INDEX TO SHEETS
INDEX TO SHEETS
J. FSR 2800 MP 5.3
I. FSR 2700 MP 6.9
H. FSR 2660 MP 4.2
G. FSR 2660 MP 4.1
F. FSR 2083 MP 0.1
E. FSR 2081 MP 2.25
D. FSR 2081 MP 1.3
C. FSR 2000 MP 39.9
B. SUMMARIES
A. GENERAL INFORMATION
V. TEMPORARY TRAFFIC CONTROL
U. DRAINAGE
T. EROSION CONTROL
S. FSR 4065 MP 1.15
R. FSR 4052 MP 3.7
Q. FSR 4052 MP 3.0
P. FSR 4052 MP 2.55
O. FSR 4052 MP 2.2
N. FSR 4052 MP 1.9
M. FSR 2810 MP 2.3
L. FSR 2800 MP 11.0 (11.4)
K. FSR 2800 MP 10.3-10.4
OPEN-BOTTOM PIPE ARCH STRUCTURAL DETAILS
OPEN-BOTTOM ARCH REINFORCED CONCRETE DETAILS
SIMULATED STREAM CULVERT INTERIOR TREATMENT
AOP CULVERT ELEVATIONS
AOP CULVERT PLAN AND PROFILE
PLAN AND PROFILE
TYPICAL SECTION
CULVERT PLAN AND PROFILE
SPECIAL ROCK EMBANKMENT
RIPRAP LAYOUT
PLAN AND PROFILE
TYPICAL SECTION
CULVERT PLAN AND PROFILE
PLAN
SUMMARY OF QUANTITIES
CONTROL SHEET
VICINITY MAPS
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
J.7
J.6
J.5
J.4
J.3
J.2
J.1
I.8
I.7
I.2-6
I.1
H.1
G.3
G.2
G.1
F.2
F.1
E.2
E.1
D.3
D.2
D.1
C.1
B.1-3
A.6
A.4-5
A.3
A.2
A.1
A.2
STATE PROJECT
NUMBER
SHEET
S u r F t
D c m y fi le s p w p r o d u c ti o n d w a e f1 a a b .d g n
WA FS ERFO 2016(1)-20(3)
A
M
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
WORK ZONE DETAILS
TABULATION OF TEMPORARY TRAFFIC CONTROL QUANTITIES
RIPRAP END TREATMENT DETAIL
RIPRAP APRON DETAIL
STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
STANDARD DETAILS
TABULATION OF EROSION CONTROL QUANTITIES
PLAN AND PROFILE
TYPICAL SECTION
PLAN
PLAN AND PROFILE
TYPICAL SECTION
CONCRETE FORD REPAIR
PLAN AND PROFILE
TYPICAL SECTION
PLAN AND PROFILE
TYPICAL SECTION
PLAN AND PROFILE
TYPICAL SECTION
PLAN
TYPICAL SECTION
PLAN
PLAN
V.2-4
V.1
U.9
U.8
U.2-7
U.1
T.2-4
T.1
S.2
S.1
R.1
Q.2-3
Q.1
P.4
P.2-3
P.1
O.2
O.1
N.2-5
N.1
M.2
M.1
L.1
K.1
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS9
J a n u a r y
U
S C m y fi le s p w p r o d u c ti o n d w a e f1 a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 FS ERFO 2016(1)-20(3)WA
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
SCALE IN MILES
0 5 105
SCALE IN FEET
SCALE IN FEET
SCALE IN FEET
SCALE IN FEET
SCALE IN FEET
N
Sheet 1 of 2
VICINITY MAPS
A.4
STATE PROJECT
NUMBER
SHEET
S u r F t m y fi le s p w p r o d u c ti o n d w a e f1 a a d .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
K
H a r r is o n
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
0 5000
E N .
e v
A ht
F
N Sauk River
NF 2083
District, Mt. Baker
Darrington Ranger
530 530
Marysville
Granite falls
Arlington
McMurry
Baker HeightsAvon
Sedro-Woolley
Junction Hamilton
Birdsview
Van horn
Sauk
Marblemount
Island Camano
Reservation
Tulalip Indian
& 4.2
MP 4.1
FSR 2660
MP 2.3
FSR 2810
MP 2.25
FSR 2081
MP 1.3
FSR 2081
MP 0.1
FSR 2083
M T. B A K E R
N A T I O N A L F O R E S T
Point
Smokey
Skagit
Riv er
FSR 2081 MP 1.3
MP 2.25
FSR 2081
MP 0.1
FSR 2083
FSR 2083, MP 0.1
FSR 2081, MP 2.25
FSR 2081, MP 1.3
N F 2860
N F
N F
Camp Rd
Christian
River
Sauk
Mt. Pugh
Mountain
White Chuck ywH p oo
L nia t n u o
M kuaS reviR
32 FN
F N
F N
.dR keerC saneT
F N
F N keerC saneT
Big Creek
Suiattle River dR eiriarP kuaS
N. Mountain Rd.
.dR enilrewoP
FSR 2810, MP 2.3
revi
R k u a
S
Darrington Sauk River Rd.
Giles Rd
St at e
RTE
N E
Boyd Rd.
FSR 2810, MP 2.3
DARRINGTON
FSR 2700, MP 6.9
MP 5.3
FSR 2800
MP 6.9
FSR 2700
MP 5.3
FSR 2800
Mountain Loop Rd
MP 10.3-10.4
FSR 2800
MP 11.0(11.4)
FSR 2800
FSR 2700, MP 6.9
FSR 2800, MP 11.0 (11.4)
FSR 2800, MP 10.3-10.4
FSR 2800, MP 5.3
FSR 2660, MP 4.2
FSR 2660, MP 4.1
FSR 2660, MP 4.2
FSR 2660, MP 4.1
MP 10.3-10.4
FSR 2800
MP 11.0 (11.4)
FSR 2800
Clearcreek Rd.
SCALE IN MILES
SHEET 2 of 2
VICINITY MAP
A.5
STATE PROJECT
NUMBER
SHEET
S u r F t m y fi le s p w p r o d u c ti o n d w a e f1 a a e .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
FS
R
D eer C reek
M tn
L o o p H w y .M
tn. Loop H w y.
