Q&A6-28-17.pdf
PDF 42 KB Posted
- Solicitation number
- DTFH7017B00022
About this file
Contractors Questions Answered
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.Hagg_Lake.pdf | ||
| A001.pdf | ||
| Plan_Request_for_Hagg_Lake.pdf | ||
| CrossSection_Hagg-Lake_MP27.pdf | ||
| ShearKey-Volume_Hagg-Lake_MP27.txt | TXT text file | |
| Earthwork_MP2722.log | LOG file | |
| Plans_Hagg-Lake_MP27.pdf | ||
| IFB.pdf | ||
| ESCP_OR_WASH_2015(2)_Hagg_Lake_Perimeter_Road.pdf | ||
| Alignment-Report_Hagg-Lake_MP27.txt | TXT text file | |
| PROJECT_DESCRIPTION_OR_WASH_2015(2),_Hagg_Lake_Perimeter_RD,_MP_2.7_Slide_Repair.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. OR WASH 2015(2) Project HAGG LAKE PERIMETER ROAD, MP 2.7 SLIDE REPAIR
# General Technical Question Answer 1 x Is there a location available or designated for the disposal of the excess excavated material from this project?
There are no government provided disposal sites. Please refer to Subsection 105.02 Material Sources.
File details come from the government source that posted it. Updated .