SWPPP_ID_FS_SAW_T_2017(1).pdf

PDF 42 MB Posted

Attached to
ID FS SAW T 2017(1), Redfish Lake to Stanley Trail
Solicitation number
DTFH7017B00029
Issued by

About this file

Physical Data (SWPPP)

View the file

Other files

File Type Posted
BidSum_ID_FS_SAW_T_2017(1).pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_8-16-18.pdf PDF
Q&A_8-14-18.pdf PDF
Q&A_8-10-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_8-9-18.pdf PDF
Plan_Request_for_Internet.pdf PDF
ID_FS_SAW_T_2017(1)_SIGNOFF_Plans.pdf PDF
IFB_Redfish_Lake.pdf PDF
ID_Redfish_Lake_to_Stanley_Trail_Preliminary-Letter.pdf PDF
Id-f-saw201701-Preliminary_Plan.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P ro je c t N a m e

A ln en tlm en t''

N.

ll fi iH

~r

W F

L H

D

-4

5/

F E

D E

R A

L H

IG

H

W A

Y A

D M

IN

IS

T R

A T

IO

N

E

S T

E R

N F

E D

E R

A L

L A

N D

S H

IG

H

W A

Y D

IV

IS

IO

N

S

P P

P A

M E

N D

M E

N T

L O

G

~a~ -ef ti l" ff

O f

Inspection Requirements for NPDES Compliance

EPA Construction General Permit Part 4 inspection requirements for NPDES compliance:

Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.

You must specify in your SWPPP which schedule you will be following.

1. At least once every 7 calendar days, OR

2. At least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site~ The SWPPP should also include a daily rainfall log.)

Case-by-Case Reductions in Inspection Frequency: You may reduce your inspection frequency to at least once every month if: · ·

I . The entire site is temporarily stabilized, 2~ Runoff is unlikely due to winter_conditions (e.g., site is covered with snow, ice, or the ground is frozen), or

3. Construction is occurring during seasonal arid periods in arid areas and semi-arid areas.

Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is av~ilable until one month before thawing conditions are e.xpected to result in a discharge if all of the following requirements are met:

· I. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month);

2. Land disturbance activities have been suspended; and

3. The beginning and ending dates of the waiver period are documented in the SWPPP.

Qualified Personnel: Inspections must be .conducted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact stormwater quality and t9 assess the effectiveness of any sediment and erosion control measures · selected to control the quality of stormwater disch~rges from the construction activity. . ·

Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage ofm~terials that are exposed to precipitation. Inspectors must look for evidence of, or the potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections .are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.

A// .reports required by this permit, including th·e SWPPP, S.WPPP amendments, and inspection reports must be signed by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.

1. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge .of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with enVironmental laws and regulations; the manager can en8ure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

2. For a partnership· or sole proprietorship: By a general partner or the proprietor, respectiv~ly; or

· 3. For a municipality, state, federal, or other public agency: By either a principal executivy officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit !)fthe agency (e.g., Regional Administrator of EPA). · ·

A person is a duly authorized representative only if:

The authorization is made in writing by a-person described in Appendix G, Subsection I I.A;

The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, positfon of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and ·

The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. ·

FEDERAL HIGHWAY .ADMINISTRATION

WESf.£RN FEDERAL LANDS filGRWAYDMSION

SWPPP CONSl'RUCTION S.lTE INSPECTION REPORT

Project Name:

Date ofln.spectio~:

~tart/End Times:

Project Name:

Inspector's Namein lnspector's Comllany:

Inspector's Contact Information:

Inspector's Qualifications (CES.CL or other certification number): Inspector's Qlllalifi.cations expiratton date:

Descdbe present p.hase of construction

Type ofinspection:

0Regular 0 Post-storm.event 0 Reduced inspection frequency period

Has there been a storp) event since the last1nspectimn? 0 Yes No lf yes, provide:

Estimated Stom;i. Start Date & Time:._.;......_ ____ ~-- Estimated Storm Duratio:µ (hrs):

Approximate Amount of Precipitation (in): _____ _

Weather at time oftbis inspection? · 0 Clear 0Cloudy 0 Rain 0 Sleet 0Fog D Snowing 0 High Winds 0 Other:

Temperature: ______ _

WFLHD 157-2 (5/201i)

I

5.

Site-specific BMPs

• BMP - Describe and give the /~cation of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation sheets. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precip"itation.

• BMP Installed.:__ If a BMP should be installed at the current phase of the project and you marked "No" in the "BMP Installed" column, then you must check "Yes" in the "BMP Action Required?" column

• BMPAction Required? - .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.

• BMP Action Required, Complete by Date - Before certifying the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a BMP Action is NOT required, leave the "Complete by Date" blank. ·

• DescribeBMP Action, ifNeeded-Anytimeyou check "Yes"for "BMP Action Required", then you must also fill in the "Describe BMP Action" column.

• Delay~d Action Item Report - When a BMP Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed Af:tion Item Report in the SWPPP. · ·

• Corrective Action Log - When a BMP Action is required as noted in this report, you must also enter all the

· information for this action in the Corrective Action Log.

BMP & Location BM.P BMPAction Describe BMP Action, if Needed Installed? Required?

0Yes QNo LJYes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No UYes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

UYes 0No 0Yes 0No

Complete by Date:

0Yes 0No UYes UNo

Complete by Date:

LJYes 0No UYes 0No

Complete by Date:

L]Yes 0No UYes 0No

Complete by Date:

Page2 Project Name:

Inspection Date:

·10

BMP & Location BMP BMP Action Describe BMP Action, if Needed Installed? Required?