Mountain Sheep
Mountain Big Four
Mountain Twin Peaks
Mt Forgotten
Devils Peak
Long Mountain
Silverton
Bedal
Ice Caves Big Four
S a u k R iv e r
W il li a m s o n C re e k
S tilla g u a m is h R iv e r
S o u th F rk
FS
R
FS
R
FSR 4052, MP 3.7
FSR 4052, MP 3.0
FSR 4052, MP 2.55
FSR 4052, MP 2.2
FSR 4052, MP 1.9
FSR 2000, MP 39.9
FSR 4065, MP 1.15
FSR 4065, MP 1.15
FSR 4052, MP 3.7
FSR 4052, MP 3.0
FSR 4052, MP 2.55
FSR 4052, MP 2.2
FSR 4052, MP 1.9
FSR 2000, MP 39.9
m ile s Ve rlo t, W A m ile s
D a rrin g to n , W
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
20811 1000.000 2000.000 1000.000 5/8" IR W/FHWA ALUM CAP
20812 959.459 1888.615 1014.383 5/8" IR W/FHWA ALUM CAP
20813 3053.424 6079.210 2995.055
20814 3000.000 6000.000 3000.000
20815 2983.635 5868.982 2998.061
20831 2181.639 3958.064 1984.589 5/8" IR W/FHWA ALUM CAP
20832 2000.000 4000.000 2000.000 5/8" IR W/FHWA ALUM CAP
20833 1666.617 4314.665 2043.854 5/8" IR W/FHWA ALUM CAP
20834 1592.349 4480.539 2062.878 5/8" IR W/FHWA ALUM CAP
26601 3000.000 4000.000 1000.000 5/8" IR w/fhwa alum cap
26602 2960.222 4138.719 1005.018 5/8" IR w/fhwa alum cap
27651 1000.000 2000.000 1000.000 5/8" IR w/fhwa alum cap
27652 866.248 2133.751 982.813 5/8" IR w/fhwa alum cap
28401 2128.349 3089.871 999.950 5/8" IR w/fhwa alum cap
28402 2000.000 3000.000 1000.000 5/8" IR w/fhwa alum cap
40521 2000.000 4000.000 2000.000 5/8" IR w/fhwa alum cap
40522 2175.834 3906.507 2015.916 5/8" IR w/fhwa alum cap
40523 3000.000 6000.000 3000.000 5/8" IR W/FHWA ALUM CAP
40524 3125.610 5833.309 3008.246 5/8" IR W/FHWA ALUM CAP
40527 5000.000 5000.000 500.000 5/8" IR W/FHWA ALUM CAP
40528 5152.370 5000.000 513.821 5/8" IR W/FHWA ALUM CAP
40529 29994.992 20143.405 4989.369 5/8" IR W/FHWA ALUM CAP
40530 30000.000 20000.000 5000.000 5/8" IR W/FHWA ALUM CAP
4052 Road MP 2.55
4052 Road MP 3.0
PROJECT :Darrington District Emergency Repairs, Phase 1 DATE OF FIELD WORK : Multiple entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed
VERTICAL DATUM : Assumed
PROJECT COORDINATES
2081 Road MP 1.3
2081 Road MP 2.25
2083 Road MP 0.1
2700 Road MP 6.9
2800 Road MP 5.3
4052 Road MP 1.9
4052 Road MP 2.2
2660 Road MP 4.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
M t_ B ak er -S no qu al m ie _2
6_
ER
FO
_a ll_ as su m ed
_s ite s.
xl sx ]S he et
4- Ja n-
2:
P M
W
FL
H D
S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.6
SHEET
NUMBER
FS ERFO 2016(1)-20(3)WA
SURVEY CONTROL
Sheet and Description
FSR
2000 MP
39.9
FSR
MP 1.3
FSR
MP 2.25
FSR
MP 0.1
FSR
MP 4.1
FSR
MP 4.2
FSR
MP 6.9
FSR
MP 5.3
FSR
MP 10.3-
10.4
FSR
MP 11.0
(11.4)
FSR
MP 2.3
FSR
MP 1.9
FSR
MP 2.2
FSR
MP 2.55
FSR
MP 3.0
FSR
MP 3.7
FSR
4065 MP
1.15
Temp.
Traffic Control
ALLOW-
ANCE
Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2000 MP 39.9) LPSM ALL ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2081 MP 1.3) LPSM ALL ALL
A0140 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2081 MP 2.25) LPSM ALL ALL
A0160 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2660 MP 4.1) LPSM ALL ALL
A0180 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2800 MP 11.0
(11.4)) LPSM ALL ALL
A0200 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 2800 MP 5.3) LPSM ALL ALL
A0220 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 4052 MP 1.9) LPSM ALL ALL
A0240 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 4052 MP 2.2) LPSM ALL ALL
A0260 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 4052 MP 2.55) LPSM ALL ALL
A0280 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL (FSR 4052 MP 3.0) LPSM ALL ALL
A0300 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING (FSR
2660 MP 4.1) LPSM ALL ALL
-M ar -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a-ef l1
_E st im at e-
.x ls x] Sh ee t
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
STATE PROJECT
B.1FS ERFO 2016(1)-20(3)WA
SHEET
NUMBER
2000 MP
39.9
FSR
MP 1.3
FSR
MP 2.25
FSR
MP 0.1
FSR
MP 4.1
FSR
MP 4.2
FSR
MP 6.9
FSR
MP 5.3
FSR
MP 10.3-
10.4
FSR
MP 11.0
(11.4)
FSR
MP 2.3
FSR
MP 1.9
FSR
MP 2.2
FSR
MP 2.55
FSR
MP 3.0
FSR
MP 3.7
FSR
4065 MP
1.15
Temp.
Traffic Control
ALLOW-
ANCE
Bid Schedule
A0320 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING (FSR
2800 MP 5.3) LPSM ALL ALL
A0340 15705-1400 SOIL EROSION CONTROL,
FIBER ROLL LNFT 64 48 175 228 233 121 48 143 293 124 183 90 1,750
A0360 15705-1800 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LNFT 56 90 9 155
A0380 20302-2100 REMOVAL OF PIPE CULVERT
(damaged section) LNFT 8 8
A0400 20304-9000 REMOVAL OF STREAM DEBRIS
(FSR 2000 MP 39.9) LPSM ALL ALL
A0420 20304-9000 REMOVAL OF STREAM DEBRIS
(FSR 4052 MP 2.55) LPSM ALL ALL
A0440 20304-9000 REMOVAL OF STREAM DEBRIS
(FSR 4052 MP 3.7) LPSM ALL ALL
A0460 20305-1000 REMOVAL OF CONCRETE CUYD 7 8 15
A0480 20401-0000 ROADWAY EXCAVATION CUYD 126 47 2,699 308 356 52 18 167 1,838 971 256 49 275 7,162
A0500 20403-0000 UNCLASSIFIED BORROW CUYD 223 1,068 15 1,106 54 2,137 1 47 16 238 10 234 5,149
A0520 25101-2300 PLACED RIPRAP, METHOD B,
CLASS 3 CUYD 10 94 107 40 40 50 20 14 193 228 68 23 246 36 1,169
A0540 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 113 80 444 28 665
A0560 25101-2500 PLACED RIPRAP, METHOD B,
CLASS 5 CUYD 131 9 140
A0580 25101-2600 PLACED RIPRAP, METHOD B,
CLASS 6 CUYD 1,337 68 1,405
A0600 25201-0000 SPECIAL ROCK EMBANKMENT CUYD 366 24 390
A0620 30202-1000 ROADWAY AGGREGATE, METHOD
1 TON 175 87 234 268 4 116 130 28 248 110 290 56 1,746
A0640 30202-2000 ROADWAY AGGREGATE, METHOD
2 TON 36 134 170
A0660 30302-6000 ROADWAY RECONDITIONING LNFT 150 812 300 200 740 281 160 240 136 3,019
A0680 40301-0200 ASPHALT CONCRETE
PAVEMENT, TYPE 2 TON 18 2 20
A0700 60101-0000 CONCRETE CUYD 5 5
A0720 60201-0800 24-INCH PIPE CULVERT LNFT 28 22 3 53
A0740 60201-1000 36-INCH PIPE CULVERT
(government furnished) LNFT 54 50 5 109
A0760 60201-1000 36-INCH PIPE CULVERT LNFT 30 30 40 8 108
A0780 60201-1200 48-INCH PIPE CULVERT LNFT 35 63 84 11 193
Estimated Quantities
-M ar -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a-ef l1
_E st im at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FS ERFO 2016(1)-20(3)WA
2000 MP
39.9
FSR
MP 1.3
FSR
MP 2.25
FSR
MP 0.1
FSR
MP 4.1
FSR
MP 4.2
FSR
MP 6.9
FSR
MP 5.3
FSR
MP 10.3-
10.4
FSR
MP 11.0
(11.4)
FSR
MP 2.3
FSR
MP 1.9
FSR
MP 2.2
FSR
MP 2.55
FSR
MP 3.0
FSR
MP 3.7
FSR
4065 MP
1.15
Temp.
