1-11-2019Q&A.pdf

PDF 56 KB Posted

Attached to
OR DOT 35(1), Highway 35 Safety Improvements at Meadows Creek & Mt Hood Meadows Ski Area
Solicitation number
DTFH7017B00031
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary.pdf PDF
2-25-2019Q&A.pdf PDF
A001.pdf PDF
Plan_Request_Form_Hwy_35.pdf PDF
Physical_Data.zip ZIP file
IFB_Meadows.pdf PDF
Plan_Sheets.pdf PDF
OR_35(1)_Preliminary-Letter.pdf PDF
OR_DOT_35(1)_Highway_35_Safety_Improvements_at_Meadows_Creek_&_Mt_Hood_Meadows_Ski_Area.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. OR DOT 35(1) Highway 35 Safety Improvements at Meadow Creek & Mt Hood Meadows Ski Area

# General Technical Question Answer Date

1 X Is the highway poles and lighting going to be part of this project?

Highway poles and lighting are not part of the project.

1/4/19

2 X

I would like to clarify that slope reinforcement/shoring (such as soil nail walls) will be required only for the excavation to install culverts at the Meadows Creek (OR35) and Teacup Lake Rd locations. Will slope reinforcement/shoring be required for any other work in this area?

The temporary support structures are provided for the excavation to install the reinforced box culvert under OR35 as well as along the temporary widening constructed in Stage I. The temporary support structures along the temporary widening are required to prevent fill within the existing Meadows Creek to allow staged construction outside the in‐water work period. See sheets H.3 and H.5.

1/10/19

3 X

On Sheet G.9, the Watertight Box Joint Section Detail displays a shiplap style of joint, with a mastic rope and a foam gasket. This is not typical, nor really recommend for a staggered split culvert application. Historically, in between section lengths, we use a male/female keyway, and apply the use of a butyl tape. Would this suffice?

Bid according to the contract. Requests for change will be evaluated after contract award.

1/11/19