Q&A_8-10-18.pdf

PDF 78 KB Posted

Attached to
ID FS SAW T 2017(1), Redfish Lake to Stanley Trail
Solicitation number
DTFH7017B00029
Issued by

View the file

Other files

File Type Posted
BidSum_ID_FS_SAW_T_2017(1).pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_8-16-18.pdf PDF
Q&A_8-14-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_8-9-18.pdf PDF
SWPPP_ID_FS_SAW_T_2017(1).pdf PDF
Plan_Request_for_Internet.pdf PDF
ID_FS_SAW_T_2017(1)_SIGNOFF_Plans.pdf PDF
IFB_Redfish_Lake.pdf PDF
ID_Redfish_Lake_to_Stanley_Trail_Preliminary-Letter.pdf PDF
Id-f-saw201701-Preliminary_Plan.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID FS SAW T 2017(1)

Redfish Lake to Stanley Trail

# General Technical Question Answer Date

1 X We want to know if there is a dumping fee for disposing of materials at the Nip and Tuck pit?

There is no dumping or disposal of waste, debris, or excess suitable allowed at the USFS Nip‐N‐Tuck pit. Stockpile milled asphalt material and removed aggregate according to Subsection 105.04(c).

8/9/18

2 X Is the Gravel supplied from the 4th of July pit or will a purchase of gravel have to be made?

There is no government‐provided material source for gravel. Provide gravel according to the contract documents.

8/9/18

3 X

And I was wondering if the Road removal going to be added on to the bid schedule because I have looked and I don't see it under any of the bid Items?

See Item No. 21101‐2000 in the Bid Schedule and Section 211 of the Special Contract Requirements.

8/9/18

4 X Please ask if these mats are going to be adequate for the wetland mitigation mats. I need to know as soon as possible please.

See Section 647 and Subsection 713.18A of the Special Contract Requirements.

8/10/18

5 X

Also, specs call out contractor responsible for SWPPP, but I thought I heard from CO that there was already SWPPP in place. Please confirm. My bid will be less if I only must modify a SWPPP as opposed to do a full blown SWPPP.

We are unaware of any CO saying this.

Conform to the requirements of Subsection 107.01A.

8/10/18

6 X BMP inspections not clear in the specs. Is it every 7 days plus rain events or every 14 days plus rain events? Please advise.

This will be addressed in a forthcoming amendment.

8/10/18

7 X

Are the seeding 4.0 archers to be performed where the white rock is to be removed along HWY 75.? What areas of the project that re‐ seeding will be required.

No. See Plan Section C, and Subsection

625.03 of the Special Contract Requirements.

8/10/18

Check General or Technical

8 X Please provide additional information on bid line item 63302‐0000 sign system 49 SQFT?

See Plan Sheets D.2, E.1, K.1‐4; Section 633 of the Special Contract Requirements; and Section 633 of FHWA FP‐14.

8/10/18