Traffic Control
ALLOW-
ANCE
Bid Schedule
A0800 60201-1400 60-INCH PIPE CULVERT LNFT 54 48 6 108
A0820 60201-2000 96-INCH PIPE CULVERT LNFT 94 5 99
A0840 60201-2200 108-INCH PIPE CULVERT
(government furnished) LNFT 76 4 80
A0860 60301-0360 216-INCH STRUCTURAL PLATE
PIPE LNFT 108 7 115
A0880 60702-1000 REMOVING, CLEANING, AND
RELAYING CULVERT (96-inch pipe culvert) LNFT 66 5 71
A0900 60704-0000 CLEANING CULVERT IN PLACE EACH 2 2 2 1 1 2 1 1 12
A0920 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20 20
A0940 62201-0600 BACKHOE LOADER, 8 CUBIC
FOOT MINIMUM RATED
CAPACITY BUCKET, 30-INCH
WIDTH HOUR 20 20
A0960 62201-2850 MOTOR GRADER, 12 FOOT
MINIMUM BLADE HOUR 20 20
A0980 62301-0000 GENERAL LABOR HOUR 20 20
A1000 62402-0200 FURNISHING AND PLACING
TOPSOIL, 3-INCH DEPTH ACRE 0.1 0.1 0.3 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.3 2.0
A1020 62501-0000 TURF ESTABLISHMENT ACRE 0.1 0.1 0.3 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.3 2.0
A1040 62901-0000 ROLLED EROSION CONTROL
PRODUCT SQYD 167 657 824
A1060 63308-0000 OBJECT MARKER EACH 2 2
A1080 63502-0600 TEMPORARY TRAFFIC
CONTROL, BARRICADE TYPE 3 EACH 8 4 12
A1100 63502-2000 TEMPORARY TRAFFIC
CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
A1120 63504-1000 TEMPORARY TRAFFIC
CONTROL, CONSTRUCTION SIGN SQFT 157 5 162
A1140 63509-1000 TEMPORARY TRAFFIC
CONTROL, FLAGGER FXHR 10 10
A1160 64703-2000 MITIGATION, LOG DEFLECTOR EACH 6 4 10
A1180 64703-5000 MITIGATION, ROOT WAD EACH 21 4 25
A1200 64704-1000 MITIGATION, STREAMBED
MATERIAL CUYD 16 179 2 7 204
Estimated Quantities
-M ar -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a-ef l1
_E st im at e-
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3FS ERFO 2016(1)-20(3)WA
P
C P
15N
SECTION A-A
PLAN
FSR 2000 MP 39.9
SECTION B-B
Install soil erosion control devices as needed.
conditions.
Match existing horizontal alignment. Adjust to fit field
20 40020
SCALE IN FEET
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
NOTE:
Edge of road
LEGEND:
(60" Plastic)
Cleaning culvert in place
MP 39.9
1:2.5 1:2 .5
1:2.5
New stream channel
10'
30'
50'50'
(~740 CUYD)
Removal of stream debris
(~260 CUYD)
Removal of stream debris
(Government furnished)
36-inch pipe culvert
MP 39.9
Roadway reconditioning
END CONSTRUCTION
BEGIN CONSTRUCTION
(government furnished)
36" Pipe culvert
2.
1.
LC
LC
Cleaning culvert in place (48")
MP 39.9
B
B
A
A
Roadway reconditioning
El=492.69
E=2051.37
N=814.28
El=486.30
E=2081.63
N=667.37
150'
See U.9 for detail (5 CUYD) class 3 riprap end treatment, Placed riprap, method B, See U.9 for detail (5 CUYD) class 3 riprap end treatment, Placed riprap, method B, NO SCALE
FOOTNOTE:
Turf establishment[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
[1] Slope
PAVEMENT TRANSITION
BEGINNING AND ENDING
21+70 to 23+88
TYPICAL SECTION
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
[3] [3]
TYPICAL SECTION
FSR 2081 MP 1.3
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
1:4
1:4 [2]
[2]
1:20
7'7'
T o e o f fi ll
T o p o f c u t
Existing ground
8" compacted depth
Roadway aggregate, method 1, grade
Profile
Existing surface for structure dimensions
Profile, see Typical Section
Matchline
Variable Variable
Travel Lane Travel Lane elevation and cross slope
Match existing aggregate surface
Unclassified borrow
See Typical Sections
LC
CP
20811
20812
CP
0 995
100010
995 1
Curve= C1003
D
R= 90.00'
T= 84.83'
L= 136.05' Curve= C1004
D
R= 1,100.00'
T= 60.72'
L= 121.32'
P C .1
4 PT 21+
25.93
PC
1+
.0
2 2
P T
.0
P C
.6
,0
.3
,0
.5
-8.5000%
.3
-13.5000%
-8.7500% 9 .1
95' VC
K = 20
50' VC
K = 10
SSD = 241'
N
NOTE:
this site.
1. Coordinates are assumed and unique to
10 20010
SCALE IN FEET
CUYD
EXC.
CUYD
EMB.
24+0023+5023+0022+5022+0021+5021+00
985 985
990 990
995 995
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 d b .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Slope stake limits
Profile grade
Existing ground
Line to be constructed
21+70
BEGIN FSR 2081
END FSR 2081
23+88
El= 995.17
E= 2050.01
N= 1019.72
El= 1018.32
E=1859.74
N=990.54
Slope stake limits
Placed riprap, see D.3
22+68
Placed riprap, see D.3
22+68 fiber roll (64 LNFT)
Soil erosion control, 22+74 to 23+32 LT
21+70 to 23+88
FSR 2081 MP 1.3
See D.3 for detail
Install 60-inch pipe culvert
Remove existing 36-inch pipe culvert
22+68
Slo pe
27.
