ESCP_OR_WASH_2015(2)_Hagg_Lake_Perimeter_Road.pdf

PDF 18 MB Posted

Attached to
OR WASH 2015(2), Hagg Lake Perimeter Road, MP 2. 7 Slide Repair
Solicitation number
DTFH7017B00022
Issued by

About this file

Physical Data - ESCP OR WASH Hagg Lake

View the file

Other files

File Type Posted
BidSum.Hagg_Lake.pdf PDF
Q&A6-28-17.pdf PDF
A001.pdf PDF
Plan_Request_for_Hagg_Lake.pdf PDF
CrossSection_Hagg-Lake_MP27.pdf PDF
ShearKey-Volume_Hagg-Lake_MP27.txt TXT text file
Earthwork_MP2722.log LOG file
Plans_Hagg-Lake_MP27.pdf PDF
IFB.pdf PDF
Alignment-Report_Hagg-Lake_MP27.txt TXT text file
PROJECT_DESCRIPTION_OR_WASH_2015(2),_Hagg_Lake_Perimeter_RD,_MP_2.7_Slide_Repair.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of

TAB 1: SWPPP/ESCP Narrative

TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)

TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence

TAB 4: Delegation of Authority

TAB 5: Maps

TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)

TAB 7: Permanent Stabilization and Revegetation Plan (phm sets and details)

TAB 8: SWPPP Amendment Log

TAB 9: Erosion/Sediment Control Inspection Reports and Requirements

TAB 10: Corrective Action Log

TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training Log

TAB 13: Waste and/or Borrow Site Information

TAB 14: Grading and Stabilization Log

TAB 15: Hazardous Spill Plan

TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)

TAB 17: NPDES Quality Assurance Checklist

TAB 18: NPDES Notice of Termination (NOT)

·" 1 l ..

r ~, .

l .

r :',t l' f, .t

.1

. 7'" .!.o· j·, ...... ·~':! ' "'i f

SWPPP (ESCP - Oireg@n) NARRATIVE

'1 .

.f'

'1

J: . . ,.,, 3: EPA/State Acknowledgement, EPA/State does apply Oregon projects

A sign or other notice will be posted conspicuously near the main entrance of the construction site. For linear projects, the sign or other notice will be posted at a publicly accessible location near the active part of the construction project.

If displaying near the main entrance is infeasible, the notice can be posted in. a local public building such as the town hall or public library. ·

The sign or other notice will contain the following information:

1. A copy of the completed Notice of Intent (NOI) as submitted to the EPA Stormwater Notice Processing Center or State Authorization; and

2. The current location of the SWPPP and the name and telephone number of the contact person for scheduling SWPPP viewing.

: I ~

-1'· , .. • • ' ... , ~ • ~ •,i- -· ·.. ', ~ ~

. /· .. ' J.·· .

G .. ~':J.C. ."I , • ·• ·~ ,.

i..... " , -~- "t , ' ~

' .. . I.' r""I ' J • 1.. • i· . ..

"I •• • ~ .· •. ,I' . ' . '

./: ,:.:, .. .J.

. f.

l . '). ·~

'"'I,, "·'" L.. ,,. - • ,../ -1""

, . : ': : ' F . . :' . ~. • •• , f'.";) ,'", ,' ' ". : !''>,? . • ~ '• ~. '• • I

.f' -

. l. \·!

.I·

.f

.. f

'' I

1 · j !

p. , j.

i

4: Delegation of Authority

···:• ·1) ·.'

~' t' 1'

TABS: Maps

Location of the construction site and waters of the United States within one mile of the site.

t f

.f t

. . i i' i

I

J.

r I f i .

C"

,• i l .l

,f :. ..

r ., i' l

J;

., .f i-

" f

J:

.f

Sheets

ErnsfoIDl/SedimeIDJ.t COlntro.11. Plan Sheets induding maj@r stru.du:ra.11. and non·stnctu:ral BMPs and typical!. details.

/ I ·'< ·] ...

l r '7

:i .~. ·" /;; l _, ,, ..,~ " ..

~·~ I ,, '

. l Ji ... - :'\..

1'

1_,:

I .t . ..J

'!~ r· -, ·-j•

I. . ' .! '

I ,, . ., ' .-~ .i ·'',_ i r ._ ... -, I ·;_,.

7:

r f.

.i i ! ' r ~

, 1 leas Structures such as

Slope Stabilizatio s from the P ............ .._ .... Sheets ap

I.

.t.

J

A

·•1 ·I ,, l

I ") r.-r . .,.. '•

'" . .. 'i'

8:

l r f . "

.• , J.i'I'.

.L .. ;.' J:" I " ·~

.I"

•. ~J

', .1 ,\.'

