AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 08/10/2018 N/A ID FS SAW T 2017(1)
Redfish Lake to Stanley Trail
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH7017B00029
9B. DATED (SEE ITEM 11)
07/18/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ID FS SAW T 2017(1), Redfish Lake to Stanley Trail
Amendment A001 is issued to revise the following:
SPECIAL CONTRACT REQUIREMENTS Page E-49, Subsection 157.14 Inspection and Reporting. Removes discrepancy in the eighth paragraph.
ENCLOSURES: Pages E-49
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
E-49 DIVISION 150
Special Contract Requirements Project: ID FS SAW T 2017(1), Redfish Lake to Stanley Trail
157.14 Inspection and Reporting. Delete the text of this Subsection and substitute the following:
Inspect the following areas of the project:
(a) All areas where soil has been disturbed and that have not been permanently stabilized;
(b) All erosion and sediment control measures and pollution prevention measures;
(c) Government-provided material, waste, borrow, staging and maintenance areas;
(d) All areas where storm water typically flows within the site;
(e) All points of storm water discharge from the site; and
(f) All locations where temporary stabilization measures have been implemented.
Inspect all erosion and sediment control measures at least once every 7 days, or once every 14 days and within 24 hours of a storm event of 0.25 inches (6 millimeters) or greater as determined by an on-site rain gauge. Specify in the project SWPPP (tab 9) which inspection schedule will be used and use the same schedule throughout the duration of construction.
Furnish completed inspection reports to the CO within 24-hours after performing an inspection.
Inspections may be temporarily suspended when construction has stopped due to seasonally-frozen conditions if all disturbed areas have been permanently or temporarily stabilized.
Document the reason for the reduction in inspection frequency in the SWPPP (tab 9). Resume the normal inspection schedule when the construction site thaws or construction activities resume.
157.15 Maintenance and Cleanup. Delete the text of this Subsection and substitute the following:
Maintain erosion and sediment control measures in working condition until final acceptance or until disturbed sites have been stabilized as determined by the CO. Clean devices and structures when half full of sediment. Remove accumulated sediment and dispose of in an upland location according to Subsection 204.14.
Implement maintenance of erosion and sediment control devices or other corrective action within the following time requirements:
(a) In the event of discharge of sediment or other pollutants, immediately take steps to prevent further discharge until a permanent solution is installed and made operational;
(b) Begin corrective maintenance of sediment and erosion control devices within 24 hours of discovery and complete as soon as possible.
Revised by Amendment A001