32%
CL
PIPE INLET OUTLETHYDRAULIC INFORMATION
Q : 30.1 CFS
Q : 87.5 CFS
Q : 99.2 CFS
INSTREAM WORK WINDOW: N/A
BANKFULL CHANNEL WIDTH: 5 FT
HW : 1009.02 FT
OHW : - - TYPE: AL-Type 2
LENGTH: 54 ft
PIPE SLOPE: 0.2732 FT/FT
INFILL TYPE: - -
SPAN: 5 FT RISE: 5 FT
WALL THICKNESS: 0.109 IN
FLOWLINE SLOPE: 0.3266 FT/FT
TYPE: - -
INV N/E/EL: 937.75/1943.19/1005.88
BURIAL DEPTH: 0 FT
LOWER BEVEL HEIGHT: 1.25 FT
BEVEL: STEP, 1.5(h):1(v)
HEADWALL: RIPRAP
INV N/E/EL: 988.79/1953.47/991.66
BURIAL DEPTH: 0 FT
LOWER BEVEL HEIGHT: 1.25 FT
BEVEL: STEP, 1.5(h):1(v)
HEADWALL: RIPRAP
CULVERT LAYOUT
FSR 2081 MP 1.3
N
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 d c .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
L e
S te in h a u s
C h e c k e d b y
D e s ig n e d b y
P T .0
SCALE IN FEET
10 0 10 20 30 40
0 20 40 60 8020406080
100 120100120140
Existing ground
Proposed 60-inch CMP culvert
22+68.01
22+84.97, 30.14 LT 22+62.01, 21.92 RT
Slope stake limits
Mitigation, streambed material (16 CUYD)
See U.9 for detail (7 CUYD) class 3 riprap end treatment, Placed riprap, method B, See U.9 for detail (7 CUYD) class 3 riprap end treatment, Placed riprap, method B, See U.9 for detail (7 CUYD) class 3, riprap end treatment, Placed Riprap, method B, See U.9 for detail (7 CUYD) class 3 riprap end treatment, Placed riprap, method B, 36'
65°55'2"
Cross-culvert flowline
Cross-culvert elev. 991.66
Cross-culvert elev. 1005.88
Road grade
See U.8 for detail (80 CUYD) riprap apron, minimum 3' thick
Placed riprap, method B, class 3
See U.8 for detail (80 CUYD) riprap apron, minimum 3' thick
Placed riprap, method B, class 3
[1]Slope
FOOTNOTE:
Turf establishment[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
30+80 to 32+50
FSR 2081 MP 2.25
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
[3][3]
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
1:4 1:4
[2
[2]
Existing ground grade
Profile
6" compacted depth
Roadway aggregate, method 1, T o e o f fi ll
T o e o f fi ll
VariableVariable
Existing surface for structure dimensions
Profile, see Typical Section
Matchline
Unclassified borrow elevation and cross slope
Match existing aggregate surface
See Typical Sections
LC
Travel Lane
6'
Travel Lane
6'
20815
,0
.1
,9
.8
-10.2500%
+4.15 00%
,9
.5
150' VC
K = 10
PC
.7
PT 30+
54.82
PC
1+
.6
P T
.6
1 3
P C
.4
PT
2+
.0 4 33
PC 33+44.18
PT 33+
67.67
NOTE:
Curve= C1006
R= 115.00'
T= 43.74'
L= 83.59'
D
Curve= C1002
D
R= 40.00'
T= 31.98'
L= 53.95'
D
R= 100.00'
T= 5.05'
L= 10.09'
Curve= C1001
30+80 TO 32+50
FSR 2081 MP 2.25
20 40020
SCALE IN FEET
CUYD
EXC.
CUYD
EMB.
35+0034+0033+0032+0031+0030+00
2980 2980
2984 2984
2988 2988
2992 2992
2996 2996
3000 3000
33004 3004
3008 3008
3012 3012
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y site.
Coordinates are assumed and unique to this1.
30+80
BEGIN FSR 2081
END FSR 2081
El=2998.58
E=5879.00
N=2987.97
32+50
Profile grade
Existing ground
Line to be constructed
Edge of travel way
Slope stake limits
El=3003.19
E=5822.94
N=3111.92
Fiber roll (17 LNFT)
Soil erosion control, 32+43 to 32+53 LT
See U.9 for detail (10 CUYD) class 3 riprap end treatment, Placed riprap, method B, 31+67 RT
35'
Fiber roll (31 LNFT)
Soil erosion control, 31+15 to 31+28 LT
(96-inch pipe culvert) and relaying culvert
Removing, cleaning, 31+67 product (167 SQYD)
Rolled erosion control
31+24 to 32+07 LT
See U.8 for detail (97 CUYD) riprap apron, minimum 3.5' thick
31+67 LT
Turf establishment[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
NO SCALE
[1]Slope
TYPICAL SECTION
FSR 2083 MP 0.1
TYPICAL SECTION
11+70 to 16+70
Travel Lane Travel Lane
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 2016(1)-20(3)
F e b r u a r y
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
1:4 1:4
[2
[2]
[2
Existing ground
6" compacted depth
Roadway aggregate, method 1, grade
Profile
T o e o f fi ll
LC
Variable
Variable
6'6'
Existing surface for structure dimensions
Profile, see Typical Section
Matchline
[3] elevation and cross slope
Match existing aggregate surfacing
20832
P
P
P
CP
20833
52005
P T
.9
P C
.5
P T
.8
,0
.3
,0
.6
+3.7500%
,0
.3
+14.
0%
+7.100 0%
,0
.6
SSD = 176
K = 8
60' VC
K = 19
200' VC
20202025
N
NOTE:
11+70 to 14+00
FSR 2083 MP 0.1
20 40020
SCALE IN FEET
Curve= ALT-3
D
R= 90.00'
T= 7.34'
L= 14.65' Curve= ALT-4
D
R= 100.00'
T= 40.65'
L= 77.22'
FOOTNOTE:
minimum depth and 40 feet long width, 1V:2H side slopes, 3-foot
Excavate channel of 4-foot bottom
CUYD
EXC.
CUYD
EMB.
17+0016+0015+0014+0013+0012+0011+00
1980 1980
1990 1990
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fb .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y to this site.
Coordinates are assumed and unique 1.
Line to be constructed
Slope stake limits
Slope stake limits
Profile grade
Existing ground
11+75
BEGIN FSR 2083
Edge of travel way
36-inch pipe culvert
13+38 fiber roll (57 LNFT)
Soil erosion control, 12+25 to 12+49 LT
See U.9 for detail (6 CUYD) class 3 riprap end treatment, Placed riprap, method B, 31+67 RT
16+70
END FSR 2083
16+70
END FSR 2083
11+75
BEGIN FSR 2083
(44 CUYD)
[1]Roadway excavation
31+67 RT
[1]
14'
18'-4"
Install 48-inch pipe culvert
Remove existing 24-inch pipe culvert
12+44 fiber roll (118 LNFT)
Soil erosion control, 13+27 to 13+98 LT
El= 2001.36
E= 4000.98
N= 1970.12
El= 2046.67
E= 4330.75
N= 1646.65
See U.9 for detail (5 CUYD) class 3 riprap end treatment, Placed riprap, method B, 31+38 RT product (657 SQYD)
Rolled erosion control
12+00 - 13+35 RT
See U.8 for detail (13 CUYD) minimum 2' thick riprap apron, class 3 Placed riprap, method B, 12+43
See U.8 for detail (16 CUYD) minimum 2' thick riprap apron, class 3 Placed riprap, method B, 13+38
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
NO SCALE
[1]Slope
TYPICAL SECTION
FSR 2660 MP 4.1
401+25 to 404+50
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g a .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y grade
Profile
9" compacted depth
Roadway aggregate, method 1, 1:4 1:4
[2]
[2]
1:20
T o e o f fi ll
T o e o f fi ll
VariableVariable
Travel Lane Travel Lane
[3] [3]
Existing surface for structure dimensions
Profile, see Typical Section
Matchline elevation and cross slope
Match existing aggregate surface
Unclassified borrow
See Typical Sections
6'6'
LC
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it
26602
CP
10201020
10251030
P T
.8
P C
.9
P T
.2
P C
.5
P T
.1
P O
T
.7
,0
.6
,0
.0
+3.0
70' VC
K = 32
,0
.9
+5.
