FSR 4052 MP 3.0 Earthwork.pdf

PDF 43 KB Posted

Attached to
WA FS ERFO 2016(1)-20(3), Darrington District Emergency Repairs, Phase I
Solicitation number
DTFH7017B00033
Issued by

About this file

FSR 4052 MP 3.0 Earthwork.pdf

View the file

Other files

File Type Posted
Bid_Opening_Summary_Darrington_District_Emergency_Repairs,_Phase_I.pdf PDF
Amendment_A002.pdf PDF
FSR_2081_MP_2.25_(A002).pdf PDF
FSR_2083_MP_0.1_(A002).pdf PDF
Q&A_5-18-18.pdf PDF
Amendment_A001_Darrington_District.pdf PDF
Q&A_5-10-18.pdf PDF
Q&A_5-9-18.pdf PDF
IFB_Darrington_District.pdf PDF
FSR 2660 MP 4.1.pdf PDF
WA_FS_ERFO_2016(1)-20(3)_Plans_Updated_03-30-2018.pdf PDF
FSR 4052 MP 2.55.pdf PDF
FSR_4065_MP_1.15.pdf PDF
FSR 2083 MP 0.1.pdf PDF
GM34-17_PH-1_Geotechnical_Recommendations.pdf PDF
SWPPP-WA FS ERFO 2016(1)-20(3) Darrington District Phase 1.pdf PDF
FSR 2800 MP 5.3.pdf PDF
FSR_2800_MP_5-3_Dar_AOP_Hydraulics_Memo_combined-1.pdf PDF
wa-fserfo2016012003_HydReport_20170719.pdf PDF
FSR 2800 MP 5.3 Earthwork.pdf PDF
FSR 2081 MP 2.25.pdf PDF
FSR 2700 MP 6.9 Earthwork Site 3.pdf PDF
FSR 4052 MP 1.9 Earthwork.pdf PDF
FSR 4052 MP 2.2.pdf PDF
FSR 2081 MP 1.3.pdf PDF
FSR 2700 MP 6.9.pdf PDF
Plan_Request_form.pdf PDF
FSR 4052 MP 2.2 Earthwork.pdf PDF
FSR 4052 MP 2.55 Earthwork.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary-Letter-Darrington.pdf PDF
60__Darrington_Emergency_Repairs_Preliminary_Plan_Set.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

File: c:\myfiles\pw_production\d0319908\FSR 4052 MP 3.0 Earthwork.log 3/16/2018, 4:47:

04 PM

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

81+20.00 RDWYEXC

Excavation 16.91 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.36 0 0 0.00 0 0

81+33.97 RDWYEXC

Excavation 17.85 9 9 1.00 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 6 0 0.00 9 6

81+40.00 RDWYEXC

Excavation 22.65 4 4 1.00 13 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 13 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.31 3 0 0.00 13 9

81+60.00 RDWYEXC

Excavation 19.47 16 16 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.65 10 10 1.00 19 10

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.36 8 0 0.00 19 17

81+73.71 RDWYEXC

Excavation 9.42 7 7 1.00 36 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.79 13 13 1.00 13 23

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 1

Subsoil Exc 0.00 0 0 0.00 0 Fill 12.49 6 0 0.00 13 23

81+80.00 RDWYEXC

Excavation 6.45 2 2 1.00 38 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.99 3 3 1.00 12 26

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.37 3 0 0.00 12 26

82+00.00 RDWYEXC

Excavation 7.73 6 6 1.00 44 Subsoil Exc 0.00 0 0 1.00 0 Fill 213.00 79 79 1.00 ‐61 105

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.37 8 0 0.00 ‐61 34

82+20.00 RDWYEXC

Excavation 8.40 6 6 1.00 50 Subsoil Exc 0.00 0 0 1.00 0 Fill 58.34 100 100 1.00 ‐155 205

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.37 8 0 0.00 ‐155 42

82+40.00 RDWYEXC

Excavation 32.85 16 16 1.00 66 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 22 22 1.00 ‐161 227

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.35 8 0 0.00 ‐161 50

82+60.00 RDWYEXC

Excavation 33.17 24 24 1.00 90 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.56 1 1 1.00 ‐138 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.31 8 0 0.00 ‐138 58

82+61.87 RDWYEXC

Excavation 33.04 3 3 1.00 93

Page: 2

Subsoil Exc 0.00 0 0 1.00 0 Fill 2.77 0 0 1.00 ‐135 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 1 0 0.00 ‐135 59

82+65.00 RDWYEXC

Excavation 32.67 3 3 1.00 96 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐132 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 1 0 0.00 ‐132 60

82+80.00 RDWYEXC

Excavation 38.77 20 20 1.00 116 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐112 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.28 6 0 0.00 ‐112 66

83+00.00 RDWYEXC

Excavation 25.50 23 23 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐89 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.26 8 0 0.00 ‐89 74

83+20.00 RDWYEXC

Excavation 13.48 14 14 1.00 153 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.88 0 0 1.00 ‐75 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.25 8 0 0.00 ‐75 82

83+40.00 RDWYEXC

Excavation 10.21 9 9 1.00 162 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.90 2 2 1.00 ‐68 230

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Page: 3

Fill 11.25 8 0 0.00 ‐68 90

83+60.00 RDWYEXC

Excavation 7.55 7 7 1.00 169 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.36 4 4 1.00 ‐65 234

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.27 8 0 0.00 ‐65 98

83+77.42 RDWYEXC

Excavation 22.57 9 9 1.00 178 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.64 3 3 1.00 ‐59 237

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.38 7 0 0.00 ‐59 105

83+80.00 RDWYEXC

Excavation 23.01 2 2 1.00 180 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.51 0 0 1.00 ‐57 237

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.29 1 0 0.00 ‐57 106

84+00.00 RDWYEXC

Excavation 20.13 16 16 1.00 196 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.51 1 1 1.00 ‐42 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.32 8 0 0.00 ‐42 114

84+20.00 RDWYEXC

Excavation 17.30 14 14 1.00 210 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.42 0 0 1.00 ‐28 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.33 8 0 0.00 ‐28 122

84+40.00 RDWYEXC

Excavation 23.49 15 15 1.00 225 Subsoil Exc 0.00 0 0 1.00 0

Page: 4

Fill 0.02 0 0 1.00 ‐13 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.29 8 0 0.00 ‐13 130

84+44.32 RDWYEXC

Excavation 8.28 2 2 1.00 227 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐11 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 2 0 0.00 ‐11 132

84+60.00 RDWYEXC

Excavation 26.15 10 10 1.00 237 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.27 7 0 0.00 ‐1 139

84+80.00 RDWYEXC

Excavation 25.79 19 19 1.00 256 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 18 238

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.26 8 0 0.00 18 147

Page: 5

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 256 256 1.00 Subsoil Exc 0 0 1.00 Fill 238 238 1.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 147 0 0.00