J 'f"'

/' l ,--, ·"!' •Jr ! .l1 .~ .\

,. " i ? ,-, I '"" -A ~ :..<1~ r ··'_; I ~ :~· r1 .,.

" " - ' j , 1• r _, ' i ,\

,. ···1 ·:i ., !~' .-;

]J .- . ). '

.l ;." .. :l- '

! . , l _f,· '-. I: ~

,.,"I, . . l'

-J.

'.t ! - , ·.~

,,J'

·; ""l r J J;

·1 ·

Inspection Requirements for NPDES Compliance

EPA Construction General Permit Part 4 inspection requirements for NPDES compliance:

Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.

You must specify in your SWPPP which schedule you will be following.

1. At least once every 7 calendar days, OR

2. At least once every 14 calendar days and within 24 hours of the end ofa storm event of0.5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site: The SWPPP should also include a daily rainfall log.)

Case-by-Case Reduction.s in Inspection Frequency: You may reduce your inspection frequency to at least once every month if: ·

1. The entire site is temporarily stabilized, 2~ Runoff is unlikely due to winter_conditions (e.g., site is covered with snow, ice, or the ground is frozen), or

3. Construction is occurring during seasonal arid periods in arid areas and semi-arid areas.

Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is available until one month before thawing conditions are expected to result in a discharge if all of the following requirements are met:

· 1. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month);

2. Land disturbance activities have been suspended; and

3. The beginning and ending dates of the waiver period are documented in the SWPPP.

Qualified Personnel: Inspections must be .conducted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact storm water quality and to assess the effectiveness of any sediment and erosion control measures · selected to control the quality of stormwater discharges from the construction activity. ·

Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation. Inspectors niust look for evidence of, or the potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to aseertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections .are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.

All reports required by this permit, including the SWPPP, S.WPPP amendments, and inspection reports must be signed by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.

1. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer ineans: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person, who performs similar policy- or. decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term envirorimental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

2. For a partnership or sole proprietorship: By a general partner or the proprietor, respectiv~ly; or

3. For a municipality, state, federal, or other public agency: By either a principal executivt? officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit ofthe agency (e.g., Regional Administrator of EPA). ·

A person is a duly authorized representative only if:

The authorization is made in writing by a person described in Appendix G, Subsection 11.A;

The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator ofa well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and ·

The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. ·

Water

Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring infonnatio:ri will be retained; including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation; copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least 3 years from the date of the sample, measurement, report or application.

Records of monitoring information will include:

1. The date, exact place, and time of sampling or measurements;

2. The individual(s) who performed the sampling or measurements;

3. The date(s) analyses Were performed

4. The individual(s) who performed the analyses;

5. The analytical techniques .or methods used; and

6. The results of such analyses.

I I :~·:_ ···~ J l- I ... l

•; -;-,1

I..., l . .:J I,_ f

:· i ·

F' ·'--. . 1: ...

-. I ;_. f.

i r"1

• 1:

.f

' .~ • ' • ·~ '"'1 r ··1

L·

''. r l. '' ·1

£ 1. r. ~2 l :: ·

.1 r-1'

.l

.i

.t

.f

.t r.

! '\i' . ·:i ·-, l.'

T .•. ·

I ;r ~ , ,.~ l l T '" ~·, .. -.

' ·:' C: .. , i ·' .. ~1 12

" l ... _:;..1 } " l .I-:

;.;t '.

.t .

. • i. .-'I ••

·.' l'

.t .

. 1

.i: j i l r.

f

.. 1.. ,ti

,Ji

. i·.

'' .I

. i:

,.J ••

" 1 ·.

TAB 14: Grading and Stabilization Log

/;? :· .. "f,. l /2':

12 .·

.-.1

:.J;_ f ·--r- r· f r .

l

'' i·

J·

·::-i

.I.

.-r.

'i, . Hazardous

..'.,1, r·· '·· ',_ ~-

1 '.

.J.

.i '"'! ··r· r

;.1 r 1

- i f -

1' 71 • .., •••

:...J•.-

. l

:.' 1'

• ..J' .

.-.l.

7 ...,., ' ~ ,_

I -~

.·l

.I.

' J: ••

·.'f.AB 17: NPDES· Quality Assurance Checklist

_-1 ..

~.,l.

,1· r:···

Table of Contents
Tab 1
Tab 2
Tab 3
Tab 4
Tab 5
Tab 6
Tab 7
Tab 8
Tab 9
Tab 10
Tab 11
Tab 12
Tab 13
Tab 14
Tab 15
Tab 16
Tab 17
Tab 18

File details come from the government source that posted it. Updated .