75' VC
K = 20
SSD = 321'
,0
.5
9+1.4000
60' VC
K = 43
,0
.9
+2.8
+3.9
0%
35' VC
K = 32
,0
.3
CONSTRUCTION
END
404+50
NOTE:
N
401+25
CONSTRUCTION
BEGIN
CUYD
EXC.
CUYD
EMB.
998 998
1000 1000
1002 1002
1004 1004
1006 1006
1008 1008
1010 1010
1012 1012
1214 1014
Curve= C1003
D
R= 200.00'
T= 40.89'
L= 80.66'
D
R= 300.00'
Curve= C1002
T= 52.16'
L= 103.28'
Curve= C1001
D
R= 800.00'
T= 59.15'
L= 118.09'
401+00 402+00 403+00 405+00404+00 406+00 407+00
El.= Match Existing
E= 4399.7424
N= 2915.3409
El.= Match Existing
E= 4083.5779
N= 2969.6655
401+25 to 404+50
FSR 2660 MP 4.1
10 20010
SCALE IN FEET
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g b .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
M il le
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Profile grade
Existing ground
Slope stake limits
FOOTNOTE:
pipe culvert
36-inch
403+08
Diversion Channel Detail
Diversion Berm Detail
15'4 .5
2'
(155 LNFT)
Soil erosion control, fiber roll
401+25 to 402+75 LT
(73 LNFT)
Soil erosion control, fiber roll
403+80 to 404+50 LT
53'
[1]temporary diversion channel
Soil erosion control, top elevation approx. 988 feet
,[2]temporary diversion berm
Soil erosion control, embankment details
See G.3 for riprap
(18-inch pipe culvert)
Clean culvert in-place
402+25 pipe culvert) in-place (24-inch
Clean culvert
402+80 pipe culvert) in-place (18-inch
Clean culvert
403+51 channel.
Work is incidental to temporary diversion existing contours as directed by the CO.
diversion berms post construction to match excavated streambed material. Regrade
Diversion berms may be constructed from [2] construction.
Leave diversion channel in place post [1] top elevation approx. 997 feet
, [2]temporary diversion berm
Soil erosion control, S1 S2 S3
S4
S5
S6
R1
R2
R3 R4
R5 to beginning work.
Submit access plan to CO for approvial prior this site.
Coordinates are assumed and unique to
2.
1.
Construction limits
0 20 40 60 10080 120 140 160 173
0 20 40 60 80 100 120 140 160 180 192
TRANSITION TO 5 FT THICKNESS
UPSTREAM SECTION
10 FT THICKNESS
FULL THICKNESS SECTION
RIPRAP LAYOUT
FSR 2660 MP 4.1
G.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g c .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Excavation incidental to riprap maximum projection into channel log embedment with 16 ft minimum 14 ft Excavate as needed to provide
Excavation incidental to riprap maximum projection into channel log embedment with 16 ft minimum 14 ft Excavate as needed to provide
Placed riprap, class 6, method B
10'-0"
Dia. = 12-18in, Length = 14+ ft Mitigation, log deflector
14'-0" min.
'-0
" m in
OHW El. Varies 2-3 ft above thalweg
14'-0" min.
10'-0" min.
Dia. = 12-18in, Length = 14+ ft Mitigation, log deflector
OHW El. Varies 2-3 ft above thalweg
'-0
" m in
[1]Mitigation, streambed material
[1]Mitigation, streambed material
FOOTNOTE:
[1] Backfill with streambed material to match existing streambed.
streambed material to meet rootball Backfill with conserved streambed material to meet rootball Backfill with conserved nonwoven, type A Geotextile filter, class 1, nonwoven, type A Geotextile filter, class 1, R Points
S Points class 6, method B Placed riprap, R Points
S Points
402+82 to 403+53
403+53 to 403+67
1.5
1.5
Length = 20-30ft Dia. = 12-18in Mitigation, root wad
Dia. = 12-18in, Length = 20-30ft Mitigation, root wad
FSR 2660 MP 4.2
NOTE:
1.
17 150
SCALE IN FEET
PLAN VIEW
PROFILE VIEW FOOTNOTE:
representation. Adjust to fit field conditions.
Site not surveyed. Horizontal and vertical alignment is a
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h a .d g n
WA FS ERFO 2016(1)-20(3)
F e b r u a r y
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y to be determined in the field as approved by the CO.
Adjust riprap layout to tie into existing riprap. Final location [1]
Edge of travel way
T e n a s C re e k
FSR 2660
Existing ground
Existing pier
Existing riprap
4.6'
Line to be constructed diversion berm
Install temporary
[1
[1
.4 class 5, 5' (min.) thickness
Placed riprap, method B, 12" compacted depth method 1, Roadway aggregate, [1]class 5, 5' (min.) thickness
Placed riprap, method B, for wood post detail
OM3R, see V.4
Place object marker, for wood post detail
OM3L, see V.4
Place object marker, Turf establishment.[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
NO SCALE
[1]Slope
C o n s tr u c ti o n L im it s
278+25 to 279+30
273+62 to 274+80
271+50 to 272+31
TYPICAL SECTION
TYPICAL SECTION
FSR 2700 MP 6.9
C o n s tr u c ti o n L im
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ia .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
1:4 1:4
[2
[2]
[2
Existing ground
6" compacted depth
Roadway aggregate, method 2, grade
Profile
T o e o f fi ll
Variable
Variable
Travel Lane Travel Lane
Existing surface for structure dimensions
Profile, see Typical Section
Matchline elevation and cross slope
Match existing aggregate surface
See Typical Sections
6'6'
27652
P C
.0
P T
.0
P C
.8
P R
C
.4
.7
.0
-7.5000%
-14.0000%
.7
SSD = 181'
K = 5
30' VC
N
CUYD
EXC.
CUYD
EMB.
272+00271+50271+00 270+00 270+50 272+50 273+00
Curve= RTP-1
D
R= 420.00'
T= 65.54'
L= 130.03'
Curve= RTP-2
D
R= 310.00'
T= 29.41'
L= 58.64'
LEGEND:
955955
NOTE:
FOOTNOTE:
1.
to this site.
Coordinates are assumed and unique
270+00 to 273+00
FSR 2700 MP 6.9
10 20010
SCALE IN FEET
I.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ib .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
3-foot minimum depth.
width, 1V:1H side slopes, and
Provide channel of 5-foot bottom
Excavate drainage by 30 ft. [1]
BEGIN CONSTRUCTION
270+00.00
El=996.23
E=2073.9069
N=934.0910
Existing ground
Profile grade
Roadway Reconditioning
Line to be constructed
Edge of travel way fiber roll (46 LNFT)
Soil erosion control, 271+86 to 272+30 RT
See I.8 for details
60-inch pipe culvert, 272+02
(37 CUYD)
[1]Roadway excavation
See U.9 for detail class 3 riprap end treatment.