LJYes 0No LJYes lJNo

Complete by Date:

LJYes L)No LJYes 0No

Complete by Date:

LJYes LJNo LJYes lJNo

Complete by Date.:

lJYes LJNo lJYes LJNo

Complete by Date:

lJYes LJNo lJYe5 0No

Complete by Date:

LJYes LJNo 0Yes LJNo

Complete by· Date:

lJYes 0No lJYes lJNo

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

LJYes 0No 0Yes 0No

~mpleteby

Date:

0Yes UNo UYes 0No

Complete by Date:

0Yes 0No 0Yes LJNo

Complete by Date:

0Yes UNo UYes LJNo

Complete by Date:

0Yes 0No OYes_LJNo

Complete by Date:

• Please use continuation sheets if there are additional IJMPs to list.

Pag~ 3 Project Name:

Overall Site Issues

• BMP or Activity · -- These are some general site issues that must be assessed during inspectioiis.

• Implemented? - If a BMP or activity sh'auldbe implemented at the current phase· of the project and you check "No", then you must mark "Yes" in the "Corrective Action Required?" column. .

• . Corrective Action Required? - When maintenance or some other corrective action is required, check

"Yes" in this column. .

• Correciive Action Required, Complete by Date - When a corrective acti~n is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave th~ "Complete by Date" blank. · .

• Describe Corrective Action, if Needed-Anytime you check "Yes" in the "Corrective Action Required?"

column, you must fill in the "J?escribe Corrective Action" column as well.

• Delayed Action Item Report- When a Corrective Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed Action Item Report in the SWPPP.

• Corrective Action Log - When a Corrective Action is required as noted in this report, you must also enter aU the information for this action in the Cor:ective Action Log.

BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed Action Reauired?

Have stabilization 0Yes LJNo UYes UNo measures been initiated on slopes and disturbed Complete ·by areas not actively being Date:

worked?

Are natural resource 0Yes 0No 0Yes 0No areas (e.g., streams, wetlands, mature trees, Complete by etc.) required by the Date:

SWPPP to be delineated in the field, identified with barriers or markings?

Are perimeter controls LJYes 0No LJYes 0No and sediment barriers . adequately installed Complete by (keyed into substrate) .Date:

and maintained?

Are .sto~ drain inlets 0Yes 0No 0Yes LJNo pr9perly protected? Complete by

Date:

Are the construction LJYes LJNo UY~ LJNo ' exits preventing sediment from being Complete by tracked. into the street? Date:

Is trash/litter from work LJYes LJNo LJYes LJNo areas collected and placed in covered Complete by dumpsters? Date:

Are washoµt faciliti~s LJYes LJNo LJYes LJNo (e.g., paint, concrete) available, clearly Complete by marked, and maintained? Date:

Page4 Project Name:

BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed '

Action Required?

8 Aie vehicle and 0Yes 0No 0Yes 0No equipment fueling, cleaning, and Complete by maintenance areas free Date:

of spills, leaks, or any other deleterious material?

9 Aie materials that are 0Yes 0No 0Yes O·No potential stormwater Complete by contaminants stored Date:

inside or under cover?

IO Are non-stormwater LJYes 0No 0Yes 0No discharges (e.g., wash Complete by water, dewatering) Date:

properly controlled?

Overall Site Issue Answer to Corrective Question Action Describe Corrective Action and Location, if Needed

Reauired?

I . At the time of LI Yes LINo 0Yes 0No inspection, are the Complete by discharge points and Date:

receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See continuation page for list of discharge points)

2 Since the last inspection; 0Yes 0No 0Yes 0No are the discharge points · Complete by and receiving waters free Date:

of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)?. (See continuation page for list of discharge ooints)

3 Has Spill Response kit 0Yes 0No 0Yes 0No been used since the last COmpleteby inspection? If yes, has Date:

stock been maintained?

4 . Afe any additional 0Yes 0No OYes 0No BMPs needed? Complete by

Date:

5 (Other) 0Yes LJNo LI Yes LINo D Complete by

Date:

Page5 Project Name:

Scope of Inspection

Did you inspect all areas of the project that are [JYes LJNo If you did not inspect any required .areas, list those required to be inspected by the CGP (areas locations here and explain why they weren't inspected.

disturbed by construction activity, areas used for storage of materials that are exposed to precipitation, discharge locations and locations .where vehides enter or exit the site)?

• Check the box below if the project is in compliance with the CGP and the SWPPP:

D I certify that on the date of this inspection, this project was found to be in compliance with the terms of its Storm Water ·Pollution Prevention Plan and the curr~nt Construction General Permit.

• If there are incidences of non-compliance, then do not check the box above. .

• When you don 't check the box above, then you must describe each incident of non-compliance and the· actions that are·needed to bring the project into compliance.

• If there is an Action Item described in the non-compliance box· that does not already have a "Complete by

Date" assigned elsewhere in this report, then add a completion date within the box.

Non-Compliance

Incidence of Non-compliance:

Action Item and Complete by Date:

CERTIFICATION STATEMENT

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system desigried to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belie~ true, accurate, and complete. I am aware that there are signifieant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

Contractor's Duly Authorized Representative FHW A's Duly Authoriied Representative

Print name: Print Name: ·

Title: Superintendent Title: Proj~t Engineer

Signature: Signature:

Page6 Project Name:

Table of Contents
Tab 1
Tab 2
Tab 3
Tab 4
Tab 5
Tab 6
Tab 7
Tab 8
Tab 9
Tab 10
Tab 11
Tab 12
Tab 13
Tab 14
Tab 15
Tab 16
Tab 17
Tab 18

File details come from the government source that posted it.