lid on vaults placed within the roadway.6.
the manufacturer's recommendations.
Paint vault lids with flat black epoxy coating, according to 5.
-inch below pavement grade.2 1Install top of vault lids to 4.
paving.
Apply emulsified asphalt to exposed concrete surfaces after final3.
and the actual arrangement.
to the approved manufacturer's shop drawings for all dimensions shown. Each manufacturer's Cable Vault assembly will vary. Refer
This drawing depicts a typical vault assembly. Reinforcing not 2.
Place concrete collar around manhole rim.1.
DETAILS
UTILITY TRENCH
NOTE:
F.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m u g .d g n
WA NPS OLYM 207(1)
N o v e m b e r
L a n
K e tt e lk a
C h e c k e d b y
D e s ig n e d b y top 6" and use as the final lift during backfilling.
When trenching is in a non paved location, conserve the 3.
CO approval is required for all trench locations and types.2.
Saw cut pavement at all trench locations.1.
NO SCALE
24"
Saw cut
Existing finished grade
Saw cut
Bedding material
2" PVC conduit (3)
3"
UTILITY TRENCH, TYPE A
Existing pavement structure, depth varies marker tape Telecom
6" min.6" min.
Power marker tape
24"
Saw cut
Saw cut
Bedding material
2" PVC conduit (3)
3"
Existing pavement structure, depth varies marker tape Telecom
6" min.
6" min.
Power marker tape
6" compacted depth
Roadway aggregate, method 1
Existing road grade
UTILITY TRENCH, TYPE B
Backfill material native material
Undisturbed native material
Undisturbed
6" compacted depth
Roadway aggregate, method 1
Backfill Concrete Lean
FOOTNOTE:
place in two equal lifts type 1 4" compacted depth, Asphalt concrete pavement, place in two equal lifts type 1 4" compacted depth, Asphalt concrete pavement, Tack coat
Tack coat overflow parking road.
Asphalt concrete pavement depth is 3" when trenching along encountered in the excavation.
Utility Trench Type B may be used when competent rock is
10.4 x 16 25101 -0400
60201 -0600
60201 -0800
60202 -0600
60210 -1000
60704 -0000
Station
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C H
P
IP
E C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
6-
IN
H
PI
PE
C
U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
CUYD LNFT LNFT LNFT EACH EACH Lt Rt 10+51 36 11+90 40 13+46 70 15+00 1 16+20 60 17+58 1 20+69 1 21+32 1 23+36 1 27+67 22 30 28+92 1 33+95 1 36+74 1 38+25 1 40+50 50 43+76 1 50+81 1 52+13 1 52+84 55 1 59+74 1
Total 22 36 250 55 1 13 Allowable Pipe Material A Aluminum
4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel
P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w -w or k\ d0
D ra in ag e.
xl sx
]S he et
-N ov
-2
:2
T.
P ha n
6/
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
G.1
SHEET
NUMBER
NPS OLYM 207(1)WA
NPS PMIS No. 170144 NPS Drwg. No. --/----
Note: The quantities shown hereon are approximate and are subject to field adjustments.
TEMPORARY TRAFFIC CONTROL
TUBULATION OF
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o ly m n a .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n
Dry ree k
NATIONAL PARK BOUNDARY
NATIONAL FOREST BOUNDARY
WILDERNESS
MOUNT SKOKOMISH
Cop per Cre ek
Skokom ish
OLYMPIC NATIONAL FOREST
FOREST
OLYMPIC NATIONAL
STATE PARK
LAKE CUSHMAN
5. Conform with the current M.U.T.C.D edition on all signing.
4. Use standard alphabet sizes, letter series C.
3. Sign colors are orange background with black legend and border.
2. Mount signs on wood posts. See standard 635-14.
1. Adjust location to match field conditions as approved by CO.
N
HOODSPORT
LILLIWAUP
N Lake Cushman Rd.
Clubhouse Way
D o w M o u n ta in R d
N Lake Cushman Rd.
36" x 36" W20-3
REF-1
REF-2
ROAD CLOSURE PLAN
TRAFFIC CONTROL
TEMPORARY
REF-1
REF-2
36" x 36" W20-3
STAIRCASE RD
NOTE:
CLOSED
ROAD
3 MILES
MOUNTAIN
DOW
L a k e C u s h m a n
10+00.00
CLOSED
ROAD
1000 FT
BOUNDARY
CLOSED AT PARK
STAIRCASE RD
BOUNDARY
CLOSED AT PARK
APR 1 to MAY 24
APR 1 to MAY 24
H.2
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o ly m n b .d g n
WA NPS OLYM 207(1)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n
END PROJECT
no stationing available)
(At bridge abutment, LAKE
PRINCE
Prince Lake Rd.
SCALE IN MILES
Dry Creek Trail
Ridge Rd.
North Staircase
Mount Church Dr.
N. Standstill Dr
Cushman Potlatch Rd
Robinson Rd.
01 22
BEGIN PROJECT
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS OLYM 207(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d o ly m n c .d g n o v e m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS Drwg. No. ---/------
NPS PMIS No. 170144
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
31/2"
4"C
3"
4"C
31/2"
R=13/8"
TH=03/4"
IN=01/2"
BORDER
ROAD CLOSURE DETAIL
TRAFFIC CONTROL
TEMPORARY
3" 4"C 3" 4"C 3" 4"B 3"
3'-0"
4'-0"
31/2"
4"C
3"
4"C
31/2"
3'-0" 3'-0"
R11-2
ROAD
CLOSED
TYPE 3 BARRICADE
8 FT
NOTE:
5. Conform with the current M.U.T.C.D edition on all signing.
4. Use standard alphabet sizes, letter series C.
3. Sign colors are orange background with black legend and border.
2. Mount signs on wood posts. See standard 635-14.
1. Adjust location to match field conditions as approved by CO.
NO SCALE
1000 FT
CLOSED
ROAD
W20-3
ROAD
CLOSED
REF-2
ROAD
CLOSED
CLOSED
REF-1
BOUNDARY
CLOSED AT PARK
STAIRCASE RD
REF-3 REF-4
PARKING AREA
CLOSED
CAMPGROUND
H.4
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c p w w o r k d o ly m n d .d g n
WA NPS OLYM 207(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y T
P h a n to front of barricade
Mount supplemental signs
F
T
See detail this sheet Type 3 barricade
S ta ir c a s e R o a d
F
T
File details come from the government source that posted it.