Placed riprap, method B, 272+02
See U.8 for detail (22 CUYD) riprap apron, minimum 3' thick
272+02
R
C
.4
3 P
R C
.7
P T
.8
P C
.4
P T
.0
P C
.9
P T
.9
P C
.7
-7.3728%
.4
.7
CUYD
EXC.
CUYD
EMB.
275+00274+50274+00 273+00 273+50 275+50 276+00
N
Curve= RTP-3
D
R= 260.00'
T= 29.76'
L= 59.26'
Curve= RTP-4
D
R= 220.00'
T= 16.59'
L= 33.12'
Curve= RTP-5
D
R= 75.00'
T= 23.56'
L= 45.66'
Curve= RTP-6
D
R= 750.00'
T= 23.51'
L= 46.99'
NOTE:
this site.
1. Coordinates are assumed and unique to
LEGEND:
273+00 to 276+00
FSR 2700 MP 6.9
10 20010
SCALE IN FEET
I.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ic .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Roadway Reconditioning
Edge of travel way
Line to be constructed
Profile grade fiber roll (115 LNFT)
Soil erosion control, 273+62 to 274+80 RT
(18-inch pipe culvert)
Cleaning culvert in place
274+39
Existing ground
P T
.1
P C
.1
N
CUYD
EXC.
CUYD
EMB.
277+50277+00276+50 276+00 278+00
Curve= RTP-7
D
R= 240.00'
T= 67.94'
L= 132.41'
NOTE:
this site.
1. Coordinates are assumed and unique to
LEGEND:
276+00 to 278+00
FSR 2700 MP 6.9
10 20010
SCALE IN FEET
I.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 id .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Existing ground
Roadway Reconditioning
910910
920920
P T
.7
P C
.4
-6.4140%
.6
.9
N
CUYD
EXC.
CUYD
EMB.
279+50279+00278+50 278+00 280+00
NOTE:NOTE:
this site.
1. Coordinates are assumed and unique to
NOTE:
Curve= RTP-8
D
R= 345.00'
T= 96.72'
L= 188.60'LEGEND:
278+00 to 280+00
FSR 2700 MP 6.9
10 20010
SCALE IN FEET
I.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ie .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Roadway Reconditioning
Line to be constructed
Edge of travel way fiber roll (72 LNFT)
Soil erosion control, 278+56 to 279+11
See I.7 for details rock embankment,Special
278+56 to 279+11
24-inch pipe culvert
278+42
(18-inch pipe culvert)
Cleaning culvert in place
279+78
See U.9 for detail (2 CUYD) class 3 riprap end treatment, Placed riprap, method B, 278+42 RT
See U.9 for detail (2 CUYD) class 3 riprap end treatment, Placed riprap, method B, 278+42 LT
P C
.4
P T
.4
P O
T
.1
N
CUYD
EXC.
CUYD
EMB.
281+50281+00280+50 280+00 this site.
1. Coordinates are assumed and unique to
NOTE:
Curve= RTP-9
D
R= 340.00'
T= 46.29'
L= 92.01'
LEGEND:
885 885
10 20010
SCALE IN FEET
280+00 to 281+16
FSR 2700 MP 6.9
I.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 if .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Existing ground
END CONSTRUCTION
281+16.00
El=901.46
E=2829.7870
N=212.8530
El=901.46
E=2829.7870
N=212.8530
WELDED WIRE REINFORCEMENT
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
SPECIAL ROCK EMBANKMENT PROFILE
12"
DETAIL
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
FSR 2700 MP 6.9
I.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ig .d g n
WA FS ERFO 2016(1)-20(4)
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
[2][3]
[2][3]
[2][3]
Existing ground special rock embankment
Mechanically placed rock for
:1 M a x
PLAN VIEW
F a c e o f
S lo p e class 1, non-woven, type A
Geotextile filter, Longitudinal direction
LC Varies x x x x x x x x x x x x x x x x x x x
Finished face
Geotextile filter, class 1, non-woven, type A
W9.4 wires on 12" c-c
W9.4 wires on 12" c-c pavement structure
See Sheet H.1 for
8' (min.)
12-inch depth
Unclassified Borrow
(max.)
at 2.5-foot vertical spacing
Welded wire reinforcement
Foundation width
B e n c h h e ig h ts m a x
Cut bench steps in accordance with Section 204.09.[4]
Allow 10-inch setback from finished face.[3] faces flatter than 1V:1.25H.
Welded wire reinforcment not required for finished slope [2]
30 days.
required if the short term back slope will be open more than
(29CFT, Part 1926. Subpart P, excavation). Shoring may be
Short term back slope ratio per OSHA Safety Regulations[1]
[1]backslope short term
1H:1V
[1]backslope short term
1H:1V
Existing roadway
Welded wire reinforcement
Toe elevationVaries
[1]Var.
V a r . V a r ie s
Special rock embankment
278+56 - 279+11
(max.)
at 2.5-foot vertical spacing
Welded wire reinforcement
(max.)
at 2.5-foot vertical spacing
Welded wire reinforcement
N
:1
PC 272+33.84
PC 272+33.84
PIPE INLET OUTLETHYDRAULIC INFORMATION
Q : 74.9 CFS
Q : 85.1 CFS
INSTREAM WORK WINDOW: N/A
BANKFULL CHANNEL WIDTH: 5 FT
TYPE: AL-Type 2
LENGTH: 48 ft
PIPE SLOPE: 0.1097 FT/FT
INFILL TYPE: - -
SPAN: 5 FT RISE: 5 FT
FLOWLINE SLOPE: 0.1097 FT/FT
TYPE: - -
INV N/E/EL: 859.71/2196.82/972.72
BURIAL DEPTH: 0 FT
LOWER BEVEL HEIGHT: 1.25 FT
HEADWALL: RIPRAP
INV N/E/EL: 812.44/2189.82/967.46
BURIAL DEPTH: 0 FT
LOWER BEVEL HEIGHT: 1.25 FT
HEADWALL: RIPRAP
CULVERT LAYOUT
FSR 2700 MP 6.9
Q : 25 CFS
HW : 975.65 FT
OHW : 973.96 FT
WALL THICKNESS: N/A
BEVEL: 1.75(H):1(V) BEVEL: 1.75(H):1(V)
I.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ih .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
L e
S te in h a u
C h e c k e d b y
D e s ig n e d b y
0 10 20 30 4010203040
Slope 10.97%
5060 50 60
SCALE IN FEET
10 0 10 20 30 40
Flow Flow
See U.9 for detail (7 CUYD) class 3 riprap end treatment.
Placed riprap, method B, See U.9 for detail (7 CUYD) class 3 riprap end treatment.
Placed riprap, method B, New culvert centerline
20'-0"
955 955
See U.9 for detail (7 CUYD) class 3 riprap end treatment.
Placed riprap, method B, See U.9 for detail (7 CUYD) class 3 riprap end treatment.
