PROJECT_DESCRIPTION.pdf

PDF 45 KB Posted

Attached to
ID FS SAW T 2017(1), Redfish Lake to Stanley Trail
Solicitation number
DTFH7017B00029
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
BidSum_ID_FS_SAW_T_2017(1).pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_8-16-18.pdf PDF
Q&A_8-14-18.pdf PDF
Q&A_8-10-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_8-9-18.pdf PDF
SWPPP_ID_FS_SAW_T_2017(1).pdf PDF
Plan_Request_for_Internet.pdf PDF
ID_FS_SAW_T_2017(1)_SIGNOFF_Plans.pdf PDF
IFB_Redfish_Lake.pdf PDF
ID_Redfish_Lake_to_Stanley_Trail_Preliminary-Letter.pdf PDF
Id-f-saw201701-Preliminary_Plan.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID FS SAW T 2017(1), Redfish Lake to Stanley Trail, Custer County, Idaho.

The work consists of construction of a gravel trail. The Contractor will construction the trail based on typical cross sections and fit the trail within the project corridor, to best fit within the project’s natural features. The trail will be approximately 4.5 miles long, 78-inch wide with granular surfacing and include appropriate water diversion features such as culverts, grade reversals, reversed grade dips, etc. The trail shall be constructed using hand labor and low impact mechanized equipment such as trail dozers. This work also consists of reconstruction existing trailhead and trails, obliterating existing service roads, and installations of gates, cattle guards, fence and signs. and other small items of work.

Project length: Approximately 5 Miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: 4.5 Miles South of Stanley, Idaho

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Ba se

DIVISION 150 – Project Requirements

152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance

Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules)

Yes

157 Soil Erosion & Sediment Control (erosion control devices)

LPSM

158 Watering for Dust Control 1,200 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 11 ACRE 202 Additional Clearing & Grubbing (Hazard

203 Removal of Structures & Obstructions

204 Unclassified Borrow 5,000 CY

211 Roadway Obliteration 10,000 212 Linear Grading 4.5 MILE

DIVISION 250 – Slope

251 Riprap 400 CUYD

252 Rockery, Special Rock Embankment, and

257 Contactor-Designed Retaining Walls

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 2200 CUYD

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 200 LNFT 619 Fences, Gates, Cattle Guards & Bollard

622 Rental Equipment Yes 623 General Labor Yes 624 Topsoil (landscaping & related items) 625 Turf Establishment