Placed riprap, method B, Exisiting ground
LC
Mitigation, streambed material (2 CUYD)
Profile grade
Channel Flowline
Channel elev. 972.72
Channel elev. 967.46
60-inch pipe culvert
272+02
See U.8 for detail (22 CUYD) riprap apron, minimum 3' thick
Placed riprap, method B, class 3
See U.8 for detail (22 CUYD)
FOOTNOTE:
Turf establishment[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
40+46 to 42+98
TYPICAL SECTION
TYPICAL SECTION
FSR 2800 MP 5.3
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it
[3][3]
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ja .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
1:4 1:4
[2
[2]
Existing ground
6'6' grade
Profile
6" compacted depth
Roadway aggregate, method 1, T o e o f fi ll
T o e o f fi ll
Variable Variable
Existing surface for structure dimensions
Profile, see Typical Section
Matchline elevation and cross slope
Match existing aggregate surface
28402
99510
.8
.6
+0.6700%
+5.00 00%
,0
.4
+2.0000%
,0
.1
120' VC
K = 28
60' VC
K = 20
SSD = 390'
P O
T
.0
P C
.5
P T
.2
P O
T
.0
N
Curve= C1001
D
R= 100.00'
T= 44.49'
L= 83.72'
NOTE:
this site.
1. Coordinates are assumed and unique to
40+46 to 42+98
FSR 2800 MP 5.3
CUYD
EXC.
CUYD
EMB.
45+0044+0043+0042+0041+0040+0030+00
974 974
978 978
982 982
986 986
990 990
994 994
998 998
1002 1002
1006 1006
J.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 jb .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Line to be constructed
El=994.88
E=2961.662
N=1759.060
El=1001.19
E=3027.419
N=2053.146
Slope stake limits
40+46 42+98
BEGIN FSR 2800 END FSR 2800
fiber roll (74 LNFT)
Soil erosion control, 40+82 to 41+80 RT fiber roll (47 LNFT)
Soil erosion control, 40+46 to 40+77 RT
20 40020
SCALE IN FEET
See Sheets J.3-7 for details
Install 216-inch Structural plate pipe, Remove existing 48-inch pipe culvert
41+63
See U.9 for detail class 3 riprap end treatment.
Placed riprap, method B, 41+63
See U.9 for detail class 3 riprap end treatment.
41+63
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130 80 90 100 110 120 130 140 150
160 170
975 975
Flow
N
PIPE INLET OUTLET
FISH SPECIES:
INSTREAM WORK WINDOW: 7/16 - 2/28
ACTIVE CHANNEL WIDTH: 14 feet
LENGTH: 108 feet
INFILL TYPE: SBM
SPAN: 18'-0"
FLOWLINE SLOPE: 0.06 ft/ft
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 2.0 feet
HW : 5.3 feetQ : 220 cfs
SCALE IN FEET
0 1010 20 25
BURIAL DEPTH: 2 feet BURIAL DEPTH: 2 feet
PLAN & PROFILE
AOP CULVERT
FSR 2800 MP 5.3RISE: 9'-0"
LOWER BEVEL HEIGHT: 1 foot LOWER BEVEL HEIGHT: 1 foot
BEVEL: 1.5(h):1(v) BEVEL: 1.5(h):1(v)
HEADWALL: Concrete collar/riprap HEADWALL: Concrete collar/riprap
INV N/E/EL: 980.2 INV N/E/EL: 974.8
PIPE SLOPE: 0.05 ft/ft
Q : 69 cfs
WALL THICKNESS: 0.2 in
TYPE: CMP Arch - Aluminum
J.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 jc .d g n
WA FS ERFO 2016(1)-20(3)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y
Grade fill to match conc. collar
Remove existing 48" CMP culvert road edgeExisting
Station 41+67.1
LC
Culvert crown Temporary flow barrier
Concrete collar
6%
LC
Footing top, elev 980.2
Footing top, elev 974.8 field verifyon bedrock, Footing bottom, LC
Concrete collar
Class 3 riprap headwall
Class 3 riprap headwall
Concrete collar
Concrete collar
Footing top guide bank
Class 3 riprap
Bedrock surface
Road
Culvert material
Conserved streambed locate as needed
Temporary flow barrier, locate as needed
Temporary flow barrier, guide bankClass 3 riprap channel edgeActive channel edgeActive
Temporary flow barrier
Existing stream bottom
Existing grade contour
100-yr WS depth 5.3'
Profile grade
Culvert wall
Culvert stem wall
Culvert foundation
5'-0" 15'-0"
"8 747'-1
.7
ELEVATIONS
AOP CULVERT
FSR 2800 MP 5.3
J.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 jd .d g n
WA FS ERFO 2016(1)-20(3)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y
Existing grade
CULVERT OUTLET
48" CMP culvert
Remove existing
48" CMP culvert
Remove existing
CULVERT INLET
for embedding min. 1 foot into bedrock*
Concrete footing, height as needed
Existing grade for embedding min. 1 foot into bedrock*
Concrete footing, height as needed
TYPICAL CULVERT CHANNEL
Profile grade
Profile gradeConcrete collar
Class 3 riprap headwall
LC
materialConserved streambed
17'-0"
5'-0" 3'-0"
17'-0"
3'-0" 5'-0"
Culvert stream bottomExisting
Existing bedrock
LC Culvert
100-yr WS depth 5.3'
2-yr WS depth 2.0'
2-yr WS depth 2.0'
100-yr WS depth 5.3' materialConserved streambed
Concrete collar Class 3 riprap headwall stream bottomExisting
Existing bedrock
Culvert wall
Culvert wall
10'-0"
14'-0"
18"
LOCATION
(ft)
D
(ft)
W
(in)
GRADATION
COBBLE
STREAMBED
INFILL INFORMATIONAL QUANTITIES
(cuyd)
COBBLE
STREAMBED
(cuyd)
SEDIMENT
STREAMBED
14 Class E 18 60
(cuyd)
STONE
BANK
18 30
(in +/- 4)
BOULDER DIAMETER
FISH PASSAGE
60 150
(each)
BOULDER
FP
FSR 2800 MP 5.3
INTERIOR TREATMENT
SIMULATED STREAM CULVERT
FSR 2800 MP 5.3
J.5
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e f1 je .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
C h e c k e d b y
D e s ig n e d b y
NO SCALE
SECTION A-A
Flow sediment
Streambed
D2
SECTION B-B
PLAN
LC
F lo w
Channel flowline
A A
B
B
NOTE:
FOOTNOTE:
Streambed cobble
D
D ty p
D ty p
(typ.)
(typ.)
Streambed sediment
36" min.
3.
2.
1.
or Length on plan sheet
Culvert outlet
Culvert inlet
W
Streambed sediment
Streambed cobble
Pipe arch culvert wall
Box culvert wall boulder
Fish passage boulder
Fish passage
Stagger in-channel fish passage boulder within the culvert span.
streambed cobble, and bank stone gradations.
See special contract requirements for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
[3]Fish passage boulder
[2]Bank stone
[2]Bank stone d e p th b u r ia l b u r ia l d e p th
Round pipe culvert wall top
Streambed
[1]Channel flowline
LC
Culvert wall
See Subsection 703.18 for gradation.[5]
216-inch Structural Plate Pipe
Informational quantities are incidental to ITEM 60301-0360[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] streambed sediment.
Construct well defined banks with bank stone and[2] parabolic shape.
Slope streambed aggregate towards flowline to ensure[1]
[4]
[5]
SECTION C-C
ANCHOR BOLT DETAIL
SECTION A-A
ISOMETRIC VIEW
SECTION B-B
REINFORCED CONCRETE HEADWALL
3'-0"
2.
1.
NOTE:
COLLAR DETAILS
REINFORCED CONCRETE
OPEN-BOTTOM ARCH
FSR 2800 MP 5.3
J.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 jf .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
C h e c k e d b y
D e s ig n e d b y
#4 stirrups
18" O.C. See detail
" Anchor bolt @4 as needed
Provide beveled washers LC m in
" Ø galvanized4 bolt design - 4" hook
Acceptable anchor
Culvert crown
3'-0"
B
B
C
C
A
A
3' -0
Sp an
3' -0
18" O.C. See detail
" Anchor bolt @4 ty p
C lr
18" O.C. See detail
" Anchor bolt @4
#4 Each face
Pipe
C lr
Per plans (1.5 min.) 2'-0" min. lap splice
(3 each face, 6 total)
#4 Reinf @ equal spacing
#4 stirrups
E a c h f a c e
Top of footing
Top of footing
Bottom of footing
Bottom of footing
O .C
Anchor dowels
Anchor dowels least 1 foot. Excavation and backfill according to Section 209.
be reduced provided the collar is keyed into the rock at
Where bedrock is encountered, the depth of the collar may install bolts as shown.
Provide slotted hole at bolt locations as necessary in order to
NO SCALE
spacing each face
#4 @ equal
GENERAL NOTES:
Bearing Capacity: 2 tons/sq. ft.
SOIL:
all other locations.
cover for concrete cast against ground, and 2-inch minimum for conforming to ASTM A1064, GRADE 65. Provide 3-inch minimum
(ASTM, A615), deformed, grade 60, or welded wire reinforcing
Furnish reinforcing steel bars conforming to AASHTO M31
REINFORCING STEEL:
f'c=3000 psi.
per Section 6-1, with minimum 28-day compressive strength
-inch. Furnish minor concrete for headwall 4 3exposed edges design compressive strength f'c=4500 psi. Chamfer all
Furnish minor concrete per Section 601 with minimum 28-day
CONCRETE:
conforminG to AASHTO M 167 for the sizes and types specified.
Furnish structures and assembly fasteners for connecting plates
STEEL STRUCTURAL PLATE STRUCTURES:
As specified in design specifications.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
with AASHTO LRFD Bridge Design Specifications, latest edition.
latest edition. Design precast stem walls and footings in accordance
Design structural plate arch in accordance with ASTM A796, DESIGN:
precast sections.
Install tie rods or connector plates per manufacturer between
FP-14 (U.S. Customary). Field verify all dimensions and elevations.
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
SECTION
" (min.)2 12'-6
1'-3" (min.)
ty p
Flow
STRUCTURAL DETAILS
OPEN-BOTTOM PIPE ARCH
FSR 2800 MP 5.3
J.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 jg .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
C h e c k e d b y
D e s ig n e d b y
15°
V a r ie s
4½"
4¼" 8 31 ref.
ref.
foam gasket Closed cell
Shim
Grout
Pipe arch
Span (per plan) as required short & long bolts
Structural-plate bolts, R is e p e r p la n in stem wall
Center pipe arch
Pipe arch wall
3" m in elev per plan
Bottom of pipe arch, elev per plan
Bottom of footing, elev per plan
Top of footing, foundation
Outside of foundation
Inside of
WATERTIGHT FOUNDATION JOINT SECTION
NO SCALE
sided box culvert wall
Precast three
" thick material16
Base channel, 15" (min.)
Non-shrink grout rope
" mastic 4
" gap2
(outside joint) on top and sides mastic joint wrap
Grout and 9" wide at channel bottom
Streambed elevation material down, per plan
Place streambed
BASE CHANNEL
TOP OF FOOTING/STEM WALL
DETAIL
DETAIL
O Ring if required
" (max.)2 12'-9
1'-5" (max.)
DETAIL
12" into bedrock to and embedded a min.
footing to be extended
Cast-in-place or precast
>3 feet - 2 per joint
<3 feet - 1 per joint
Stem wall height, inside face
Stem wall
SUPPLEMENTAL PRECAST CONCRETE STEM WALL TIE
m a x bend down & twist
Base channel anchor lugs, Concrete stem wall tapered holes permitted when precast
" Ø Hole for 1" Ø joint tie,4
DETAIL A
Flow
SECTION A-A
Flow
SECTION B-B
PLAN
FSR 2800 MP 10.3-10.4
LEGEND:
PLAN
K.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 k b .d g n
WA FS ERFO 2016(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Install soil erosion control devices as needed.
representation. Adjust to fit field conditions.
Site not surveyed. Horizontal alignment is a
2.
1.
NOTE:
Edge of road
300'
12'
A A
Pipe culvert
B
B
17'
See U.9 for detail (5 CUYD) class 3 riprap end treatment, Placed riprap, method B, See U.9 for detail (5 CUYD) class 3 riprap end treatment, Placed riprap, method B, minimum 2' thick (16 CUYD) class 3, riprap apron, Placed riprap, method B, class 4, see Detail A (113 CUYD)
Placed riprap, method B, See U.9 for detail (12 CUYD) class 3 riprap end treatment, Placed riprap, method B, See U.9 for detail (12 CUYD) class 3 riprap end treatment, Placed riprap, method B, 45'
45'
27'
Roadway Reconditioning
108" pipe culvert method B, class 4
Placed riprap, method B, class 4, Placed riprap, (government furnished)
Install 36-inch pipe culvert
Remove existing 18-inch pipe culvert
MP 10.3
(government furnished)
Install 108-inch pipe culvert
Remove existing 36-inch pipe culvert
MP 10.4
Geotextile filter, class 1, type C
PLAN
FSR 2800 MP 11.0 (11.4)
LEGEND:
NO SCALE
DETAIL A
Flow
SECTION A-A
Flow
SECTION B-B
PLAN
L.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 lb .d g n
WA FS ERFO 206(1)-20(3)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Install soil erosion control devices as needed.
Adjust to fit field conditions.
Site not surveyed. Horizontal alignment is a representation.
2.
1.
Edge of Road
NOTE:
96-inch pipe culvert
See U.9 for detail (10 CUYD) class 3 riprap end treatment, Placed riprap, method B, FOOTNOTE:
See U.9 for detail (10 CUYD) class 3 riprap end treatment, Placed riprap, method B, A A
Pipe culvert
B
B 45'
45'
Roadway Reconditioning method A, class 4
Placed riprap, method A, class 4, Placed riprap, 20'
96" pipe culvert
[1]Roadway excavation (18 CUYD) bottom width, 1V:1H side slopes, and 3-foot minimum depth.
Excavate up drainage by 20 ft. Provide channel of 5-foot[1]
See Detail A (80 CUYD) method B, class 4.
Placed riprap, NO SCALE TYPICAL SECTION
FSR 2810 MP 2.3
70 LNFT (L.2)
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it
Turf establishment[1]
M.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 m a .d g n
WA FS ERFO 2016(1)-20(3)
a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
LC
Profile grade
2%
Exis…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.